FUTURASERV. X Q (L/S)X
TRAMO el TRAMO tramo datos
A-B 122 6.507 C= 140 √pie/seg
B-C 161 8.587 Qd= 60 L/s
C-D 160 8.533
C-E 157 8.373
B-Rp 100 5.333
Rp-F 103 5.493
F-G 119 6.347
F-H 105 5.600
H-I 98 5.227
TOTAL 1125 60
Diametro
Caudal (l/s) Long velocidad perdida de carga
Tramo (m) (pulg)
Diametro
Caudal (l/s) Long velocidad perdida de carga
Tramo (m) (pulg)
tramo diseño (m) Ø m/s unit(%) tramo (m)
reser-A 60 60 6 3.29 3.53
A-B 0.191 60 125 6 3.29 7.36
B-C 0.252 0.747 97 1 1.47 10.44
C-D 0.250 0.250 67 3/4 0.88 3.86
C-E 0.245 0.245 105 4 0.03 0.00
B-F 0.317 0.820 199 1 1.62 25.49
F-G 0.186 0.186 86 4 0.02 0.00
F-H 0.164 0.317 100 4 0.04 0.00
H-I 0.153 0.153 120 4 0.02 0.00
N° de HAB. De
la POBL.
FUTURASERV. X Q (L/S)X
TRAMO el TRAMO tramo datos
A-B 122 0.191 C= 140 √pie/seg
B-C 161 0.252 Qd= 1.758 L/s
C-D 160 0.250
C-E 157 0.245
B-F 203 0.317
F-G 119 0.186
F-H 105 0.164
H-I 98 0.153
TOTAL 1125 1.758
coeficiento Qtramo
longitud por (L/S)X
TRAMO tramo
Diametro
Caudal (l/s) Long velocidad perdida de carga
Tramo (m) (pulg)
tramo diseño (m) Ø m/s unit(%) tramo (m)
reser-A 31.760 60 6 1.74 1.09
A-B 4.140 31.760 125 6 1.74 2.26
B-C 3.212 8.909 97 4 1.10 1.20
C-D 2.219 2.219 67 3 0.49 0.26
C-E 3.477 3.477 105 4 0.43 0.23
B-Rp 3.610 16.725 109 4 2.06 4.34
Rp-F 2.981 13.115 90 4 1.62 2.28
F-G 2.848 2.848 86 3 0.62 0.52
F-H 3.312 7.286 100 4 0.90 0.85
H-I 3.974 3.974 120 2 1.96 9.76
cota piezometrica cota del terreno presion (m)
(msnm)
C= 150
ITERACION 01
longitud diametro caudal velocidad pendiente perdida
circuito tramo C
L (m) Ø (pulg) Qo (l/s) v (m/s) S (m/m) Hf (m)
AB 600 150 14 191.12 1.924 0.0071 4.286
BI 300 150 10 95.55 1.886 0.0102 3.056
CIRCUITO I
IJ 300 150 6 35.83 1.964 0.0199 5.981
JH 600 150 12 -119.44 1.637 0.0063 -3.802
HA 600 150 14 -238.88 2.405 0.0108 -6.477
∑ 3.043
BI 300 150 10 -95.55 1.886 0.0102 -3.056
BC 300 150 8 47.74 1.472 0.0084 2.506
CIRCUITO II
DI 300 150 6 -23.89 1.310 0.0094 -2.823
CD 300 150 6 35.82 1.964 0.0199 5.978
∑ 2.605
JI 300 150 6 -35.83 1.964 0.0199 -5.981
ID 300 150 6 23.89 1.310 0.0094 2.823
CIRCUITO III
DE 300 150 6 23.88 1.309 0.0094 2.821
EJ 300 150 6 -29.86 1.637 0.0142 -4.267
∑ -4.604
HJ 600 150 12 119.44 1.637 0.0063 3.802
HG 300 150 10 -71.66 1.414 0.0060 -1.794
CIRCUITO V
CIRCUITO V
JE 300 150 6 29.86 1.637 0.0142 4.267
EF 300 150 4 11.94 1.473 0.0188 5.631
GF 900 150 8 -59.72 1.842 0.0126 -11.383
∑ 0.524
ITERACION 02
longitud diametro caudal velocidad pendiente perdida
circuito tramo C
L (m) Ø (pulg) Qo (l/s) v (m/s) S (m/m) Hf (m)
AB 600 150 14 185.252 1.865 0.0067 4.045
BI 300 150 10 93.492 1.845 0.0098 2.935
CIRCUITO I
IJ 300 150 6 25.405 1.393 0.0105 3.164
JH 600 150 12 -124.980 1.713 0.0069 -4.135
HA 600 150 14 -244.748 2.464 0.0113 -6.775
∑ -0.766
BI 300 150 10 -93.492 1.845 0.0098 -2.935
BC 300 150 8 43.930 1.355 0.0072 2.149
CIRCUITO II
DI 300 150 6 -32.256 1.768 0.0164 -4.923
CD 300 150 6 32.010 1.755 0.0162 4.854
∑ -0.856
JI 300 150 6 -25.405 1.393 0.0105 -3.164
ID 300 150 6 32.256 1.768 0.0164 4.923
CIRCUITO III
DE 300 150 6 28.436 1.559 0.0130 3.898
EJ 300 150 6 -24.975 1.369 0.0102 -3.065
∑ 2.592
HJ 600 150 12 124.980 1.713 0.0069 4.135
HG 300 150 10 -71.989 1.421 0.0060 -1.809
CIRCUITO V
JE 300 150 6 24.975 1.369 0.0102 3.065
EF 300 150 4 11.611 1.432 0.0178 5.348
GF 900 150 8 -60.049 1.852 0.0128 -11.499
∑ -0.760
ITERACION 03
longitud diametro caudal velocidad pendiente perdida
circuito tramo C
L (m) Ø (pulg) Qo (l/s) v (m/s) S (m/m) Hf (m)
AB 600 150 14 186.987 1.883 0.0069 4.116
BI 300 150 10 94.025 1.856 0.0099 2.966
CIRCUITO I
IJ 300 150 6 29.750 1.631 0.0141 4.238
JH 600 150 12 -123.737 1.696 0.0068 -4.059
HA 600 150 14 -243.013 2.447 0.0111 -6.686
∑ 0.575
BI 300 150 10 -94.025 1.856 0.0099 -2.966
BC 300 150 8 45.133 1.392 0.0075 2.259
CIRCUITO II
DI 300 150 6 -28.444 1.559 0.0130 -3.900
CIRCUITO II
ITERACION 04
longitud diametro caudal velocidad pendiente perdida
circuito tramo C
L (m) Ø (pulg) Qo (l/s) v (m/s) S (m/m) Hf (m)
AB 600 150 14 185.776 1.871 0.0068 4.066
BI 300 150 10 93.662 1.848 0.0098 2.945
CIRCUITO I
IJ 300 150 6 27.656 1.516 0.0123 3.703
JH 600 150 12 -124.615 1.708 0.0069 -4.112
HA 600 150 14 -244.224 2.459 0.0112 -6.748
∑ -0.147
BI 300 150 10 -93.662 1.848 0.0098 -2.945
BC 300 150 8 44.284 1.366 0.0073 2.181
CIRCUITO II
DI 300 150 6 -30.176 1.654 0.0145 -4.351
CD 300 150 6 32.364 1.774 0.0165 4.954
∑ -0.162
JI 300 150 6 -27.656 1.516 0.0123 -3.703
ID 300 150 6 30.176 1.654 0.0145 4.351
CIRCUITO III
DE 300 150 6 26.709 1.464 0.0116 3.471
EJ 300 150 6 -26.861 1.473 0.0117 -3.508
∑ 0.612
HJ 600 150 12 124.615 1.708 0.0069 4.112
HG 300 150 10 -71.829 1.418 0.0060 -1.801
CIRCUITO V
JE 300 150 6 26.861 1.473 0.0117 3.508
EF 300 150 4 11.771 1.452 0.0183 5.484
GF 900 150 8 -59.889 1.847 0.0127 -11.443
∑ -0.140
ITERACION 05
longitud diametro caudal velocidad pendiente perdida
circuito tramo C
L (m) Ø (pulg) Qo (l/s) v (m/s) S (m/m) Hf (m)
AB 600 150 14 186.096 1.874 0.0068 4.079
BI 300 150 10 93.751 1.850 0.0098 2.950
CIRCUITO I
IJ 300 150 6 28.591 1.567 0.0131 3.938
JH 600 150 12 -124.384 1.705 0.0068 -4.098
HA 600 150 14 -243.904 2.456 0.0112 -6.732
∑ 0.137
BI 300 150 10 -93.751 1.850 0.0098 -2.950
BC 300 150 8 44.515 1.373 0.0073 2.202
CIRCUITO II
DI 300 150 6 -29.330 1.608 0.0138 -4.128
CD 300 150 6 32.595 1.787 0.0167 5.019
∑ 0.143
JI 300 150 6 -28.591 1.567 0.0131 -3.938
ID 300 150 6 29.330 1.608 0.0138 4.128
CIRCUITO III
DE 300 150 6 26.095 1.431 0.0111 3.325
EJ 300 150 6 -27.565 1.511 0.0123 -3.680
∑ -0.165
HJ 600 150 12 124.384 1.705 0.0068 4.098
HG 300 150 10 -71.740 1.416 0.0060 -1.797
CIRCUITO V
JE 300 150 6 27.565 1.511 0.0123 3.680
EF 300 150 4 11.860 1.463 0.0185 5.561
GF 900 150 8 -59.800 1.844 0.0127 -11.411
∑ 0.131
ITERACION 06
longitud diametro caudal velocidad pendiente perdida
circuito tramo C
L (m) Ø (pulg) Qo (l/s) v (m/s) S (m/m) Hf (m)
AB 600 150 14 185.802 1.871 0.0068 4.067
BI 300 150 10 93.663 1.848 0.0098 2.945
CIRCUITO I
IJ 300 150 6 28.132 1.542 0.0127 3.821
JH 600 150 12 -124.594 1.708 0.0069 -4.111
HA 600 150 14 -244.198 2.459 0.0112 -6.747
∑ -0.024
BI 300 150 10 -93.663 1.848 0.0098 -2.945
BC 300 150 8 44.309 1.366 0.0073 2.183
CIRCUITO II
DI 300 150 6 -29.701 1.628 0.0141 -4.225
CD 300 150 6 32.389 1.776 0.0165 4.961
∑ -0.026
JI 300 150 6 -28.132 1.542 0.0127 -3.821
ID 300 150 6 29.701 1.628 0.0141 4.225
CIRCUITO III
DE 300 150 6 26.260 1.440 0.0112 3.364
EJ 300 150 6 -27.317 1.497 0.0121 -3.619
∑ 0.149
HJ 600 150 12 124.594 1.708 0.0069 4.111
HG 300 150 10 -71.823 1.417 0.0060 -1.801
CIRCUITO V
CIRCUITO V
JE 300 150 6 27.317 1.497 0.0121 3.619
EF 300 150 4 11.777 1.453 0.0183 5.489
GF 900 150 8 -59.883 1.847 0.0127 -11.441
∑ -0.023
ITERACION 07
longitud diametro caudal velocidad pendiente perdida
circuito tramo C
L (m) Ø (pulg) Qo (l/s) v (m/s) S (m/m) Hf (m)
AB 600 150 14 185.855 1.871 0.0068 4.069
BI 300 150 10 93.678 1.849 0.0098 2.946
CIRCUITO I
IJ 300 150 6 28.335 1.553 0.0129 3.872
JH 600 150 12 -124.556 1.707 0.0068 -4.109
HA 600 150 14 -244.145 2.458 0.0112 -6.744
∑ 0.035
BI 300 150 10 -93.678 1.849 0.0098 -2.946
BC 300 150 8 44.347 1.368 0.0073 2.187
CIRCUITO II
DI 300 150 6 -29.513 1.618 0.0139 -4.176
CD 300 150 6 32.427 1.778 0.0166 4.972
∑ 0.036
JI 300 150 6 -28.335 1.553 0.0129 -3.872
ID 300 150 6 29.513 1.618 0.0139 4.176
CIRCUITO III
DE 300 150 6 26.111 1.431 0.0111 3.329
EJ 300 150 6 -27.480 1.506 0.0122 -3.659
∑ -0.027
HJ 600 150 12 124.556 1.707 0.0068 4.109
HG 300 150 10 -71.809 1.417 0.0060 -1.801
CIRCUITO V
