Professional Documents
Culture Documents
BASIC REQUIREMENTS
1. LAND
2. WORKING SHED
3. POWER
4. WATER AVAILABILITY
5. TRANSPORTATION FACILITY
1.LAND The requirement of the land is depends on the total volume of production
This should be sufficient to store the Raw meterial, Sawn Slabs, Finished Goods and the wa
to handle a two Gang Saw Plant The require ment of the Land will Be nearly 6 to 8 acres.
2.WORKING SHED The Size of the shed Should be not less than in length 180 meters and in width 30 meters
The Column center to column center distance should not be less than 8.00 mtr
MACHINE DISCRIPTION
The Area Required per gang saw 128
The Area Required for Polishing 160
The Sawn Slabs Storage area 480
The Resin Line 720
Finished Goods Storing Area 1680
Container Loading Area 480
Carpentry 120
Total area
4. WATER AVAILABILITY As the entire process depends on water the requirement of water is very high
To minimise the water consumption Now a days every one installing a water recycling plant
The Cutting section and the polishing section catered by two diffent lines
The requirement of water in cycle is 100000 litres
5. TRANSPORT FECILITY The Most Important and the required point is the transportation fecility
It should be easily accesable to the main roads
It should be near to the mines
It should be near to the shipping yard
It should be near to the international Airports to receive the Buyers
PRODUCTION DETAILS
The plan for executing the export of no of containers.
for example :
we are planning for export of 90 containers per month
The require ment of machines are
1. Gantry Crane
2. Gang Saws
3. Polishing Machine
4. Resin Line if required
5. EOT Cranes
6. Slabs Shifting Pallets
7. Bridge Cutting Machine
In an gang saw the Avarage sawings we can achieve 1.5 trolley within 16 Hrs of working
The polishing machine should have a capacity to polish 450 sq.mtr per shift.
Therefore the machine should run at speed of 80cm/min belt speed
It should cover all the corners of the slab evenly with a high gloss finish.
Almost all the colours available as on date are to be epoxy treated except Vietnam White.
Assuming only two shifts working,Per shift the production should be 90 slabs/shift
PROJECT MACHINES
MACHINE Nos
Gang Saws 2
Polishing 1
Resin Line 1
Bridge cutter 1
E.O.T Cranes 5 ton capacity 1
E.O.T Cranes 10 ton capacity 1
Gantry Crane 30 Ton capacity 1
Top Loader for Container load 1
WTP Plant 1
Air Compressor 2
High Pressure water Cleaners 2
Generator 750 KVA 1
CONSUMABLES
Diamond Segmented Steel Blades
Spacers in steel
Tie rods
Nylon belts
Polishing abbrasives
Edge Cutting Blade
flocculent
Packing wood
Nails
Polythin Sheet
V.XAVIER
FOR MARBLE
511505.28 Sq.Feet
nstall Two Later
AREA
4 Gang saws 256
1 Pol.Machine 160
480
720
1680
480
120
3896
800
r is very high
ing a water recycling plant
100000 litres
ize will be defined by the size of the trolley.
Sq.Mtrs
450 sq.Mtr