You are on page 1of 3

PRO-POOR EASTERN INFRASTRUCTURE DEVELOPMENT PROJECT MONTHLY PROGRESS REPORT

CONSTRUCTION OF NEW KALLADY BRIDGE No. 05 September 2010

4. PROJECT CHRONICLE

1.1 CORRESPONDENCE

4.1.1 Outgoing

The following project correspondence was issued in September 2010 to the Engineer.

Table 4.1.1 Outgoing Letters to the Employer (RDA)

Date Reference Subject


None

Chapter 4 Page 1 of 3
PRO-POOR EASTERN INFRASTRUCTURE DEVELOPMENT PROJECT MONTHLY PROGRESS REPORT
CONSTRUCTION OF NEW KALLADY BRIDGE No. 05 September 2010

Table 4.1.2 Outgoing letters to the Engineer

Date Reference Subject


1-Sep-10 KB-SDCC-ER-112 Requesting Approval for Admixture
1-Sep-10 KB-SDCC-ER-113 Concreting for Pilling P11 for pier No-1
1-Sep-10 KB-SDCC-ER-114 Programm for PSC Beam Casting and Launching
1-Sep-10 KB-SDCC-ER-115 Test report for PDA and PIT
1-Sep-10 KB-SDCC-ER-116 Calibration report for the concrete mixing plant
1-Sep-10 KB-SDCC-ER-117 Civil Engineer
KB-SDCC-ER-118 Cancelled
KB-SDCC-ER-119 Cancelled
KB-SDCC-ER-120 Cancelled
5-Sep-10 KB-SDCC-ER-121 Modified road alignment
5-Sep-10 KB-SDCC-ER-122 Deflection calculation of 48Mprecast beam
5-Sep-10 KB-SDCC-ER-123 Design check for 48.0M Post-Tensioned beam at P2-P3 span
9-Aug-10 KB-SDCC-ER-124 Test report for PDA and PIT
11-Sep-10 KB-SDCC-ER-125 Pilling work for Pier No 05
11-Sep-10 KB-SDCC-ER-126 Civil Engineer
KB-SDCC-ER-127 Cancelled
13-Sep-10 KB-SDCC-ER-128 Modified cross section Batticaloa end approach
16-Sep-10 KB-SDCC-ER-129 Counter measures for bored pile work
16-Sep-10 KB-SDCC-ER-130 Mix Design Programm and Trial Mix Progress for Grade 50
concrete
16-Aug-10 KB-SDCC-ER-131 Submit of chemical testing report of admixture
21-Aug-10 KB-SDCC-ER-132 Submission of Design Report and Drawing
17-Sep-10 KB-SDCC-ER-133 Counter measure for bored piling work
17-Sep-10 KB-SDCC-ER-134 Method Statement for P5
17-Sep-10 KB-SDCC-ER-135 Monthly progress report
18-Sep-10 KB-SDCC-ER-136 Shop drawing for Abutment A1
18-Sep-10 KB-SDCC-ER-137 Modified design calculation for Barge
20-Sep-10 KB-SDCC-ER-138 Man power and machineries details
20-Sep-10 KB-SDCC-ER-139 Cross Sections for the approach Road
20-Sep-10 KB-SDCC-ER-140 Modified method statement for pilling work of A2 abutment
20-Sep-10 KB-SDCC-ER-141 Revised work programme
20-Sep-10 KB-SDCC-ER-142 Final drawing of general arrangement & substructure
A AAA
20-Sep-10 KB-SDCC-ER-143 Design check of coffer dam-Abutment A2
23-Sep-10 KB-SDCC-ER-144 Correction in the method statement(Pier No-05)
23-Sep-10 KB-SDCC-ER-145 As build drawing pilling work P1
24-Sep-10 KB-SDCC-ER-146 Civil Engineer
24-Sep-10 KB-SDCC-ER-147 Civil Engineer
24-Sep-10 KB-SDCC-ER-148 Modified Method Statement
27-Sep-10 KB-SDCC-ER-149 Steel laminated rubber bearing design report

Chapter 4 Page 2 of 3
PRO-POOR EASTERN INFRASTRUCTURE DEVELOPMENT PROJECT MONTHLY PROGRESS REPORT
CONSTRUCTION OF NEW KALLADY BRIDGE No. 05 September 2010

4.1.2 Incoming

The following project correspondence was received in July 2010 from the Engineer.

Table 4.1.2 Incoming Letters from the Engineer.

Date Reference Subject


1- Oct-10 CS-KB-SD&CC-127 Warning (I) about delay of work progress
1- Oct--10 CS-KB-SD&CC-128 Casting Bed Elevation at A1 Side
2- Oct--10 CS-KB-SD&CC-129 Ignoring Engineer’s Instruction
6- Oct--10 CS-KB-SD&CC-130 Contractor’s Laboratory Technicians
9- Oct--10 CS-KB-SD&CC-131 P5 Pilling works
9- Oct--10 CS-KB-SD&CC-132 Sheet Pile Cofferdam
9- Oct--10 CS-KB-SD&CC-133 Countermeasure for Low Productivity of Concrete Mixer
11- Oct--10 CS-KB-SD&CC-134 Payment for Overtime of Engineer’s Staff for September 2010
12- Oct--10 CS-KB-SD&CC-135 Approval for Grade 40/20 Substructure Concrete with Holcim Ready
Flow Cement
14- Oct--10 CS-KB-SD&CC-136 Pre-Stressing Strands
14- Oct--10 CS-KB-SD&CC-137 Reminder-1 Submittal of Test Certificate for Welded Joints of permanent
Casing
17- Oct--10 CS-KB-SD&CC-113 Test Report of Pile Test of A1 Abutment
17- Oct--10 CS-KB-SD&CC-114 Comments of Bridge Design Drawings
18- Oct -10 CS-KB-SD&CC-115 Countermeasures for P1 Pile Works
18- Oct -10 CS-KB-SD&CC-116 Comments of Shop Drawings of A1
18- Oct -10 CS-KB-SD&CC-117 Method Statement for P5 Piling Works
21- Oct--10 CS-KB-SD&CC-118 Revised Schedule of A1 Abutment and Approach Filling Works
21- Oct--10 CS-KB-SD&CC-119 Calculation of Cofferdam of A2 Abutment
21- Oct--10 CS-KB-SD&CC-120 Method Statement of A2 Piling Work
23- Oct--10 CS-KB-SD&CC-121 Cross-Sections of A2 Approach Roads
23- Oct--10 CS-KB-SD&CC-122 Certificates of Test Results for Permanent Casing
23- Oct--10 CS-KB-SD&CC-123 Test Certificate of Admixture for Grade 40/20 Concrete
24- Oct--10 CS-KB-SD&CC-124 Preparation Works for Beam Casting and Launching
28- Oct--10 CS-KB-SD&CC-125 Comments for Bearing Design
28-Oct-
2010 CS-KB-SD&CC-126 Comments for Bridge Design

Chapter 4 Page 3 of 3