JE 300 150 6 27.480 1.506 0.0122 3.659
EF 300 150 4 11.791 1.454 0.0183 5.502
GF 900 150 8 -59.869 1.846 0.0127 -11.436
∑ 0.034
ITERACION 08
longitud diametro caudal velocidad pendiente perdida
circuito tramo C
L (m) Ø (pulg) Qo (l/s) v (m/s) S (m/m) Hf (m)
AB 600 150 14 185.780 1.871 0.0068 4.066
BI 300 150 10 93.655 1.848 0.0098 2.945
CIRCUITO I
IJ 300 150 6 28.233 1.548 0.0128 3.847
JH 600 150 12 -124.609 1.708 0.0069 -4.112
HA 600 150 14 -244.220 2.459 0.0112 -6.748
∑ -0.002
BI 300 150 10 -93.655 1.848 0.0098 -2.945
BC 300 150 8 44.295 1.366 0.0073 2.182
CIRCUITO II
DI 300 150 6 -29.593 1.622 0.0140 -4.197
CIRCUITO II
ITERACION 09
longitud diametro caudal velocidad pendiente perdida
circuito tramo C
L (m) Ø (pulg) Qo (l/s) v (m/s) S (m/m) Hf (m)
AB 600 150 14 185.786 1.871 0.0068 4.067
BI 300 150 10 93.657 1.848 0.0098 2.945
CIRCUITO I
IJ 300 150 6 28.276 1.550 0.0129 3.858
JH 600 150 12 -124.605 1.708 0.0069 -4.112
HA 600 150 14 -244.214 2.459 0.0112 -6.748
∑ 0.009
BI 300 150 10 -93.657 1.848 0.0098 -2.945
BC 300 150 8 44.299 1.366 0.0073 2.182
CIRCUITO II
DI 300 150 6 -29.551 1.620 0.0140 -4.186
CD 300 150 6 32.379 1.775 0.0165 4.958
∑ 0.010
JI 300 150 6 -28.276 1.550 0.0129 -3.858
ID 300 150 6 29.551 1.620 0.0140 4.186
CIRCUITO III
DE 300 150 6 26.100 1.431 0.0111 3.326
EJ 300 150 6 -27.471 1.506 0.0122 -3.657
∑ -0.003
HJ 600 150 12 124.605 1.708 0.0069 4.112
HG 300 150 10 -71.829 1.418 0.0060 -1.801
CIRCUITO V
JE 300 150 6 27.471 1.506 0.0122 3.657
EF 300 150 4 11.771 1.452 0.0183 5.484
GF 900 150 8 -59.889 1.847 0.0127 -11.443
∑ 0.009
ITERACION 10
longitud diametro caudal velocidad pendiente perdida
circuito tramo C
L (m) Ø (pulg) Qo (l/s) v (m/s) S (m/m) Hf (m)
AB 600 150 14 185.766 1.870 0.0068 4.066
BI 300 150 10 93.650 1.848 0.0098 2.944
CIRCUITO I
IJ 300 150 6 28.253 1.549 0.0128 3.852
JH 600 150 12 -124.620 1.708 0.0069 -4.113
HA 600 150 14 -244.234 2.459 0.0112 -6.749
∑ 0.000
BI 300 150 10 -93.650 1.848 0.0098 -2.944
BC 300 150 8 44.285 1.366 0.0073 2.181
CIRCUITO II
DI 300 150 6 -29.567 1.621 0.0140 -4.190
CD 300 150 6 32.365 1.774 0.0165 4.954
∑ 0.000
JI 300 150 6 -28.253 1.549 0.0128 -3.852
ID 300 150 6 29.567 1.621 0.0140 4.190
CIRCUITO III
DE 300 150 6 26.102 1.431 0.0111 3.327
EJ 300 150 6 -27.463 1.506 0.0122 -3.655
∑ 0.010
HJ 600 150 12 124.620 1.708 0.0069 4.113
HG 300 150 10 -71.835 1.418 0.0060 -1.802
CIRCUITO V
JE 300 150 6 27.463 1.506 0.0122 3.655
EF 300 150 4 11.765 1.451 0.0183 5.479
GF 900 150 8 -59.895 1.847 0.0127 -11.445
∑ 0.001
ITERACION 11
longitud diametro caudal velocidad pendiente perdida
circuito tramo C
L (m) Ø (pulg) Qo (l/s) v (m/s) S (m/m) Hf (m)
AB 600 150 14 185.765 1.870 0.0068 4.066
BI 300 150 10 93.650 1.848 0.0098 2.944
CIRCUITO I
IJ 300 150 6 28.262 1.549 0.0128 3.854
JH 600 150 12 -124.620 1.708 0.0069 -4.113
HA 600 150 14 -244.235 2.459 0.0112 -6.749
∑ 0.003
BI 300 150 10 -93.650 1.848 0.0098 -2.944
BC 300 150 8 44.284 1.366 0.0073 2.181
CIRCUITO II
DI 300 150 6 -29.558 1.620 0.0140 -4.188
CD 300 150 6 32.364 1.774 0.0165 4.954
∑ 0.003
JI 300 150 6 -28.262 1.549 0.0128 -3.854
ID 300 150 6 29.558 1.620 0.0140 4.188
CIRCUITO III
DE 300 150 6 26.092 1.430 0.0111 3.324
EJ 300 150 6 -27.473 1.506 0.0122 -3.657
∑ 0.000
HJ 600 150 12 124.620 1.708 0.0069 4.113
HG 300 150 10 -71.835 1.418 0.0060 -1.802
CIRCUITO V
CIRCUITO V
JE 300 150 6 27.473 1.506 0.0122 3.657
EF 300 150 4 11.765 1.451 0.0183 5.479
GF 900 150 8 -59.895 1.847 0.0127 -11.445
∑ 0.003
ITERACION 12
longitud diametro caudal velocidad pendiente perdida
circuito tramo C
L (m) Ø (pulg) Qo (l/s) v (m/s) S (m/m) Hf (m)
AB 600 150 14 185.759 1.870 0.0068 4.066
BI 300 150 10 93.648 1.848 0.0098 2.944
CIRCUITO I
IJ 300 150 6 28.257 1.549 0.0128 3.853
JH 600 150 12 -124.624 1.708 0.0069 -4.113
HA 600 150 14 -244.241 2.459 0.0112 -6.749
∑ 0.000
BI 300 150 10 -93.648 1.848 0.0098 -2.944
BC 300 150 8 44.281 1.365 0.0073 2.181
CIRCUITO II
DI 300 150 6 -29.561 1.621 0.0140 -4.189
CD 300 150 6 32.361 1.774 0.0165 4.953
∑ 0.000
JI 300 150 6 -28.257 1.549 0.0128 -3.853
ID 300 150 6 29.561 1.621 0.0140 4.189
CIRCUITO III
DE 300 150 6 26.092 1.430 0.0111 3.324
EJ 300 150 6 -27.471 1.506 0.0122 -3.657
∑ 0.003
HJ 600 150 12 124.624 1.708 0.0069 4.113
HG 300 150 10 -71.837 1.418 0.0060 -1.802
CIRCUITO V
JE 300 150 6 27.471 1.506 0.0122 3.657
EF 300 150 4 11.763 1.451 0.0183 5.478
GF 900 150 8 -59.897 1.847 0.0127 -11.445
∑ 0.000
ITERACION 13
longitud diametro caudal velocidad pendiente perdida
circuito tramo C
L (m) Ø (pulg) Qo (l/s) v (m/s) S (m/m) Hf (m)
AB 600 150 14 185.758 1.870 0.0068 4.066
BI 300 150 10 93.648 1.848 0.0098 2.944
CIRCUITO I
IJ 300 150 6 28.259 1.549 0.0128 3.853
JH 600 150 12 -124.625 1.708 0.0069 -4.113
HA 600 150 14 -244.242 2.459 0.0112 -6.749
∑ 0.001
BI 300 150 10 -93.648 1.848 0.0098 -2.944
BC 300 150 8 44.280 1.365 0.0073 2.180
CIRCUITO II
DI 300 150 6 -29.559 1.620 0.0140 -4.188
CIRCUITO II
ITERACION 14
longitud diametro caudal velocidad pendiente perdida
circuito tramo C
L (m) Ø (pulg) Qo (l/s) v (m/s) S (m/m) Hf (m)
AB 600 150 14 185.756 1.870 0.0068 4.065
BI 300 150 10 93.648 1.848 0.0098 2.944
CIRCUITO I
IJ 300 150 6 28.258 1.549 0.0128 3.853
JH 600 150 12 -124.626 1.708 0.0069 -4.113
HA 600 150 14 -244.244 2.459 0.0112 -6.749
∑ 0.000
BI 300 150 10 -93.648 1.848 0.0098 -2.944
BC 300 150 8 44.279 1.365 0.0073 2.180
CIRCUITO II
DI 300 150 6 -29.560 1.620 0.0140 -4.188
CD 300 150 6 32.359 1.774 0.0165 4.952
∑ 0.000
JI 300 150 6 -28.258 1.549 0.0128 -3.853
ID 300 150 6 29.560 1.620 0.0140 4.188
CIRCUITO III
DE 300 150 6 26.088 1.430 0.0111 3.323
EJ 300 150 6 -27.474 1.506 0.0122 -3.658
∑ 0.001
HJ 600 150 12 124.626 1.708 0.0069 4.113
HG 300 150 10 -71.838 1.418 0.0060 -1.802
CIRCUITO V
JE 300 150 6 27.474 1.506 0.0122 3.658
EF 300 150 4 11.762 1.451 0.0183 5.477
GF 900 150 8 -59.898 1.847 0.0127 -11.446
∑ 0.000
ITERACION 15
longitud diametro caudal velocidad pendiente perdida
circuito tramo C
L (m) Ø (pulg) Qo (l/s) v (m/s) S (m/m) Hf (m)
AB 600 150 14 185.756 1.870 0.0068 4.065
BI 300 150 10 93.647 1.848 0.0098 2.944
CIRCUITO I
IJ 300 150 6 28.258 1.549 0.0128 3.853
JH 600 150 12 -124.626 1.708 0.0069 -4.113
HA 600 150 14 -244.244 2.459 0.0112 -6.749
∑ 0.000
BI 300 150 10 -93.647 1.848 0.0098 -2.944
BC 300 150 8 44.278 1.365 0.0073 2.180
CIRCUITO II
DI 300 150 6 -29.559 1.620 0.0140 -4.188
CD 300 150 6 32.358 1.774 0.0165 4.952
∑ 0.000
JI 300 150 6 -28.258 1.549 0.0128 -3.853
ID 300 150 6 29.559 1.620 0.0140 4.188
CIRCUITO III
DE 300 150 6 26.087 1.430 0.0111 3.323
EJ 300 150 6 -27.475 1.506 0.0122 -3.658
∑ 0.000
HJ 600 150 12 124.626 1.708 0.0069 4.113
HG 300 150 10 -71.838 1.418 0.0060 -1.802
CIRCUITO V
JE 300 150 6 27.475 1.506 0.0122 3.658
EF 300 150 4 11.762 1.451 0.0183 5.477
GF 900 150 8 -59.898 1.847 0.0127 -11.446
∑ 0.000
k2= 1.8 2.5
QMH= 0.00000
k1= 1.3
0
30
0
+ −
Hf/Qo ∆Q Q1
Hf/Qo ∆Q Q1
Hf/Qo ∆Q Q1
Hf/Qo ∆Q Q1
Hf/Qo ∆Q Q1
0.022 -0.29389 185.802
0.031 -0.08802 93.663
0.138 -0.45884 28.132
0.033 -0.21055 -124.594
0.028 -0.29389 -244.198
0.252
0.031 0.08802 -93.663
0.049 -0.20587 44.309
0.141 -0.37082 -29.701
0.154 -0.20587 32.389
0.376
0.138 0.45884 -28.132
0.141 0.37082 29.701
0.127 0.16495 26.260
0.134 0.24829 -27.317
0.539
0.033 0.21055 124.594
0.025 -0.08334 -71.823
0.134 -0.24829 27.317
0.469 -0.08334 11.777
0.191 -0.08334 -59.883
0.851
Hf/Qo ∆Q Q1
Hf/Qo ∆Q Q1
Hf/Qo ∆Q Q1
Hf/Qo ∆Q Q1
Hf/Qo ∆Q Q1
0.022 -0.00098 185.765
0.031 -0.00036 93.650
0.136 0.00920 28.262
0.033 -0.00064 -124.620
0.028 -0.00098 -244.235
0.250
