Professional Documents
Culture Documents
A S S O C I A T E S, I N C.
# REVISIONS
ISSUANCE
TRIAD CAPITAL
SEATTLE, WA 98105
SYMBOL
SCHEDULE
FILE LOCATION: X:\AES\DRAWINGS\TRIAD 12\E-0.1 TRI12 - SYMBOL.DWG
DATE: 05.22.2013
PLOTDATE: 6.11.2013
PROJECT #: 1152
DRAWN BY: RA
CHECKED BY: BR/RA
FILE NAME:
PRINTED BY: RYAN
C
E-0.1
2012 NICHOLSON KOVALCHICK ARCHITECTS PS
NICHOLSON KOVALCHICK ARCHITECTS
T
TE
A S S O C I A T E S, I N C.
T
T
T T T T T T TV TV
TV
T
T
# REVISIONS
T
ISSUANCE
T
TRIAD CAPITAL
SEATTLE, WA 98105
T
SITE PLAN
FILE LOCATION: X:\AES\DRAWINGS\TRIAD 12\E-1.0 TRI12 - SITE.DWG
DATE: 05.22.2013
PLOTDATE: 5.20.2013
PROJECT #: 1152
DRAWN BY: RA
CHECKED BY: BR/RA
SITE PLAN FILE NAME:
1/8" = 1'-0"
E-1.0
PRINTED BY: RYAN
1 2 3 4 5 6
A S S O C I A T E S, I N C.
TRANSFORMER
ACCESS WELL
B15
TRANSFORMER
ACCESS WELL
B15
A A
SPRINKLER
ROOM
B04
TENANT
STORAGE
TRANSFORMER VAULT B17
B16
UP
METER STAIR A TELECOM
B18 B00 B05
# REVISIONS
TRANSFORMER
B B
VESTIBULE
B14 BICYCLE
S
PARKING
B06
DN
C S C
ELEV
UP B02 100% CD SET / PERMIT 05.22.13
PRICING SET 03.08.13
85% CD Set 01.15.13
CORR. COORDINATION SET 01.02.13
B03
A MUP SUBMITTAL 05.03.12
STAIR B ISSUANCE
B01
D D
TRIAD CAPITAL
B08
SEATTLE, WA 98105
PC
F F
PATIO PATIO PATIO PATIO PATIO UP
CANOPY ABOVE
1 2 3 4 5 6
LEVELS B1 PLAN
FILE LOCATION: X:\AES\DRAWINGS\TRIAD 12\E-2.0 TRI12 - B1.DWG
DATE: 05.22.2013
PLOTDATE: 5.20.2013
PROJECT #: 1152
DRAWN BY: RA
CHECKED BY: BR/RA
LEVEL B1 PLAN FILE NAME:
1/8" = 1'-0"
E-2.0
PRINTED BY: RYAN
A S S O C I A T E S, I N C.
1 2 3 4 5 6
BENCH PER
LANDSCAPE DRAWINGS
DECORATIVE
TRANSFORMER
METAL GATE
ACCESS HATCH
METAL
GATE
P
PC
A BLDG. A
REFUSE/ STAIR A ENTRY
RECYCLING 100
AREA PC VESTIBULE
LOBBY
114 118 PC
# REVISIONS
P
BENCH
PC
UNIT B.5 ON A5.3
UNIT B.3 ON A5.2 UNIT B.2 ON A5.2 STUDIO
STUDIO STUDIO 117
PC
115 116 UP PC
BLDG.
EXIT
P 100% CD SET / PERMIT 05.22.13
PRICING SET 03.08.13
B UP B 85% CD Set 01.15.13
BATH CONCIERGE COORDINATION SET 01.02.13
120 OFFICE A MUP SUBMITTAL 05.03.12
119
12TH AVENUE NE
S ISSUANCE
S
C C
UP ELEV
102
ALLEY
TRIAD CAPITAL
SEATTLE, WA 98105
UNIT B.4 ON A5.2
STUDIO
UNIT C.1 ON A5.3 UNIT B.1 ON A5.2 UNIT B.1 ON A5.2 UNIT B.1 ON A5.2 109
STUDIO STUDIO STUDIO STUDIO
113 112 111 110
UNIT A.3 ON A5.1
STUDIO
108
F F
PATIO PATIO PATIO PATIO PATIO
UP
CANOPY
BELOW
1 2 3 4 5 6
LEVEL 1 PLAN
FILE LOCATION: X:\AES\DRAWINGS\TRIAD 12\E-2.1 TRI12 - 1ST.DWG
DATE: 05.22.2013
PLOTDATE: 5.20.2013
PROJECT #: 1152
DRAWN BY: RA
CHECKED BY: BR/RA
FILE NAME:
LEVEL 1 PLAN
E-2.1
PRINTED BY: RYAN
1/8" = 1'-0"
A S S O C I A T E S, I N C.
1 2 3 4 5 6
A A
UNIT A.5 ON A5.1 # REVISIONS
STUDIO
204
UNIT D.1 ON A5.3
STUDIO
214 UNIT B.5 ON A5.3
UNIT B.2 ON A5.2 UNIT B.2 ON A5.2 STUDIO
STUDIO STUDIO 217
215 216
100% CD SET / PERMIT 05.22.13
PRICING SET 03.08.13
STAIR A UP 85% CD Set 01.15.13
200 UNIT A.1 ON A5.1 COORDINATION SET 01.02.13
STUDIO
205 A MUP SUBMITTAL 05.03.12
B B
ISSUANCE
S
C C
UP S ELEV
202 UNIT A.2 ON A5.1
STUDIO
206
CORR.
