You are on page 1of 1

000000Classification: Internal

Request For Inspection


Contract no: CT/RG18/G120A/15 Contract Ref.: Field Maintenance Scaffolding, Painting, Insulation & Refractory Services long term call off contract
RFI no: ONSH/RFI/PNT/JUNE19 - 07 Date: 11.06.2019
Item FLOC/TAG/Descriptions: As mentioned below
We would like to have your presence for inspection according to the following schedule:

Legend: Inspection / Tests Hold Witness Surveillance Accept - A


Rejected - B Hold - C

Work order Category Inspection Status


Sr.no Date of inspection Contractor Asset/ Painting Block FLOC Item FLOC/ TAG/Descriptions Inspection Activity Work order Corrosion Pkg/ Weekly Accetpted -A
scheduled/ CIAN Rejected - B
Hold - C

1 12.06.2019 Ineco TRAIN - 03 / BLOCK-13 33LV-208/CCI-18265 (P5) PRE INSPECTION /BLASTING INSPECTION 11146963 CORROSION PACKAGE

2 12.06.2019 Ineco TSF YARD 17BDV-711VT /BUFFER VESSSEL REPAIR AREA BLASTING INSPECTION 11103915 WEEKLY SCHEDULED

3 12.06.2019 Ineco TSF YARD 167HZ-0772C/ MANUAL SWITCH HAND TOOL INSPECTION 11285251 WEEKLY SCHEDULED

4 12.06.2019 Ineco TRAIN - 03 / BLOCK-13 33-V015/CCI- 18290- (P5) PRIMER INSPECTION 11146963 CORROSION PACKAGE

5 12.06.2019 Ineco TRAIN - 03 / BLOCK-13 33FV-212/CCI-18273 (P5) PRIMER INSPECTION 11146963 CORROSION PACKAGE

6 12.06.2019 Ineco TSF YARD B87/BRACKET SUPPORT TOP COAT APPLICATION 11150511 WEEKLY SCHEDULED

7 12.06.2019 Ineco TRAIN - 03 / BLOCK-01 83MV-093/CCI-17680 (P6) TOP COAT APPLICATION 11083411 CORROSION PACKAGE

8 12.06.2019 Ineco TRAIN - 03 / BLOCK-01 83WF-31211-3-W0WA5-N / CCI-16671 ( Pillar 41 to47) (P5) TOP COAT APPLICATION 11083411 CORROSION PACKAGE

9 12.06.2019 Ineco TRAIN - 03 / BLOCK-01 83WF-31213-6-W0WA5-N / CCI-16672 ( Pillar 41 to47) -(P5) TOP COAT APPLICATION 11083411 CORROSION PACKAGE

10 12.06.2019 Ineco TRAIN - 03 / BLOCK-01 83WF-31212-4-W0WA5-N / CCI-16673( Pillar 41 to47) -(P5) TOP COAT APPLICATION 11083411 CORROSION PACKAGE

11 12.06.2019 Ineco TRAIN - 03 / BLOCK-01 83WF-31215-4-W0WA5-N / CCI-16674 ( Pillar 41 to47) -(P5) TOP COAT APPLICATION 11083411 CORROSION PACKAGE

12 12.06.2019 Ineco TRAIN - 03 / BLOCK-01 83WF-31214-4-W0WA5-N / CCI-16675( Pillar 41 to47) - (P5) TOP COAT APPLICATION 11083411 CORROSION PACKAGE

13 12.06.2019 Ineco TRAIN - 03 / BLOCK-01 83WF-31210-3-W0WA5-N /CCI- 16676( Pillar 41 to47) -(P5) TOP COAT APPLICATION 11083411 CORROSION PACKAGE

14 12.06.2019 Ineco TRAIN - 03 / BLOCK-01 83WF-31221-3-W0WA5-N /CCI- 16678( Pillar 41 to47) - (P5) TOP COAT APPLICATION 11083411 CORROSION PACKAGE

15 12.06.2019 Ineco TRAIN3-BLOCK13 33-S010/CCI-16307 (P5) TOP COAT APPLICATION 11146963 CORROSION PACKAGE

16 12.06.2019 Ineco TRAIN3-BLOCK13 AH-51/CCI-18285 ( ASSOCIATED PIPES,SUPPORTS AND DUCT) (P5) TOP COAT APPLICATION 11146963 CORROSION PACKAGE

INECO QATARGAS

Name DEEPAK MOHAN/ MANIKANDAN MURUGAN FAHAD MOMIN / OBINDRA

Signature

Date 12.06.2019 12.06.2019