0.031 0.00036 -93.650
0.049 -0.00062 44.284
0.142 0.00956 -29.558
0.153 -0.00062 32.364
0.375
0.136 -0.00920 -28.262
0.142 -0.00956 29.558
0.127 -0.01018 26.092
0.133 -0.00984 -27.473
0.539
0.033 0.00064 124.620
0.025 -0.00034 -71.835
0.133 0.00984 27.473
0.466 -0.00034 11.765
0.191 -0.00034 -59.895
0.848
Hf/Qo ∆Q Q1
Hf/Qo ∆Q Q1
Hf/Qo ∆Q Q1
Hf/Qo ∆Q Q1
Hf/Qo ∆Q Q1
0.022 -0.00053 185.755
0.031 -0.00016 93.647
0.136 -0.00029 28.258
0.033 -0.00037 -124.627
0.028 -0.00053 -244.245
0.250
0.031 0.00016 -93.647
0.049 -0.00036 44.278
0.142 -0.00012 -29.559
0.153 -0.00036 32.358
0.375
0.136 0.00029 -28.258
0.142 0.00012 29.559
0.127 -0.00024 26.087
0.133 -0.00009 -27.475
0.539
0.033 0.00037 124.627
0.025 -0.00015 -71.838
0.133 0.00009 27.475
0.466 -0.00015 11.762
0.191 -0.00015 -59.898
0.848
POBLACION FUTURA= 25000 HAB CALCULO DEL CAUDAL DE DISEÑO
DOTACION= 200 LT/HAB/DIA
1. CADAL MAXIMO HORARIO
CAUDAL PROMEDIO Qp= 57.87037 lt/seg
2. QMD+Qincendio
CAUDAL DE DISEÑO
105.231 LT/SEG
QMD+Qincendio=
C= 140
ITERACION 01
longitud diametro caudal velocidad pendiente
circuito tramo C
L (m) Ø (pulg) Qo (l/s) v (m/s) S (m/m)
AB 500 140 6 14.215 0.779 0.0041
BC 800 140 6 -33.139 1.817 0.0196
CIRCUITO I
CD 1500 140 8 -40.503 1.249 0.0070
AD 700 100 4 16.837 2.077 0.0752
∑
AD 700 100 4 -16.837 2.077 0.07516
FA 500 100 5 -15.785 1.246 0.02250
CIRCUITO II
EF 500 100 5 10.523 0.831 0.01062
DE 1000 100 6 17.889 0.981 0.0117
∑
ITERACION 02
longitud diametro caudal velocidad pendiente
circuito tramo C
L (m) Ø (pulg) Qo (l/s) v (m/s) S (m/m)
AB 500 140 6 10.369 0.568 0.0023
BC 800 140 6 -36.985 2.028 0.0240
CIRCUITO I
CD 1500 140 8 -44.349 1.368 0.0083
AD 700 100 4 7.917 0.976 0.0186
∑
AD 700 100 4 -7.917 0.976 0.0186
CIRCUITO II
FA 500 100 5 -10.711 0.846 0.0110
CIRCUITO II
EF 500 100 5 15.597 1.231 0.0220
DE 1000 100 6 22.963 1.259 0.0185
∑
ITERACION 03
longitud diametro caudal velocidad pendiente
circuito tramo C
L (m) Ø (pulg) Qo (l/s) v (m/s) S (m/m)
AB 500 140 6 14.074 0.772 0.0040
BC 800 140 6 -33.280 1.824 0.0198
CIRCUITO I
CD 1500 140 8 -40.644 1.253 0.0070
AD 700 100 4 13.249 1.634 0.0482
∑
AD 700 100 4 -13.249 1.634 0.0482
FA 500 100 5 -12.338 0.974 0.0143
CIRCUITO II
EF 500 100 5 13.970 1.103 0.0179
DE 1000 100 6 21.336 1.170 0.0162
∑
ITERACION 04
longitud diametro caudal velocidad pendiente
circuito tramo C
L (m) Ø (pulg) Qo (l/s) v (m/s) S (m/m)
AB 500 140 6 12.593 0.690 0.0033
BC 800 140 6 -34.761 1.906 0.0214
CIRCUITO I
CD 1500 140 8 -42.125 1.299 0.0075
AD 700 100 4 9.888 1.220 0.0281
∑
AD 700 100 4 -9.888 1.220 0.0281
FA 500 100 5 -10.459 0.826 0.0105
CIRCUITO II
EF 500 100 5 15.849 1.251 0.0227
DE 1000 100 6 23.215 1.273 0.0189
∑
ITERACION 05
longitud diametro caudal velocidad pendiente
circuito tramo C
L (m) Ø (pulg) Qo (l/s) v (m/s) S (m/m)
AB 500 140 6 13.938 0.764 0.0039
BC 800 140 6 -33.416 1.832 0.0199
CIRCUITO I
CD 1500 140 8 -40.780 1.257 0.0071
AD 700 100 4 11.955 1.475 0.0399
∑
AD 700 100 4 -11.955 1.475 0.0399
FA 500 100 5 -11.180 0.883 0.0119
CIRCUITO II
CIRCUITO II
EF 500 100 5 15.128 1.194 0.0208
DE 1000 100 6 22.494 1.233 0.0178
∑
ITERACION 06
longitud diametro caudal velocidad pendiente
circuito tramo C
L (m) Ø (pulg) Qo (l/s) v (m/s) S (m/m)
AB 500 140 6 13.381 0.734 0.0037
BC 800 140 6 -33.973 1.862 0.0205
CIRCUITO I
CD 1500 140 8 -41.337 1.275 0.0073
AD 700 100 4 10.700 1.320 0.0325
∑
AD 700 100 4 -10.700 1.320 0.0325
FA 500 100 5 -10.482 0.827 0.0105
CIRCUITO II
EF 500 100 5 15.826 1.249 0.0226
DE 1000 100 6 23.192 1.271 0.0189
∑
ITERACION 07
longitud diametro caudal velocidad pendiente
circuito tramo C
L (m) Ø (pulg) Qo (l/s) v (m/s) S (m/m)
AB 500 140 6 13.880 0.761 0.0039
BC 800 140 6 -33.474 1.835 0.0200
CIRCUITO I
CD 1500 140 8 -40.838 1.259 0.0071
AD 700 100 4 11.483 1.416 0.0370
∑
AD 700 100 4 -11.483 1.416 0.0370
FA 500 100 5 -10.766 0.850 0.0111
CIRCUITO II
EF 500 100 5 15.542 1.227 0.0219
DE 1000 100 6 22.908 1.256 0.0184
∑
ITERACION 08
longitud diametro caudal velocidad pendiente
circuito tramo C
L (m) Ø (pulg) Qo (l/s) v (m/s) S (m/m)
AB 500 140 6 13.671 0.749 0.0038
BC 800 140 6 -33.683 1.847 0.0202
CIRCUITO I
CD 1500 140 8 -41.047 1.266 0.0072
AD 700 100 4 11.014 1.358 0.0342
∑
AD 700 100 4 -11.014 1.358 0.0342
FA 500 100 5 -10.506 0.829 0.0106
CIRCUITO II
EF 500 100 5 15.802 1.247 0.0225
CIRCUITO II
ITERACION 09
longitud diametro caudal velocidad pendiente
circuito tramo C
L (m) Ø (pulg) Qo (l/s) v (m/s) S (m/m)
AB 500 140 6 13.857 0.760 0.0039
BC 800 140 6 -33.497 1.836 0.0200
CIRCUITO I
CD 1500 140 8 -40.861 1.260 0.0071
AD 700 100 4 11.308 1.395 0.0360
∑
AD 700 100 4 -11.308 1.395 0.0360
FA 500 100 5 -10.615 0.838 0.0108
CIRCUITO II
EF 500 100 5 15.693 1.239 0.0223
DE 1000 100 6 23.059 1.264 0.0187
∑
ITERACION 10
longitud diametro caudal velocidad pendiente
circuito tramo C
L (m) Ø (pulg) Qo (l/s) v (m/s) S (m/m)
AB 500 140 6 13.778320 0.755329 0.003859
BC 800 140 6 -33.575680 1.840624 0.020084
CIRCUITO I
CD 1500 140 8 -40.939680 1.262430 0.007142
AD 700 100 4 11.132607 1.373155 0.034935
∑
AD 700 100 4 -11.132607 1.373155 0.034935
FA 500 100 5 -10.517287 0.830245 0.010606
CIRCUITO II
EF 500 100 5 15.790713 1.246535 0.022511
DE 1000 100 6 23.156713 1.269454 0.018822
∑
ITERACION 11
longitud diametro caudal velocidad pendiente
circuito tramo C
L (m) Ø (pulg) Qo (l/s) v (m/s) S (m/m)
AB 500 140 6 13.847989 0.759149 0.003895
BC 800 140 6 -33.506011 1.836804 0.020007
CIRCUITO I
CD 1500 140 8 -40.870011 1.260281 0.007120
AD 700 100 4 11.243221 1.386799 0.035581
∑
AD 700 100 4 -11.243221 1.386799 0.035581
FA 500 100 5 -10.558232 0.833477 0.010682
CIRCUITO II
EF 500 100 5 15.749768 1.243303 0.022403
DE 1000 100 6 23.115768 1.267210 0.018761
∑
CAUDAL DE DISEÑO
k2= 1.8 2.5
MAXIMO HORARIO QMH= 104.16667
k1= 1.3
QMD= 75.2314814815
Qincend= 30
QMD+Qincendio= 105.23148148
+ −
perdida Hf/Qo ∆Q Q1
Hf (m)
1.634 0.130 1.34540 13.938
-17.134 0.493 1.34540 -33.416
-11.295 0.268 1.34540 -40.780
19.636 1.986 2.06663 11.955
-7.160 2.876
-19.636 1.986 -2.06663 -11.955
-5.248 0.502 -0.72122 -11.180
11.333 0.715 -0.72122 15.128
18.911 0.815 -0.72122 22.494
5.360 4.017
perdida Hf/Qo ∆Q Q1
Hf (m)
1.971 0.141 -0.55760 13.381
-15.926 0.477 -0.55760 -33.973
-10.636 0.261 -0.55760 -41.337
27.905 2.334 -1.25534 10.700
3.314 3.213
-27.905 2.334 1.25534 -10.700
-5.938 0.531 0.69774 -10.482
10.397 0.687 0.69774 15.826
17.837 0.793 0.69774 23.192
-5.609 4.346
perdida Hf/Qo ∆Q Q1
Hf (m)
1.828 0.137 0.49928 13.880
-16.422 0.483 0.49928 -33.474
-10.907 0.264 0.49928 -40.838
22.723 2.124 0.78350 11.483
-2.778 3.008
-22.723 2.124 -0.78350 -11.483
-5.270 0.503 -0.28423 -10.766
11.302 0.714 -0.28423 15.542
18.875 0.814 -0.28423 22.908
2.185 4.154
perdida Hf/Qo ∆Q Q1
Hf (m)
1.956 0.141 -0.20938 13.671
-15.977 0.477 -0.20938 -33.683
-10.664 0.261 -0.20938 -41.047
25.900 2.255 -0.46957 11.014
1.214 3.135
-25.900 2.255 0.46957 -11.014
-5.538 0.514 0.26019 -10.506
10.929 0.703 0.26019 15.802
18.449 0.805 0.26019 23.168
-2.059 4.278
perdida Hf/Qo ∆Q Q1
Hf (m)
1.902 0.139 0.18633 13.857
-16.163 0.480 0.18633 -33.497
-10.766 0.262 0.18633 -40.861
23.973 2.177 0.29479 11.308
-1.054 3.058
-23.973 2.177 -0.29479 -11.308
-5.292 0.504 -0.10846 -10.615
11.270 0.713 -0.10846 15.693
18.839 0.813 -0.10846 23.059
0.844 4.207
perdida Hf/Qo ∆Q Q1
Hf (m)
1.950 0.141 -0.07858 13.778
-15.998 0.478 -0.07858 -33.576
-10.675 0.261 -0.07858 -40.940
25.175 2.226 -0.17582 11.133
0.451 3.106
-25.175 2.226 0.17582 -11.133
-5.394 0.508 0.09724 -10.517
11.127 0.709 0.09724 15.791
18.676 0.810 0.09724 23.157
