ANALISIS DE PRECIOS UNITARIOS

Presupuesto CREACION DE CASA VECINAL No.4 CONDE DE LEMOS-COMPONENTE OBRA NUEVA


Subpresupuesto ESTRUCTURAS
Cliente EMPRESA MUNICIPAL INMOBILIARIA DE LIMA
Lugar LIMA-LIMA-BARRIOS ALTOS

PARTIDA 01.02.03.02.02 ENCOFRADO Y DESENCOFRADO CARAVISTA EN PLACAS


RENDIMIENTO M2/DIA MO = 12.00 EQ = 12.00

CODIGO DESCRIPCION UNIDAD


MANO DE OBRA

470101 CAPATAZ HH
470102 OPERARIO HH
470103 OFICIAL HH

MATERIALES

20008 ALAMBRE NEGRO RECOCIDO # 8 KG


20105 CLAVOS PARA MADERA C/C 3" KG
20501 PERNO DE ANCLAJE P. ENCOF. 1/2"x0.50 m. PZA
301912 CURADOR ANTISOL KG
302005 LACA DESMOLDEADORA GLN
440300 TRIPLAY LUPUNA DE 4'x8'x 10 mm PLN
450101 MADERA TORNILLO INC.CORTE P/ENCOFRADO P2

EQUIPOS

370101 HERRAMIENTAS MANUALES %MO


OS UNITARIOS

NENTE OBRA NUEVA

STA EN PLACAS
COSTO UNITARIO POR: M2 69.54

CUADRILLA CANTIDAD PRECIO S/. PARCIAL S/.


26.98

0.1 0.0667 25.15 1.68


1 0.6667 20.96 13.97
1 0.6667 16.99 11.33

38.52

0.1 2.97 0.30


0.15 4 0.60
0.2 4.54 0.91
0.25 16.3 4.08
0.08 25 2.00
0.35 47.6 16.66
2.41 5.8 13.98

4.05

0.03 5 26.98 4.05


Presupuesto CREACION DE CASA VECINAL No.4 CONDE DE LEMOS-COMPONENTE OBRA NUEVA
Subpresupuest ESTRUCTURAS
Cliente EMPRESA MUNICIPAL INMOBILIARIA DE LIMA
Lugar LIMA-LIMA-BARRIOS ALTOS
PARTIDA 01.02.03.02.02 ENCOFRADO Y DESENCOFRADO CARAVISTA EN PLACAS

METRADOS COSTO
PARTIDA DESCRIPCION
UNDAD CANTIDAD UNITARIO PARCIAL
01.02.03.02.02 ENCOFRADO Y DESENCOFRADO M² 356.41 69.54 24,785.17
PRESUPUESTO
E OBRA NUEVA

STA EN PLACAS

MANO DE OBRA
CAPATAZ OPERARIO OFICIAL TOTAL

UNITARIO TOTAL UNITARIO TOTAL UNITARIO TOTAL UNITARIO TOTAL


1.68 597.58 13.97 4,980.24 11.33 4,036.94 26.98 9,614.75
PRESUPUESTO

MATERIALES
ALAMBRE NEGRO CLAVOS PARA MADERA PERNO DE ANCLAJE P. TRIPLAY LUPUNA DE
RECOCIDO # 8 C/C 3" ENCOF. 1/2"x0.50 m. 4'x8'x 10 mm
UNITARIO TOTAL UNITARIO TOTAL UNITARIO TOTAL UNITARIO TOTAL
0.297 105.85 0.60 213.85 0.91 323.62 16.66 5,937.79
ALES HERRAMIENTAS
MADERA TORNILLO
LACA HERRAMIENTAS
INC.CORTE CURADOR ANTISOL
DESMOLDEADORA MANUALES
P/ENCOFRADO
UNITARIO TOTAL UNITARIO TOTAL UNITARIO TOTAL UNITARIO TOTAL
13.98 4,981.90 4.075 1452.37075 2.00 712.82 4.05 1442.21
CALCULO DE LOS COEFICIENTES DE INCIDENCIA de la FORMULA POLINOMICA

Presupuesto CREACION DE CASA VECINAL No.4 CONDE DE LEMOS-COMPONENTE OBRA NUEVA


Subpresupuesto ESTRUCTURAS
Cliente EMPRESA MUNICIPAL INMOBILIARIA DE LIMA
Lugar LIMA-LIMA-BARRIOS ALTOS
PARTIDA 01.02.03.02.02 ENCOFRADO Y DESENCOFRADO CARAVISTA EN PLACAS
Jr AAr ALr Cr MEHr GUr
K a  b  c  d  e  f
Jo AAo ALo Cr MEHo GUo

Costo total(sin IGV) =


Calculo de "a" Mano de obra o Jornal (J)
INSUMOS TOTALES COSTO DE HH. S/. COSTO TOTAL S/.
CAPATAZ 1.6767 25.150 42.168
OPERARIO 13.9733 20.960 292.881
OFICIAL 11.3267 16.990 192.440
Total 527.489
Jr

Jo

Calculo de "b" ALAMBRE, CLAVOS Y PERNOS


INSUMOS TOTALES COSTO UNIT. S/. COSTO TOTAL S/.
ALAMBRE NEGRO RECOC 0.297000 2.97 0.882
CLAVOS PARA MADERA C 0.600000 4.00 2.400
PERNO DE ANCLAJE P. EN 0.908000 4.54 4.122
7.404

Calculo de "d" Cemento (C)


INSUMOS TOTALES COSTO UNIT. S/. COSTO TOTAL S/.
CURADOR ANTISOL 4.07500 16.3000 66.423
LACA DESMOLDEADORA 2.00000 25.0000 50.000
116.423

Calculo de "e" Madera, Equipos y Herramientas (MEH)


INSUMOS TOTALES COSTO DE HM. S/. COSTO TOTAL S/.
MADERA TORNILLO 13.9780 5.80 81.072
TRIPLAY LUPUNA DE 4'x8 16.6600 47.60 793.016
EQUIPOS
HERRAMIENTAS MANUALES 4.0465 3%MO 527.489
1,401.578

Jr AAr ALr Cr MEHr GUr


K a  b  c  d  e  f
Jo AAo ALo Cr MEHo GUo
LA POLINOMICA

PONENTE OBRA NUEVA

MONTO 22,820.93 sin IGV


ARAVISTA EN PLACAS METRADO 356.41

24,785.167

Coef incid / insumo


0.024110419
0.2009361361
0.1628771447
0.3879

Coef incid / insumo


0.0042708516
0.0086279829
0.0130570142
0.0260

Coef incid / insumo


0.0585983842
0.0287599432
0.0874

Coef incid / insumo


0.2010032427
0.2395703264

0.058188555
0.4988
M EH r

MEHo

Jr AAr ALr Cr MEHr GUr


K a  b  c  d  e  f
Jo AAo ALo Cr MEHo GUo

EHr GUr
 f
EHo GUo
MEHr GUr
 f
MEHo GUo
Jr
Jo
CALCULO DEL COEFICIENT
Presupuesto 101072 CREACION DE CASA V
Subpresupuesto 1 ESTRUCTURAS
Fecha Presupuesto Base 8/21/2018
Moneda NUEVO SOLES
Ubicacioó n Geografica 150145 LIMA-LIMA-BARRIO
PARTIDA 01.02.03.02.02 ENCOFRADO Y DESENCOFRADO CARAVISTA E

K = 0.388 (Jr/Jo) + #REF!

0.087 (MBHr/MBHo) + 0.499

INDICE
MONOMIO DESCRIPCION SIMBOLO
UNIFICADO
1 MANO DE OBRA (INCLUIDO LEYES SOCIALES) M 47
ALAMBRE NEGRO RECOCIDO # 8 18
2 CLAVOS PARA MADERA C/C 3" CAH 2
PERNO DE ANCLAJE P. ENCOF. 1/2"x0.50 m. 2
CURADOR ANTISOL 48
3 MBH
LACA DESMOLDEADORA 54
MADERA TORNILLO 43
4 TRIPLAY LUPUNA DE 4'x8'x 10 mm D 18
HERRAMIENTAS MANUALES 37
TOTAL
DEL COEFICIENTE " K "
CREACION DE CASA VECINAL No.4 CONDE DE LEMOS-COMPONENTE OBRA NUEVA

018

LIMA-LIMA-BARRIOS ALTOS
OFRADO CARAVISTA EN PLACAS

(Cr/Co) + #REF! (Ar/ Ao) + #REF! (Mr/Mo) + 0.026

(Dr/Do) + 0.000 (GUr/Guo)

INDICE INDICE INDICE


COEF DE INCIDENCIA % UNIFICADO UNIFICADO UNIFICADO
AGOSTO SETIEMBRE OCTUBRE
0.3879 100.000% 602.11 602.11 602.11
20.000% 330.04 325.56 327.19
0.0260 21.818% 546.81 550.63 555.22
58.182% 546.81 550.63 555.22
21.818% 368.15 372.23 370.7
0.0874
18.182% 408.28 408.51 815.95
100.000% 677.88 682.25 685.45
0.4988 100.000% 330.04 325.56 327.19
100.000% 305.79 306.17 310.13
1.000 OK!
OK! K=
(CAHr/CAHo) +

COEF.
COEF. SETIEMBRE
OCTUBRE
0.388 0.388

0.026 0.026

0.0879 0.1296

0.499 0.502

1.001 1.046
RELACION DE PAR

OBRA:
PROPIETARIO
CONTRATISTA
MODALIDAD
FECHA

Item
01

01 01

01 01 01

01 01 01 01

01 010101 01

01 01 01 01 02

01 01 01 01 03

01 01 01 02

01 01 01 02 01

01 01 01 03

01 01 01 03 01

01 01 01 04

01 01 01 04 01

01 01 02

01 01 02 01

01 01 02 02

01 01 02 03

01 01 02 04

01 01 02 05

01 01 03

01 01 03 01

01 01 03 02
01 02

01 02 01

01 02 01 01

01 02 01 02

01 02 01 03

01 02 01 04

01 02 02

01 02 02 01

01 02 0202

01 02 02 03

01 02 02 04

01 02 02 05

01 02 03

01 02 03 01

01 02 03 01 01

01 02 03 01 02

01 02 03 01 03

01 02 03 02

01 02 03 02 01

01 02 03 02 02

01 02 03 02 03

01 02 03 03

01 02 03 03 01

01 02 03 03 02

01 02 03 03 03

01 02 03 04
01 02 03 04 01

01 02 03 04 02

01 02 03 04 04

01 02 03 05

01 02 03 05 01

01 02 03 05 02

01 02 03 05 03

01 02 04

01 02 04 01

02

02 01

02 01 01

02 01 02

02 01 03

02 02

02 02 01

02 02 02

02 02 03

02 02 04

02 02 05

02 02 06

02 02 07

02 02 08

02 02 09

02 02 I0

02 02 11
02 02 12

02 02 13

02 03

02 03 01

02 03 02

02 03 03

02 04

02 04 01

02 04 02

02 04 03

02 04 04

02 04 05

02 04 06

02 04 07

02 04 08

02 05

02 05 01

02 05 02

02 06

02 06 01

02 07

02 07 01

02 07 02

02 07 03

02 08

02 08 01

02 08 02
02 08 03

02 08 04

02 08 05

02 09

02 09 01

02 09 02

02 09 03

02 10

02 10 01

02 10 02

02 11

02 11 01

02 12

02 12 01

02 12 02

02 12 03

02 13

02 13 01

02 13 02

02 13 03

02 13 04

02 13 05

02 13 06

02 13 07

02 13 08

02 13 09
02 14

02 14 01

02 14 02

02 14 03

02 14 04

02 14 05

02 14 06

02 14 07

02 14 08

02 14 09

02 14 10

02 14 11

02 14 12

21 14 13

21 14 14

21 14 15

21 14 16

21 14 17

21 14 18

21 14 19

21 14 20

21 14 21

21 14 22

Gastos Fijos
Gastos Variables
Gastos Generales
Utilidad
SUBTOTAL
IMPUESTO (IGV)
TOTAL PRESUPUESTO
RELACION DE PARTIDAS A VALORIZAR P

"CREACION DE LA CASA VECINAL No 4 CONDE DE LEMOS"


EMILIMA S.A.
CREACION DE LA CASA VECINAL No 4 CONDE DE LEMOS
LLAVE EN MANO
10/26/2018

Descripción
ESTRUCTURAS

OBRAS PROVISIONALES, TRABAJOS PRELIMINARES, SEGURIDAD Y SALUD

OBRAS PROVISIONALES V TRABAJOS PRELIMINARES

CONSTRUCCIONES PROVISIONALES

CARTEL DE IDENTIFICACION DE LA OBRA DE 3 60X2 40M H=3 00M CON GIGANTOGRAFIA

SERVICIO HIGIENICO PORTATIL

ALQUILER DE CONTENEDOR PARA OFICINA, ALMACEN Y COMEDOR

INSTALACIONES PROVISIONALES

ENERGIA ELECTRICA PROVISIONAL

MOVILIZACION DE MATERIALES, MAQUINARIA Y HERRAMIENTAS

MOVILIZACIÓN Y DESMOVILIZACIÓN DE MAQUINARIA PESADA PARA LA OBRA

TRAZOS, NIVELES Y REPLANTEO

TRAZOS Y REPLANTEO DURANTE EJECUCION DE OBRA

SEGURIDAD Y SALUD

EQUIPOS DE PROTECCION INDIVIDUAL

EQUIPOS DE PROTECCION COLECTIVA

SEÑALIZACION TEMPORAL DE SEGURIDAD

CAPACITACION EN SEGURIDAD Y SALUD

RECURSOS PARA RESPUESTAS ANTE EMERGENCIAS EN SEGURIDAD Y SALUD DURANTE EL

MITIGACION DE IMPACTO AMBIENTAL

CAPACITACION EN TEMAS AMBIENTALES

RECOLECCION Y TRANSPORTE DE RESIDUOS SOLIDOS


ESTRUCTURA NUEVA

MOVIMIENTO DE TIERRAS

EXCAVACION MANUAL PARA ESTRUCTURAS DE CIMENTACION

NIVELACION INTERIOR Y COMPACTAClON FINAL DEL TERRENO PREVIO AL FALSO PISO

BASE AFIRMADA C/EQUIPO E=10an

ELIMINACION DE MATERIAL EXCEDENTE CON EQUIPO R=10 Km

OBRAS DE CONCRETO SIMPLE

CONCRETO FC 100 KG/CM2 P/SOLADOS

CONCRETO F'C = 100 K^cm2 P/CIMIENTOS CORRIDOS

CONCRETO FC = 100 K9/cm2 P/SOBRECIMIENTOS

ENCOFRADO Y DESENCOFRADO P/SOBRECIMIENTOS

FALSO PISO e=1 Ocm, CONCRETO 1:8 C:H

OBRAS DÉ CONCRETO ARMADO

COLUMNAS

CONCRETO PREMEZCLADO FC 210KG/CM2 P/COLUMNAS

ENCOFRADO Y DESENCOFRADO P/COLUMNAS

ACERO DE REFUERZO fy=4200 KG/CM2

MUROS REFORZADOS

CONCRETO PREMEZCLADO FC 210KG/CM2 P/MUROS REFORZADOS

ENCOFRADO Y DESENCOFRADO CARAVISTA P/MUROS REFORZADOS

ACERO DE REFUERZO fy=4200 KG/CM2

VIGAS

CONCRETO PREMEZCLADO FC 210KG/CM2 P/VIGAS

ENCOFRADO Y DESENCOFRADO P/VIGAS RECTAS Y DINTELES

ACERO DE REFUERZO Fy=4200 KG/CM2

LOSAS ALIGERADAS
CONCRETO PREMEZCLADO F'C 210KG/CM2 P/LOSAS ALIGERADAS

ENCOFRADO Y DESENCOFRADO P/LOSAS ALIGERADAS

LADRILLO DE ARCILLA HUECO DE 15X30X30CM P/LOSA ALIGERADA

ESCALERAS

CONCRETO PREMEZCLADO FC 2I0KG/CM2 P/ESCALERAS

ENCOFRADO Y DESENCOFRADO P/ESCALERAS

ACERO DE REFUERZO ty=4200 KG/CM2

VARIOS

SELLADO DE JUNTA DE DILATACIÓN SISMICA

ARQUITECTURA

MUROS Y TABIQUES DE ALBAÑILERIA

MUROS DE LADRILLO K K ARCILLA TIPO IV, SOGA C/M 1 5X1 5CM

MUROS DE LADRILLO K K ARCILLA TIPO IV. CABEZA C/M 1:5X1 5CM

MURO DE LADRILLO K K ARCILLA TIPO IV, CANTO MEZC 1:5

REVOQUES, ENLUCIDOS Y MOLDURAS

TARRAJEO PRIMARIO MEZCLA C:A 1:5, E=1 Oon

TARRAJEO MURO INTERIOR FROTACHADO MEZCLAC:A 1 S. E=1 5cm

TARRAJEO COLUMNA FROTACHADO MEZCLA C:A 1:5, E=1 bem

TARRAJEO VIGAS FROTACHADO MEZCLA C:A 1 5. É=1 5cm

TARRAJEO FROTACHADO MUROS DE CONCRETO MEZCLA C:A 1 5, E=1 5cm

TARRAJEO CON IMPERMEABILIZANTE

VESTIDURA DE DERRAME FROTACHADO MEZ C A1 5, E=1 5CM

EJECUCION DE BRUNAS EN TARRAJEO

TARRAJEO DE FONDO DE ESCALERA MEZC 1:5 C A. E=1 5CM

PREPARACION DE GRADAS DE CONCRETO

PREPARACION DE DESCANSO
GRADAS (ACABADO TERRAZO)

