TABLE OF CONTENTS
1. PF-SAPS/4HANA-120-05: Calibration Maintenance Process ............................................................. 2
CALIBRATION PROCESS USER MANUAL
1. From the above menu path open the Create Master inspection char. window as shown below &
fill the below details in the below screen.
Master Insp. Charac. (R) OUTERDIA Enter the req. MIC name.
2. Press the Enter key to continue to the next screen. & fill the respective fields to create MIC.
Short Text (R) Outer Diameter Enter the short text of Char.
Search field (O) Outer Diameter Enter the search field name.
3. Press enter key & it will show a pop up window as below (or) You click on this icon
.
4. Select the Check box “Lower Specif.limit” & “Upper Specif.limit” in Type.
5. Select the Check box “Sampling Procedure” in sample as in the below screen.
CALIBRATION PROCESS USER MANUAL
7. Press enter key (or) Click on continue icon to process next pop up window.
10. Press enter key twice / Click on continue icon twice to process next pop up window.
12. Press enter key (or) click on continue to process further. It will get back to initial first screen.
1. From the above menu path open the Create Sampling procedure window as shown below & fill
the below details in the below screen.
2. Press enter key to process on next screen & fill the below details.
3. Press Enter key to process on next screen & Click on icon to fill the details as below in
the pop up window.
15. From the above menu path open the Create General Task List window as shown below.
Short description (R) Calibration process testing Enter the description of task list.
Work Center / Plant (R) 1000-MEC / 1000 Enter the required work center.
Enter Usage of task list.
Usage (R) 4
Always 4 – Plant Maintenance.
Planner Group (R) JZ Enter the Planner group.
Choose Status as “4 – Released
Status (R) 4
(general)” (For all task list)
Inspection Points (R) 300 Choose the inspection point 300 for
CALIBRATION PROCESS USER MANUAL
Work ctr 1000-MEC These fields will take the work center, Plant
Plnt 1000 which is given in the header.
Operation short text (R) Shaft Outer dia check Enter the Operation name.
20. As like the above sample data, you can enter no.of operation as in the below screen.
21. Select the operation line item & click on icon, to assign the inspection
characteristics.
CALIBRATION PROCESS USER MANUAL
23. Same as assign the master inspection char. & sampling procedure for the next operation.
24. Select the line item & Click on icon to view the upper & lower limits
value which is assigned to that MIC.
CALIBRATION PROCESS USER MANUAL
25. As same as click on icon to view the scope & type of MIC.
26. Select the line item & click on icon to assign the test equipment for the respective
operation as below.
27. It will navigate to next screen with pop up window as below. Click on Equipment to change the
field from “Material”.
CALIBRATION PROCESS USER MANUAL
28. Then place the cursor on the “Equipment “field & click on F4 to choose the PRT Equipment from
the Equipment list.
30. Double click on the equipment that you want to assign in the task list.
31. Click on continue icon to assign the PRT equipment as Test Equipment in task list as below.
CALIBRATION PROCESS USER MANUAL
32. Once the Operation, Inspection Char. & PRT Equipment has been assigned, Click on save
icon to create the “General Task List”.
1. From the above menu path open the Create Maintenance Plan window as shown below.
Maint.plan cat. PM Maintenance Order Choose “Maintenance order” for all plan.
CALIBRATION PROCESS USER MANUAL
4. Click on Select task list icon to find the task list which had created at the beginning.
CALIBRATION PROCESS USER MANUAL
5. It will get you to the below screen & all required details will be copied from task list as in the
below.
6. Select the task list type, which you had created as in the above screen. Click on execute
icon. It will list out all task lists.
CALIBRATION PROCESS USER MANUAL
7. Double click on the task list which you want to assign to the maintenance plan.
10. Click on save icon to create “Preventive maintenance plan (Single cycle).
11. From the above menu path open the Change Maintenance Plan window as shown below.
13. Once the changes has made, Click on save icon to save the changes.
CALIBRATION PROCESS USER MANUAL
1. From the above menu path open the Schedule Maintenance Plan window as shown below.
2. Press Enter Key to schedule the plan on the next screen. Initial screen appear as below without
future plan date/call date.
CALIBRATION PROCESS USER MANUAL
3. Click on the start icon, to create a schedule with respect to the maintenance plan. It will
show a pop up window as below.
5. It will schedule the maintenance plan with respect to the given input such as Cycle/Unit, Call
Horizon, Scheduling Period, Time-Key date & etc.
CALIBRATION PROCESS USER MANUAL
6. Now the Maintenance Plan has been Scheduled. Click on save icon to save the plan.
NOTE:- Once the call date has been reached, the maintenance order will be created automatically.