-0.765 4.253
perdida Hf/Qo ∆Q Q1
Hf (m)
1.929639 0.140049 0.069669 13.847989
-16.067384 0.478542 0.069669 -33.506011
-10.713449 0.261689 0.069669 -40.870011
24.454613 2.196666 0.110614 11.243221
-0.396581 3.076945
-24.454613 2.196666 -0.110614 -11.243221
-5.302944 0.504212 -0.040945 -10.558232
11.255512 0.712793 -0.040945 15.749768
18.822194 0.812818 -0.040945 23.115768
0.320 4.226
perdida Hf/Qo ∆Q Q1
Hf (m)
1.947746 0.140652 -0.029485 13.818504
-16.005699 0.477696 -0.029485 -33.535496
-10.679711 0.261309 -0.029485 -40.899496
24.906483 2.215245 -0.065860 11.177361
0.168820 3.094902
-24.906483 2.215245 0.065860 -11.177361
-5.341239 0.505884 0.036375 -10.521857
11.201525 0.711218 0.036375 15.786143
18.760609 0.811594 0.036375 23.152143
-0.286 4.244
AB 500 140 6 31.569
BC 800 140 6 -15.785
CD 1500 140 8 -23.181
AD 700 100 4 34.191
140 6 13.154
140 6 -18.415
140 8 -34.195
100 4 -16.837
100 4 16.837
100 5 15.78
100 5 26.303
100 6 33.669
140 4 17.229
140 4 10.884
140 6 -44.978
140 4 -12.689
140 4 12.689
140 6 -21.377
140 6 -13.866
140 4 -7.522
140 6 54.715
140 6 23.146
140 8 7.366
100 4 -16.837
100 4 16.837
100 5 57.332
100 5 67.855
100 6 75.221
140 6 34.722
140 6 3.153
140 8 -12.632
100 4 -6.741
100 4 6.741
100 5 -14.31
100 5 -3.786
100 6 3.58
calculo de las presiones en cad
tramo diametro caudal velocidad perdida PUNTO
AB 6 13.8479889 0.75914877 1.94774629 A
BC 6 -33.506011 1.83680441 -16.005699 B
CD 8 -40.870011 1.26028123 -10.679711 C
AD 4 11.2432206 1.38679873 24.9064833 D
E
AD 4 -11.243221 1.38679873 -24.906483 F
FA 5 -10.558232 0.83347748 -5.341239 A
EF 5 15.7497682 1.24330261 11.201525
DE 6 23.1157682 1.26720978 18.7606093
Q
D
C
38.0253497
62.207 98.0591715
8 6.83606046
140
33.3333333 15.499223
L 0.45
HF 6.97465034
C= 140
ITERACION 01
longitud diametro caudal velocidad pendiente perdida
circuito tramo C
L (m) Ø (pulg) Qo (l/s) v (m/s) S (m/m) Hf (m)
AB 186 140 6 43.784 2.400 0.0328 6.108
BC 252.31 140 6 37.435 2.052 0.0246 6.199
CIRCUITO I
AF 253.15 140 4 -18.423 2.272 0.0476 -12.055
FC 186 140 4 12.689 1.565 0.0239 4.440
∑ 4.692
FC 186 140 4 -12.689 1.565 0.0239 -4.440
FE 203 140 4 -7.511 0.926 0.0090 -1.835
CIRCUITO II
ED 186 140 4 6.344 0.783 0.0066 1.230
DC 203.31 140 4 13.866 1.710 0.0281 5.720
∑ 0.675
ITERACION 02
longitud diametro caudal velocidad pendiente perdida
circuito tramo C
L (m) Ø (pulg) Qo (l/s) v (m/s) S (m/m) Hf (m)
AB 186 140 6 41.847 2.294 0.0302 5.617
BC 252.31 140 6 35.498 1.946 0.0223 5.618
CIRCUITO I
AF 253.15 140 4 -20.360 2.511 0.0573 -14.506
CIRCUITO I
ITERACION 03
longitud diametro caudal velocidad pendiente perdida
circuito tramo C
L (m) Ø (pulg) Qo (l/s) v (m/s) S (m/m) Hf (m)
AB 186 140 6 41.778 2.290 0.0301 5.599
BC 252.31 140 6 35.429 1.942 0.0222 5.598
CIRCUITO I
AF 253.15 140 4 -20.429 2.520 0.0577 -14.598
FC 186 140 4 11.547 1.424 0.0200 3.729
∑ 0.328
FC 186 140 4 -11.547 1.424 0.0200 -3.729
FE 203 140 4 -8.376 1.033 0.0111 -2.245
CIRCUITO II
ED 186 140 4 5.479 0.676 0.0050 0.938
DC 203.31 140 4 13.001 1.604 0.0250 5.077
∑ 0.040
ITERACION 04
longitud diametro caudal velocidad pendiente perdida
circuito tramo C
L (m) Ø (pulg) Qo (l/s) v (m/s) S (m/m) Hf (m)
AB 186 140 6 41.644 2.283 0.0299 5.566
BC 252.31 140 6 35.295 1.935 0.0220 5.559
CIRCUITO I
AF 253.15 140 4 -20.563 2.536 0.0584 -14.775
FC 186 140 4 11.433 1.410 0.0197 3.661
∑ 0.011
FC 186 140 4 -11.433 1.410 0.0197 -3.661
FE 203 140 4 -8.395 1.035 0.0111 -2.255
CIRCUITO II
ED 186 140 4 5.460 0.674 0.0050 0.932
DC 203.31 140 4 12.982 1.601 0.0249 5.063
∑ 0.080
ITERACION 05
longitud diametro caudal velocidad pendiente perdida
circuito tramo C
L (m) Ø (pulg) Qo (l/s) v (m/s) S (m/m) Hf (m)
AB 186 140 6 41.640 2.283 0.0299 5.565
CIRCUITO I
BC 252.31 140 6 35.291 1.935 0.0220 5.557
CIRCUITO I
AF 253.15 140 4 -20.567 2.537 0.0584 -14.781
FC 186 140 4 11.466 1.414 0.0198 3.680
∑ 0.022
FC 186 140 4 -11.466 1.414 0.0198 -3.680
FE 203 140 4 -8.432 1.040 0.0112 -2.273
CIRCUITO II
ED 186 140 4 5.423 0.669 0.0049 0.920
DC 203.31 140 4 12.945 1.597 0.0248 5.036
∑ 0.003
ITERACION 06
longitud diametro caudal velocidad pendiente perdida
circuito tramo C
L (m) Ø (pulg) Qo (l/s) v (m/s) S (m/m) Hf (m)
AB 186 140 6 41.631 2.282 0.0299 5.563
BC 252.31 140 6 35.282 1.934 0.0220 5.555
CIRCUITO I
AF 253.15 140 4 -20.576 2.538 0.0584 -14.793
FC 186 140 4 11.458 1.413 0.0198 3.676
∑ 0.001
FC 186 140 4 -11.458 1.413 0.0198 -3.676
FE 203 140 4 -8.433 1.040 0.0112 -2.274
CIRCUITO II
ED 186 140 4 5.422 0.669 0.0049 0.920
DC 203.31 140 4 12.944 1.597 0.0248 5.036
∑ 0.005
ITERACION 07
longitud diametro caudal velocidad pendiente perdida
circuito tramo C
L (m) Ø (pulg) Qo (l/s) v (m/s) S (m/m) Hf (m)
AB 186 140 6 41.631 2.282 0.0299 5.563
BC 252.31 140 6 35.282 1.934 0.0220 5.555
CIRCUITO I
AF 253.15 140 4 -20.576 2.538 0.0584 -14.793
FC 186 140 4 11.460 1.414 0.0198 3.677
∑ 0.001
FC 186 140 4 -11.460 1.414 0.0198 -3.677
FE 203 140 4 -8.436 1.040 0.0112 -2.275
CIRCUITO II
ED 186 140 4 5.419 0.668 0.0049 0.919
DC 203.31 140 4 12.941 1.596 0.0248 5.034
∑ 0.000
ITERACION 08
longitud diametro caudal velocidad pendiente perdida
circuito tramo C
circuito tramo C
L (m) Ø (pulg) Qo (l/s) v (m/s) S (m/m) Hf (m)
AB 186 140 6 41.630 2.282 0.0299 5.563
BC 252.31 140 6 35.281 1.934 0.0220 5.554
CIRCUITO I
AF 253.15 140 4 -20.577 2.538 0.0584 -14.794
FC 186 140 4 11.460 1.414 0.0198 3.677
∑ 0.000
FC 186 140 4 -11.460 1.414 0.0198 -3.677
FE 203 140 4 -8.436 1.041 0.0112 -2.275
CIRCUITO II
ED 186 140 4 5.419 0.668 0.0049 0.919
DC 203.31 140 4 12.941 1.596 0.0248 5.034
∑ 0.000
ITERACION 09
longitud diametro caudal velocidad pendiente perdida
circuito tramo C
L (m) Ø (pulg) Qo (l/s) v (m/s) S (m/m) Hf (m)
AB 186 140 6 41.630 2.282 0.0299 5.563
BC 252.31 140 6 35.281 1.934 0.0220 5.554
CIRCUITO I
AF 253.15 140 4 -20.577 2.538 0.0584 -14.794
FC 186 140 4 11.460 1.414 0.0198 3.677
∑ 0.000
FC 186 140 4 -11.460 1.414 0.0198 -3.677
FE 203 140 4 -8.436 1.041 0.0112 -2.275
CIRCUITO II
ED 186 140 4 5.419 0.668 0.0049 0.919
DC 203.31 140 4 12.941 1.596 0.0248 5.034
∑ 0.000
ITERACION 10
longitud diametro caudal velocidad pendiente perdida
circuito tramo C
L (m) Ø (pulg) Qo (l/s) v (m/s) S (m/m) Hf (m)
AB 186 140 6 41.630 2.282 0.0299 5.563
BC 252.31 140 6 35.281 1.934 0.0220 5.554
CIRCUITO I
AF 253.15 140 4 -20.577 2.538 0.0584 -14.794
FC 186 140 4 11.460 1.414 0.0198 3.677
∑ 0.000
FC 186 140 4 -11.460 1.414 0.0198 -3.677
FE 203 140 4 -8.436 1.041 0.0112 -2.275
CIRCUITO II
ED 186 140 4 5.419 0.668 0.0049 0.919
DC 203.31 140 4 12.941 1.596 0.0248 5.034
∑ 0.000
k2= 1.8 2.5
QMH= 44.59500
k1= 1.3
32.2075
30
62.2075
+ −
Hf/Qo ∆Q Q1
Hf/Qo ∆Q Q1
Hf/Qo ∆Q Q1
Hf/Qo ∆Q Q1
Hf/Qo ∆Q Q1
Hf/Qo ∆Q Q1
Hf/Qo ∆Q Q1
Hf/Qo ∆Q Q1
0.134 -0.00002 41.630
0.157 -0.00002 35.281
0.719 -0.00002 -20.577
0.321 0.00015 11.460
1.331
0.321 -0.00015 -11.460
0.270 -0.00017 -8.436
0.170 -0.00017 5.419
0.389 -0.00017 12.941
1.149
Hf/Qo ∆Q Q1
QMD+Qincendio=
C= 140
ITERACIÓN 01
longitud diametro caudal velocidad pendiente
circuito tramo C
L (m) Ø (pulg) Qo (l/s) v (m/s) S (m/m)
AB 500 140 8 61.340 1.892 0.0151
EF 510 140 6 -26.710 1.464 0.0131
CIRCUITO I
FA 300 140 6 -36.370 1.994 0.0233
BE 200 140 4 14.500 1.789 0.0306
∑
BE 200 140 4 -14.500 1.789 0.0306
BC 400 140 4 10.390 1.282 0.0165
CIRCUITO II
CD 200 140 3 5.620 1.232 0.0214
DE 400 140 4 -8.69 1.072 0.0118
∑
ITERACIÓN 02
longitud diametro caudal velocidad pendiente
circuito tramo C
L (m) Ø (pulg) Qo (l/s) v (m/s) S (m/m)
AB 500 140 8 61.356 1.892 0.0151
EF 510 140 6 -26.694 1.463 0.0131