DESCANSO (ACABADO TERRAZO)

CIELO RASOS

TARRAJEO CIELO RASO FROTACHADO MEZCLA C:A 1:5, E=1 5an

CIELO RASO CON IMPERMEABILIZADO

FALSO CIELO RASO SUSPENDIDO DE UKYWAL

PISOS Y PAVIMENTOS

CONTRAPISO DE CEMENTO(E=1 5CM). CON MORTERO 1 3 C/A

COLOCACION DE PIEZAS DE CERAMICA DE 40X40

COLOCACION DE PIEZAS DE PORCELANATO DÉ 40X40

PISO ACABADO OE CEMENTO PULIDO IMPERMEABILIZADO C:A 1 2. E=1 5CM

PISO ACABADO OE CEMENTO FROTACHADO C:A 1:2. E=1 SCM

PISO ACABADO DE CEMENTO SEMIPULIDO C:A 1:2. E=1 5CM

COLOCACION DE PISO PARQUET DE MADERA PUMAQUIRO

COLOCACION DE ENTABLADO DE MADERA

CONTRAZOCALOS

CONTRAZOCALO DE PORCELANATO PULIDO COLOR BEIGE DE 10X60CM

CONTRAZOCALO DE CEMENTO PULIDO C/MORTERO 1:4 DE e=1cm, h=10an

ZOCALOS

ZOCALO DE PORCELANATO PALIDO HUESO DE 60X6QCM

CARPINTERIA DE MADERA

PUERTA CONTRAPLACADA DE 43MM C/TRlPLAY 4MM INCLUYE MARCO DE MADERA

DIVISION METALICA PARA BAÑO H=1 90m. INC PUERTAS Y PINTURA

VENTANA DE MADERA MACIZA

CARPINTERIA METALICA

PUERTA METALICA CORTA FUEGO (1 20x2 40), MINIMO 60min

BARANDA DE TUBERIA F*N" PASAMANO 02’ X 0 90m ALTURA


ESCALERA DE GATO CON VARILLA LISA 0= P@0 30m

TAPA METALICA CON MARCO, PLANCHA ESTRIADA LAC E=l/4" C/SEGURO

REJILLA C/PERFILES MET rXI/FXÍfl' MARCO L T

CERRAJERIA

BISAGRA CAPUCHINA DE 4\4\ STANLEY F179, US26D

CERRADURA TIPO BOLA PARA PUERTA INTERIOR

CERRADURA P/PUERTA EXTERIOR C/MANI JA LLAVE INT Y EXT 2 GOLP

CUBIERTAS

TECHO VIGUETAS DE MADERA

CUBIERTA CON PLANCHA DE POLICARBONATO, INCLUYE ACCESORIOS EN CUMBRERA Y

CARPINTERIA DE ALUMINIO

VENTANA DE ALUMINIO ANODIZADO

VÍDRIOS, CRISTALES Y SIMILARES

ESPEJO BISELADO 1/2-

CRISTAL TEMPLADO INCOLORO DÉ E=6mm. INCLUYE ACCESORIOS

CRISTAL TEMPLADO INCOLORO 0E E=lOmm, INCLUYE ACCESORIOS

PINTURA

PINTADO DE MURO INTERIOR C/LATEX ACRILICO

PINTADO DE COLUMNA C/LATEX ACRILICO

PINTADO DE VIGA C/LATEX ACRILICO

PINTADO DE DERRAMES C/LATEX ACRILICO

PINTADO DE PUERTAS METALICAS

PINTADO DE VENTANAS METALICAS

PINTURA EN PUERTAS DE MADERA

PINTURA EN VENTANAS DE MADERA

PINTURA DE BARANDAS METALICAS


SEÑALIZACION Y EXTINTORES

SEÑALIZACIÓN DE SALIDA

SEÑALIZACION DE SALIDA DE EMERGENCIA

SEÑAL DE EVACUACION DIRECCIONAL DERECHA

SEÑAL DE EVACUACION DIRECCIONAL IZQUIERDA

ZONA SEGURA EN CASO DE SISMO

EXTINTOR POLVO QUIMICO SECO

EXTINTOR C02

EXTINTOR AGUA NEBULIZADA

LUCES DE EMERGENCIA

RIESGO ELECTRICO

DETECTOR DE HUMO Y/O TEMPERATURA

PULSADOR DÉ ALARMA CONTRA INCENDIO

GCI (GABINETE CONTRA INCENDIO)

SEÑAL DE CARTEL PROHIBIDO FUMAR

SEÑAL DE NO USAR EN CASO DE SISMO

SEÑAL DE LUGAR DE REUNION DE SISMO

PUERTA CORTAFUEGO (RF-90)

SEÑAL BAÑO DISCAPACITADOS

PASE MANGUERA CONTRA INCENDIO

SUMINISTRO E INSTALACION DE EXTINTOR CONTRA INCENDIO POLVO QUIMICO SECO TIPO ABC, 6.0 Kg

SUMINISTRO E INSTALACION DE EXTINTOR CONTRA INCENDIO TIPO H20 2.5 GAL

SUMINISTRO E INSTALACION DE EXTINTOR CONTRA INCENDIO DE DIOXIDO DE CARBONO (CO2), 5 Kg

Costo Directo (CD) S/.

1.94%
12.61%
14.557251810%
8%
18%
ALORIZAR POR CADA MES

SUPERVISOR ING. RUIZ PALACIOS, ANGEL


RESIDENTE ING. BALBIN SAENZ, ANGEL
MONTO REFERENCIAL 2,785,800.08
MONTO CONTRATO 2,925,090.08
FACTOR RE RELACION 1

Parcial SI. M1 M2 M3 M4
489,888.95 151,013.70 244,010.89 62,672.00 13,050.00

142,963.39 75,359.95 21,104.45 16,270.87 13,050.00

89,053.85 23,047.01 21,104.45 15,420.87 13,050.00

60,701.56 13,301.55 11,850.00 11,850.00 11,850.00

1,451.56 1,451.56 0.00 0.00 0.00

4,500.00 900.00 900.00 900.00 900.00

54,750.00 10,950.00 10,950.00 10,950.00 10,950.00

6,000.00 1,200.00 1,200.00 1,200.00 1,200.00

6,000.00 1,200.00 1,200.00 1,200.00 1,200.00

6,763.04 3,381.52 0.00 0.00 0.00

6,763.04 3,381.52 0.00 0.00 0.00

15,589.25 5,163.94 8,054.45 2,370.86 0.00

15,589.25 5,163.94 8,054.45 2,370.86 0.00

51,862.94 51,012.94 0.00 850.00 0.00

22,840.00 22,840.00 0.00 0.00 0.00

7,422.94 7,422.94 0.00 0.00 0.00

2,000.00 2,000.00 0.00 0.00 0.00

18,750.00 18,750.00 0.00 0.00 0.00

850.00 0.00 0.00 850.00 0.00

2,046.60 1,300.00 0.00 0.00 0.00

1,300.00 1,300.00 0.00 0.00 0.00

746.60 0.00 0.00 0.00 0.00


346,925.56 75,653.75 222,906.44 46,401.13 0.00

25,881.11 24,467.76 1,413.35 0.00 0.00

1,932.59 1,932.59 0.00 0.00 0.00

5,320.86 3,907.51 1,413.35 0.00 0.00

15,149.79 15,149.79 0.00 0.00 0.00

3,477.87 3,477.87 0.00 0.00 0.00

63,089.64 13,092.39 49,997.25 0.00 0.00

1,315.16 1,315.16 0.00 0.00 0.00

6,570.79 6,570.79 0.00 0.00 0.00

3,321.36 3,321.36 0.00 0.00 0.00

1,885.08 1,885.08 0.00 0.00 0.00

49,997.25 0.00 49,997.25 0.00 0.00

257,700.31 38,093.60 171,495.84 46,146.63 0.00

10,754.29 6,573.63 4,180.66 0.00 0.00

1,614.85 0.00 1,614.85 0.00 0.00

2,425.95 0.00 2,425.95 0.00 0.00

6,713.49 6,573.63 139.86 0.00 0.00

60,371.82 16,353.82 42,053.76 0.00 0.00

15,195.49 0.00 15,195.49 0.00 0.00

24,785.17 4,374.01 20,411.16 0.00 0.00

20,391.16 11,979.81 8,411.35 0.00 0.00

77,722.68 0.00 59,551.00 18,171.68 0.00

18,171.68 0.00 0.00 18,171.68 0.00

30,272.11 0.00 30,272.11 0.00 0.00

29,278.89 0.00 29,278.89 0.00 0.00

71,491.49 0.00 53,271.64 18,219.85 0.00


18,219.85 0.00 0.00 18,219.85 0.00

21,600.89 0.00 21,600.89 0.00 0.00

11,504.00 0.00 11,504.00 0.00 0.00

37,360.03 15,166.15 12,438.78 9,755.10 0.00

9,755.10 0.00 0.00 9,755.10 0.00

15,920.38 4,676.61 11,243.77 0.00 0.00

11,684.55 10,489.54 1,195.01 0.00 0.00

254.50 0.00 0.00 254.50 0.00

254.50 0.00 0.00 254.50 0.00

624,189.20 0.00 22,120.89 83,304.53 238,475.52

38,562.46 0.00 11,839.43 26,723.03 0.00

15,721.99 0.00 0.00 15,721.99 0.00

19,940.10 0.00 11,839.43 8,100.67 0.00

2,900.37 0.00 0.00 2,900.37 0.00

79,804.19 0.00 4,987.29 34,203.92 40,612.98

4,947.06 0.00 0.00 4,947.06 0.00

15,918.42 0.00 0.00 7,876.30 8,042.12

4,133.07 0.00 0.00 4,133.07 0.00

11,687.28 0.00 0.00 4,017.50 7,669.78

12,880.56 0.00 4,987.29 7,893.27 0.00

3,603.97 0.00 0.00 0.00 3,603.97

870.41 0.00 0.00 0.00 870.41

147.49 0.00 0.00 0.00 147.49

1,835.87 0.00 0.00 1,835.87 0.00

3,474.81 0.00 0.00 651.53 2,823.28

696.69 0.00 0.00 653.15 43.54


15,714.48 0.00 0.00 0.00 15,714.48

3,894.08 0.00 0.00 0.00 3,894.08

51,605.47 0.00 0.00 5,720.20 19,178.05

19,335.89 0.00 0.00 5,720.20 13,615.69

616.58 0.00 0.00 0.00 616.58

31,653.00 0.00 0.00 0.00 4,945.78

134,627.44 0.00 5,294.17 15,124.73 109,272.75

34,261.44 0.00 0.00 12,162.81 22,098.63

16,401.78 0.00 0.00 0.00 16,401.78

22,718.99 0.00 0.00 0.00 22,718.99

370.57 0.00 370.57 0.00 0.00

631.84 0.00 631.84 0.00 0.00

7,253.68 0.00 4,291.76 2,961.92 0.00

34,840.89 0.00 0.00 0.00 29,905.10

18,148.25 0.00 0.00 0.00 18,148.25

2,527.58 0.00 0.00 892.17 1,635.41

892.17 0.00 0.00 892.17 0.00

1,635.41 0.00 0.00 0.00 1,635.41

21,227.27 0.00 0.00 640.48 20,586.79

21,227.27 0.00 0.00 640.48 20,586.79

41,328.27 0.00 0.00 0.00 24,357.64

32,749.77 0.00 0.00 0.00 24,357.64

7,413.97 0.00 0.00 0.00 0.00

1,164.53 0.00 0.00 0.00 0.00

61,740.62 0.00 0.00 0.00 5,826.16

17,826.86 0.00 0.00 0.00 0.00

36,476.83 0.00 0.00 0.00 5,826.16


4,798.03 0.00 0.00 0.00 0.00

1,868.10 0.00 0.00 0.00 0.00

770.80 0.00 0.00 0.00 0.00

20,369.00 0.00 0.00 0.00 14,025.64

18,858.00 0.00 0.00 0.00 14,025.64

1,269.05 0.00 0.00 0.00 0.00

241.95 0.00 0.00 0.00 0.00

2,980.10 0.00 0.00 0.00 2,980.10

1,758.48 0.00 0.00 0.00 1,758.48

1,221.62 0.00 0.00 0.00 1,221.62

818.85 0.00 0.00 0.00 0.00

818.85 0.00 0.00 0.00 0.00

117,586.60 0.00 0.00 0.00 0.00

1,254.26 0.00 0.00 0.00 0.00

53,119.08 0.00 0.00 0.00 0.00

63,213.26 0.00 0.00 0.00 0.00

44,381.35 0.00 0.00 0.00 0.00

33,063.46 0.00 0.00 0.00 0.00

1,810.08 0.00 0.00 0.00 0.00

3,726.60 0.00 0.00 0.00 0.00

1,247.75 0.00 0.00 0.00 0.00

2,100.68 0.00 0.00 0.00 0.00

120.88 0.00 0.00 0.00 0.00

922.31 0.00 0.00 0.00 0.00

118.38 0.00 0.00 0.00 0.00

1,271.21 0.00 0.00 0.00 0.00


6,630.00 0.00 0.00 0.00 0.00

101.36 0.00 0.00 0.00 0.00

24.94 0.00 0.00 0.00 0.00

355.59 0.00 0.00 0.00 0.00

233.40 0.00 0.00 0.00 0.00

121.86 0.00 0.00 0.00 0.00

185.92 0.00 0.00 0.00 0.00

35.76 0.00 0.00 0.00 0.00

12.62 0.00 0.00 0.00 0.00

850.45 0.00 0.00 0.00 0.00

47.28 0.00 0.00 0.00 0.00

548.55 0.00 0.00 0.00 0.00

97.38 0.00 0.00 0.00 0.00

46.04 0.00 0.00 0.00 0.00

34.86 0.00 0.00 0.00 0.00

36.69 0.00 0.00 0.00 0.00

54.75 0.00 0.00 0.00 0.00

57.50 0.00 0.00 0.00 0.00

10.95 0.00 0.00 0.00 0.00

22.30 0.00 0.00 0.00 0.00

3,231.84 0.00 0.00 0.00 0.00

129.99 0.00 0.00 0.00 0.00

389.97 0.00 0.00 0.00 0.00

1,114,078.15 151,013.70 266,131.78 145,976.53 251,525.52

21,613.12 2,929.67 5,162.96 2,831.94 4,879.60


140,485.25 19,042.83 33,559.22 18,407.64 31,717.37
162,179.16 21,983.44 38,741.47 21,250.17 36,615.20
89,126.25 12,081.10 21,290.54 11,678.12 20,122.04
1,365,383.56 185,078.24 326,163.80 178,904.82 308,262.76
245,769.04 33,314.08 58,709.48 32,202.87 55,487.30
1,611,152.61 218,392.32 384,873.28 211,107.69 363,750.06
M5 Parcial SI. M1 M2
17,178.12 487,924.71 489888.95 151013.70 244010.89