CALIBRATION PROCESS USER MANUAL
8. Select the line item, Click on Display call object icon to display the created maintenance
order.
CALIBRATION PROCESS USER MANUAL
9. From the above menu path open the Scheduling overview list window as shown below.
10. Enter the below details in the respective fields.
Maintenance Plan (R) 44 Choose the plan which you to view the list.
CALIBRATION PROCESS USER MANUAL
1. From the above menu path open the Change PM Orders window as shown below.
Maintenance Plant (R) 1000 Choose the plant number & respective dates
CALIBRATION PROCESS USER MANUAL
3. You will get list of multiple orders if available. Dobule click the required order to change.
CALIBRATION PROCESS USER MANUAL
4. Click on inspection lot icon, it will navigate to below screen in display mode.
CALIBRATION PROCESS USER MANUAL
8. INSPECTION LOT:
Logistics Plant maintenance Maint. Processing Order
Menu path
Inspection Processing Inspection Lot Worklist Change Data
Transaction code QA32
1. From the above menu path open the Inspection lot selection window as shown below & fill the
below details.
2. List of inspection lots will be displayed which is not completed the usage decision.
CALIBRATION PROCESS USER MANUAL
NOTE: Synbol indicates that MIC has assigned in task list for the 1st operation.
Symbol indicates that MIC has not assigned in task list for the 2nd operation.
5. It will navigate to next screen with a pop up window. On that click on Assigned Insp. Points
.
CALIBRATION PROCESS USER MANUAL
6. Enter Results for each MIC as in the below screen for Qualitative and Quantitative .
7. After results has been entered, click on Valuate icon to valuate the MIC whether “Accept” or
“Reject”.
8. And then click on close icon to close the MIC. It will be get locked.
NOTE:- After the valuation the above marked status will be changed to 3-Valuated.
After the Close the MIC, status will be changed to 5-Processing is completed.
9. Click on save icon. A pop up screen will appears to make final valuation for Inspection lot.
CALIBRATION PROCESS USER MANUAL
11. Choose the respective valuation & click on continue icon . The system will return back to
the inspection lot screen with saving of current inspection lot.
12. Select the same inspection lot and click on Usage decision button.
14. Click on the drop down icon of the UD Code field. You will get the below screen.
CALIBRATION PROCESS USER MANUAL
16. Click on save icon to save the usage decision for the inspection lot.
Note – When usage decision is completed automatically technical completion (TECO) will be completed
for maintenance order.
CALIBRATION PROCESS USER MANUAL
17. Select the the appropriate Inspection lot which needs to be printed by clicking the line item and
19. It will get you to the next screen. & Choose/Enter the output device in the respective fields.
CALIBRATION PROCESS USER MANUAL
9. TIME CONFIRMATION:
Logistics Plant maintenance Maint. processing Completion
Menu path
Confirmation Entry Individual Time Confirmation
Transaction code IW41
1. From the above menu path open the PM Order confirmation window as shown below.
2. Press enter key to confirm the operations on the next screen. It will show you the list of operation.
CALIBRATION PROCESS USER MANUAL
3. Select all line item & double click on operation 0010 to enter next screen as below.
CALIBRATION PROCESS USER MANUAL
4. Before confirming the order, first check the below mentioned fields in the above screen.
Work Center
Acutal Work
Activity Type
Final Confirmation & No Remain. Work Check box as
Work Start & Work Finish.
5. You can change actual work if any changes from the planned work. And these changes & these
values only will reflect in the costing of maintenance order.
6. Click icon in the header to confirm the second operation. Check the above mentioned fields.
7. Once you reach the last operation Click on save icon to Save the Confirmation of
maintenance order.
1. From the above menu path open the Change Orders window as shown below.
3. Go to Cost tab & Click icon to view the Planned cost vs Actual
cost variation as in the below screen.
4. It will show you the variation between planned work & actual work cost.
1. From the above menu path open the Change Orders window as shown below.
3. Click on Complete (technically) icon in the header page. It will show a pop up window as
below.
Reference Date (R) 05.04.2019 Enter the Reference date of technical comp.
Reference time (R) 12:19:00 Enter the Reference time of technical comp.
CALIBRATION PROCESS USER MANUAL
5. You can view the status of maintenance order by using transaction code IW32-Change
maintenance order.
CALIBRATION PROCESS USER MANUAL
NOTE: You can view the detailed status of order by click on icon.
CALIBRATION PROCESS USER MANUAL
2. You will get the below screen with settlement cost details.
CALIBRATION PROCESS USER MANUAL
1. Once the order has closed/completed by the FI-CO team, you can view the status.
2. Go to IW32 (Change maintenance order), enter the order number& click continue.