CIRCUITO I
FA 300 140 6 -36.354 1.993 0.0233
BE 200 140 4 14.524 1.791 0.0307
∑
BE 200 140 4 -14.524 1.791 0.0307
BC 400 140 4 10.382 1.281 0.0165
CIRCUITO II
CD 200 140 3 5.612 1.231 0.0214
DE 400 140 4 -8.698 1.073 0.0119
∑
ITERACIÓN 03
longitud diametro caudal velocidad pendiente
circuito tramo C
L (m) Ø (pulg) Qo (l/s) v (m/s) S (m/m)
AB 500 140 8 61.352 1.892 0.0151
EF 510 140 6 -26.698 1.464 0.0131
CIRCUITO I
FA 300 140 6 -36.358 1.993 0.0233
BE 200 140 4 14.518 1.791 0.0306
∑
BE 200 140 4 -14.518 1.791 0.0306
BC 400 140 4 10.385 1.281 0.0165
CIRCUITO II
CD 200 140 3 5.615 1.231 0.0214
DE 400 140 4 -8.695 1.073 0.0119
∑
ITERACIÓN 04
longitud diametro caudal velocidad pendiente
circuito tramo C
L (m) Ø (pulg) Qo (l/s) v (m/s) S (m/m)
AB 500 140 8 61.354 1.892 0.0151
EF 510 140 6 -26.696 1.463 0.0131
CIRCUITO I
FA 300 140 6 -36.356 1.993 0.0233
BE 200 140 4 14.519 1.791 0.0306
∑
BE 200 140 4 -14.519 1.791 0.0306
BC 400 140 4 10.384 1.281 0.0165
CIRCUITO II
CD 200 140 3 5.614 1.231 0.0214
DE 400 140 4 -8.696 1.073 0.0119
∑
ITERACIÓN 05
longitud diametro caudal velocidad pendiente
circuito tramo C
L (m) Ø (pulg) Qo (l/s) v (m/s) S (m/m)
AB 500 140 8 61.353 1.892 0.0151
EF 510 140 6 -26.697 1.464 0.0131
CIRCUITO I
FA 300 140 6 -36.357 1.993 0.0233
BE 200 140 4 14.519 1.791 0.0306
∑
BE 200 140 4 -14.519 1.791 0.0306
BC 400 140 4 10.384 1.281 0.0165
CIRCUITO II
CD 200 140 3 5.614 1.231 0.0214
CIRCUITO II
ITERACIÓN 06
longitud diametro caudal velocidad pendiente
circuito tramo C
L (m) Ø (pulg) Qo (l/s) v (m/s) S (m/m)
AB 500 140 8 61.353 1.892 0.0151
EF 510 140 6 -26.697 1.464 0.0131
CIRCUITO I
FA 300 140 6 -36.357 1.993 0.0233
BE 200 140 4 14.519 1.791 0.0306
∑
BE 200 140 4 -14.519 1.791 0.0306
BC 400 140 4 10.384 1.281 0.0165
CIRCUITO II
CD 200 140 3 5.614 1.231 0.0214
DE 400 140 4 -8.696 1.073 0.0119
∑
ITERACIÓN 07
longitud diametro caudal velocidad pendiente
circuito tramo C
L (m) Ø (pulg) Qo (l/s) v (m/s) S (m/m)
AB 500 140 8 61.353 1.892 0.0151
EF 510 140 6 -26.697 1.464 0.0131
CIRCUITO I
FA 300 140 6 -36.357 1.993 0.0233
BE 200 140 4 14.519 1.791 0.0306
∑
BE 200 140 4 -14.519 1.791 0.0306
BC 400 140 4 10.384 1.281 0.0165
CIRCUITO II
CD 200 140 3 5.614 1.231 0.0214
DE 400 140 4 -8.696 1.073 0.0119
∑
ITERACIÓN 08
longitud diametro caudal velocidad pendiente
circuito tramo C
L (m) Ø (pulg) Qo (l/s) v (m/s) S (m/m)
AB 500 140 8 61.353 1.892 0.0151
EF 510 140 6 -26.697 1.464 0.0131
CIRCUITO I
FA 300 140 6 -36.357 1.993 0.0233
BE 200 140 4 14.519 1.791 0.0306
∑
BE 200 140 4 -14.519 1.791 0.0306
BC 400 140 4 10.384 1.281 0.0165
CIRCUITO II
CD 200 140 3 5.614 1.231 0.0214
DE 400 140 4 -8.696 1.073 0.0119
∑
ITERACIÓN 09
longitud diametro caudal velocidad pendiente
circuito tramo C
L (m) Ø (pulg) Qo (l/s) v (m/s) S (m/m)
AB 500 140 8 61.353 1.892 0.0151
EF 510 140 6 -26.697 1.464 0.0131
CIRCUITO I
FA 300 140 6 -36.357 1.993 0.0233
BE 200 140 4 14.519 1.791 0.0306
∑
BE 200 140 4 -14.519 1.791 0.0306
BC 400 140 4 10.384 1.281 0.0165
CIRCUITO II
CD 200 140 3 5.614 1.231 0.0214
DE 400 140 4 -8.696 1.073 0.0119
∑
ITERACIÓN 10
longitud diametro caudal velocidad pendiente
circuito tramo C
L (m) Ø (pulg) Qo (l/s) v (m/s) S (m/m)
AB 500 140 8 61.353 1.892 0.0151
EF 510 140 6 -26.697 1.464 0.0131
CIRCUITO I
FA 300 140 6 -36.357 1.993 0.0233
BE 200 140 4 14.519 1.791 0.0306
∑
BE 200 140 4 -14.519 1.791 0.0306
BC 400 140 4 10.384 1.281 0.0165
CIRCUITO II
CD 200 140 3 5.614 1.231 0.0214
DE 400 140 4 -8.696 1.073 0.0119
∑
ITERACIÓN 11
longitud diametro caudal velocidad pendiente
circuito tramo C
L (m) Ø (pulg) Qo (l/s) v (m/s) S (m/m)
AB 500 140 8 61.353 1.892 0.0151
EF 510 140 6 -26.697 1.464 0.0131
CIRCUITO I
FA 300 140 6 -36.357 1.993 0.0233
BE 200 140 4 14.519 1.791 0.0306
∑
BE 200 140 4 -14.519 1.791 0.0306
BC 400 140 4 10.384 1.281 0.0165
CIRCUITO II
CD 200 140 3 5.614 1.231 0.0214
DE 400 140 4 -8.696 1.073 0.0119
∑
ITERACIÓN 12
longitud diametro caudal velocidad pendiente
circuito tramo C
circuito tramo C
L (m) Ø (pulg) Qo (l/s) v (m/s) S (m/m)
AB 500 140 8 61.353 1.892 0.0151
EF 510 140 6 -26.697 1.464 0.0131
CIRCUITO I
FA 300 140 6 -36.357 1.993 0.0233
BE 200 140 4 14.519 1.791 0.0306
∑
BE 200 140 4 -14.519 1.791 0.0306
BC 400 140 4 10.384 1.281 0.0165
CIRCUITO II
CD 200 140 4 5.614 0.693 0.0053
DE 400 140 4 -8.696 1.073 0.0119
∑
k1= 1.3
QMD= 67.7083333
Qincend= 30
QMD+Qincendio= 97.708333
CAUDAL DE DISEÑO
97.708 LT/SEG
perdida Hf/Qo ∆Q Q1
Hf (m)
7.551
-6.706
0.123
0.251
0.01585
0.01585
61.356
-26.694
+ −
-6.987 0.192 0.01585 -36.354
6.113 0.422 0.02386 14.524
-0.029 0.988
-6.113 0.422 -0.02386 -14.524
6.595 0.635 -0.00800 10.382
4.290 0.763 -0.00800 5.612
-4.737 0.545 -0.00800 -8.698
0.035 2.365
perdida Hf/Qo ∆Q Q1
Hf (m)
7.554 0.123 -0.00344 61.352
-6.698 0.251 -0.00344 -26.698
-6.981 0.192 -0.00344 -36.358
6.131 0.422 -0.00628 14.518
0.006 0.988
-6.131 0.422 0.00628 -14.518
6.585 0.634 0.00284 10.385
4.279 0.762 0.00284 5.615
-4.745 0.546 0.00284 -8.695
-0.012 2.364
perdida Hf/Qo ∆Q Q1
Hf (m)
7.554 0.123 0.00122 61.354
-6.700 0.251 0.00122 -26.696
-6.982 0.192 0.00122 -36.356
6.126 0.422 0.00183 14.519
-0.002 0.988
-6.126 0.422 -0.00183 -14.519
6.589 0.634 -0.00062 10.384
4.283 0.763 -0.00062 5.614
-4.742 0.545 -0.00062 -8.696
0.003 2.365
perdida Hf/Qo ∆Q Q1
Hf (m)
7.554 0.123 -0.00027 61.353
-6.699 0.251 -0.00027 -26.697
-6.982 0.192 -0.00027 -36.357
6.128 0.422 -0.00048 14.519
0.000 0.988
-6.128 0.422 0.00048 -14.519
6.588 0.634 0.00022 10.384
4.282 0.763 0.00022 5.614
-4.743 0.545 0.00022 -8.696
-0.001 2.365
perdida Hf/Qo ∆Q Q1
Hf (m)
7.554 0.123 0.00009 61.353
-6.699 0.251 0.00009 -26.697
-6.982 0.192 0.00009 -36.357
6.127 0.422 0.00014 14.519
0.000 0.988
-6.127 0.422 -0.00014 -14.519
6.588 0.634 -0.00005 10.384
4.282 0.763 -0.00005 5.614
-4.743 0.545 -0.00005 -8.696
0.000 2.365
perdida Hf/Qo ∆Q Q1
Hf (m)
7.554 0.123 -0.00002 61.353
-6.699 0.251 -0.00002 -26.697
-6.982 0.192 -0.00002 -36.357
6.127 0.422 -0.00004 14.519
0.000 0.988
-6.127 0.422 0.00004 -14.519
6.588 0.634 0.00002 10.384
4.282 0.763 0.00002 5.614
-4.743 0.545 0.00002 -8.696
0.000 2.365
perdida Hf/Qo ∆Q Q1
Hf (m)
7.554 0.123 0.00001 61.353
-6.699 0.251 0.00001 -26.697
-6.982 0.192 0.00001 -36.357
6.127 0.422 0.00001 14.519
0.000 0.988
-6.127 0.422 -0.00001 -14.519
6.588 0.634 0.00000 10.384
4.282 0.763 0.00000 5.614
-4.743 0.545 0.00000 -8.696
0.000 2.365
perdida Hf/Qo ∆Q Q1
Hf (m)
7.554 0.123 0.00000 61.353
-6.699 0.251 0.00000 -26.697
-6.982 0.192 0.00000 -36.357
6.127 0.422 0.00000 14.519
0.000 0.988
-6.127 0.422 0.00000 -14.519
6.588 0.634 0.00000 10.384
4.282 0.763 0.00000 5.614
-4.743 0.545 0.00000 -8.696
0.000 2.365
perdida Hf/Qo ∆Q Q1
Hf (m)
7.554 0.123 0.00000 61.353
-6.699 0.251 0.00000 -26.697
-6.982 0.192 0.00000 -36.357
6.127 0.422 0.00000 14.519
0.000 0.988
-6.127 0.422 0.00000 -14.519
6.588 0.634 0.00000 10.384
4.282 0.763 0.00000 5.614
-4.743 0.545 0.00000 -8.696
0.000 2.365
perdida Hf/Qo ∆Q Q1
Hf (m)
7.554 0.123 0.00000 61.353
-6.699 0.251 0.00000 -26.697
-6.982 0.192 0.00000 -36.357
6.127 0.422 0.00000 14.519
0.000 0.988
-6.127 0.422 0.00000 -14.519
6.588 0.634 0.00000 10.384
4.282 0.763 0.00000 5.614
-4.743 0.545 0.00000 -8.696
0.000 2.365
perdida Hf/Qo ∆Q Q1
Hf (m)
7.554 0.123 0.00000 61.353
-6.699 0.251 0.00000 -26.697
-6.982 0.192 0.00000 -36.357
6.127 0.422 0.00000 14.519
0.000 0.988
-6.127 0.422 0.00000 -14.519
6.588 0.634 0.00000 10.384
4.282 0.763 0.00000 5.614
-4.743 0.545 0.00000 -8.696
0.000 2.365
perdida Hf/Qo ∆Q Q1
Hf (m)
7.554 0.123 0.00000 61.353
