You are on page 1of 29
WorleyParsons resources & energy DOCUMENT NO: 0435-JHO902-PE-BOD-0001 10F 29 GGSR PRODUCT EVACUATION PROJECT BASIS OF DESIGN PIPING 1 | Issued for Design Sl ap woes ax 06/05/09) 0 | Issue for Client Comments S| MD AK 2104/09 Rev. Description Originated By | Checked By | Approved By| Date DOC.NO. - 0435-JHO902-PE-BOD-0001 Rev.1 BASIS OF DESIGN PIPING WorleyParsons resources & energy DOCUMENT NO: 0435-JH0902-PE-BOD-0001 REV. NO.:1 20F 29 TABLE OF CONTENTS 1.0 SCOPE. 2.0 CODES, REGULATIONS AND STANDARDS, 30 GENERAL 4.0 MATERIALS .. 5.0 _ LINE DESIGNATIONS AND LINE LISTS. 5.1 Line Designation... 5.2 Line Lists 6.0 DESIGN CONDITIONS... 6.1 Operating Conditions 6.2 Design Temperature 6.3 Design Pressure.. 6.4 Other Conditions. 7.0 Other Limitations 8.0 PIPING ARRANGEME] 8.1 General .. 8.2 Maintenance. 8.3 Clearance and Accessibility. 8.4 Access for Maintenance 8.5 Platforms, Ladders and Stairways. 8.6 Pipe Routing. 9.0 EQUIPMENT PIPING. 3 9.1 Static Equipment Pipin, 4 9.2 Pump Piping. 4 9.3 Emergency Shutdown Valves 8 DOC.NO. - 0435-JH0902-PE-BOD-0001 Rev.1 BASIS OF DESIGN PIPING WorleyParsons resources & energy @ DOCUMENT NO: 0435-JH0902-PE-BOD-0001 REV. NO.: 1 3 OF 29 11.0 PRESSURE RELIEF SYSTEMS.. WA 11.2 14.3. Discharge Piping.. 12.0 WALL THICKNESS AND CORROSION ALLOWANCE 424 12.2 13.0 UNDERGROUND PIPING... 13.4 General... 132 Painting and Protective Coating 140 TANK PIPING. 14.1 General... 14.2. Tank Valves and 14.3 Above Ground Piping 14.4 Piping Below Ground. 14.5. Internal Tank Heater Piping. 15.0 BRANCH CONNECTIONS. 45.1 General .. 15.2 Gussets. 15.3 Hot Tapping. 16.0 UTILITY STATIONS... 16.1 General 16.2 Location: 17.0 PIPE SUPPORTS.. 474 General 17.2. Pipe Racks/Pipe Ways... 17.3. Pipe Support Layout. 17.4. Pipe Support Spacin: 17.5 Support Shoes 17.6 Anchors DOC.NO. - 0435-JH0902-PE-BOD-0001 Rev.1 BASIS OF DESIGN PIPING

You might also like