NO Energy Source Base Time Final Time

1 Electric 2016 2020

2 Fuel 2016 2020

3 Improving Waste Water Quality 2016 2020

4 Emission to air 2016 2020

5 Waste Quantity 2016 2020

Page 1
Sheet1

Reduction Target Current


Reduction Plan
(%) Action
- Energy Reduction Commitment Policy from Top
Management (including for Electric, Fuel, Improving Waste
Water Quality, Emission to air, and Waste Water Quantity
- Factory had installed transparent roof
Reduction)
to reduce lamps usage
- Factory had installed servo motor to
- Conducting Energy Reduction Commitment & Electric
several sewing machines to reduce
Reduction Training to All Employees
electric consumption

5.00% - Factory had changed Light tube with


T5 Lamp which has less electric power - Training Material are:
- Boiler machine had been changed
with electric steam machine which has
less electric power - Reducting lamps usage
- Reducting production machine usage
- Reducting Air Conditioner consumption
- Installing solar system for electric back up
- Installing Servo motor to sewing machines
- Energy Reduction Commitment Policy from Top
2.00% Management (including for Electric, Fuel, Waste Water
Quality, Emission to air, and Waste Water Quantity)
- Conducting Fuel Consumptive Reduction training to all
drivers
- Energy Reduction Commitment Policy from Top
2.00% Management (including for Electric, Fuel, Waste Water
Quality, Emission to air, and Waste Water Quantity)
- Factory has domestic water only. Domestic Water test
result that conducted by third party is good. Factory will
maintain the quality of waste water
- Energy Reduction Commitment Policy from Top
2.00% Management (including for Electric, Fuel, Waste Water
Quality, Emission to air, and Waste Water Quantity)

- Factory had been tested for air emission. The result of test
is good. Factory will maintain air emission quality

- Energy Reduction Commitment Policy from Top


2.00% Management (including for Electric, Fuel, Waste Water
Quality, Emission to air, and Waste Water Quantity)
- Factory will conduct solid waste reduction training to all relate

Page 2
Sheet1

Energy Source
Reduction Plan
Information
ergy Reduction Commitment Policy from Top
agement (including for Electric, Fuel, Improving Waste
er Quality, Emission to air, and Waste Water Quantity
uction)

nducting Energy Reduction Commitment & Electric


uction Training to All Employees

ining Material are:

educting lamps usage


educting production machine usage
educting Air Conditioner consumption
alling solar system for electric back up
alling Servo motor to sewing machines
ergy Reduction Commitment Policy from Top
agement (including for Electric, Fuel, Waste Water
ity, Emission to air, and Waste Water Quantity)
nducting Fuel Consumptive Reduction training to all
rs
ergy Reduction Commitment Policy from Top
agement (including for Electric, Fuel, Waste Water
ity, Emission to air, and Waste Water Quantity)
ctory has domestic water only. Domestic Water test
t that conducted by third party is good. Factory will
tain the quality of waste water
ergy Reduction Commitment Policy from Top
agement (including for Electric, Fuel, Waste Water
ity, Emission to air, and Waste Water Quantity)

ctory had been tested for air emission. The result of test
od. Factory will maintain air emission quality

ergy Reduction Commitment Policy from Top


agement (including for Electric, Fuel, Waste Water
ity, Emission to air, and Waste Water Quantity)
ctory will conduct solid waste reduction training to all related staff

Page 3
Sheet2

TIME
INFORMATION JUMLAH Report 2015
Base Time (2016) 2017
Energy Consumption for:
1. Production Machine
2. Lamps
3. Air Conditioner