203
TRIAD CAPITAL
207 E
SEATTLE, WA 98105
E
F F
1 2 3 4 5 6
LEVEL 2 PLAN
FILE LOCATION: X:\AES\DRAWINGS\TRIAD 12\E-2.2 TRI12 - L2.DWG
DATE: 05.22.2013
PLOTDATE: 5.20.2013
PROJECT #: 1152
DRAWN BY: RA
CHECKED BY: BR/RA
FILE NAME:
LEVEL 2 PLAN
E-2.2
PRINTED BY: RYAN
1/8" = 1'-0"
A S S O C I A T E S, I N C.
1 2 3 4 5 6
TELECOM
CLOSET
418
BATH
A A
CLOSET W/D
STAIR A
300
UP
# REVISIONS
D D
TRIAD CAPITAL
STUDIO STUDIO STUDIO STUDIO 309
SEATTLE, WA 98105
313 312 311 310
F F
1 2 3 4 5 6
DATE: 05.22.2013
PLOTDATE: 5.20.2013
PROJECT #: 1152
DRAWN BY: RA
CHECKED BY: BR/RA
FILE NAME:
1/8" = 1'-0"
A S S O C I A T E S, I N C.
ELEV
MECH. R02
ROOM
R05
# REVISIONS
MECH & ELEVATOR MACHINE ROOMS PLAN 100% CD SET / PERMIT 05.22.13
1/4" = 1'-0" PRICING SET 03.08.13
85% CD Set 01.15.13
COORDINATION SET 01.02.13
A A A MUP SUBMITTAL 05.03.12
STAIR A ISSUANCE
R00
GREEN ROOF
MECH. R02
S
ROOM
R05
TRIAD CAPITAL
SEATTLE, WA 98105
CONTROL RM. ELEV LOBBY
R03 R04
STAIR B
R01 PC
S
D D
GREEN ROOF
F F
ROOF PLAN
FILE LOCATION: X:\AES\DRAWINGS\TRIAD 12\E-2.4 TRI12 - ROOF.DWG
1 2 3 4 5 6
DATE: 05.22.2013
PLOTDATE: 5.20.2013
PROJECT #: 1152
DRAWN BY: RA
CHECKED BY: BR/RA
FILE NAME:
ROOF PLAN
1/8" = 1'-0"
E-2.4
PRINTED BY: RYAN
4 6
NICHOLSON KOVALCHICK ARCHITECTS
D
CLOSET
BATH
KITCHEN
BATH A S S O C I A T E S, I N C.
KITCHEN
W/D
W/D T
LIVING ROOM/
BATH LIVING ROOM/ W/D BEDROOM
BEDROOM
KITCHEN
CLOSET T
C
COLUMN LOCATIONS
AT LEVEL 2
HEATER UNITS
110, 111, 112, 210, 211, 212, 213, 215, 216,
LIVING ROOM/ 310, 311, 312, 315, 316, 410, 411, 412, 415,
BEDROOM
UNIT A.2 - STUDIO 416, 510, 511, 512, 515, 516, 610, 611, 612,
UNIT A.1 - STUDIO - TYPE A
HEATER UNITS 1/4" = 1'-0" HEATER UNITS T 615, 615
1/4" = 1'-0" 107, 206, 207, 306, 307, 406, 407, 506, 507, 606, 607
205, 305, 405, 505, 605
B09, B10, B11, B12, 109, 209, 309, 409,
106, 706, 707
CLOSET
705 509, 609, 710, 711, 712, 715, 716
B08, 108, 208, 308, 408, 508, 608,708 204 709 # REVISIONS
- DRYER BOOSTER FAN (DBF-1) LOCATED IN UNIT 115 ONLY 100% CD SET / PERMIT 05.22.13
PRICING SET 03.08.13
UNIT B.1 - STUDIO 85% CD Set 01.15.13
- PATIO WALL SCONCE USED ON BASEMENT LEVEL UNITS &
1/4" = 1'-0" UNITS 115-117 ONLY. COORDINATION SET 01.02.13
A MUP SUBMITTAL 05.03.12
ISSUANCE
3 1
TRIAD CAPITAL
SEATTLE, WA 98105
D
A A
T
BATH
CLOSET
KITCHEN
KITCHEN W/D
W/D KITCHEN
W/D T
BATH
BATH
LIVING ROOM/ B
BEDROOM
TYPICAL UNIT
PLANS
FILE LOCATION: X:\AES\DRAWINGS\TRIAD 12\E-3.0 TRI12 - UNITS.DWG
E-3.0
LEVEL UNITS & UNITS 115-117 ONLY.
PRINTED BY: RYAN
A S S O C I A T E S, I N C.
# REVISIONS
ISSUANCE
TRIAD CAPITAL
SEATTLE, WA 98105
FILE LOCATION: X:\AES\DRAWINGS\TRIAD 12\E-4.0 TRI12 - POWER RISER.DWG
DATE: 05.22.2013
PLOTDATE: 5.20.2013
PROJECT #: 1152
DRAWN BY: RA
CHECKED BY: BR/RA
FILE NAME:
E-4.0
PRINTED BY: RYAN
A S S O C I A T E S, I N C.
# REVISIONS
ISSUANCE
TRIAD CAPITAL
SEATTLE, WA 98105
FILE LOCATION: X:\AES\DRAWINGS\TRIAD 12\E-4.0 TRI12 - POWER RISER.DWG
DATE: 05.22.2013
PLOTDATE: 5.20.2013
PROJECT #: 1152
DRAWN BY: RA
CHECKED BY: BR/RA
FILE NAME:
E-4.1
PRINTED BY: RYAN