17,178.12 142963.39 75359.95 21104.45

16,431.52 89053.85 23047.01 21104.45

11,850.00 60701.56 13301.55 11850

0.00 1451.56 1451.56

900.00 4500.00 900.00 900

10,950.00 54750.00 10950.00 10950

1,200.00 6000.00 1200.00 1200

1,200.00 6000.00 1200.00 1200

3,381.52 6763.04 3381.52

3,381.52 6763.04 3381.52

0.00 15589.25 5163.94 8054.45

0.00 15589.25 5163.94 8054.45

0.00 51862.94 51012.94

0.00 22840.00 22840.00

0.00 7422.94 7422.94

0.00 2000.00 2000.00

0.00 18750.00 18750.00

0.00 850.00

746.60 2046.60 1300.00

0.00 1300.00 1300.00

746.60 746.60
0.00 346925.56 75653.75 222906.44

0.00 25881.11 24467.76 1413.35

0.00 1932.59 1932.59

0.00 5320.86 3907.51 1413.35

0.00 15149.79 15149.79

0.00 3477.87 3477.87

0.00 63089.64 13092.39 49997.25

0.00 1315.16 1315.16

0.00 6570.79 6570.79

0.00 3321.36 3321.36

0.00 1885.08 1885.08

0.00 49997.25 49997.25

0.00 257700.31 38093.60 171495.84

0.00 10754.29 6573.63 4180.66

0.00 1614.85 1614.85

0.00 2425.95 2425.95

0.00 6713.49 6573.63 139.86

0.00 60371.82 16353.82 42053.76

0.00 15195.49 15195.49

0.00 24785.17 4374.01 20,411.16

0.00 20391.16 11979.81 8411.35

0.00 77722.68 59551

0.00 18171.68

0.00 30272.11 30272.11

0.00 29278.89 29278.89

0.00 71491.49 53271.64


0.00 18219.85

0.00 21600.89 21600.89

0.00 11504.00 11504

0.00 37360.03 15166.15 12438.78

0.00 9755.10

0.00 15920.38 4676.61 11243.77

0.00 11684.55 10489.54 1195.01

0.00 254.50

0.00 254.50

280,288.26 624189.20 22120.89

0.00 38562.46 11839.43

0.00 15721.99

0.00 19940.10 11839.43

0.00 2900.37

0.00 79804.19 4987.29

0.00 4947.06

0.00 15918.42

0.00 4133.07

0.00 11687.28

0.00 12880.56 4987.29

0.00 3603.97

0.00 870.41

0.00 147.49

0.00 1835.87

0.00 3474.81

0.00 696.69
0.00 15714.48

0.00 3894.08

26,707.22 51605.47

0.00 19335.89

0.00 616.58

26,707.22 31653.00

4,935.79 134627.44 5294.17

0.00 34261.44

0.00 16401.78

0.00 22718.99

0.00 370.57 370.57

0.00 631.84 631.84

0.00 7253.68 4291.76

4,935.79 34840.89

0.00 18148.25

0.00 2527.58

0.00 892.17

0.00 1635.41

0.00 21227.27

0.00 21227.27

16,970.63 41328.27

8,392.13 32749.77

7,413.97 7413.97

1,164.53 1164.53

55,914.46 61740.62

17,826.86 17826.86

30,650.67 36476.83
4,798.03 4798.03

1,868.10 1868.10

770.80 770.80

6,343.36 20369.00

4,832.36 18858.00

1,269.05 1269.05

241.95 241.95

0.00 2980.10

0.00 1758.48

0.00 1221.62

818.85 818.85

818.85 818.85

117,586.60 117586.60

1,254.26 1254.26

53,119.08 53119.08

63,213.26 63213.26

44,381.35 44381.35

33,063.46 33063.46

1,810.08 1810.08

3,726.60 3726.60

1,247.75 1247.75

2,100.68 2100.68

120.88 120.88

922.31 922.31

118.38 118.38

1,271.21 1271.21
6,630.00 6630.00

101.36 101.36

24.94 24.94

355.59 355.59

233.40 233.40

121.86 121.86

185.92 185.92

35.76 35.76

12.62 12.62

850.45 850.45

47.28 47.28

548.55 548.55

97.38 97.38

46.04 46.04

34.86 34.86

36.69 36.69

54.75 54.75

57.50 57.50

10.95 10.95

22.30 22.30

3,231.84 3231.84

129.99 129.99

389.97 389.97

297,466.38

5,770.85
37,510.51
43,302.93
23,797.31
364,566.62
65,621.99
430,188.61
M3 M4 M5
62672.00 13050.00 17178.12

16270.87 13050.00 17178.12

15420.87 13050.00 16431.52

11850.00 11850.00 11850.00

900.00 900.00 900.00

10950.00 10950.00 10950.00

1200.00 1200.00 1200.00

1200.00 1200.00 1200.00

3381.52

3381.52

2370.86

2370.86

850.00

850.00

746.60

746.60
46401.13

46146.63

18171.68

18171.68

18219.85
18219.85

9755.10

9755.10

254.50

254.50

83304.53 238475.52 280288.26

26723.03

15721.99

8100.67

2900.37

34203.92 40612.98

4947.06

7876.30 8042.12

4133.07

4017.50 7669.78

7893.27

3603.97

870.41

147.49

1835.87

651.53 2823.28

653.15 43.54
15714.48

3894.08

5720.2 19178.05 26707.22

5720.2 13615.69

616.58

4945.78 26707.22

15124.73 109272.75 4935.79

12162.81 22098.63

16401.78

22718.99

2961.92

29905.1 4935.79

18148.25

892.17 1635.41

892.17

1635.41

640.48 20586.79

640.48 20586.79

24357.64 16970.63

24357.64 8392.13

7413.97

1164.53

5826.16 55914.46

17826.86

5826.16 30650.67
4798.03

1868.10

770.80

14025.64 6343.36

14025.64 4832.36

1269.05

241.95

2980.1

1758.48

1221.62

818.85

818.85

117586.60

1254.26

53119.08

63213.26

44381.35

33063.46

1810.08

3726.60

1247.75

2100.68

120.88

922.31

118.38

1271.21
6630.00

101.36

24.94

355.59

233.40

121.86

185.92

35.76

12.62

850.45

47.28

548.55

97.38

46.04

34.86

36.69

54.75

57.50

10.95

22.30

3231.84

129.99

389.97
OBRA
PROPIETARIO
CONTRATISTA
MODALIDAD
FECHA

ITEM PARTIDA

01 ESTRUCTURAS

01 01 OBRAS PROVISIONALES, TRABAJOS PRELIMINARES, SEGURIDAD Y SALUD

01 01 01 OBRAS PROVISIONALES V TRABAJOS PRELIMINARES

01 01 01 01 CONSTRUCCIONES PROVISIONALES

01 010101 01 CARTEL DE IDENTIFICACION DE LA OBRA DE 3 60X2 40M H=3 00M CON GIGANTOGRAFIA

01 01 01 01 02 SERVICIO HIGIENICO PORTATIL

01 01 01 01 03 ALQUILER DE CONTENEDOR PARA OFICINA, ALMACEN Y COMEDOR

01 01 01 02 INSTALACIONES PROVISIONALES

01 01 01 02 01 ENERGIA ELECTRICA PROVISIONAL

01 01 01 03 MOVILIZACION DE MATERIALES, MAQUINARIA Y HERRAMIENTAS

01 01 01 03 01 MOVILIZACIÓN Y DESMOVILIZACIÓN DE MAQUINARIA PESADA PARA LA OBRA

01 01 01 04 TRAZOS, NIVELES Y REPLANTEO

01 01 01 04 01 TRAZOS Y REPLANTEO DURANTE EJECUCION DE OBRA

01 01 02 SEGURIDAD Y SALUD

01 01 02 01 EQUIPOS DE PROTECCION INDIVIDUAL

01 01 02 02 EQUIPOS DE PROTECCION COLECTIVA

01 01 02 03 SEÑALIZACION TEMPORAL DE SEGURIDAD

01 01 02 04 CAPACITACION EN SEGURIDAD Y SALUD


01 01 02 05 RECURSOS PARA RESPUESTAS ANTE EMERGENCIAS EN SEGURIDAD Y SALUD DURANTE EL T

01 01 03 MITIGACION DE IMPACTO AMBIENTAL

01 01 03 01 CAPACITACION EN TEMAS AMBIENTALES

01 01 03 02 RECOLECCION Y TRANSPORTE DE RESIDUOS SOLIDOS

01 02 ESTRUCTURA NUEVA

01 02 01 MOVIMIENTO DE TIERRAS

01 02 01 01 EXCAVACION MANUAL PARA ESTRUCTURAS DE CIMENTACION

01 02 01 02 NIVELACION INTERIOR Y COMPACTAClON FINAL DEL TERRENO PREVIO AL FALSO PISO

01 02 01 03 BASE AFIRMADA C/EQUIPO E=10an

01 02 01 04 ELIMINACION DE MATERIAL EXCEDENTE CON EQUIPO R=10 Km

01 02 02 OBRAS DE CONCRETO SIMPLE

01 02 02 01 CONCRETO FC 100 KG/CM2 P/SOLADOS

01 02 0202 CONCRETO F'C = 100 K^cm2 P/CIMIENTOS CORRIDOS

01 02 02 03 CONCRETO FC = 100 K9/cm2 P/SOBRECIMIENTOS

01 02 02 04 ENCOFRADO Y DESENCOFRADO P/SOBRECIMIENTOS

01 02 02 05 FALSO PISO e=1 Ocm, CONCRETO 1:8 C:H

01 02 03 OBRAS DÉ CONCRETO ARMADO

01 02 03 01 COLUMNAS

01 02 03 01 01 CONCRETO PREMEZCLADO FC 210KG/CM2 P/COLUMNAS

01 02 03 01 02 ENCOFRADO Y DESENCOFRADO P/COLUMNAS

01 02 03 01 03 ACERO DE REFUERZO fy=4200 KG/CM2

01 02 03 02 MUROS REFORZADOS
01 02 03 02 01 CONCRETO PREMEZCLADO FC 210KG/CM2 P/MUROS REFORZADOS

01 02 03 02 02 ENCOFRADO Y DESENCOFRADO CARAVISTA P/MUROS REFORZADOS

01 02 03 02 03 ACERO DE REFUERZO fy=4200 KG/CM2

01 02 03 03 VIGAS

01 02 03 03 01 CONCRETO PREMEZCLADO FC 210KG/CM2 P/VIGAS

01 02 03 03 02 ENCOFRADO Y DESENCOFRADO P/VIGAS RECTAS Y DINTELES

01 02 03 03 03 ACERO DE REFUERZO Fy=4200 KG/CM2

01 02 03 04 LOSAS ALIGERADAS

01 02 03 04 01 CONCRETO PREMEZCLADO F'C 210KG/CM2 P/LOSAS ALIGERADAS

01 02 03 04 02 ENCOFRADO Y DESENCOFRADO P/LOSAS ALIGERADAS

01 02 03 04 03 ACERO DE REFUERZO fy=420C KG/CM2

01 02 03 04 04 LADRILLO DE ARCILLA HUECO DE 15X30X30CM P/LOSA ALIGERADA

01 02 03 05 ESCALERAS

01 02 03 05 01 CONCRETO PREMEZCLADO FC 2I0KG/CM2 P/ESCALERAS

01 02 03 05 02 ENCOFRADO Y DESENCOFRADO P/ESCALERAS

01 02 03 05 03 ACERO DE REFUERZO ty=4200 KG/CM2

01 02 04 VARIOS

01 02 04 01 SELLADO DE JUNTA DE DILATACIÓN SISMICA

COSTO DIRECTO
GASTOS GENERALES
UTILIDAD
SUB-TOTAL
FACTOR DE RELACION

MONTO BRUTO
VALORIZAC

: CREACION DE LA CASA VECINAL No 4 CONDE DE LEMOS


: EMILIMA S.A.
: ING. LEONEL CORTEZ MEZA
: LLAVE EN MANO
: 21/08/2018

PROPUESTA CO
PARTIDA
Und.

IONALES, TRABAJOS PRELIMINARES, SEGURIDAD Y SALUD

IONALES V TRABAJOS PRELIMINARES

CIONES PROVISIONALES

DENTIFICACION DE LA OBRA DE 3 60X2 40M H=3 00M CON GIGANTOGRAFIA UND

GIENICO PORTATIL MES

E CONTENEDOR PARA OFICINA, ALMACEN Y COMEDOR MES

NES PROVISIONALES

ECTRICA PROVISIONAL MES

ON DE MATERIALES, MAQUINARIA Y HERRAMIENTAS

ÓN Y DESMOVILIZACIÓN DE MAQUINARIA PESADA PARA LA OBRA GBL

VELES Y REPLANTEO

EPLANTEO DURANTE EJECUCION DE OBRA MES

E PROTECCION INDIVIDUAL GBL

E PROTECCION COLECTIVA GBL

ON TEMPORAL DE SEGURIDAD GBL

ON EN SEGURIDAD Y SALUD MES


PARA RESPUESTAS ANTE EMERGENCIAS EN SEGURIDAD Y SALUD DURANTE EL TRABAJO GBL

IMPACTO AMBIENTAL

ON EN TEMAS AMBIENTALES GBL

ON Y TRANSPORTE DE RESIDUOS SOLIDOS MES

E TIERRAS

N MANUAL PARA ESTRUCTURAS DE CIMENTACION M3

INTERIOR Y COMPACTAClON FINAL DEL TERRENO PREVIO AL FALSO PISO M2

ADA C/EQUIPO E=10an M2

N DE MATERIAL EXCEDENTE CON EQUIPO R=10 Km M3

NCRETO SIMPLE

FC 100 KG/CM2 P/SOLADOS M3

F'C = 100 K^cm2 P/CIMIENTOS CORRIDOS M3

FC = 100 K9/cm2 P/SOBRECIMIENTOS M3

O Y DESENCOFRADO P/SOBRECIMIENTOS M2

e=1 Ocm, CONCRETO 1:8 C:H M2

NCRETO ARMADO

PREMEZCLADO FC 210KG/CM2 P/COLUMNAS M3

O Y DESENCOFRADO P/COLUMNAS M2

REFUERZO fy=4200 KG/CM2 KG


PREMEZCLADO FC 210KG/CM2 P/MUROS REFORZADOS M3

O Y DESENCOFRADO CARAVISTA P/MUROS REFORZADOS M2

REFUERZO fy=4200 KG/CM2 KG

PREMEZCLADO FC 210KG/CM2 P/VIGAS M3

O Y DESENCOFRADO P/VIGAS RECTAS Y DINTELES M2

REFUERZO Fy=4200 KG/CM2 KG

PREMEZCLADO F'C 210KG/CM2 P/LOSAS ALIGERADAS M3

O Y DESENCOFRADO P/LOSAS ALIGERADAS M2

REFUERZO fy=420C KG/CM2 KG

E ARCILLA HUECO DE 15X30X30CM P/LOSA ALIGERADA UND

PREMEZCLADO FC 2I0KG/CM2 P/ESCALERAS M3

O Y DESENCOFRADO P/ESCALERAS M2

REFUERZO ty=4200 KG/CM2 KG

E JUNTA DE DILATACIÓN SISMICA M2

VALORIZADO ( SIN IGV) = VC S/.


VALORIZACION DE OBRA N° 01 DELC MES DE SETIEMBRE
ESTRUCTURAS OS
T
O

P
A
R
C
PROPUESTA CONTRACTUAL I AVANCE
A ANTERIOR AVANCE DEL MES
METRADO
COSTO UNITARIO COSTO PARCIAL L METRADO S/. METRADO
487,924.71
###

142,963.39
###

89,053.85
###

60,701.56
###

1.00 1,451.56 1,451.56


### 0.00 0.00 1.00

5.00 900.00 4,500.00


### 0.00 0.00 1.00

5.00 10,950.00 54,750.00


### 0.00 0.00 1.00

5.00 1,200.00 6,000.00


### 0.00 0.00 1.00

1.00 6,763.04 6,763.04


### 0.00 0.00 0.50

2.50 6,235.70 15,589.25


### 0.00 0.00 0.83

1.00 22,840.00 22,840.00


### 0.00 0.00 1.00

1.00 7,422.94 7,422.94


### 0.00 0.00 1.00

1.00 2,000.00 2,000.00


### 0.00 0.00 1.00

5.00 3,750.00 18,750.00


### 0.00 0.00 5.00
1.00 850.00 850.00
### 0.00 0.00 0.00

1.00 1,300.00 1,300.00


### 0.00 0.00 1.00

5.00 149.32 746.60


### 0.00 0.00 0.00

86.78 22.27 1,932.59


### 0.00 0.00 86.78

945.09 5.63 5,320.86


### 0.00 0.00 694.05

945.09 16.03 15,149.79


### 0.00 0.00 945.09

108.48 32.06 3,477.87


### 0.00 0.00 108.48

5.59 235.27 1,315.16


### 0.00 0.00 5.59

27.31 240.60 6,570.79


### 0.00 0.00 27.31

9.96 333.47 3,321.36


### 0.00 0.00 9.96

39.82 47.34 1,885.08


### 0.00 0.00 39.82

1501.87 33.29 49,997.25


### 0.00 0.00 0.00

4.65  347.28 1,614.85


### 0.00 0.00 0.00

37.60  64.52 2,425.95


### 0.00 0.00 0.00

1495.21 4.49 6,713.49


### 0.00 0.00 1,464.06
41.86  363.01 15,195.60
### 0.00 0.00 0.00

356.41  69.54 24,784.75


### 0.00 0.00 62.90

4,541.46  4.49 20,391.16


### 0.00 0.00 2,668.11

54.80  331.60 18,171.68


### 0.00 0.00 0.00

408.20 74.16 30,272.11


### 0.00 0.00 0.00

6520.91 4.49 29,278.89


### 0.00 0.00 0.00

53.94  337.78 18,219.85


### 0.00 0.00 0.00

431.50 50.06 21,600.89


### 0.00 0.00 0.00

4491.48 4.49 20,166.75


### 0.00 0.00 0.00

3595.00 3.20 11,504.00


### 0.00 0.00 0.00

28.09 347.28 9,755.10


### 0.00 0.00 0.00

164.06 97.04 15,920.38


### 0.00 0.00 48.19

2602.35 4.49 11,684.55


### 0.00 0.00 2,336.20

26.40 9.64 254.50


### 0.00 0.00 0.00

979,777.59 0.00
14.5573% 142,628.69 0.00
8.00% 78,382.21 0.00
1,200,788.49 0.00
1.05 1,260,827.91

1,260,827.91 0.00% 0.00 15.41%


SUPERVISOR : ING. RUIZ PALACIOS, ANGEL
RESIDENTE : ING. BALBIN SAENZ, ANGEL
MONTO REFERENCIAL : S/ 2'785,800.08 (CON IGV )
MONTO CONTRATO : S/ 2'925,090.08 (CON IGV )
FACTOR DE RELACION 1

AVANCE SALDO POR EJECUTAR


AVANCE DEL MES ACUMULADO ACTUAL
METRADO
S/. METRADO S/. COSTO PARCIAL S/.

