BINDRA ENGINEERING WORKS PVT. LTD.

MOCK DRILL REPORT (FOR FIRE)


Date of Mock Drill : 15.03.19

Building /Facility/Location : All company facility Locations

Device Activation Location :


Time Initiated : 3.00 PM

Time Completed : 3.40 PM

Time of Complete Evacuation: 15 (Minutes)

Sr .No. During the evacution YES NO NA


1 Occupants/employees exited using the nearest exit
2 Occupants/employees responded and reported to assembly area
3 Occupants/employees in orderly manner
4 Persons with disabilities were accounted for
5 Visitors were properly directed
6 Missing or trapped personnel were accounted for
7 Alarms functioned and were audible throughout the area
8 No premature reentry
9 Faculty/Staff reported to assigned areas and performed duties
( ) In appropriate cell

Evaluation of the fire drill (Comments on all NO marks also include additional marks about the fire drill :
1) All empolyees leaving the from the nearest emergency exit.

2) All employees assembled outside at required emergency assembly point.

3) Performing a mock fire drill.

4) Successful demostration and explanation of using fire extingusher incase of emergency.

Problems encountered (i.e Observe procedure or instructions followed or not)


No problems encountered

Recommondations:
All employees should avoid running at all times and leave the premises in a orderly manner.

Note : Attached Attendence sheet to this report


Signature :

Name : Navjeet S Bindra Contact No : 9922687784

(Safety Coordinator /Designated Employee/Administrator ) Name (Title) : Director