FALSE CEILING AND ELEVATION WORKS

s.no ACTIVITY Unit Qty Rate in figures

1 Preparation

1.1 Cleaning surface sq.m 187.54

1.2 Fxing joints sq.m 187.54

2 Gypsum board panels

2.1 Fixing of panels sq.m 42.72 55/sq.ft

3 Laminate false ceiling

3.1 Fixing ceiling panels sq.m 38.1 200/sq.ft

4 Baffle ceiling

4.1 Fixing ceiling panels sq.m 106.76 250/sq,ft

5 Elevation finish

5.1 Laminate fixing sq.m 23.1 275/sqft


5.3 Wood finish sq.m 82 230/sqft

5.4 Glass for balcony sq.m 13.17 600/sqft


LABOUR

Material
LABOUR RATES LABOUR RATES
cost in LABOUR REQUIRED
STANDARD (Real time)
rupees

Raker - 2 334 500


Mazdoor(Male) - 4 320 550

Fitter 455 600


Supervisor 600 1000
Mazdoor 320 550
Welder 396 550

Fitter
455 600
Supervisor
600 1000
39100 Mazdoor
320 550
Welder
396 550

Fitter
455 600
Supervisor
600 1000
82,000 Mazdoor
320 550
Welder
396 550

Fitter
455 600
Supervisor
600 1000
287,750 Mazdoor
320 550
Welder
396 550

Fitter
455 600
Supervisor
600 1000
68,365 Mazdoor
320 550
Welder
396 550
Fitter
455 600
Supervisor
600 1000
176520 Mazdoor
320 550
Welder
396 550

Fitter
455 600
Supervisor
600 1000
85200 Mazdoor
320 550
Welder
396 550

738935
LABOUR

Labour cost Labour cost


No of Labour No of days
STANDARD real time

2
0.6 DAY 1170 1920
4

3
1
1.5 DAYS 5275 6175
3
2

2
1 2.5 DAYS 6265 9500
3
1

2
1 2 DAYS 5012 7600
3
1

2
1 3 DAYS 7518 11400
3
1

2
1 1 DAY 2506 3800
3
1
2 2 DAYS 5012 7600
1
3
1

2
1 0.5 DAY 1253 1900
3
1

13.5 DAYS 34011 49895


FACILITY SUSTAINING OVERHEADS

Sanitation Security Security


Electricity Haulage First Aids
Facilities STANDARD REAL TIME

30 60 120 165

200 75 150 300 415

300 125 250 500 690

200 100 200 400 550

400 150 300 600 825


2500

120 50 100 200 275


200 100 200 400 550

100 25 50 100 140

1520 2500 655 1310 2620 3610


UNIT LEVEL OVERHEADS

TOOL &
Labour TOOL & PLANTS
Tools & Plants PLANTS Equipment
Stay STANDARD
REAL TIME

Scraper - 6
Dry wall sander -
Dust sheet - 100 300 1020
2
Trowel - 6

Drilling
machines
Hack saw

Punch pliers Drilling


speed square 1200 1800 machines
Hammer Hack saw

Punch pliers Drilling


speed square 960 1440 machines
Hammer Hack saw

3500

Punch pliers Drilling


speed square 1440 2160 machines
Hammer Hack saw

Punch pliers Drilling


speed square 480 720 machines
Hammer Hack saw
Punch pliers Drilling
speed square 960 1440 machines
Hammer Hack saw

Punch pliers Drilling


speed square 240 360 machines
Hammer Hack saw

3500 5580 8940


BATCH LEVEL
VEL OVERHEADS
OVERHEADS

Equip. cost Equip. cost Site


Safeguards Storage Change orders
STANDARD REAL TIME office

600 900 60

1200 1950 150

2000 3250 250

1600 2600 200

3900

2400 3900 300


2200

800 1300 100


1600 2600 200

400 650 50

10600 17150 1310 3900 2200 1200


PROJECT SUSTAINING
OVERHEADS

Site Civil
GST
engineer Engineer
7500 4500 133010
S.no DESCRIPTION COST (In Rupees)

1 MATERIAL COST 738,935


2 LABOUR COST ( STANDARD) 34,011
3 LABOUR COST ( MARKET PRICE) 49,895

Electricity 1520
Haulage 2,500
FACILITY First Aids 655
4 SUSTAINING Sanitation Facilities 1310
OVERHEADS
Security - STANDARD 2,620
Security- REAL TIME 3,610
Labour Stay 3,500

TOOL & PLANTS- STANDARD 5,580


TOOL & PLANTS - REAL TIME 8,940
UNIT Equip. Cost- STANDARD 10,600
5 LEVEL Equip. Cost- REAL TIME 17,150
OVERHEADS Site office 1,310
Safeguard 3900
Storage 2200

BATCH LEVEL
6
OVERHEADS
Change orders 1200

PROJECT Site engineer 7500


7 SUSTAINING Civil engineer 4500
OVERHEADS GST 133010

TOTAL - STANDARD 954,851


TOTAL - MARKET PRICE 981,635
NO. OF DAYS 13.5 DAYS
SI.NODESCRIPTION OF ITEM RATE in % TOTAL

1 Material charges 738,935

2 Labour Charges 50,000

3 Tools &plants 3.00% 23700

4 Over heads &profits 20.00% 157780

5 Wastage 1.00% 7890

6 Electricity 2.50% 19740

7 GST @ 18 % 18% 142010

8 Site Checking 4% 27600


TOTAL ###
CARPENTARY WORKS

s.no ACTIVITY Unit Qty Rate in figures

Fixing framework in slab &


1
beam

1.1 Cleaning surface sq.m 187.54

1.2 Fixing aluminium framework

2 Fixing suspended framework

2.1 Fixing vertical struts

2.2 Fixing wall supports

Insulation panels & ceiling


3
panels

3.1 Fixing insulation panels

3.2 Fxing Ceiling panels

4 Finishing & Editing profile

4.1 Grouting

4.2 Edging

5 Elevation finish

5.1 Laminate fixing


5.2 Groove work

5.3 Wood finish

5.4 Glass for balcony

5.5 ACP panels


L

Material
LABOUR RATES LABOUR RATES
cost in LABOUR REQUIRED
STANDARD (Real time)
rupees
LABOUR

Total
Labour productivity No of Labour output No of days
per day
FACILITY SUSTAINING OVER

Labour cost Labour cost


Electricity Haulage First Aids
STANDARD real time
CILITY SUSTAINING OVERHEADS

Sanitation Security Security Labour


Tools & Plants
Facilities STANDARD REAL TIME Stay
UNIT LEVEL OVERHEADS

TOOL &
TOOL & PLANTS Equip. cost Equip. cost
PLANTS Equipment
STANDARD STANDARD REAL TIME
REAL TIME
BATCH LEVEL PROJECT SUSTAINING
OVERHEADS OVERHEADS

Site Site Civil


Safeguards Storage Change orders
office engineer Engineer
SUSTAINING
RHEADS

GST
WORK TYPE
CARPENTARY WORKS
s.no ACTIVITY L B D No Unit Total
1 Preparation
1.1 Cleaning surface sq.m 187.54
1.2 Levelling sq.m 187.54
Gypsum board
2
panels
2.1 Fxing of panels sq.m 42.72
Laminate false
3
ceiling
3.1 Fixing ceiling panels sq.m 38.1
4 Baffle ceiling
4.1 Fixing ceiling panels sq.m 106.76
5 Elevation finish
5.1 Laminate fixing sq.m 23.1
5.3 Wood finish sq.m 82
5.4 Glass for balcony sq.m 13.17
171.5