-6.699 0.251 0.00000 -26.697
-6.982 0.192 0.00000 -36.357
6.127 0.422 -0.97470 13.544
0.000 0.988
-6.127 0.422 0.97470 -13.544
6.588 0.634 0.97470 11.359 calculo de linea de aducci
1.055 0.188 0.97470 6.589 N
-4.743 0.545 0.97470 -7.721 P
-3.227 1.790 Qo
C
calculo de las presiones en cada punto cota.R
punto cota carga estatica Hf presion cota.A
A 220 30 L
B 210 40 7.554 32.446 Hfo
C 205 37.446151292 6.588 30.858
D 190 45.858038381 1.055 44.803
E 200 34.803305951 -4.743 39.546
F 210 29.545902653 -6.699 36.245 N
A 220 26.245321902 -6.982 33.227 P
Qo
C
cota.R
cota.A
punto cota carga estatica Hf presion L
A 220.00000 30 Hfo
B 210.00000 40 7.55384871 32.4461513
C 205.00000 37.446151292 6.58811291 30.8580384
D 190.00000 45.858038381 4.28193648 41.5761019
E 200.00000 31.576101903 -4.7425967 36.3186986
F 210.00000 26.318698605 -6.6994192 33.0181179
A 220.00000 23.018117854 -6.9818822 30
D(pulg) V(m/seg) S(m/km) Hf(m)
6 5.35638506 145.191711 87.1150268
8 3.0129666 35.7638202 21.4582921
presion en A Pa 38.5417079
2
14.4
97.7083333
140
280 punto cota carga estatica Hf
220 A 220
600 B 210 48.5417079 7.554
30 C 205 45.9878591 6.588
D 190 54.3997462 1.055
E 200 43.3450138 -4.743
F 210 38.0876105 -6.699
A 220 34.7870298 -6.982
presion
38.5417079
40.988
39.400
53.345
48.088
44.787
41.769
presion
38.5417079
40.9878591
39.3997462
50.1178098
44.8604065
41.5598257
38.5417079
POBLACION FUTURA= 38950 HAB CALCULO DEL CAUDAL DE DISEÑO
DOTACION= 250 LT/HAB/DIA
1. CADAL MAXIMO HORARIO
CAUDAL PROMEDIO Qp= 112.70255 lt/seg
2. QMD+Qincendio
QMD=
Qincend=
QMD+Qincendio=
C= 140 ITERACIÓN 01
longitud diametro caudal velocidad pendiente perdida
circuito tramo C
L (m) Ø (pulg) Qo (l/s) v (m/s) S (m/m) Hf (m)
AB 1000 140 12 85.266 1.169 0.0039 3.857
BC 500 140 10 63.119 1.246 0.0054 2.685
CIRCUITO I
CD 300 140 6 29.677 1.627 0.0160 4.794
DE 500 140 6 21.039 1.153 0.0085 4.226
EF 700 140 10 -95.452 1.884 0.0116 -8.087
FA 1000 140 12 -117.599 1.612 0.0070 -6.996
∑ 0.480
CG 900 140 10 27.905 0.551 0.0012 1.066
GH 1200 140 10 -31.891 0.629 0.0015 -1.820
CIRCUITO II
HI 1200 140 8 -63.782 1.967 0.0162 -19.481
IE 700 140 8 -84.6 2.609 0.0274 -19.173
ED 500 140 6 -21.039 1.153 0.0085 -4.226
DC 300 140 6 -29.677 1.627 0.0160 -4.794
∑ -48.427
ITERACIÓN 02
longitud diametro caudal velocidad pendiente perdida
circuito tramo C
L (m) Ø (pulg) Qo (l/s) v (m/s) S (m/m) Hf (m)
AB 1000 140 12 84.830 1.163 0.0038 3.821
BC 500 140 10 62.683 1.237 0.0053 2.651
CIRCUITO I
CD 300 140 6 2.792 0.153 0.0002 0.060
DE 500 140 6 -5.846 0.320 0.0008 -0.394
EF 700 140 10 -95.888 1.892 0.0117 -8.155
FA 1000 140 12 -118.035 1.618 0.0070 -7.044
∑ -9.062
CG 900 140 10 54.353 1.073 0.0041 3.665
GH 1200 140 10 -5.443 0.107 0.0001 -0.069
CIRCUITO II
HI 1200 140 8 -37.334 1.151 0.0060 -7.225
IE 700 140 8 -58.152 1.793 0.0137 -9.576
ED 500 140 6 5.846 0.320 0.0008 0.394
DC 300 140 6 -2.792 0.153 0.0002 -0.060
∑ -12.872
ITERACIÓN 03
longitud diametro caudal velocidad pendiente perdida
circuito tramo C
L (m) Ø (pulg) Qo (l/s) v (m/s) S (m/m) Hf (m)
AB 1000 140 12 100.084 1.372 0.0052 5.190
BC 500 140 10 77.937 1.538 0.0079 3.968
CIRCUITO I
CD 300 140 6 4.852 0.266 0.0006 0.168
DE 500 140 6 -3.786 0.208 0.0004 -0.176
EF 700 140 10 -80.634 1.591 0.0085 -5.917
FA 1000 140 12 -102.781 1.409 0.0055 -5.452
∑ -2.219
CG 900 140 10 67.548 1.333 0.0061 5.480
GH 1200 140 10 7.752 0.153 0.0001 0.133
CIRCUITO II
HI 1200 140 8 -24.139 0.744 0.0027 -3.222
IE 700 140 8 -44.957 1.386 0.0085 -5.946
ED 500 140 6 3.786 0.208 0.0004 0.176
DC 300 140 6 -4.852 0.266 0.0006 -0.168
∑ -3.547
ITERACIÓN 04
longitud diametro caudal velocidad pendiente perdida
circuito tramo C
L (m) Ø (pulg) Qo (l/s) v (m/s) S (m/m) Hf (m)
AB 1000 140 12 103.950 1.425 0.0056 5.567
BC 500 140 10 81.803 1.614 0.0087 4.340
CIRCUITO I
CD 300 140 6 4.411 0.242 0.0005 0.140
DE 500 140 6 -4.227 0.232 0.0004 -0.216
EF 700 140 10 -76.768 1.515 0.0077 -5.402
FA 1000 140 12 -98.915 1.356 0.0051 -5.078
∑ -0.649
CG 900 140 10 71.854 1.418 0.0068 6.145
GH 1200 140 10 12.058 0.238 0.0003 0.301
CIRCUITO II
HI 1200 140 8 -19.833 0.612 0.0019 -2.239
IE 700 140 8 -40.651 1.254 0.0070 -4.934
ED 500 140 6 4.227 0.232 0.0004 0.216
DC 300 140 6 -4.411 0.242 0.0005 -0.140
∑ -0.652
ITERACIÓN 05
longitud diametro caudal velocidad pendiente perdida
circuito tramo C
L (m) Ø (pulg) Qo (l/s) v (m/s) S (m/m) Hf (m)
AB 1000 140 12 105.076 1.440 0.0057 5.679
BC 500 140 10 82.929 1.637 0.0089 4.452
CIRCUITO I
CD 300 140 6 4.713 0.258 0.0005 0.159
DE 500 140 6 -3.925 0.215 0.0004 -0.189
EF 700 140 10 -75.642 1.493 0.0075 -5.256
FA 1000 140 12 -97.789 1.340 0.0050 -4.971
∑ -0.127
CG 900 140 10 72.679 1.434 0.0070 6.276
GH 1200 140 10 12.883 0.254 0.0003 0.340
CIRCUITO II
HI 1200 140 8 -19.008 0.586 0.0017 -2.070
IE 700 140 8 -39.826 1.228 0.0068 -4.751
ED 500 140 6 3.925 0.215 0.0004 0.189
DC 300 140 6 -4.713 0.258 0.0005 -0.159
∑ -0.175
ITERACIÓN 06
longitud diametro caudal velocidad pendiente perdida
circuito tramo C
L (m) Ø (pulg) Qo (l/s) v (m/s) S (m/m) Hf (m)
AB 1000 140 12 105.297 1.443 0.0057 5.701
CIRCUITO I
BC 500 140 10 83.150 1.641 0.0089 4.474
CIRCUITO I
CD 300 140 6 4.710 0.258 0.0005 0.159
DE 500 140 6 -3.928 0.215 0.0004 -0.189
EF 700 140 10 -75.421 1.488 0.0075 -5.228
FA 1000 140 12 -97.568 1.337 0.0050 -4.951
∑ -0.034
CG 900 140 10 72.903 1.439 0.0070 6.312
GH 1200 140 10 13.107 0.259 0.0003 0.351
CIRCUITO II
HI 1200 140 8 -18.784 0.579 0.0017 -2.025
IE 700 140 8 -39.602 1.221 0.0067 -4.701
ED 500 140 6 3.928 0.215 0.0004 0.189
DC 300 140 6 -4.710 0.258 0.0005 -0.159
∑ -0.034
ITERACIÓN 07
longitud diametro caudal velocidad pendiente perdida
circuito tramo C
L (m) Ø (pulg) Qo (l/s) v (m/s) S (m/m) Hf (m)
AB 1000 140 12 105.356 1.444 0.0057 5.707
BC 500 140 10 83.209 1.642 0.0090 4.480
CIRCUITO I
CD 300 140 6 4.726 0.259 0.0005 0.160
DE 500 140 6 -3.912 0.214 0.0004 -0.187
EF 700 140 10 -75.362 1.487 0.0075 -5.220
FA 1000 140 12 -97.509 1.336 0.0049 -4.945
∑ -0.006
CG 900 140 10 72.946 1.440 0.0070 6.319
GH 1200 140 10 13.150 0.260 0.0003 0.353
CIRCUITO II
HI 1200 140 8 -18.741 0.578 0.0017 -2.017
IE 700 140 8 -39.559 1.220 0.0067 -4.692
ED 500 140 6 3.912 0.214 0.0004 0.187
DC 300 140 6 -4.726 0.259 0.0005 -0.160
∑ -0.009
ITERACIÓN 08
longitud diametro caudal velocidad pendiente perdida
circuito tramo C
L (m) Ø (pulg) Qo (l/s) v (m/s) S (m/m) Hf (m)
AB 1000 140 12 105.367 1.444 0.0057 5.708
BC 500 140 10 83.220 1.642 0.0090 4.481
CIRCUITO I
CD 300 140 6 4.726 0.259 0.0005 0.160
DE 500 140 6 -3.912 0.214 0.0004 -0.187
EF 700 140 10 -75.351 1.487 0.0075 -5.219
FA 1000 140 12 -97.498 1.336 0.0049 -4.944
∑ -0.002
CG 900 140 10 72.957 1.440 0.0070 6.321
CIRCUITO II
GH 1200 140 10 13.161 0.260 0.0003 0.353
CIRCUITO II
HI 1200 140 8 -18.730 0.578 0.0017 -2.014
IE 700 140 8 -39.548 1.220 0.0067 -4.689
ED 500 140 6 3.912 0.214 0.0004 0.187
DC 300 140 6 -4.726 0.259 0.0005 -0.160
∑ -0.002
ITERACIÓN 09
longitud diametro caudal velocidad pendiente perdida
circuito tramo C
L (m) Ø (pulg) Qo (l/s) v (m/s) S (m/m) Hf (m)
AB 1000 140 12 105.370 1.444 0.0057 5.709
BC 500 140 10 83.223 1.642 0.0090 4.481
CIRCUITO I
CD 300 140 6 4.727 0.259 0.0005 0.160
DE 500 140 6 -3.911 0.214 0.0004 -0.187
EF 700 140 10 -75.348 1.487 0.0075 -5.219
FA 1000 140 12 -97.495 1.336 0.0049 -4.944
∑ 0.000
CG 900 140 10 72.959 1.440 0.0070 6.321
GH 1200 140 10 13.163 0.260 0.0003 0.354
CIRCUITO II
HI 1200 140 8 -18.728 0.577 0.0017 -2.014
IE 700 140 8 -39.546 1.219 0.0067 -4.689
ED 500 140 6 3.911 0.214 0.0004 0.187