1,451.56 1.00 1,451.56 0.00 0.00

900.00 1.00 900.00 4.00 3,600.00

10,950.00 1.00 10,950.00 4.00 43,800.00

1,200.00 1.00 1,200.00 4.00 4,800.00

3,381.52 0.50 3,381.52 0.50 3,381.52

5,175.63 0.83 5,175.63 1.67 10,413.62

22,840.00 1.00 22,840.00 0.00 0.00

7,422.94 1.00 7,422.94 0.00 0.00

2,000.00 1.00 2,000.00 0.00 0.00

18,750.00 5.00 18,750.00 0.00 0.00


0.00 0.00 0.00 1.00 850.00

1,300.00 1.00 1,300.00 0.00 0.00

0.00 0.00 0.00 5.00 746.60

1,932.59 86.78 1,932.59 0.00 0.00

3,907.50 694.05 3,907.50 251.04 1,413.36

15,149.79 945.09 15,149.79 0.00 0.00

3,477.87 108.48 3,477.87 0.00 0.00

1,315.16 5.59 1,315.16 0.00 0.00

6,570.79 27.31 6,570.79 0.00 0.00

3,321.36 9.96 3,321.36 0.00 0.00

1,885.08 39.82 1,885.08 0.00 0.00

0.00 0.00 0.00 1,501.87 49,997.25

0.00 0.00 0.00 4.65 1,614.85

0.00 0.00 0.00 37.60 2,425.95

6,573.63 1,464.06 6,573.63 31.15 139.86


0.00 0.00 0.00 41.86 15,195.60

4,374.07 62.90 4,374.07 293.51 20,410.69

11,979.81 2,668.11 11,979.81 1,873.35 8,411.34

0.00 0.00 0.00 54.80 18,171.68

0.00 0.00 0.00 408.20 30,272.11

0.00 0.00 0.00 6,520.91 29,278.89

0.00 0.00 0.00 53.94 18,219.85

0.00 0.00 0.00 431.50 21,600.89

0.00 0.00 0.00 4,491.48 20,166.75

0.00 0.00 0.00 3,595.00 11,504.00

0.00 0.00 0.00 28.09 9,755.10

4,676.36 48.19 4,676.36 115.87 11,244.02

10,489.54 2,336.20 10,489.54 266.15 1,195.01

0.00 0.00 0.00 26.40 254.50

151,025.20 151,025.20 338,863.44


21,985.12 21,985.12 49,329.20
12,082.02 12,082.02 27,109.08
185,092.34 185,092.34 0.00 415,301.72
194,346.96 194,346.96 436,066.81

194,346.96 15.41% 194,346.96 34.59% 436,066.81


OR EJECUTAR
%
487,924.71
0.00
142,963.39
0.00
89,053.85
0.00
60,701.56
0.00
0.00% 1,451.56 1,451.56

80.00% 900.00 4,500.00

80.00% 10,950.00 54,750.00

80.00% 1,200.00 6,000.00

50.00% 6,763.04 6,763.04

67.00% 6,235.70 15,589.25

0.00% 22,840.00 22,840.00

0.00% 7,422.94 7,422.94

0.00% 2,000.00 2,000.00

0.00% 3,750.00 18,750.00


100.00% 850.00 850.00

0.00% 1,300.00 1,300.00

100.00% 149.32 746.60

0.00% 22.27 1,932.59

27.00% 5.63 5,320.86

0.00% 16.03 15,149.79

0.00% 32.06 3,477.87

0.00% 235.27 1,315.16

0.00% 240.60 6,570.79

0.00% 333.47 3,321.36

0.00% 47.34 1,885.08

100.00% 33.29 49,997.25

100.00% 347.28 1,614.85

100.00% 64.52 2,425.95

2.00% 4.49 6,713.49


100.00% 363.01 15,195.49

82.00% 69.54 24,785.17

41.00% 4.49 20,391.16

100.00% 331.60 18,171.68

100.00% 74.16 30,272.11

100.00% 4.49 29,278.89

100.00% 337.78 18,219.85

100.00% 50.06 21,600.89

100.00% 4.49 20,166.75

100.00% 3.20 11,504.00

100.00% 347.28 9,755.10

71.00% 97.04 15,920.38

10.00% 4.49 11,684.55

100.00% 9.64 254.50


OBRA
PROPIETARIO
CONTRATISTA
MODALIDAD
FECHA

ITEM PARTIDA

01 ESTRUCTURAS
01 01 OBRAS PROVISIONALES, TRABAJOS PRELIMINARES, SEGURIDAD Y SALUD
01 01 01 OBRAS PROVISIONALES V TRABAJOS PRELIMINARES
01 01 01 01 CONSTRUCCIONES PROVISIONALES

01 01 01 01 01 CARTEL DE IDENTIFICACION DE LA OBRA DE 3 60X2 40M H=3 00M CON GIGANTOGRAFIA

01 01 01 01 02 SERVICIO HIGIENICO PORTATIL

01 01 01 01 03 ALQUILER DE CONTENEDOR PARA OFICINA, ALMACEN Y COMEDOR

01 01 01 02 INSTALACIONES PROVISIONALES

01 01 01 02 01 ENERGIA ELECTRICA PROVISIONAL

01 01 01 03 MOVILIZACION DE MATERIALES, MAQUINARIA Y HERRAMIENTAS

01 01 01 03 01 MOVILIZACIÓN Y DESMOVILIZACIÓN DE MAQUINARIA PESADA PARA LA OBRA

01 01 01 04 TRAZOS, NIVELES Y REPLANTEO

01 01 01 04 01 TRAZOS Y REPLANTEO DURANTE EJECUCION DE OBRA

01 01 02 SEGURIDAD Y SALUD

01 01 02 01 EQUIPOS DE PROTECCION INDIVIDUAL

01 01 02 02 EQUIPOS DE PROTECCION COLECTIVA

01 01 02 03 SEÑALIZACION TEMPORAL DE SEGURIDAD

01 01 02 04 CAPACITACION EN SEGURIDAD Y SALUD

01 01 02 05 RECURSOS PARA RESPUESTAS ANTE EMERGENCIAS EN SEGURIDAD Y SALUD DURANTE


01 01 03 MITIGACION DE IMPACTO AMBIENTAL

01 01 03 01 CAPACITACION EN TEMAS AMBIENTALES

01 01 03 02 RECOLECCION Y TRANSPORTE DE RESIDUOS SOLIDOS

01 02 ESTRUCTURA NUEVA

01 02 01 MOVIMIENTO DE TIERRAS

01 02 01 01 EXCAVACION MANUAL PARA ESTRUCTURAS DE CIMENTACION

01 02 01 02 NIVELACION INTERIOR Y COMPACTAClON FINAL DEL TERRENO PREVIO AL FALSO PISO

01 02 01 03 BASE AFIRMADA C/EQUIPO E=10an

01 02 01 04 ELIMINACION DE MATERIAL EXCEDENTE CON EQUIPO R=10 Km

01 02 02 OBRAS DE CONCRETO SIMPLE

01 02 02 01 CONCRETO FC 100 KG/CM2 P/SOLADOS

01 02 0202 CONCRETO F'C = 100 K^cm2 P/CIMIENTOS CORRIDOS

01 02 02 03 CONCRETO FC = 100 K9/cm2 P/SOBRECIMIENTOS

01 02 02 04 ENCOFRADO Y DESENCOFRADO P/SOBRECIMIENTOS

01 02 02 05 FALSO PISO e=1 Ocm, CONCRETO 1:8 C:H

01 02 03 OBRAS DÉ CONCRETO ARMADO

01 02 03 01 COLUMNAS

01 02 03 01 01 CONCRETO PREMEZCLADO FC 210KG/CM2 P/COLUMNAS

01 02 03 01 02 ENCOFRADO Y DESENCOFRADO P/COLUMNAS

01 02 03 01 03 ACERO DE REFUERZO fy=4200 KG/CM2

01 02 03 02 MUROS REFORZADOS

01 02 03 02 01 CONCRETO PREMEZCLADO FC 210KG/CM2 P/MUROS REFORZADOS

01 02 03 02 02 ENCOFRADO Y DESENCOFRADO CARAVISTA P/MUROS REFORZADOS


01 02 03 02 03 ACERO DE REFUERZO fy=4200 KG/CM2

01 02 03 03 VIGAS

01 02 03 03 01 CONCRETO PREMEZCLADO FC 210KG/CM2 P/VIGAS

01 02 03 03 02 ENCOFRADO Y DESENCOFRADO P/VIGAS RECTAS Y DINTELES

01 02 03 03 03 ACERO DE REFUERZO Fy=4200 KG/CM2

01 02 03 04 LOSAS ALIGERADAS

01 02 03 04 01 CONCRETO PREMEZCLADO F'C 210KG/CM2 P/LOSAS ALIGERADAS

01 02 03 04 02 ENCOFRADO Y DESENCOFRADO P/LOSAS ALIGERADAS

01 02 03 04 03 ACERO DE REFUERZO Fy=4200 KG/CM2

01 02 03 04 04 LADRILLO DE ARCILLA HUECO DE 15X30X30CM P/LOSA ALIGERADA

01 02 03 05 ESCALERAS

01 02 03 05 01 CONCRETO PREMEZCLADO FC 2I0KG/CM2 P/ESCALERAS

01 02 03 05 02 ENCOFRADO Y DESENCOFRADO P/ESCALERAS

01 02 03 05 03 ACERO DE REFUERZO ty=4200 KG/CM2

01 02 04 VARIOS

01 02 04 01 SELLADO DE JUNTA DE DILATACIÓN SISMICA

COSTO DIRECTO
GASTOS GENERALES
UTILIDAD
SUB-TOTAL
FACTOR DE RELACION

MONTO BRUTO
VALORIZAC

: CREACION DE LA CASA VECINAL No 4 CONDE DE LEMOS


: EMILIMA S.A.
: ING. LEONEL CORTEZ MEZA
: LLAVE EN MANO
: 21/08/2018

PROPUESTA CONT
PARTIDA
Und.

IONALES, TRABAJOS PRELIMINARES, SEGURIDAD Y SALUD


IONALES V TRABAJOS PRELIMINARES
CIONES PROVISIONALES

DENTIFICACION DE LA OBRA DE 3 60X2 40M H=3 00M CON GIGANTOGRAFIA Und

GIENICO PORTATIL mes

E CONTENEDOR PARA OFICINA, ALMACEN Y COMEDOR mes

NES PROVISIONALES

ECTRICA PROVISIONAL mes

ON DE MATERIALES, MAQUINARIA Y HERRAMIENTAS

ÓN Y DESMOVILIZACIÓN DE MAQUINARIA PESADA PARA LA OBRA GLB

VELES Y REPLANTEO

EPLANTEO DURANTE EJECUCION DE OBRA MES

E PROTECCION INDIVIDUAL GBL

E PROTECCION COLECTIVA GBL

ON TEMPORAL DE SEGURIDAD GBL

ON EN SEGURIDAD Y SALUD MES

PARA RESPUESTAS ANTE EMERGENCIAS EN SEGURIDAD Y SALUD DURANTE EL GBL


IMPACTO AMBIENTAL

ON EN TEMAS AMBIENTALES GBL

ON Y TRANSPORTE DE RESIDUOS SOLIDOS MES

E TIERRAS

N MANUAL PARA ESTRUCTURAS DE CIMENTACION M3

INTERIOR Y COMPACTAClON FINAL DEL TERRENO PREVIO AL FALSO PISO M2

ADA C/EQUIPO E=10an M3

N DE MATERIAL EXCEDENTE CON EQUIPO R=10 Km M3

NCRETO SIMPLE

FC 100 KG/CM2 P/SOLADOS M3

F'C = 100 K^cm2 P/CIMIENTOS CORRIDOS M3

FC = 100 K9/cm2 P/SOBRECIMIENTOS M3

O Y DESENCOFRADO P/SOBRECIMIENTOS M2

e=1 Ocm, CONCRETO 1:8 C:H P

NCRETO ARMADO

PREMEZCLADO FC 210KG/CM2 P/COLUMNAS M3

O Y DESENCOFRADO P/COLUMNAS M2

REFUERZO fy=4200 KG/CM2 KG

PREMEZCLADO FC 210KG/CM2 P/MUROS REFORZADOS M3

O Y DESENCOFRADO CARAVISTA P/MUROS REFORZADOS M2


REFUERZO fy=4200 KG/CM2 KG

PREMEZCLADO FC 210KG/CM2 P/VIGAS M3

O Y DESENCOFRADO P/VIGAS RECTAS Y DINTELES M2

REFUERZO Fy=4200 KG/CM2 KG

PREMEZCLADO F'C 210KG/CM2 P/LOSAS ALIGERADAS M3

O Y DESENCOFRADO P/LOSAS ALIGERADAS M2

REFUERZO Fy=4200 KG/CM2 KG

E ARCILLA HUECO DE 15X30X30CM P/LOSA ALIGERADA UND

PREMEZCLADO FC 2I0KG/CM2 P/ESCALERAS M3

O Y DESENCOFRADO P/ESCALERAS M2

REFUERZO ty=4200 KG/CM2 KG

E JUNTA DE DILATACIÓN SISMICA M2

VALORIZADO ( SIN IGV) = VC S/.


C
O
S
T
O
VALORIZACION DE OBRA N° 02 DEL MES DE OCTUBRE
P
ESTRUCTURASA
R
C
I
A
L

B
PROPUESTA CONTRACTUAL A AVANCE
S ANTERIOR AVANCE DEL MES
METRADO
COSTO UNITARIO COSTO PARCIAL E METRADO S/. METRADO
###
###
###
###

1.00 1,451.56 1,451.56


### 1.00 1,451.56 0.00

5.00 900.00 4,500.00


### 1.00 900.00 1.00

5.00 10,950.00 54,750.00


### 1.00 10,950.00 1.00

###

5.00 1,200.00 6,000.00


### 1.00 1,200.00 1.00

###

1.00 6,763.04 6,763.04


### 0.50 3,381.52 0.00

###

2.50 6,235.70 15,589.25


### 0.83 5,175.63 1.29

###

1.00 22,840.00 22,840.00


### 1.00 22,840.00 0.00

1.00 7,422.94 7,422.94


### 1.00 7,422.94 0.00

1.00 2,000.00 2,000.00


### 1.00 2,000.00 0.00

5.00 3,750.00 18,750.00


### 5.00 18,750.00 0.00

1.00 850.00 850.00


### 0.00 0.00 0.00
###

1.00 1,300.00 1,300.00


### 1.00 1,300.00 0.00

5.00 149.32 746.60


### 0.00 0.00 0.00

###

###

86.78 22.27 1,932.59


### 86.78 1,932.59 0.00

945.09 5.63 5,320.86


### 694.05 3,907.50 251.04

945.09 16.03 15,149.79


### 945.09 15,149.79 0.00

108.48 32.06 3,477.87


### 108.48 3,477.87 0.00

###

5.59 235.27 1,315.16


### 5.59 1,315.16 0.00

27.31 240.60 6,570.79


### 27.31 6,570.79 0.00

9.96 333.47 3,321.36


### 9.96 3,321.36 0.00

39.82 47.34 1,885.08


### 39.82 1,885.08 0.00

1501.87 33.29 49,997.25


### 0.00 0.00 1,501.87

###

###

4.65 347.28 1,614.85


### 0.00 0.00 4.65

37.60 64.52 2,425.95


### 0.00 0.00 37.60

1495.21 4.49 6,713.49


### 1,464.06 6,573.63 31.15

###

41.66 364.75 15,195.49


### 0.00 0.00 41.66

356.41 69.54 24,784.75


### 62.90 4,374.07 265.27
4541.41 4.49 20,390.93
### 2,668.11 11,979.81 1,873.35

###

54.80 331.60 18,171.68


### 0.00 0.00 0.00

408.20 74.16 30,272.11


### 0.00 0.00 408.20

6520.91 4.49 29,278.89


### 0.00 0.00 6,520.91

###

53.94 337.78 18,219.85


### 0.00 0.00 0.00

431.50 50.06 21,600.89


### 0.00 0.00 431.50

4491.48 4.49 20,166.75


### 0.00 0.00 4,491.48

3595.00 3.20 11,504.00


### 0.00 0.00 3,595.00

###

28.09 347.28 9,755.10


### 0.00 0.00 0.00

164.06 97.04 15,920.38


### 48.19 4,676.36 115.87

2625.04 4.45 11,681.43


### 2,357.20 10,489.54 268.54

###

26.40 9.64 254.50


### 0.00 0.00 0.00

489,885.18 151,025.20
14.5573% 71,313.82 21,985.12
8.00% 39,190.81 12,082.02
600,389.81 185,092.34
1.05 630,409.30

630,409.30 30.83% 185,092.34 49.81%


SUPERVISOR : ING. RUIZ PALACIOS, ANGEL
RESIDENTE : ING. BALBIN SAENZ, ANGEL
MONTO REFERENCIAL : S/ 2'785,800.08 (CON IGV )
MONTO CONTRATO : S/ 2'925,090.08 (CON IGV )
FACTOR DE RELACION 1

AVANCE SALDO POR EJECUTAR


AVANCE DEL MES ACUMULADO ACTUAL
METRADO
S/. METRADO S/. COSTO PARCIAL S/.

