You are on page 1of 2

Liceo Campoverde

Feria de la Imaginación 2019 Year 9


ESCAPE ROOM
PROJECT RUBRIC
3 2 1 0 Score

n of students
Collaboratio
The student collaborated well
The student assumed a role in
The student was a leader in the with the group, by sharing The student did not
GROUP WORK the group and participated in
project. ideas and participating in an collaborate with the group.
some activities.
equitable way.

An achievable Escape Room An Escape Room project was An Escape Room project was The planning of the Escape
Effectiveness
and detail of
project was fully planned, with planned in a reasonable planned in some way but Room project was non-existent

planning
PLANNING consideration of individual manner, with consideration of without full consideration of or gave no consideration to the
roles and the materials individual roles and the individual roles and the roles of participants and
required. materials required. materials required. materials required.
plan into action

The project was well


The implementation of the The project was not
Putting the

implemented, so that it The project was implemented


project was incomplete and or implemented and so did not
IMPLEMENTATION became an outstanding and contributed to the success
the project was not properly contribute to the Year 9
contribution to the success of of the Escape Room.
managed. Escape Room.
the Escape Room.
Creativity of project

The idea of the project and the


The idea of the project and its The project idea was not The project was neither
manner in which it integrated
integration into the overall original or was not creatively original nor creative, and did
CREATIVITY into the overall vision of the
vision of the Escape Room integrated into the vision of not form a useful role in the
Escape Room showed real
showed some original ideas. the Escape Room. activities of the Escape Room.
creativity and imagination.
Management of

The members of the group


The members of the group The members of the group did
deadlines

combined to complete the


time and

combined but were not able to not complete the project to any
TIME MANAGEMENT project efficiently and within
complete all the tasks within acceptable standard within the
the time set for the
the time set for the project. time set.
assignment.

GRADE TOTAL SCORE /10


14 10
13, 12 9, 9.5
11, 10 8, 8.5
9, 8 7, 7.5
7, 6 6
5, 4 5
3, 2 4
1 3
0 0

You might also like