DC 300 140 6 -4.727 0.259 0.0005 -0.160
∑ 0.000
ITERACIÓN 10
longitud diametro caudal velocidad pendiente perdida
circuito tramo C
L (m) Ø (pulg) Qo (l/s) v (m/s) S (m/m) Hf (m)
AB 1000 140 12 105.371 1.444 0.0057 5.709
BC 500 140 10 83.224 1.642 0.0090 4.481
CIRCUITO I
CD 300 140 6 4.727 0.259 0.0005 0.160
DE 500 140 6 -3.911 0.214 0.0004 -0.187
EF 700 140 10 -75.347 1.487 0.0075 -5.218
FA 1000 140 12 -97.494 1.336 0.0049 -4.944
∑ 0.000
CG 900 140 10 72.960 1.440 0.0070 6.321
GH 1200 140 10 13.164 0.260 0.0003 0.354
CIRCUITO II
HI 1200 140 8 -18.727 0.577 0.0017 -2.014
IE 700 140 8 -39.545 1.219 0.0067 -4.689
ED 500 140 6 3.911 0.214 0.0004 0.187
DC 300 140 6 -4.727 0.259 0.0005 -0.160
∑ 0.000
k2= 1.8 2.5
QMH= 202.86458
k1= 1.3
146.51331
30
176.51331
AL DE DISEÑO
LT/SEG
Hf/Qo ∆Q Q1
0.045
0.043
-0.43647
-0.43647
84.830
62.683
+ −
0.162 -26.88494 2.792
0.201 -26.88494 -5.846
0.085 -0.43647 -95.888
0.059 -0.43647 -118.035
0.594
0.038 26.44846 54.353
0.057 26.44846 -5.443
0.305 26.44846 -37.334
0.227 26.44846 -58.152
0.201 26.88494 5.846
0.162 26.88494 -2.792
0.990
Hf/Qo ∆Q Q1
Hf/Qo ∆Q Q1
Hf/Qo ∆Q Q1
Hf/Qo ∆Q Q1
Hf/Qo ∆Q Q1
Hf/Qo ∆Q Q1
Hf/Qo ∆Q Q1
Hf/Qo ∆Q Q1
Hf/Qo ∆Q Q1
QMD=
Qincend=
QMD+Qincendio=
C= 140
ITERACIÓN 01
longitud diametro caudal velocidad pendiente perdida
circuito tramo C
L (m) Ø (pulg) Qo (l/s) v (m/s) S (m/m) Hf (m)
AB 1000 140 12 101.433 1.390 0.0053 5.320
BC 500 140 10 79.286 1.565 0.0082 4.096
CIRCUITO I
CD 300 140 6 8.637 0.473 0.0016 0.488
DE 500 140 6 -21.039 1.153 0.0085 -4.226
EF 700 140 10 -79.286 1.565 0.0082 -5.735
FA 1000 140 12 -101.433 1.390 0.0053 -5.320
∑ -5.377
CG 900 140 10 65.112 1.285 0.0057 5.120
GH 1200 140 10 37.207 0.734 0.0020 2.422
CIRCUITO II
HI 1200 140 8 -26.577 0.820 0.0032 -3.851
IE 700 140 8 -47.3945 1.461 0.0094 -6.557
ED 500 140 6 21.039 1.153 0.0085 4.226
DC 300 140 6 -8.637 0.473 0.0016 -0.488
∑ 0.873
ITERACIÓN 02
longitud diametro caudal velocidad pendiente perdida
circuito tramo C
L (m) Ø (pulg) Qo (l/s) v (m/s) S (m/m) Hf (m)
AB 1000 140 12 107.410 1.472 0.0059 5.915
BC 500 140 10 85.263 1.683 0.0094 4.687
CIRCUITO I
CD 300 140 6 15.304 0.839 0.0047 1.406
DE 500 140 6 -14.372 0.788 0.0042 -2.086
EF 700 140 10 -73.308 1.447 0.0071 -4.960
FA 1000 140 12 -95.455 1.308 0.0048 -4.754
∑ 0.208
CG 900 140 10 64.422 1.271 0.0056 5.020
GH 1200 140 10 36.517 0.721 0.0019 2.339
CIRCUITO II
HI 1200 140 8 -27.266 0.841 0.0034 -4.038
IE 700 140 8 -48.084 1.483 0.0096 -6.734
ED 500 140 6 14.372 0.788 0.0042 2.086
DC 300 140 6 -15.304 0.839 0.0047 -1.406
∑ -2.733
ITERACIÓN 03
longitud diametro caudal velocidad pendiente perdida
circuito tramo C
L (m) Ø (pulg) Qo (l/s) v (m/s) S (m/m) Hf (m)
AB 1000 140 12 107.169 1.469 0.0059 5.890
BC 500 140 10 85.022 1.678 0.0093 4.662
CIRCUITO I
CD 300 140 6 12.849 0.704 0.0034 1.017
DE 500 140 6 -16.827 0.922 0.0056 -2.794
EF 700 140 10 -73.549 1.452 0.0071 -4.990
FA 1000 140 12 -95.696 1.312 0.0048 -4.776
∑ -0.991
CG 900 140 10 66.636 1.315 0.0059 5.344
GH 1200 140 10 38.731 0.764 0.0022 2.609
CIRCUITO II
HI 1200 140 8 -25.052 0.773 0.0029 -3.452
IE 700 140 8 -45.870 1.414 0.0088 -6.171
ED 500 140 6 16.827 0.922 0.0056 2.794
DC 300 140 6 -12.849 0.704 0.0034 -1.017
∑ 0.107
ITERACIÓN 04
longitud diametro caudal velocidad pendiente perdida
circuito tramo C
L (m) Ø (pulg) Qo (l/s) v (m/s) S (m/m) Hf (m)
AB 1000 140 12 108.302 1.484 0.0060 6.006
BC 500 140 10 86.155 1.700 0.0096 4.778
CIRCUITO I
CD 300 140 6 14.068 0.771 0.0040 1.203
DE 500 140 6 -15.608 0.856 0.0049 -2.431
EF 700 140 10 -72.416 1.429 0.0069 -4.849
FA 1000 140 12 -94.563 1.296 0.0047 -4.672
∑ 0.036
CG 900 140 10 66.549 1.313 0.0059 5.331
GH 1200 140 10 38.644 0.763 0.0022 2.598
CIRCUITO II
HI 1200 140 8 -25.139 0.775 0.0029 -3.474
IE 700 140 8 -45.957 1.417 0.0088 -6.193
ED 500 140 6 15.608 0.856 0.0049 2.431
DC 300 140 6 -14.068 0.771 0.0040 -1.203
∑ -0.510
ITERACIÓN 05
longitud diametro caudal velocidad pendiente perdida
circuito tramo C
L (m) Ø (pulg) Qo (l/s) v (m/s) S (m/m) Hf (m)
AB 1000 140 12 108.261 1.484 0.0060 6.002
BC 500 140 10 86.114 1.699 0.0095 4.773
CIRCUITO I
CD 300 140 6 13.610 0.746 0.0038 1.132
DE 500 140 6 -16.066 0.881 0.0051 -2.564
EF 700 140 10 -72.457 1.430 0.0069 -4.854
FA 1000 140 12 -94.604 1.297 0.0047 -4.676
∑ -0.187
CG 900 140 10 66.966 1.322 0.0060 5.393
GH 1200 140 10 39.061 0.771 0.0022 2.650
CIRCUITO II
HI 1200 140 8 -24.722 0.762 0.0028 -3.368
IE 700 140 8 -45.540 1.404 0.0087 -6.089
ED 500 140 6 16.066 0.881 0.0051 2.564
DC 300 140 6 -13.610 0.746 0.0038 -1.132
∑ 0.019
ITERACIÓN 06
longitud diametro caudal velocidad pendiente perdida
circuito tramo C
L (m) Ø (pulg) Qo (l/s) v (m/s) S (m/m) Hf (m)
AB 1000 140 12 108.476 1.487 0.0060 6.024
BC 500 140 10 86.329 1.704 0.0096 4.796
CIRCUITO I
CD 300 140 6 13.841 0.759 0.0039 1.168
DE 500 140 6 -15.835 0.868 0.0050 -2.497
EF 700 140 10 -72.242 1.426 0.0069 -4.827
FA 1000 140 12 -94.389 1.294 0.0047 -4.656
∑ 0.007
CG 900 140 10 66.951 1.321 0.0060 5.391
GH 1200 140 10 39.046 0.771 0.0022 2.648
CIRCUITO II
HI 1200 140 8 -24.737 0.763 0.0028 -3.372
IE 700 140 8 -45.555 1.405 0.0087 -6.093
ED 500 140 6 15.835 0.868 0.0050 2.497
DC 300 140 6 -13.841 0.759 0.0039 -1.168
∑ -0.097
ITERACIÓN 07
longitud diametro caudal velocidad pendiente perdida
circuito tramo C
L (m) Ø (pulg) Qo (l/s) v (m/s) S (m/m) Hf (m)
AB 1000 140 12 108.468 1.487 0.0060 6.023
BC 500 140 10 86.321 1.704 0.0096 4.795
CIRCUITO I
CD 300 140 6 13.754 0.754 0.0038 1.154
DE 500 140 6 -15.922 0.873 0.0050 -2.522
EF 700 140 10 -72.250 1.426 0.0069 -4.828
FA 1000 140 12 -94.397 1.294 0.0047 -4.657
∑ -0.035
CG 900 140 10 67.030 1.323 0.0060 5.403
GH 1200 140 10 39.125 0.772 0.0022 2.658
CIRCUITO II
HI 1200 140 8 -24.658 0.760 0.0028 -3.352
IE 700 140 8 -45.476 1.402 0.0087 -6.074
ED 500 140 6 15.922 0.873 0.0050 2.522
DC 300 140 6 -13.754 0.754 0.0038 -1.154
∑ 0.004
ITERACIÓN 08
longitud diametro caudal velocidad pendiente perdida
circuito tramo C
L (m) Ø (pulg) Qo (l/s) v (m/s) S (m/m) Hf (m)
AB 1000 140 12 108.508 1.487 0.0060 6.027
BC 500 140 10 86.361 1.704 0.0096 4.799
CIRCUITO I
CD 300 140 6 13.798 0.756 0.0039 1.161
DE 500 140 6 -15.878 0.870 0.0050 -2.509
EF 700 140 10 -72.210 1.425 0.0069 -4.823
FA 1000 140 12 -94.357 1.293 0.0047 -4.653
∑ 0.001
CG 900 140 10 67.027 1.323 0.0060 5.402
GH 1200 140 10 39.122 0.772 0.0022 2.658
CIRCUITO II
HI 1200 140 8 -24.661 0.760 0.0028 -3.353
IE 700 140 8 -45.479 1.402 0.0087 -6.074
ED 500 140 6 15.878 0.870 0.0050 2.509
DC 300 140 6 -13.798 0.756 0.0039 -1.161
∑ -0.018
ITERACIÓN 09
longitud diametro caudal velocidad pendiente perdida
circuito tramo C
L (m) Ø (pulg) Qo (l/s) v (m/s) S (m/m) Hf (m)
AB 1000 140 12 108.507 1.487 0.0060 6.027
BC 500 140 10 86.360 1.704 0.0096 4.799
CIRCUITO I
CD 300 140 6 13.781 0.755 0.0039 1.158
DE 500 140 6 -15.895 0.871 0.0050 -2.514
EF 700 140 10 -72.211 1.425 0.0069 -4.823
FA 1000 140 12 -94.358 1.293 0.0047 -4.653
∑ -0.007
CG 900 140 10 67.042 1.323 0.0060 5.405
GH 1200 140 10 39.137 0.772 0.0022 2.660
CIRCUITO II
HI 1200 140 8 -24.646 0.760 0.0028 -3.349
IE 700 140 8 -45.464 1.402 0.0087 -6.071
ED 500 140 6 15.895 0.871 0.0050 2.514
DC 300 140 6 -13.781 0.755 0.0039 -1.158
∑ 0.001
ITERACIÓN 10
longitud diametro caudal velocidad pendiente perdida
circuito tramo C
L (m) Ø (pulg) Qo (l/s) v (m/s) S (m/m) Hf (m)
AB 1000 140 12 108.514 1.487 0.0060 6.028
BC 500 140 10 86.367 1.704 0.0096 4.800
CIRCUITO I
CD 300 140 6 13.789 0.756 0.0039 1.159
DE 500 140 6 -15.887 0.871 0.0050 -2.512
EF 700 140 10 -72.204 1.425 0.0069 -4.822