0.00 1.00 1,451.56 0.00 0.00

900.00 2.00 1,800.00 3.00 2,700.00

10,950.00 2.00 21,900.00 3.00 32,850.00

1,200.00 2.00 2,400.00 3.00 3,600.00

0.00 0.50 3,381.52 0.50 3,381.52

8,044.05 2.12 13,219.68 0.38 2,369.57

0.00 1.00 22,840.00 0.00 0.00

0.00 1.00 7,422.94 0.00 0.00

0.00 1.00 2,000.00 0.00 0.00

0.00 5.00 18,750.00 0.00 0.00

0.00 0.00 0.00 1.00 850.00


0.00 1.00 1,300.00 0.00 0.00

0.00 0.00 0.00 5.00 746.60

0.00 86.78 1,932.59 0.00 0.00

1,413.36 945.09 5,320.86 0.00 0.00

0.00 945.09 15,149.79 0.00 0.00

0.00 108.48 3,477.87 0.00 0.00

0.00 5.59 1,315.16 0.00 0.00

0.00 27.31 6,570.79 0.00 0.00

0.00 9.96 3,321.36 0.00 0.00

0.00 39.82 1,885.08 0.00 0.00

49,997.25 1,501.87 49,997.25 0.00 0.00

1,614.85 4.65 1,614.85 0.00 0.00

2,425.95 37.60 2,425.95 0.00 0.00

139.86 1,495.21 6,713.49 0.00 0.00

15,195.49 41.66 15,195.49 0.00 0.00

18,446.88 328.17 22,820.94 28.24 1,963.81


8,411.34 4,541.46 20,391.16 -0.05 -0.22

0.00 0.00 0.00 54.80 18,171.68

30,272.11 408.20 30,272.11 0.00 0.00

29,278.89 6,520.91 29,278.89 0.00 0.00

0.00 0.00 0.00 53.94 18,219.85

21,600.89 431.50 21,600.89 0.00 0.00

20,166.75 4,491.48 20,166.75 0.00 0.00

11,504.00 3,595.00 11,504.00 0.00 0.00

0.00 0.00 0.00 28.09 9,755.10

11,244.02 164.06 15,920.38 0.00 0.00

1,195.00 2,625.74 11,684.54 -0.70 -3.12

0.00 0.00 0.00 26.40 254.50

244,000.70 395,025.89 94,859.29


35,519.80 57,504.91 13,808.91
19,520.06 31,602.07 7,588.74
299,040.56 484,132.87 0.00 116,256.94
313,992.59 508,339.51 122,069.79

313,992.59 80.64% 508,339.51 19.36% 122,069.79


R EJECUTAR
%
487,924.71
142,963.39
89,053.85
60,701.56

0.00% 1,451.56 1,451.56

60.00% 900.00 4,500.00

60.00% 10,950.00 54,750.00

60.00% 1,200.00 6,000.00

50.00% 6,763.04 6,763.04

15.00% 6,235.70 15,589.25

0.00% 22,840.00 22,840.00

0.00% 7,422.94 7,422.94

0.00% 2,000.00 2,000.00

0.00% 3,750.00 18,750.00

100.00% 850.00 850.00


0.00% 1,300.00 1,300.00

100.00% 149.32 746.60

0.00% 22.27 1,932.59

0.00% 5.63 5,320.86

0.00% 16.03 15,149.79

0.00% 32.06 3,477.87

0.00% 235.27 1,315.16

0.00% 240.60 6,570.79

0.00% 333.47 3,321.36

0.00% 47.34 1,885.08

0.00% 33.29 49,997.25

0.00% 347.28 1,614.85

0.00% 64.52 2,425.95

0.00% 4.49 6,713.49

0.00% 364.75 15,195.49

8.00% 69.54 24,785.17


0.00% 4.49 20,391.16

100.00% 331.60 18,171.68

0.00% 74.16 30,272.11

0.00% 4.49 29,278.89

100.00% 337.78 18,219.85

0.00% 50.06 21,600.89

0.00% 4.49 20,166.75

0.00% 3.20 11,504.00

100.00% 347.28 9,755.10

0.00% 97.04 15,920.38

0.00% 4.45 11,684.55

100.00% 9.64 254.50


CÁLCULO DEL REAJUSTE DEL MES DE SETIEMBRE

: CREACION DE LA CASA VECINAL No 4 CONDE DE LEMOS


OBRA
PROPIETARIO : EMILIMA S.A.
CONTRATISTA : ING. LEONEL CORTEZ MEZA
MODALIDAD : LLAVE EN MANO
FECHA : 21/08/2018

Fecha Monto Reajuste


Val. N° partida K-1
Valorización Valorizado (V) (R=V*(K-1))
1 estructura setiembre 2018 194,346.96 0.001 143.94
2 estructura octubre 2018 313,992.59 0.046 14,433.35
SUB-TOTAL 508,339.55 14,577.29
CUADRO COMPARATIVO DE AVANCE DE OBRA

: CREACION DE LA CASA VECINAL No 4 CONDE DE LEMOS


OBRA
PROPIETARIO : EMILIMA S.A.
CONTRATISTA : ING. LEONEL CORTEZ MEZA
MODALIDAD : LLAVE EN MANO
FECHA : 21/08/2018

MES 1 MES 2
Nº VALORIZACION
1 2
MES DE VALORIZACION OCTUBRE NOVIEMRE
VALORIZACION PROGRAMADA 0.00 0.00% 3.54%
ACUMULADA 0.00 0.00% 3.54%
VALORIZACION EJECUTADA 0.00 30.95% 0.00%
ACUMULADA 0.00 30.95% 30.95%
LA OBRA SE ENCUENTRA: 30.95% ADELANTADA
DE OBRA

MES 3 MES 4 MES 5


3 4 5
DICIEMBRE ENERO FEBRERO
6.56% 38.56% 44.90%
10.11% 48.67% 93.57%
0.00% 0.00% 0.00%
30.95% 30.95% 30.95%
DELANTADA
RESUMEN DE METRADOS EJECUTADOS -

ITEM

01
01 01
01 01 01
01 01 01 01

01 01 01 01 01

01 01 01 01 02

01 01 01 01 03

01 01 01 02

01 01 01 02 01

01 01 01 03

01 01 01 03 01

01 01 01 04

01 01 01 04 01

01 01 02

01 01 02 01

01 01 02 02

01 01 02 03

01 01 02 04

01 01 02 05
01 01 03

01 01 03 01

01 01 03 02

01 02

01 02 01

01 02 01 01

01 02 01 02

01 02 01 03

01 02 01 04

01 02 02

01 02 02 01

01 02 0202

01 02 02 03

01 02 02 04

01 02 02 05

01 02 03

01 02 03 01

01 02 03 01 01

01 02 03 01 02

01 02 03 01 03

01 02 03 02

01 02 03 02 01

01 02 03 02 02
01 02 03 02 03

01 02 03 03

01 02 03 03 01

01 02 03 03 02

01 02 03 03 03

01 02 03 04

01 02 03 04 01

01 02 03 04 02

01 02 03 04 03

01 02 03 04 04

01 02 03 05

01 02 03 05 01

01 02 03 05 02

01 02 03 05 03

01 02 04

01 02 04 01
RESUMEN DE METRADOS EJECUTADOS - VALORIZACION Nº 0
mes de setiembre del 2018

Presupuesto
Subpresupuesto
Cliente
Lugar

PARTIDA

ESTRUCTURAS
OBRAS PROVISIONALES, TRABAJOS PRELIMINARES, SEGURIDAD Y SALUD
OBRAS PROVISIONALES V TRABAJOS PRELIMINARES
CONSTRUCCIONES PROVISIONALES

CARTEL DE IDENTIFICACION DE LA OBRA DE 3 60X2 40M H=3 00M CON GIGANTOGRAFIA

SERVICIO HIGIENICO PORTATIL

ALQUILER DE CONTENEDOR PARA OFICINA, ALMACEN Y COMEDOR

INSTALACIONES PROVISIONALES

ENERGIA ELECTRICA PROVISIONAL

MOVILIZACION DE MATERIALES, MAQUINARIA Y HERRAMIENTAS

MOVILIZACIÓN Y DESMOVILIZACIÓN DE MAQUINARIA PESADA PARA LA OBRA

TRAZOS, NIVELES Y REPLANTEO

TRAZOS Y REPLANTEO DURANTE EJECUCION DE OBRA

SEGURIDAD Y SALUD

EQUIPOS DE PROTECCION INDIVIDUAL

EQUIPOS DE PROTECCION COLECTIVA

SEÑALIZACION TEMPORAL DE SEGURIDAD

CAPACITACION EN SEGURIDAD Y SALUD

RECURSOS PARA RESPUESTAS ANTE EMERGENCIAS EN SEGURIDAD Y SALUD


MITIGACION DE IMPACTO AMBIENTAL

CAPACITACION EN TEMAS AMBIENTALES

RECOLECCION Y TRANSPORTE DE RESIDUOS SOLIDOS

ESTRUCTURA NUEVA

MOVIMIENTO DE TIERRAS

EXCAVACION MANUAL PARA ESTRUCTURAS DE CIMENTACION

NIVELACION INTERIOR Y COMPACTAClON FINAL DEL TERRENO PREVIO AL FALSO PISO

BASE AFIRMADA C/EQUIPO E=10an

ELIMINACION DE MATERIAL EXCEDENTE CON EQUIPO R=10 Km

OBRAS DE CONCRETO SIMPLE

CONCRETO FC 100 KG/CM2 P/SOLADOS

CONCRETO F'C = 100 K^cm2 P/CIMIENTOS CORRIDOS

CONCRETO FC = 100 K9/cm2 P/SOBRECIMIENTOS

ENCOFRADO Y DESENCOFRADO P/SOBRECIMIENTOS

FALSO PISO e=1 Ocm, CONCRETO 1:8 C:H

OBRAS DÉ CONCRETO ARMADO

COLUMNAS

CONCRETO PREMEZCLADO FC 210KG/CM2 P/COLUMNAS

ENCOFRADO Y DESENCOFRADO P/COLUMNAS

ACERO DE REFUERZO fy=4200 KG/CM2

MUROS REFORZADOS

CONCRETO PREMEZCLADO FC 210KG/CM2 P/MUROS REFORZADOS

ENCOFRADO Y DESENCOFRADO CARAVISTA P/MUROS REFORZADOS


ACERO DE REFUERZO fy=4200 KG/CM2

VIGAS

CONCRETO PREMEZCLADO FC 210KG/CM2 P/VIGAS

ENCOFRADO Y DESENCOFRADO P/VIGAS RECTAS Y DINTELES

ACERO DE REFUERZO fy=4200 KG/CM2

LOSAS ALIGERADAS

CONCRETO PREMEZCLADO F'C 210KG/CM2 P/LOSAS ALIGERADAS

ENCOFRADO Y DESENCOFRADO P/LOSAS ALIGERADAS

ACERO DE REFUERZO fy=420C KG/CM2

LADRILLO DE ARCILLA HUECO DE 15X30X30CM P/LOSA ALIGERADA

ESCALERAS

CONCRETO PREMEZCLADO FC 2I0KG/CM2 P/ESCALERAS

ENCOFRADO Y DESENCOFRADO P/ESCALERAS

ACERO DE REFUERZO ty=4200 KG/CM2

VARIOS

SELLADO DE JUNTA DE DILATACIÓN SISMICA


ADOS - VALORIZACION Nº 01
mes de setiembre del 2018

CREACION DE CASA VECINAL No.4 CONDE DE LEMOS-COMPONENTE OBRA NUEVA


ESTRUCTURAS
EMPRESA MUNICIPAL INMOBILIARIA DE LIMA
LIMA-LIMA-BARRIOS ALTOS

Und. METRADO BASE AVANCE DEL MES PRESUPUESTO

Und 1.00 1.00 1,451.56

mes 5.00 5.00 4,500.00

mes 5.00 5.00 54,750.00

mes 5.00 5.00 6,000.00

GLB 1.00 0.50 3,381.52

MES 2.50 2.50 15,589.25

GLB 1.00 1.00 22,840.00

GLB 1.00 1.00 7,422.94

GLB 1.00 1.00 2,000.00

MES 5.00 5.00 18,750.00

GBL 1.00 0.00 0.00


TALL 1.00 1.00 1,300.00

MES 5.00 0.00 0.00

M3 86.78 86.78 1,932.59

M2 945.09 945.09 5,320.86

M3 945.09 945.09 15,149.79

M3 108.48 108.48 3,477.87

M3 5.59 5.59 1,315.16

M3 27.31 27.31 6,570.79

M3 9.96 9.96 3,321.36

M2 39.82 39.82 1,885.08

M2 1501.87 0.00 0.00

M3 4.65 0.00 0.00

M2 37.60 0.00 0.00

KG 1495.21 747.61 3,356.75

M3 41.66 0.00 0.00

M2 356.41 178.21 11,410.47


KG 4541.41 2,270.71 10,195.58

M3 54.8 0.00 0.00

M2 408.2 0.00 0.00

KG 6520.91 0.00 0.00

M3 53.94 0.00 0.00

M2 431.5 0.00 0.00

KG 4491.48 0.00 0.00

UND 3595 0.00 0.00

M3 28.09 0.00 0.00

M2 164.06 82.03 7,960.19

KG 2602.35 1,301.18 5,842.28

M2 26.4 0.00 0.00


RESUMEN DE LA VALORIZACION DE OBRA N° 01

OBRA : CREACION DE LA CASA VECINAL No 4 CONDE DE LEMOS


PROPIETARIO : EMILIMA S.A.
CONTRATISTA : ING. LEONEL CORTEZ MEZA
MODALIDAD : LLAVE EN MANO
FECHA : 21/08/2018
MES PRESUPUESTO BASE : AGOSTO 2018
PRESUPUESTO BASE S/.1,112,113.90
RETENCION 10% POR FIEL CUMPLIMIENTO S/.111,211.39

DESCRIPCION MONTO PRESUPUESTO

MONTOS PRESUPUESTO BASE (PB)


1,200,788.49

FACTOR DE RELACION 1.05

MONTOS CONTRACTUALES (V)


MONTO BRUTO VALORIZADO 1,260,827.91
A
TOTAL CONTRACTUAL 1,260,827.91
% DE AVANCE DE OBRA A LA FECHA
REAJUSTES (R)
B DEL MONTO BRUTO VALORIZADO
TOTAL REAJUSTE
DEDUCTIVOS QUE NO CORRESPONDEN (D)
DEL ADELANTO DE MATERIALES
C DEL ADELANTO DIRECTO
TOTAL DEDUCTIVOS

D VALORIZACION BRUTA (VB=V+R-D)

AMORTIZACIONES (A)
AMORTIZACION ADELANTO DIRECTO(10%V) -
E
AMORTIZACION ADELANTO MATERIALES(20%V) -
TOTAL AMORTIZACIONES -
OTROS DESCUENTOS (OD)
E RETENCION 10% POR FIEL CUMPLIMIENTO(5%) 126,082.79
TOTAL OTROS DESCUENTOS 126,082.79
F VALORIZACION NETA (VN=VB-A-OD)
IGV = VNx(18%)

G MONTO TOTAL DE VALORIZACION CON IGV S/.

