1 Material charges
2 Labour Charges
6 Wastage 1.00%
7 Electricity 2.50%
8 GST @ 18 % 18%
9 Scaffolding 6%
10 Site Checking 5%
TOTAL 0
S.no DESCRIPTION
1 MATERIAL COST
Water
Electricity
Haulage
FACILITY
First Aids
4 SUSTAINING
OVERHEADS Sanitation Facilities
Security - STANDARD
Security- REAL TIME
Labour Stay
BATCH Scaffolding
6 LEVEL
OVERHEADS Change orders
TOTAL - STANDARD
TOTAL - MARKET PRICE
NO. OF DAYS
COST (In Rupees)
PLUMBING WORK
Running
1.2 Water pipes 76.1
metre
Running
1.3 Water Pipes for Rainwater lines 21.34
metre
2 LAYING OF SEWAGE LINES
Running
2.1 Drainage lines for soil disposal 26.92
metre
Running
2.2 Drainage lines for waste disposal 48.3
metre
Running
2.3 Soil pipes 21.34
metre
Running
2.4 Waste pipes 32.01
metre
2.5 Inspection chambers Numbers 7
Material
LABOUR RATES LABOUR RATES
cost in LABOUR REQUIRED
STANDARD (Real time)
rupees
LABOUR
Total
Labour productivity No of Labour output No of days
per day
FACILTIY SUSTAININ
TOOL &
TOOL & PLANTS Equip. cost
Tools & Plants PLANTS Equipment
STANDARD STANDARD
REAL TIME
EADS BATCH LEVEL OVERHEADS