You are on page 1of 2

SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - Mar 2013) Rev 7 Mar-13

SAIC NUMBER DATE APPROVED QR NUMBER


SAUDI ARAMCO INSPECTION CHECKLIST
Air Cooled Condenser Installation SAIC-K-4039 30-Apr-13 HVAC
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.

LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.

SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?

SAUDI ARAMCO INSPECTION LEVEL CONTRACTOR INSPECTION LEVEL

ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.
Air handlers, refrigeration condenser units, pumps, or any equipment
shall be mounted on a concrete housekeeping pad, at a minimum of SAES-K-001
A1
100 mm (4") above the floor or a minimum of 150 mm (6") above Para 5.1.1
unpaved ground.

Access doors shall be provided to every valve, coil, filter, damper or


SAES-K-001
A2 mechanical device for inspection and/or adjustment and be within
Para 5.1.3
reachable distance.
Air cooled condenser unit shall be mounted level. Vertical air-cooled SAES-K-001
A3
condensers shall be provided with wind deflectors. Para 5.3.3

Each condensing unit shall be complete with all operational


equipment of condensing unit, including solenoid valve, sight glass SAES-K-001
A4
with cover and cartridge type filter, shall be mounted on a base Para 4.8.3.4
frame.

Condenser fan motors, 25 tons and larger units, shall have a


separate overload relay protection, as described in Article 440 of the SAES-K-001
A5
National Electric Code (NEC). This protection shall be in addition to Para 4.8.10.4
other built-in condenser motor protection devices.

Rooms or spaces other than Refrigeration Machinery Rooms where


any refrigerant-containing portion of the condensing unit is located
shall be provided with one of the following means of ventilation (UMC
Para 1105.7)
1- Permanent gravity ventilation openings of not less than 2 square
feet net free area opening directly to the outside of the building or
extending to the outside of the building by continues ducts
SAES-K-100
A6 2-Mechanical exhaust system, discharging it to the outside of the
Section 1
building
Exception:
A- condensing unit in a room or space if the cubical content exceeds
1,000 cubic feet per horsepower of the unit
B- Condensing unit in a room or space that has permanent
gravity ventilation an area of 2 square feet or more to other rooms or
openings exceeding 1,000 cubic feet per horsepower

Refrigeration Systems or portions thereof (Condenser) shall not be SAES-K-100


A7
located within a required exit enclosure (UMC Para 1105.8) Section 1

All HVAC Equipment shall be properly grounded in accordance with SAES-K-001


A8
NFPA 70, National Electrical Code. Para 5.1.8

Each equipment unit shall be installed at the location indicated on the


SAES-K-001
A9 drawings and in accordance with details of mounting, with vibration
Para 5.1.7
isolation as required by the Design Specifications.

Page 1 of 2
SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - March 2013) Rev 7 Mar-13
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Air Cooled Condenser Installation SAIC-K-4039 30-Apr-13 HVAC
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

REMARKS:

REFERENCE DOCUMENTS:
1-SAES-K-100 -- Saudi Aramco Mechanical (HVAC) Code, 20 Oct 2012
2-SAES-K-001 -- Heating, Ventilating and Air Conditioning (HVAC), 5 Dec 2012
3-Uniform Mechanical Code (UMC), 1997

Contractor / Third-Party Saudi Aramco


Construction Representative* PMT Representative
Work is Complete and Ready for Inspection: T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Inspector PID Representative


Performed Inspection Work / Rework May Proceed T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Supervisor Proponent and Others


Quality Record Approved: T&I Witnessed QC Record Reviewed Work Verified
Name, Organization,
Name, Sign and Date:
Initials and Date:

*Person Responsible for Completion of Quality Work / Test Y = YES N = NO F = FAILED

Page 2 of 2

You might also like