H VALORIZACION A SOLICITAR
ION DE OBRA N° 01

VALORIZACION VALORIZACION SALDO POR


ACUMULADO ACTUAL % AVANCE
ANTERIOR ACTUAL VALORIZAR

185,092.34 15.41% 1,015,696.15


185,092.34

- 194,346.96 194,346.96 15.41% 1,066,480.96


0.00 194,346.96 194,346.96 1,066,480.96
0.00% 15.41% 15.41% 84.59%

0.00 143.94
0.00 143.94

-
- -
- -

0.00 194,490.90

- 19,434.70 - - -
- 38,869.39 - - -
- 58,304.09 - - -

0.00 63,041.40 63,041.40 63,041.40


0.00 63,041.40 63,041.40 63,041.40
0.00 73,145.41
0.00 13,166.17

0.00 86,311.59

86,311.59
RESUMEN DE LA VALORIZACION DE OBRA N° 01

OBRA : CREACION DE LA CASA VECINAL No 4 CONDE DE LEMOS


PROPIETARIO : EMILIMA S.A.
CONTRATISTA : ING. LEONEL CORTEZ MEZA
MODALIDAD : LLAVE EN MANO
FECHA : 21/08/2018
MES PRESUPUESTO BASE : SEPTIEMBRE 2018
PRESUPUESTO BASE S/.1,112,113.90
RETENCION 10% POR FIEL CUMPLIMIENTO S/.111,211.39

DESCRIPCION MONTO PRESUPUESTO

MONTOS PRESUPUESTO BASE (PB)


600,389.81

FACTOR DE RELACION 1.05

MONTOS CONTRACTUALES (V)


MONTO BRUTO VALORIZADO 630,409.30
A
TOTAL CONTRACTUAL 630,409.30
% DE AVANCE DE OBRA A LA FECHA
REAJUSTES (R)
B DEL MONTO BRUTO VALORIZADO
TOTAL REAJUSTE
DEDUCTIVOS QUE NO CORRESPONDEN (D)
DEL ADELANTO DE MATERIALES
C DEL ADELANTO DIRECTO
TOTAL DEDUCTIVOS

D VALORIZACION BRUTA (VB=V+R-D)

AMORTIZACIONES (A)
AMORTIZACION ADELANTO DIRECTO(10%V) -
E
AMORTIZACION ADELANTO MATERIALES(20%V) -
TOTAL AMORTIZACIONES -
OTROS DESCUENTOS (OD)
E RETENCION 10% POR FIEL CUMPLIMIENTO(5%) 63,040.93
TOTAL OTROS DESCUENTOS 63,040.93
F VALORIZACION NETA (VN=VB-A-OD)
IGV = VNx(18%)

G MONTO TOTAL DE VALORIZACION CON IGV S/.

H VALORIZACION A SOLICITAR
ION DE OBRA N° 01

VALORIZACION VALORIZACION SALDO POR


ACUMULADO ACTUAL % AVANCE
ANTERIOR ACTUAL VALORIZAR

299,040.56 49.81% 301,349.25


299,040.56

- 313,992.59 313,992.59 49.81% 316,416.71


0.00 313,992.59 313,992.59 316,416.71
0.00% 49.81% 49.81% 50.19%

0.00 14,433.35
0.00 14,433.35

-
- -
- -

0.00 328,425.94

- 31,399.26 - - -
- 62,798.52 - - -
- 94,197.78 - - -

0.00 31,520.47 31,520.47 31,520.47


0.00 31,520.47 31,520.47 31,520.47
0.00 202,707.70
0.00 36,487.39

0.00 239,195.08

239,195.08
RESUMEN DE PAGOS EFECTUADO

OBRA : CREACION DE LA CASA VECINAL No 4 CONDE DE LEMOS


PROPIET: EMILIMA S.A.
CONTRAT: ING. LEONEL CORTEZ MEZA
MODALID: LLAVE EN MANO
FECHA : 21/08/2018
MES PRESUPUESTO BASE : AGOSTO 2018
PRESUPUESTO BASE S/.627,886.47

VALORIZACIONES (SIN IGV) MONTO


REAJUSTADO (SIN
N° MES/AÑO MONTO REINTEGRO DEDUCTIVOS
IGV)
1 SEPTIEMBRE 194,346.96 143.94 - 194,490.90
2 OCTUBRE 313,992.59 14,433.35 - 328,425.94
3 NOVIEMBRE - - -
4 DICIEMBRE
5 ENERO - - - -

TOTALES 508,339.59 14,577.29 0.00 522,916.84


PAGOS EFECTUADOS POR LA ENTIDAD

RETENCION 10% DEDUCCIONES (SIN IGV) MONTO NETO RECIBIDO


POR FIEL AMORTIZACIONES
SUB TOTAL EFECTIVO IGV
CUMPLIMIENTO ADELANTO MATERIALES
63,041.40 19,434.70 38,869.39 121,345.48 73,145.41 13,166.17
31,520.47 31,399.26 62,798.52 125,718.24 202,707.70 36,487.39
- - -

- - - - - -

94,561.86 50,833.95 101,667.91 247,063.72 275,853.11 49,653.56


NETO RECIBIDO
TOTAL
86,311.59
239,195.08
-

325,506.67
OBRA
PROPIETARIO
CONTRATISTA
MODALIDAD
FECHA

ITEM PARTIDA

01 ESTRUCTURAS
01 01 OBRAS PROVISIONALES, TRABAJOS PRELIMINARES, SEGURIDAD Y SALUD
01 01 01 OBRAS PROVISIONALES V TRABAJOS PRELIMINARES
01 01 01 01 CONSTRUCCIONES PROVISIONALES

01 01 01 01 01 CARTEL DE IDENTIFICACION DE LA OBRA DE 3 60X2 40M H=3 00M CON GIGANTOGRAFIA

01 01 01 01 02 SERVICIO HIGIENICO PORTATIL

01 01 01 01 03 ALQUILER DE CONTENEDOR PARA OFICINA, ALMACEN Y COMEDOR

01 01 01 02 INSTALACIONES PROVISIONALES

01 01 01 02 01 ENERGIA ELECTRICA PROVISIONAL

01 01 01 03 MOVILIZACION DE MATERIALES, MAQUINARIA Y HERRAMIENTAS

01 01 01 03 01 MOVILIZACIÓN Y DESMOVILIZACIÓN DE MAQUINARIA PESADA PARA LA OBRA

01 01 01 04 TRAZOS, NIVELES Y REPLANTEO

01 01 01 04 01 TRAZOS Y REPLANTEO DURANTE EJECUCION DE OBRA

01 01 02 SEGURIDAD Y SALUD

01 01 02 01 EQUIPOS DE PROTECCION INDIVIDUAL

01 01 02 02 EQUIPOS DE PROTECCION COLECTIVA

01 01 02 03 SEÑALIZACION TEMPORAL DE SEGURIDAD

01 01 02 04 CAPACITACION EN SEGURIDAD Y SALUD

01 01 02 05 RECURSOS PARA RESPUESTAS ANTE EMERGENCIAS EN SEGURIDAD Y SALUD


01 01 03 MITIGACION DE IMPACTO AMBIENTAL

01 01 03 01 CAPACITACION EN TEMAS AMBIENTALES

01 01 03 02 RECOLECCION Y TRANSPORTE DE RESIDUOS SOLIDOS

01 02 ESTRUCTURA NUEVA

01 02 01 MOVIMIENTO DE TIERRAS

01 02 01 01 EXCAVACION MANUAL PARA ESTRUCTURAS DE CIMENTACION

01 02 01 02 NIVELACION INTERIOR Y COMPACTAClON FINAL DEL TERRENO PREVIO AL FALSO PISO

01 02 01 03 BASE AFIRMADA C/EQUIPO E=10an

01 02 01 04 ELIMINACION DE MATERIAL EXCEDENTE CON EQUIPO R=10 Km

01 02 02 OBRAS DE CONCRETO SIMPLE

01 02 02 01 CONCRETO FC 100 KG/CM2 P/SOLADOS

01 02 0202 CONCRETO F'C = 100 K^cm2 P/CIMIENTOS CORRIDOS

01 02 02 03 CONCRETO FC = 100 K9/cm2 P/SOBRECIMIENTOS

01 02 02 04 ENCOFRADO Y DESENCOFRADO P/SOBRECIMIENTOS

01 02 02 05 FALSO PISO e=1 Ocm, CONCRETO 1:8 C:H

01 02 03 OBRAS DÉ CONCRETO ARMADO

01 02 03 01 COLUMNAS

01 02 03 01 01 CONCRETO PREMEZCLADO FC 210KG/CM2 P/COLUMNAS

01 02 03 01 02 ENCOFRADO Y DESENCOFRADO P/COLUMNAS

01 02 03 01 03 ACERO DE REFUERZO fy=4200 KG/CM2

01 02 03 02 MUROS REFORZADOS

01 02 03 02 01 CONCRETO PREMEZCLADO FC 210KG/CM2 P/MUROS REFORZADOS

01 02 03 02 02 ENCOFRADO Y DESENCOFRADO CARAVISTA P/MUROS REFORZADOS


01 02 03 02 03 ACERO DE REFUERZO fy=4200 KG/CM2

01 02 03 03 VIGAS

01 02 03 03 01 CONCRETO PREMEZCLADO FC 210KG/CM2 P/VIGAS

01 02 03 03 02 ENCOFRADO Y DESENCOFRADO P/VIGAS RECTAS Y DINTELES

01 02 03 03 03 ACERO DE REFUERZO fy=4200 KG/CM2

01 02 03 04 LOSAS ALIGERADAS

01 02 03 04 01 CONCRETO PREMEZCLADO F'C 210KG/CM2 P/LOSAS ALIGERADAS

01 02 03 04 02 ENCOFRADO Y DESENCOFRADO P/LOSAS ALIGERADAS

01 02 03 04 03 ACERO DE REFUERZO fy=420C KG/CM2

01 02 03 04 04 LADRILLO DE ARCILLA HUECO DE 15X30X30CM P/LOSA ALIGERADA

01 02 03 05 ESCALERAS

01 02 03 05 01 CONCRETO PREMEZCLADO FC 2I0KG/CM2 P/ESCALERAS

01 02 03 05 02 ENCOFRADO Y DESENCOFRADO P/ESCALERAS

01 02 03 05 03 ACERO DE REFUERZO ty=4200 KG/CM2

01 02 04 VARIOS

01 02 04 01 SELLADO DE JUNTA DE DILATACIÓN SISMICA


VALORIZACION DE OBRA N°
: CREACION DE LA CASA VECINAL No 4 CONDE DE LEMOS
: EMILIMA S.A.
: ING. LEONEL CORTEZ MEZA
: LLAVE EN MANO
: 21/08/2018

PROPU
PARTIDA
Und.

IONALES, TRABAJOS PRELIMINARES, SEGURIDAD Y SALUD


IONALES V TRABAJOS PRELIMINARES
CIONES PROVISIONALES

DENTIFICACION DE LA OBRA DE 3 60X2 40M H=3 00M CON GIGANTOGRAFIA Und

GIENICO PORTATIL mes

E CONTENEDOR PARA OFICINA, ALMACEN Y COMEDOR mes

NES PROVISIONALES

ECTRICA PROVISIONAL mes

ON DE MATERIALES, MAQUINARIA Y HERRAMIENTAS

ÓN Y DESMOVILIZACIÓN DE MAQUINARIA PESADA PARA LA OBRA GLB

VELES Y REPLANTEO

EPLANTEO DURANTE EJECUCION DE OBRA MES

E PROTECCION INDIVIDUAL GLB

E PROTECCION COLECTIVA GLB

ON TEMPORAL DE SEGURIDAD GLB

ON EN SEGURIDAD Y SALUD MES

ARA RESPUESTAS ANTE EMERGENCIAS EN SEGURIDAD Y SALUD GBL


IMPACTO AMBIENTAL

ON EN TEMAS AMBIENTALES TALL

ON Y TRANSPORTE DE RESIDUOS SOLIDOS MES

E TIERRAS

N MANUAL PARA ESTRUCTURAS DE CIMENTACION M3

INTERIOR Y COMPACTAClON FINAL DEL TERRENO PREVIO AL FALSO PISO M2

ADA C/EQUIPO E=10an M3

N DE MATERIAL EXCEDENTE CON EQUIPO R=10 Km M3

NCRETO SIMPLE

FC 100 KG/CM2 P/SOLADOS M3

F'C = 100 K^cm2 P/CIMIENTOS CORRIDOS M3

FC = 100 K9/cm2 P/SOBRECIMIENTOS M3

O Y DESENCOFRADO P/SOBRECIMIENTOS M2

e=1 Ocm, CONCRETO 1:8 C:H M2

NCRETO ARMADO

PREMEZCLADO FC 210KG/CM2 P/COLUMNAS M3

O Y DESENCOFRADO P/COLUMNAS M2

REFUERZO fy=4200 KG/CM2 KG

PREMEZCLADO FC 210KG/CM2 P/MUROS REFORZADOS M3

O Y DESENCOFRADO CARAVISTA P/MUROS REFORZADOS M2


REFUERZO fy=4200 KG/CM2 KG

PREMEZCLADO FC 210KG/CM2 P/VIGAS M3

O Y DESENCOFRADO P/VIGAS RECTAS Y DINTELES M2

REFUERZO fy=4200 KG/CM2 KG

EZCLADO F'C 210KG/CM2 P/LOSAS ALIGERADAS M3

SENCOFRADO P/LOSAS ALIGERADAS M2

RZO fy=420C KG/CM2 KG

LLA HUECO DE 15X30X30CM P/LOSA ALIGERADA UND

EZCLADO FC 2I0KG/CM2 P/ESCALERAS M3

O Y DESENCOFRADO P/ESCALERAS M2

REFUERZO ty=4200 KG/CM2 KG

A DE DILATACIÓN SISMICA M2
C
O
S
T
O
IZACION DE OBRA N° 01 DEL MES DE SETIEMBRE P
A
RSUPERVISOR : ING. RUIZ PALACIOS, ANGEL
CRESIDENTE : ING. BALBIN SAENZ, ANGEL
IMONTO REFERENCIAL : S/ 2'785,800.08 (CON IGV )
AMONTO CONTRATO : S/ 2'925,090.08 (CON IGV
L

B
PROPUESTA CONTRACTUAL A AVANCE
S ANTERIOR AVANCE DEL MES
METRADO
COSTO UNITARIO COSTO PARCIAL E METRADO % METRADO
###
###
###
###

1.00 1,451.56 1,451.56


### 0.00 0.00 1.00

5.00 900.00 4,500.00


### 0.00 0.00 5.00

5.00 10,950.00 54,750.00


### 0.00 0.00 5.00

###

5.00 1,200.00 6,000.00


### 0.00 0.00 5

###

1.00 6,763.04 6,763.04


### 0.00 0.00 0.5

###

2.50 6,235.70 15,589.25


### 0.00 0.00 2.50

###

1.00 22,840.00 22,840.00


### 0.00 0.00 1.00

1.00 7,422.94 7,422.94


### 0.00 0.00 1.00

1.00 2,000.00 2,000.00


### 0.00 0.00 1.00

5.00 3,750.00 18,750.00


### 0.00 0.00 5.00

1.00 850.00 850.00 0.00 0.00 0.00


###

1.00 1,300.00 1,300.00


### 0.00 0.00 1.00

5.00 149.32 746.60 0.00 0.00 0.00

###

###

86.78 22.27 1,932.59


### 0.00 0.00 86.78

945.09 5.63 5,320.86


### 0.00 0.00 945.09

945.09 16.03 15,149.79


### 0.00 0.00 945.09

108.48 32.06 3,477.87


### 0.00 0.00 108.48

###

5.59 235.27 1,315.16


### 0.00 0.00 5.59

27.31 240.60 6,570.79


### 0.00 0.00 27.31

9.96 333.47 3,321.36


### 0.00 0.00 9.96

39.82 47.34 1,885.08


### 0.00 0.00 39.82

1501.87 33.29 49,997.25 0.00 0.00 0.00

###

###

4.65 347.28 1,614.85 0.00 0.00 0.00

37.60 64.52 2,425.95 0.00 0.00 0.00

1495.21 4.49 6,713.49


### 0.00 0.00 747.61

###

41.66 364.75 15,195.49 0.00 0.00 0.00

356.41 69.54 24,785.17


### 0.00 0.00 178.21
4541.41 4.49 20,391.16
### 0.00 0.00 2270.71

54.80 331.60 18,171.68 0.00 0.00 0.00

408.20 74.16 30,272.11 0.00 0.00 0.00

6520.91 4.49 29,278.89 0.00 0.00 0.00

53.94 337.78 18,219.85 0.00 0.00 0.00

431.50 50.06 21,600.89 0.00 0.00 0.00

4491.48 4.49 20,166.75 0.00 0.00 0.00

3595.00 3.20 11,504.00 0.00 0.00 0.00

###

28.09 347.28 9,755.10 0.00 0.00 0.00

164.06 97.04 15,920.38


### 0.00 0.00 82.03

2602.35 4.49 11,684.55


### 0.00 0.00 1301.18

26.40 9.64 254.50 0.00 0.00 0.00


. RUIZ PALACIOS, ANGEL
. BALBIN SAENZ, ANGEL
2'785,800.08 (CON IGV )
2'925,090.08 (CON IGV )
FACTOR DE RELACION 1

AVANCE
AVANCE DEL MES ACUMULADO ACTUAL
% METRADO %
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!

