15 Sep 08
APPENDIX B
EMERGENCY OPERATIONS
B-1
EM 385-1-1
15 Sep 08
B-2
EM 385-1-1
15 Sep 08
B-3
EM 385-1-1
15 Sep 08
B-4
EM 385-1-1
15 Sep 08
7. COMMUNICATIONS
8. DUTY SCHEDULE
B-5
EM 385-1-1
15 Sep 08
B-6
EM 385-1-1
15 Sep 08
(7) Whenever chipper operations are shut down for any significant
length of time (e.g., overnight or when the chipper will be left
unattended), equipment walls, crevice drums, cutter heads and
hammers, and drive mechanisms shall be cleared of all
combustible materials by blowing, washing, and wetting down.
B-7
EM 385-1-1
15 Sep 08
B-8
EM 385-1-1
15 Sep 08
B-9
EM 385-1-1
15 Sep 08
B-10
EM 385-1-1
15 Sep 08
m. The length of the pit shall not be more than 6 in (15.2 cm)
longer than the blower system at each end. The ends of the pit
shall be near vertical and extend to the top of the pit.
B-11
EM 385-1-1
15 Sep 08
B-12
EM 385-1-1
15 Sep 08
B-13
EM 385-1-1
15 Sep 08
B-14