You are on page 1of 1

STRUCTURAL BOQ FOR NAVEEN RESIDENCE AT BELLARY

BOQ CONSIDERING ONLY - 1ST FLOOR


Concrete ( Excavatio Back Filli
Element Steel (kg) Shuttering PCC
cuM) n ng
M25 8 10 12 16 20 Total sqM cuM cuM cuM
COLUMN 16.84 675 - 1106 527 315 2608 201.21
FOOTING 20 120 168 373 225 - 886 42 5.5 78 54
PLINTH 8.05 381.48 - 258.64 213.15 - 853.27 72.28
1ST FLOOR BEAM 9.08 326.62 136.32 238.23 404.32 120.74 1226.23 81.54
1ST FLOOR SLAB - 865.54 - - - - 865.54 68.45
TOTAL 53.97 2368.64 136.32 1975.87 1369.47 435.74 6439.04 465.48 5.5 78 54
Additional 5% 56.6685 6.8 tonnes

BOQ CONSIDERING - 2 FLOORS


Concrete ( Excavatio Back Filli
Element Steel (kg) Shuttering PCC
cuM) n ng
M25 8 10 12 16 20 Total sqM cuM cuM cuM
COLUMN 16.84 675 - 1106 527 315 2608 201.21
FOOTING 20 120 168 0 225 - 886 42 5.5 78 54
PLINTH 8.05 381.48 - 258.64 213.15 - 853.27 72.28
1ST FLOOR BEAM 9.08 326.62 136.32 238.23 404.32 120.74 1226.23 81.54
1ST FLOOR SLAB - 865.54 - - - - 865.54 68.45
2ND FLOOR BEAM 9.08 326.62 136.32 238.23 404.32 120.74 1226.23 81.54
2ND FLOOR SLAB - 865.54 - - - - 865.54 68.45
TOTAL 63.05 3560.8 136.32 1841.1 1773.79 435.74 8530.81 615.47 5.5 78 54
Additional 5% 66.2025 9.0 tonnes