100% 1.00 100% 1,451.56  1,451.56

100% 5.00 100% 900.00  900.00

100% 5.00 100% 10,950.00  10,950.00

1,200.00  #DIV/0!

100% 5.00 100% 1,200.00  1,200.00

3,381.52  #DIV/0!

50% 0.50 50% 3,381.52  6,763.04

5,163.94  #DIV/0!

100% 2.50 100% 5,163.94  6,235.70

51,012.94  #DIV/0!

100% 1.00 100% 22,840.00  22,840.00

100% 1.00 100% 7,422.94  7,422.94

100% 1.00 100% 2,000.00  2,000.00

100% 5.00 100% 18,750.00  3,750.00

0% 0.00 0% 0.00 
1,300.00  #DIV/0!

100% 1.00 100% 1,300.00  1,300.00

0% 0.00 0% 0.00 

75,653.75  #DIV/0!

24,467.76  #DIV/0!

100% 86.78 100% 1,932.59  22.27

100% 945.09 100% 3,907.51  5.63

100% 945.09 100% 15,149.79  16.03

100% 108.48 100% 3,477.87  32.06

13,092.39  #DIV/0!

100% 5.59 100% 1,315.16  235.27

100% 27.31 100% 6,570.79  240.60

100% 9.96 100% 3,321.36  333.47

100% 39.82 100% 1,885.08  47.34

0% 0.00 0% 0.00 

38,093.60  #DIV/0!

6,573.63  #DIV/0!

0% 0.00 0% 0.00 

0% 0.00 0% 0.00 
0.00 
50% 747.61 50% 6,573.63  4.49
0.00 
16,353.82  #DIV/0!

0% 0.00 0% 0.00 

50% 178.21 50% 4,374.01  69.54


50% 2,270.71 50% 11,979.81  4.49

0.00 

0% 0.00 0% 0.00 

0% 0.00 0% 0.00 

0% 0.00 0% 0.00 

0.00 

0% 0.00 0% 0.00 

0% 0.00 0% 0.00 

0% 0.00 0% 0.00 

0% 0.00 0% 0.00 

15,166.15  #DIV/0!

0% 0.00 0% 0.00 

50% 82.03 50% 4,676.61  97.04

50% 1,301.18 50% 10,489.54  4.49

0.00 

0% 0.00 0% 0.00 
487,924.71
142,963.39
89,053.85
60,701.56

1,451.56

4,500.00

54,750.00

6,000.00

6,000.00

6,763.04

6,763.04

15,589.25

15,589.25

51,862.94

22,840.00

7,422.94

2,000.00

18,750.00
2,046.60

1,300.00

344,961.32

25,881.11

1,932.59

5,320.86

15,149.79

3,477.87

63,089.64

1,315.16

6,570.79

3,321.36

1,885.08

255,736.07

10,754.29

6,713.49

58,407.58

24,785.17
20,391.16

37,360.03

15,920.38

11,684.55
CALENDARIO DE AVA

Presupuesto
Subpresupuesto
Cliente
Lugar

ITEM

01
01 01
01 01 01
01 01 01 01

01 010101 01

01 01 01 01 02

01 01 01 01 03

01 01 01 02

01 01 01 02 01

01 01 01 03

01 01 01 03 01

01 01 01 04

01 01 01 04 01

01 01 02

01 01 02 01

01 01 02 02

01 01 02 03

01 01 02 04

01 01 02 05

01 01 03

01 01 03 01
01 01 03 02

01 02

01 02 01

01 02 01 01

01 02 01 02

01 02 01 03

01 02 01 04

01 02 02

01 02 02 01

01 02 0202

01 02 02 03

01 02 02 04

01 02 02 05

01 02 03

01 02 03 01

01 02 03 01 01

01 02 03 01 02

01 02 03 01 03

01 02 03 02

01 02 03 02 01

01 02 03 02 02

01 02 03 02 03

01 02 03 03

01 02 03 03 01

01 02 03 03 02

01 02 03 03 03

01 02 03 04
01 02 03 04 01

01 02 03 04 02

01 02 03 04 03

01 02 03 04 04

01 02 03 05

01 02 03 05 01

01 02 03 05 02

01 02 03 05 03

01 02 04

01 02 04 01

COSTO TOTAL

02

02 01

02 01 01

02 01 02

02 01 03

02 02

02 02 01

02 02 02

02 02 03

02 02 04

02 02 05

02 02 06

02 02 07
02 02 08

02 02 09

02 02 I0

02 02 11

02 02 12

02 02 13

02 03

02 03 01

02 03 02

02 03 03

02 04

02 04 01

02 04 02

02 04 03

02 04 04

02 04 05

02 04 06

02 04 07

02 04 08

02 05

02 05 01

02 05 02

02 06

02 06 01

02 07
02 07 01

02 07 02

02 07 03

02 08

02 08 01

02 08 02

02 08 03

02 08 04

02 08 05

02 09

02 09 01

02 09 02

02 09 03

02 10

02 10 01

02 10 02

02 11

02 11 01

02 12

02 12 01

02 12 02

02 12 03

02 13

02 13 01

02 13 02
02 13 03

02 13 04

02 13 05

02 13 06

02 13 07

02 13 08

02 13 09

02 14

02 14 01

02 14 02

02 14 03

02 14 04

02 14 05

02 14 06

02 14 07

02 14 08

02 14 09

02 14 10

02 14 11

02 14 12

02 14 13

02 14 14

02 14 15

02 14 16

02 14 17

02 14 18
02 14 19

02 14 20

02 14 21

02 14 22

COSTO TOTAL

COSTO DIRECTO
CALENDARIO DE AVANCE DE OB

0101072 EJECUCION DE OBRA: "LA OBRA NUEVA - CREACION DE LA CASA VECINAL Nº4 - CONDE DE LEM
001 ESTRUCTURAS
EMPRESA MUNICIPAL INMOBILIARIA DE LIMA
LIMA-LIMA-BARRIOS ALTOS

PARTIDAS

ESTRUCTURAS
OBRAS PROVISIONALES, TRABAJOS PRELIMINARES, SEGURIDAD Y SALUD
OBRAS PROVISIONALES V TRABAJOS PRELIMINARES
CONSTRUCCIONES PROVISIONALES

CARTEL DE IDENTIFICACION DE LA OBRA DE 3 60X2 40M H=3 00M CON GIGANTOGRAFIA

SERVICIO HIGIENICO PORTATIL

ALQUILER DE CONTENEDOR PARA OFICINA, ALMACEN Y COMEDOR

INSTALACIONES PROVISIONALES

ENERGIA ELECTRICA PROVISIONAL

MOVILIZACION DE MATERIALES, MAQUINARIA Y HERRAMIENTAS

MOVILIZACIÓN Y DESMOVILIZACIÓN DE MAQUINARIA PESADA PARA LA OBRA

TRAZOS, NIVELES Y REPLANTEO

TRAZOS Y REPLANTEO DURANTE EJECUCION DE OBRA

SEGURIDAD Y SALUD

EQUIPOS DE PROTECCION INDIVIDUAL

EQUIPOS DE PROTECCION COLECTIVA

SEÑALIZACION TEMPORAL DE SEGURIDAD

CAPACITACION EN SEGURIDAD Y SALUD

RECURSOS PARA RESPUESTAS ANTE EMERGENCIAS EN SEGURIDAD Y SALUD DURANTE EL

MITIGACION DE IMPACTO AMBIENTAL

CAPACITACION EN TEMAS AMBIENTALES


RECOLECCION Y TRANSPORTE DE RESIDUOS SOLIDOS

ESTRUCTURA NUEVA

MOVIMIENTO DE TIERRAS

EXCAVACION MANUAL PARA ESTRUCTURAS DE CIMENTACION

NIVELACION INTERIOR Y COMPACTAClON FINAL DEL TERRENO PREVIO AL FALSO PISO

BASE AFIRMADA C/EQUIPO E=10an

ELIMINACION DE MATERIAL EXCEDENTE CON EQUIPO R=10 Km

OBRAS DE CONCRETO SIMPLE

CONCRETO FC 100 KG/CM2 P/SOLADOS

CONCRETO F'C = 100 K^cm2 P/CIMIENTOS CORRIDOS

CONCRETO FC = 100 K9/cm2 P/SOBRECIMIENTOS

ENCOFRADO Y DESENCOFRADO P/SOBRECIMIENTOS

FALSO PISO e=1 Ocm, CONCRETO 1:8 C:H

OBRAS DÉ CONCRETO ARMADO

COLUMNAS

CONCRETO PREMEZCLADO FC 210KG/CM2 P/COLUMNAS

ENCOFRADO Y DESENCOFRADO P/COLUMNAS

ACERO DE REFUERZO fy=4200 KG/CM2

MUROS REFORZADOS

CONCRETO PREMEZCLADO FC 210KG/CM2 P/MUROS REFORZADOS

ENCOFRADO Y DESENCOFRADO CARAVISTA P/MUROS REFORZADOS

ACERO DE REFUERZO fy=4200 KG/CM2

VIGAS

CONCRETO PREMEZCLADO FC 210KG/CM2 P/VIGAS

ENCOFRADO Y DESENCOFRADO P/VIGAS RECTAS Y DINTELES

ACERO DE REFUERZO Fy=4200 KG/CM2

LOSAS ALIGERADAS
CONCRETO PREMEZCLADO F'C 210KG/CM2 P/LOSAS ALIGERADAS

ENCOFRADO Y DESENCOFRADO P/LOSAS ALIGERADAS

ACERO DE REFUERZO fy=420C KG/CM2

LADRILLO DE ARCILLA HUECO DE 15X30X30CM P/LOSA ALIGERADA

ESCALERAS

CONCRETO PREMEZCLADO FC 2I0KG/CM2 P/ESCALERAS

ENCOFRADO Y DESENCOFRADO P/ESCALERAS

ACERO DE REFUERZO ty=4200 KG/CM2

VARIOS

SELLADO DE JUNTA DE DILATACIÓN SISMICA

COSTO TOTAL

AVANCE MENSUAL(%)

AVANCE ACUMULADO(%)

ARQUITECTURA

MUROS Y TABIQUES DE ALBAÑILERIA

MUROS DE LADRILLO K K ARCILLA TIPO IV, SOGA C/M 1 5X1 5CM

MUROS DE LADRILLO K K ARCILLA TIPO IV. CABEZA C/M 1:5X1 5CM

MURO DE LADRILLO K K ARCILLA TIPO IV, CANTO MEZC 1:5

REVOQUES, ENLUCIDOS Y MOLDURAS

TARRAJEO PRIMARIO MEZCLA C:A 1:5, E=1 Oon

TARRAJEO MURO INTERIOR FROTACHADO MEZCLAC:A 1 S. E=1 5cm

TARRAJEO COLUMNA FROTACHADO MEZCLA C:A 1:5, E=1 bem

TARRAJEO VIGAS FROTACHADO MEZCLA C:A 1 5. É=1 5cm

TARRAJEO FROTACHADO MUROS DE CONCRETO MEZCLA C:A 1 5, E=1 5cm

TARRAJEO CON IMPERMEABILIZANTE

VESTIDURA DE DERRAME FROTACHADO MEZ C A1 5, E=1 5CM


EJECUCION DE BRUNAS EN TARRAJEO

TARRAJEO DE FONDO DE ESCALERA MEZC 1:5 C A. E=1 5CM

PREPARACION DE GRADAS DE CONCRETO

PREPARACION DE DESCANSO

GRADAS (ACABADO TERRAZO)

DESCANSO (ACABADO TERRAZO)

CIELO RASOS

TARRAJEO CIELO RASO FROTACHADO MEZCLA C:A 1:5, E=1 5an

CIELO RASO CON IMPERMEABILIZADO

FALSO CIELO RASO SUSPENDIDO DE UKYWAL

PISOS Y PAVIMENTOS

CONTRAPISO DE CEMENTO(E=1 5CM). CON MORTERO 1 3 C/A

COLOCACION DE PIEZAS DE CERAMICA DE 40X40

COLOCACION DE PIEZAS DE PORCELANATO DÉ 40X40

PISO ACABADO OE CEMENTO PULIDO IMPERMEABILIZADO C:A 1 2. E=1 5CM

PISO ACABADO OE CEMENTO FROTACHADO C:A 1:2. E=1 SCM

PISO ACABADO DE CEMENTO SEMIPULIDO C:A 1:2. E=1 5CM

COLOCACION DE PISO PARQUET DE MADERA PUMAQUIRO

COLOCACION DE ENTABLADO DE MADERA

CONTRAZOCALOS

CONTRAZOCALO DE PORCELANATO PULIDO COLOR BEIGE DE 10X60CM

CONTRAZOCALO DE CEMENTO PULIDO C/MORTERO 1:4 DE e=1cm, h=10an

ZOCALOS

ZOCALO DE PORCELANATO PALIDO HUESO DE 60X6QCM

CARPINTERIA DE MADERA
PUERTA CONTRAPLACADA DE 43MM C/TRlPLAY 4MM INCLUYE MARCO DE MADERA

DIVISION METALICA PARA BAÑO H=1 90m. INC PUERTAS Y PINTURA

VENTANA DE MADERA MACIZA

CARPINTERIA METALICA

PUERTA METALICA CORTA FUEGO (1 20x2 40), MINIMO 60min

BARANDA DE TUBERIA F*N" PASAMANO 02’ X 0 90m ALTURA

ESCALERA DE GATO CON VARILLA LISA 0= P@0 30m

TAPA METALICA CON MARCO, PLANCHA ESTRIADA LAC E=l/4" C/SEGURO

REJILLA C/PERFILES MET rXI/FXÍfl' MARCO L T

CERRAJERIA

BISAGRA CAPUCHINA DE 4\4\ STANLEY F179, US26D

CERRADURA TIPO BOLA PARA PUERTA INTERIOR

CERRADURA P/PUERTA EXTERIOR C/MANI JA LLAVE INT Y EXT 2 GOLP

CUBIERTAS

TECHO VIGUETAS DE MADERA

CUBIERTA CON PLANCHA DE POLICARBONATO, INCLUYE ACCESORIOS EN CUMBRERA Y

CARPINTERIA DE ALUMINIO

VENTANA DE ALUMINIO ANODIZADO

VÍDRIOS, CRISTALES Y SIMILARES

ESPEJO BISELADO 1/2-

CRISTAL TEMPLADO INCOLORO DÉ E=6mm. INCLUYE ACCESORIOS

CRISTAL TEMPLADO INCOLORO 0E E=lOmm, INCLUYE ACCESORIOS

PINTURA

PINTADO DE MURO INTERIOR C/LATEX ACRILICO

PINTADO DE COLUMNA C/LATEX ACRILICO


PINTADO DE VIGA C/LATEX ACRILICO

PINTADO DE DERRAMES C/LATEX ACRILICO

PINTADO DE PUERTAS METALICAS

PINTADO DE VENTANAS METALICAS

PINTURA EN PUERTAS DE MADERA

PINTURA EN VENTANAS DE MADERA

PINTURA DE BARANDAS METALICAS

SEÑALIZACION Y EXTINTORES

SEÑALIZACIÓN DE SALIDA

SEÑALIZACION DE SALIDA DE EMERGENCIA

SEÑAL DE EVACUACION DIRECCIONAL DERECHA

SEÑAL DE EVACUACION DIRECCIONAL IZQUIERDA

ZONA SEGURA EN CASO DE SISMO

EXTINTOR POLVO QUIMICO SECO

EXTINTOR C02

EXTINTOR AGUA NEBULIZADA

LUCES DE EMERGENCIA

RIESGO ELECTRICO

DETECTOR DE HUMO Y/O TEMPERATURA

PULSADOR DÉ ALARMA CONTRA INCENDIO

GCI (GABINETE CONTRA INCENDIO)

SEÑAL DE CARTEL PROHIBIDO FUMAR

SEÑAL DE NO USAR EN CASO DE SISMO

SEÑAL DE LUGAR DE REUNION DE SISMO

PUERTA CORTAFUEGO (RF-90)

SEÑAL BAÑO DISCAPACITADOS


PASE MANGUERA CONTRA INCENDIO

SUMINISTRO E INSTALACION DE EXTINTOR CONTRA INCENDIO POLVO QUIMICO SECO TIPO ABC, 6.0 K

SUMINISTRO E INSTALACION DE EXTINTOR CONTRA INCENDIO TIPO H20 2.5 GAL

SUMINISTRO E INSTALACION DE EXTINTOR CONTRA INCENDIO DE DIOXIDO DE CARBONO (CO2), 5 Kg

COSTO TOTAL

AVANCE MENSUAL(%)

AVANCE ACUMULADO(%)

COSTO DIRECTO
E AVANCE DE OBRA

L Nº4 - CONDE DE LEMOS"

Costo al 8/21/2018
F.R 1.05

MONTO
MONTO BASE MES SETIEMBRE 2018
OFERTADO
1-7 8-13
S/. 487,924.71 487,924.71 151,013.70
S/. 142,963.39 142,963.39 75,359.95
S/. 89,053.85 89,053.85 23,047.01
S/. 60,701.56 60,701.56 13,301.55
S/. 1,451.56
P 1,451.56 1,451.56 1,451.56
S/. 225.00 225.00
P 4,500.00 4,500.00 900.00
S/. 2,737.50 2,737.50
P 54,750.00 54,750.00 10,950.00

S/. 6,000.00 6,000.00 1,200.00


S/. 300.00 300.00
P 6,000.00 6,000.00 1,200.00

S/. 6,763.04 6,763.04 3,381.52


S/. 3,364.61
P 6,763.04 6,763.04 3,381.52

S/. 15,589.25 15,589.25 5,163.94


S/. 1,290.99 1,290.99
P 15,589.25 15,589.25 5,163.94

S/. 51,862.94 51,862.94 51,012.94


S/. 22,840.00
P 22840 22,840.00 22,840.00
S/. 7,422.94
P 7,422.94 7,422.94 7,422.94
S/. 2,000.00
P 2,000.00 2,000.00 2,000.00
S/. 18,750.00
P 18,750.00 18,750.00 18,750.00
S/.
P 850.00 850.00 0.00

S/. 2,046.60 2,046.60 1,300.00


S/. 1,300.00
P 1,300.00 1,300.00 1,300.00
S/.
P 746.60 746.60 0.00

S/. 344,961.32 344,961.32 75,653.75

S/. 25,881.11 25,881.11 24,467.76


S/. 1,932.59
P 1,932.59 1,932.59 1,932.59
S/. 3,907.51
P 5,320.86 5,320.86 3,907.51
S/. 7,574.90
P 15,149.79 15,149.79 15,149.79
S/. 3,477.87
P 3,477.87 3,477.87 3,477.87

S/. 63,089.64 63,089.64 13,092.39


S/.
P 1,315.16 1,315.16 1,315.16
S/.
P 6,570.79 6,570.79 6,570.79
S/.
P 3,321.36 3,321.36 3,321.36
S/.
P 1,885.08 1,885.08 1,885.08
S/.
P 49,997.25 49,997.25 0.00

S/. 255,736.07 255,736.07 38,093.60

S/. 10,754.29 10,754.29 6,573.63


S/.
P 1,614.85 1,614.85 0.00
S/.
P 2,425.95 2,425.95 0.00
S/.
P 6,713.49 6,713.49 6,573.63

S/. 60,371.82 60,371.82 16,353.82


S/.
P 15,195.49 15,195.49 0.00
S/.
P 24,785.17 24,785.17 4,374.01
S/.
P 20,391.16 20,391.16 11,979.81

S/. 77,722.68 77,722.68 0.00


S/.
P 18,171.68 18,171.68 0.00
S/.
P 30,272.11 30,272.11 0.00
S/.
P 29,278.89 29,278.89 0.00

S/. 71,491.49 71,491.49 0.00


S/.
P 18,219.85 18,219.85 0.00
S/.
P 21,600.89 21,600.89 0.00
S/.
P 20,166.75 20,166.75 0.00
S/.
P 11,504.00 11,504.00 0.00

S/. 37,360.03 37,360.03 15,166.15


S/.
P 9,755.10 9,755.10 0.00
S/.
P 15,920.38 15,920.38 4,676.61
S/.
P 11,684.55 11,684.55 10,489.54

S/. 254.50 254.50 0.00


S/.
P 254.50 254.50 0.00

S/. 487,924.71 487,924.71 151,013.70


PROGRAMADO 150,973.42 30.94%
EJECUTADO 0.00%
PROGRAMADO 150,973.42 30.94%
EJECUTADO 0.00%

S/. 624,189.20 624,189.20 0.00

38,562.46 38,562.46 0.00


S/.
P 15,721.99 15,721.99 0.00
S/.
P 19,940.10 19,940.10 0.00
S/.
P 2,900.37 2,900.37 0.00

79,804.19 79,804.19 0.00


S/.
P 4,947.06 4,947.06 0.00
S/.
P 15,918.42 15,918.42 0.00
S/.
P 4,133.07 4,133.07 0.00
S/.
P 11,687.28 11,687.28 0.00
S/.
P 12,880.56 12,880.56 0.00
S/.
P 3,603.97 3,603.97 0.00
S/.
P 870.41 870.41 0.00
S/.
P 147.49 147.49 0.00
S/.
P 1,835.87 1,835.87 0.00
S/.
P 3,474.81 3,474.81 0.00
S/.
P 696.69 696.69 0.00
S/.
P 15,714.48 15,714.48 0.00
S/.
P 3,894.08 3,894.08 0.00

51,605.47 51,605.47 0.00


S/.
P 19,335.89 19,335.89 0.00
S/.
P 616.58 616.58 0.00
S/.
P 31,653.00 31,653.00 0.00

134,627.44 134,627.44 0.00


S/.
P 34,261.44 34,261.44 0.00
S/.
P 16,401.78 16,401.78 0.00
S/.
P 22,718.99 22,718.99 0.00
S/.
P 370.57 370.57 0.00
S/.
P 631.84 631.84 0.00
S/.
P 7,253.68 7,253.68 0.00
S/.
P 34,840.89 34,840.89 0.00
S/.
P 18,148.25 18,148.25 0.00

2,527.58 2,527.58 0.00


S/.
P 892.17 892.17 0.00
S/.
P 1,635.41 1,635.41 0.00

21,227.27 21,227.27 0.00


S/.
P 21,227.27 21,227.27 0.00

41,328.27 41,328.27 0.00


S/.
P 32,749.77 32,749.77 0.00
S/.
P 7,413.97 7,413.97 0.00
S/.
P 1,164.53 1,164.53 0.00

61,740.62 61,740.62 0.00


S/.
P 17,826.86 17,826.86 0.00
S/.
P 36,476.83 36,476.83 0.00
S/.
P 4,798.03 4,798.03 0.00
S/.
P 1,868.10 1,868.10 0.00
S/.
P 770.80 770.80 0.00

20,369.00 20,369.00 0.00


S/.
P 18,858.00 18,858.00 0.00
S/.
P 1,269.05 1,269.05 0.00
S/.
P 241.95 241.95 0.00

2,980.10 2,980.10 0.00


S/.
P 1,758.48 1,758.48 0.00
S/.
P 1,221.62 1,221.62 0.00

818.85 818.85 0.00


S/.
P 818.85 818.85 0.00

117,586.60 117,586.60 0.00


S/.
P 1,254.26 1,254.26 0.00
S/.
P 53,119.08 53,119.08 0.00
S/.
P 63,213.26 63,213.26 0.00

44,381.35 44,381.35 0.00


S/.
P 33,063.46 33,063.46 0.00
S/.
P 1,810.08 1,810.08 0.00
S/.
P 3,726.60 3,726.60 0.00
S/.
P 1,247.75 1,247.75 0.00
S/.
P 2,100.68 2,100.68 0.00
S/.
P 120.88 120.88 0.00
S/.
P 922.31 922.31 0.00
S/.
P 118.38 118.38 0.00
S/.
P 1,271.21 1,271.21 0.00

6,630.00 6,630.00 0.00


S/.
P 101.36 101.36 0.00
S/.
P 24.94 24.94 0.00
S/.
P 355.59 355.59 0.00
S/.
P 233.40 233.40 0.00
S/.
P 121.86 121.86 0.00
S/.
P 185.92 185.92 0.00
S/.
P 35.76 35.76 0.00
S/.
P 12.62 12.62 0.00
S/.
P 850.45 850.45 0.00
S/.
P 47.28 47.28 0.00
S/.
P 548.55 548.55 0.00
S/.
P 97.38 97.38 0.00
S/.
P 46.04 46.04 0.00
S/.
P 34.86 34.86 0.00
S/.
P 36.69 36.69 0.00
S/.
P 54.75 54.75 0.00
S/.
P 57.50 57.50 0.00
S/.
P 10.95 10.95 0.00
S/.
P 22.30 22.30 0.00
S/.
P 3,231.84 3,231.84 0.00
S/.
P 129.99 129.99 0.00
S/.
P 389.97 389.97 0.00

S/. 624,189.20 624,189.20 0.00


PROGRAMADO 0.00 0.00%
EJECUTADO 0.00%
PROGRAMADO 0.00 0.00%
EJECUTADO 0.00%

S/. 1,112,113.91 1,112,113.91


616,089.02
1

MBRE 2018 MES OCTUBRE 2018


15-20 22-27 1-6 7-13 14-20 21-31
244,010.89
21,104.45
21,104.45
11,850.00

0.00
225.00 225.00 225.00 225.00 225.00 225.00
900.00
2,737.50 2,737.50 2,737.50 2,737.50 2,737.50 2,737.50
10,950.00

1,200.00
300.00 300.00 300.00 300.00 300.00 300.00
1,200.00

0.00

0.00

8,054.45
1,290.99 1,290.99 0.00 2,013.61 2,013.61 2,013.61 2,013.61
8,054.45

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
0.00

222,906.44

1,413.35

0.00

1,413.35
7,574.90
0.00

0.00

49,997.25
1,315.16
0.00
6,570.79
0.00
3,321.36
0.00
1,885.08
0.00
24,998.63 24,998.63
49,997.25

171,495.84

4,180.66
1,614.85
1,614.85
2,425.95
2,425.95
3,286.82 3,286.82 139.86
139.86

42,053.76
15,195.49
15,195.49
4,374.01 10,205.58 10,205.58
20,411.16
5,989.91 5,989.91 8,411.35
8,411.35

59,551.00

0.00
15,136.06 15,136.06
30,272.11
29,278.89
29,278.89

53,271.64
0.00
7,560.31 14,040.58
21,600.89
7,058.36 13,108.39
20,166.75
11,504.00
11,504.00

12,438.78

0.00
4,653.23 5,621.89 5,621.89
11,243.77
10,489.54 1,195.01
1,195.01

0.00

0.00

244,010.89
244,561.78 50.12%
0.00%
395,535.20 81.06%
0.00%

22,120.89

11,839.43

0.00
5,919.72 5,919.72
11,839.43

0.00

4,987.29

0.00

0.00

0.00

0.00
2,493.65 2,493.65
4,987.29

0.00

0.00
0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

5,294.17

0.00

0.00

0.00
370.57
370.57
631.84
631.84
4,291.76
4,291.76

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
0.00

0.00

0.00

0.00

22,120.89
22,120.89 3.54%
0.00%
22,120.89 3.54%
0.00%
PERIODO
MES NOVIEMBRE 2018 MES DICIEMBRE 2018
1-10 11-17 18-24 25-30 1-10
62,672.00 13,050.00
16,270.87 13,050.00
15,420.87 13,050.00
11,850.00 11,850.00

0.00 0.00
225.00 225.00 225.00 225.00 225.00
900.00 900.00
2,737.50 2,737.50 2,737.50 2,737.50 2,737.50
10,950.00 10,950.00

1,200.00 1,200.00
300.00 300.00 300.00 300.00 300.00
1,200.00 1,200.00

0.00 0.00

0.00 0.00

2,370.86 0.00
2,370.86
2,370.86 0.00

850.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00
850.00
850.00 0.00

0.00 0.00

0.00 0.00
0.00 0.00

46,401.13 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

46,146.63 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

18,171.68 0.00
18,171.68
18,171.68 0.00

0.00 0.00

0.00 0.00

18,219.85 0.00
18,219.85
18,219.85 0.00

0.00 0.00

0.00 0.00

0.00 0.00

9,755.10 0.00
9,657.55
9,755.10 0.00

0.00 0.00

0.00 0.00

254.50 0.00
254.50
254.50 0.00

62,672.00 13,050.00
62,574.44 12.82% 13,050.00 2.67%
0.00% 0.00%
458,109.64 93.89% 471,159.64 96.56%
0.00% 0.00%

83,304.53 238,475.52

26,723.03 0.00
7,861.00 7,861.00
15,721.99 0.00

8,100.67 0.00
2,900.37
2,900.37 0.00

34,203.92 40,612.98
4,947.06
4,947.06 0.00
3,938.15 3,938.15 4,021.06
7,876.30 8,042.12
2,066.54 2,066.54
4,133.07 0.00
2,008.75 2,008.75 3,834.89
4,017.50 7,669.78
3,946.64 3,946.64
7,893.27 0.00
3,603.97
0.00 3,603.97
870.41
0.00 870.41
147.49
0.00 147.49
1,835.87
1,835.87 0.00
651.53 1,411.64
651.53 2,823.28
653.15 43.54
653.15 43.54
3,928.62
0.00 15,714.48
3,894.08
0.00 3,894.08

5,720.20 19,178.05
5,720.20 3,403.92
5,720.20 13,615.69
616.58
0.00 616.58

0.00 4,945.78

15,124.73 109,272.75
6,081.41 6,081.41 11,049.32
12,162.81 22,098.63
8,200.89
0.00 16,401.78
11,359.50
0.00 22,718.99

0.00 0.00

0.00 0.00
1,480.96 1,480.96
2,961.92 0.00

0.00 29,905.10
18,148.25
0.00 18,148.25

892.17 1,635.41
892.17
892.17 0.00
1,635.41
0.00 1,635.41

640.48 20,586.79
640.48 10,293.40
640.48 20,586.79

0.00 24,357.64
0.00 24,357.64

0.00 0.00

0.00 0.00

0.00 5,826.16

0.00 0.00

0.00 5,826.16

0.00 0.00

0.00 0.00

0.00 0.00

0.00 14,025.64

0.00 14,025.64

0.00 0.00

0.00 0.00

0.00 2,980.10

1,758.48
0.00
1,221.62
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
83,304.53 238,475.52
73,007.69 6.56% 240,671.69 38.56%
0.00% 0.00%
95,128.58 10.11% 335,800.27 48.67%
0.00% 0.00%
MES DICIEMBRE 2018 MES ENERO 2019
11-17 18-24 25-31 1-10 11-17 18-24
17,178.12
17,178.12
16,431.52
11,850.00

0.00
225.00 225.00 225.00 225.00 225.00 225.00
900.00
2,737.50 2,737.50 2,737.50 2,737.50 2,737.50 2,737.50
10,950.00

1,200.00
300.00 300.00 300.00 300.00 300.00 300.00
1,200.00

3,381.52
3,381.52
3,381.52

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

746.60

0.00
746.60
746.60

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

17,178.12
17,178.12 3.52%
0.00%
488,337.76 100.08%
0.00%

280,288.26

0.00

0.00

0.00

0.00

0.00

0.00
4,021.06
0.00

0.00
3,834.89
0.00

0.00

0.00

0.00
0.00

0.00
1,411.64
0.00

0.00
3,928.62 3,928.62 3,928.62
0.00

0.00

26,707.22
3,403.92 3,403.92 3,403.92
0.00

0.00
2,472.89 2,472.89 13,353.61 13,353.61
26,707.22

4,935.79
11,049.32
0.00
8,200.89
0.00
11,359.50
0.00

0.00

0.00

0.00
14,952.55 14,952.55 4,935.79
4,935.79

0.00

0.00

0.00

0.00

0.00
10,293.40
0.00

16,970.63
24,357.64 4,196.07 4,196.07
8,392.13
7,413.97
7,413.97
1,164.53
1,164.53

55,914.46
17,826.86
17,826.86
5,826.16 15,325.34 15,325.34
30,650.67
4,798.03
4,798.03
1,868.10

1,868.10
770.80
770.80

6,343.36
7,012.82 7,012.82 4,832.36
4,832.36
1,269.05
1,269.05
241.95
241.95

0.00
1,758.48
0.00
1,221.62
0.00

818.85
818.85
818.85

117,586.60

1,254.26

53,119.08

63,213.26

44,381.35
16,531.73 16,531.73
33,063.46
1,810.08
1,810.08
3,726.60
3,726.60
1,247.75
1,247.75
2,100.68
2,100.68
120.88
120.88

922.31

118.38

1,271.21

6,630.00
101.36
101.36

24.94

355.59

233.40

121.86

185.92

35.76

12.62

850.45

47.28

548.55

97.38

46.04

34.86

36.69

54.75

57.50

10.95
22.30

3,231.84

129.99

389.97

280,288.26
280,288.26 44.90%
0.00%
616,088.53 93.57%
0.00%
O 2019
25-31

225.00

2,737.50

300.00
1,254.26

53,119.08

63,213.26
922.31

118.38

1,271.21

24.94

355.59

233.40

121.86

185.92

35.76

12.62

850.45

47.28

548.55

97.38

46.04

34.86

36.69

54.75

57.50

10.95

22.30
3,231.84

129.99

389.97