FA 1000 140 12 -94.351 1.293 0.0047 -4.653
∑ 0.000
CG 900 140 10 67.041 1.323 0.0060 5.404
GH 1200 140 10 39.136 0.772 0.0022 2.659
CIRCUITO II
HI 1200 140 8 -24.647 0.760 0.0028 -3.349
IE 700 140 8 -45.465 1.402 0.0087 -6.071
ED 500 140 6 15.887 0.871 0.0050 2.512
DC 300 140 6 -13.789 0.756 0.0039 -1.159
∑ -0.003
k2= 1.8 2.5
QMH= 202.86458
k1= 1.3
146.51331
30
176.51331
AL DE DISEÑO
LT/SEG
Hf/Qo ∆Q Q1
0.052
0.052
5.97775
5.97775
107.410
85.263
+ −
0.056 6.66711 15.304
0.201 6.66711 -14.372
0.072 5.97775 -73.308
0.052 5.97775 -95.455
0.486
0.079 -0.68936 64.422
0.065 -0.68936 36.517
0.145 -0.68936 -27.266
0.138 -0.68936 -48.084
0.201 -6.66711 14.372
0.056 -6.66711 -15.304
0.684
Hf/Qo ∆Q Q1
Hf/Qo ∆Q Q1
Hf/Qo ∆Q Q1
Hf/Qo ∆Q Q1
Hf/Qo ∆Q Q1
Hf/Qo ∆Q Q1
Hf/Qo ∆Q Q1
Hf/Qo ∆Q Q1 CAUDAL DE
TRAMO AREA (M2) CONSUMO
0.056 -0.00032 108.514 AB 250000 22.1467886
0.056 -0.00032 86.367 BC 62500 5.53669714
0.084 -0.00316 13.786 CD 97500 8.63724754
0.158 -0.00316 -15.890 DE 237500 21.0394491
0.067 -0.00032 -72.204 EF 122500 10.8519264
0.049 -0.00032 -94.351 FA 250000 22.1467886
0.469 CG 315000 27.9049536
0.081 0.00284 67.044 GH 360000 31.8913755
0.068 0.00284 39.139 HI 360000 31.8913755
0.136 0.00284 -24.644 IE 235000 20.8179813
0.134 0.00284 -45.462 SUM 2290000 202.864583
0.158 0.00316 15.890
0.084 0.00316 -13.786
0.660
ITERACION 01
longitud diametro caudal velocidad
circuito tramo C
L (m) Ø (pulg) Qo (l/s) v (m/s)
AB 186 140 4 17.229 2.125
BC 252.31 140 4 10.884 1.342
CIRCUITO I
AF 253.15 140 6 -44.978 2.466
FC 186 140 4 -12.689 1.565
QMD= 40.625
Qincend= 30
QMD+Qincendio= 70.625
∑ 0.412 0.542
FG 400 150 6 -15.185 0.832 0.0041 -1.627 0.107 -0.43061 -15.616
GA 400 150 6 -20.000 1.096 0.0068 -2.709 0.135 -0.43061 -20.431
CIRCUITO II
AD 800 150 6 20.000 1.096 0.0068 5.418 0.271 -0.02041 19.980
ED 400 150 4 7.286 0.899 0.0075 3.008 0.413 -0.43061 6.855
EF 1200 150 6 -11.975 0.656 0.0026 -3.143 0.262 -0.43061 -12.406
∑ 0.947 1.189
ITERACIÓN 02
longitud diametro caudal velocidad pendiente perdida Hf/Qo ∆Q Q1
circuito tramo C
L (m) Ø (pulg) Qo (l/s) v (m/s) S (m/m) Hf (m)
AB 500 150 8 30.215 0.932 0.0036 1.791 0.059 -0.21876 29.996
BC 800 150 8 25.199 0.777 0.0026 2.047 0.081 -0.21876 24.980
CIRCUITO I
CD 500 150 6 14.163 0.776 0.0036 1.787 0.126 -0.21876 13.944
DA 800 150 6 -19.980 1.095 0.0068 -5.407 0.271 -0.12357 -20.103
∑ 0.217 0.537
FG 400 150 6 -15.616 0.856 0.0043 -1.713 0.110 -0.09518 -15.711
GA 400 150 6 -20.431 1.120 0.0070 -2.818 0.138 -0.09518 -20.526
CIRCUITO II
AD 800 150 6 19.980 1.095 0.0068 5.407 0.271 0.12357 20.103
ED 400 150 4 6.855 0.846 0.0067 2.687 0.392 -0.09518 6.760
EF 1200 150 6 -12.406 0.680 0.0028 -3.356 0.271 -0.09518 -12.501
∑ 0.208 1.181
ITERACIÓN 03
longitud diametro caudal velocidad pendiente perdida Hf/Qo ∆Q Q1
circuito tramo C
L (m) Ø (pulg) Qo (l/s) v (m/s) S (m/m) Hf (m)
AB 500 150 8 29.996 0.925 0.0035 1.767 0.059 -0.04825 29.948
BC 800 150 8 24.980 0.770 0.0025 2.014 0.081 -0.04825 24.932
CIRCUITO I
CD 500 150 6 13.944 0.764 0.0035 1.736 0.125 -0.04825 13.896
DA 800 150 6 -20.103 1.102 0.0068 -5.469 0.272 0.00201 -20.101
∑ 0.048 0.536
FG 400 150 6 -15.711 0.861 0.0043 -1.732 0.110 -0.05026 -15.761
GA 400 150 6 -20.526 1.125 0.0071 -2.842 0.138 -0.05026 -20.576
CIRCUITO II
AD 800 150 6 20.103 1.102 0.0068 5.469 0.272 -0.00201 20.101
ED 400 150 4 6.760 0.834 0.0065 2.618 0.387 -0.05026 6.710
EF 1200 150 6 -12.501 0.685 0.0028 -3.404 0.272 -0.05026 -12.551
∑ 0.110 1.180
ITERACIÓN 04
longitud diametro caudal velocidad pendiente perdida Hf/Qo ∆Q Q1
circuito tramo C
L (m) Ø (pulg) Qo (l/s) v (m/s) S (m/m) Hf (m)
AB 500 150 8 29.948 0.923 0.0035 1.761 0.059 -0.02554 29.922
BC 800 150 8 24.932 0.769 0.0025 2.007 0.081 -0.02554 24.906
CIRCUITO I
CD 500 150 6 13.896 0.762 0.0035 1.725 0.124 -0.02554 13.870
DA 800 150 6 -20.101 1.102 0.0068 -5.468 0.272 -0.01443 -20.116
∑ 0.025 0.536
FG 400 150 6 -15.761 0.864 0.0044 -1.743 0.111 -0.01111 -15.772
GA 400 150 6 -20.576 1.128 0.0071 -2.855 0.139 -0.01111 -20.587
CIRCUITO II
CIRCUITO II
AD 800 150 6 20.101 1.102 0.0068 5.468 0.272 0.01443 20.116
ED 400 150 4 6.710 0.828 0.0065 2.583 0.385 -0.01111 6.699
EF 1200 150 6 -12.551 0.688 0.0029 -3.429 0.273 -0.01111 -12.562
∑ 0.024 1.179
ITERACIÓN 05
longitud diametro caudal velocidad pendiente perdida Hf/Qo ∆Q Q1
circuito tramo C
L (m) Ø (pulg) Qo (l/s) v (m/s) S (m/m) Hf (m)
AB 500 150 8 29.922 0.923 0.0035 1.759 0.059 -0.00563 29.917
BC 800 150 8 24.906 0.768 0.0025 2.003 0.080 -0.00563 24.901
CIRCUITO I
CD 500 150 6 13.870 0.760 0.0034 1.719 0.124 -0.00563 13.865
DA 800 150 6 -20.116 1.103 0.0068 -5.476 0.272 0.00026 -20.115
∑ 0.006 0.535
FG 400 150 6 -15.772 0.865 0.0044 -1.745 0.111 -0.00589 -15.778
GA 400 150 6 -20.587 1.129 0.0071 -2.858 0.139 -0.00589 -20.593
CIRCUITO II
AD 800 150 6 20.116 1.103 0.0068 5.476 0.272 -0.00026 20.115
ED 400 150 4 6.699 0.826 0.0064 2.575 0.384 -0.00589 6.693
EF 1200 150 6 -12.562 0.689 0.0029 -3.435 0.273 -0.00589 -12.568
∑ 0.013 1.179
ITERACIÓN 06
longitud diametro caudal velocidad pendiente perdida Hf/Qo ∆Q Q1
circuito tramo C
L (m) Ø (pulg) Qo (l/s) v (m/s) S (m/m) Hf (m)
AB 500 150 8 29.917 0.923 0.0035 1.758 0.059 -0.00299 29.914
BC 800 150 8 24.901 0.768 0.0025 2.002 0.080 -0.00299 24.898
CIRCUITO I
CD 500 150 6 13.865 0.760 0.0034 1.718 0.124 -0.00299 13.862
DA 800 150 6 -20.115 1.103 0.0068 -5.476 0.272 -0.00170 -20.117
∑ 0.003 0.535
FG 400 150 6 -15.778 0.865 0.0044 -1.746 0.111 -0.00130 -15.779
GA 400 150 6 -20.593 1.129 0.0071 -2.859 0.139 -0.00130 -20.594
CIRCUITO II
CIRCUITO II
AD 800 150 6 20.115 1.103 0.0068 5.476 0.272 0.00170 20.117
ED 400 150 4 6.693 0.826 0.0064 2.570 0.384 -0.00130 6.692
EF 1200 150 6 -12.568 0.689 0.0029 -3.438 0.274 -0.00130 -12.569
∑ 0.003 1.179
ITERACIÓN 07
longitud diametro caudal velocidad pendiente perdida Hf/Qo ∆Q Q1
circuito tramo C
L (m) Ø (pulg) Qo (l/s) v (m/s) S (m/m) Hf (m)
AB 500 150 8 29.914 0.922 0.0035 1.758 0.059 -0.00066 29.913
BC 800 150 8 24.898 0.768 0.0025 2.002 0.080 -0.00066 24.897
CIRCUITO I
CD 500 150 6 13.862 0.760 0.0034 1.717 0.124 -0.00066 13.861
DA 800 150 6 -20.117 1.103 0.0068 -5.476 0.272 0.00003 -20.117
∑ 0.001 0.535
FG 400 150 6 -15.779 0.865 0.0044 -1.746 0.111 -0.00069 -15.780
GA 400 150 6 -20.594 1.129 0.0071 -2.860 0.139 -0.00069 -20.595
CIRCUITO II
AD 800 150 6 20.117 1.103 0.0068 5.476 0.272 -0.00003 20.117
ED 400 150 4 6.692 0.825 0.0064 2.570 0.384 -0.00069 6.691
EF 1200 150 6 -12.569 0.689 0.0029 -3.438 0.274 -0.00069 -12.570
∑ 0.002 1.179
ITERACIÓN 08
longitud diametro caudal velocidad pendiente perdida Hf/Qo ∆Q Q1
circuito tramo C
L (m) Ø (pulg) Qo (l/s) v (m/s) S (m/m) Hf (m)
AB 500 150 8 29.913 0.922 0.0035 1.758 0.059 -0.00035 29.913
BC 800 150 8 24.897 0.768 0.0025 2.002 0.080 -0.00035 24.897
CIRCUITO I
CD 500 150 6 13.861 0.760 0.0034 1.717 0.124 -0.00035 13.861
DA 800 150 6 -20.117 1.103 0.0068 -5.476 0.272 -0.00020 -20.117
∑ 0.000 0.535
FG 400 150 6 -15.780 0.865 0.0044 -1.747 0.111 -0.00015 -15.780
GA 400 150 6 -20.595 1.129 0.0071 -2.860 0.139 -0.00015 -20.595
CIRCUITO II
CIRCUITO II
AD 800 150 6 20.117 1.103 0.0068 5.476 0.272 0.00020 20.117
ED 400 150 4 6.691 0.825 0.0064 2.569 0.384 -0.00015 6.691
EF 1200 150 6 -12.570 0.689 0.0029 -3.439 0.274 -0.00015 -12.570
∑ 0.000 1.179
ITERACIÓN 09
longitud diametro caudal velocidad pendiente perdida Hf/Qo ∆Q Q1
circuito tramo C
L (m) Ø (pulg) Qo (l/s) v (m/s) S (m/m) Hf (m)
AB 500 150 8 29.913 0.922 0.0035 1.758 0.059 -0.00008 29.913
BC 800 150 8 24.897 0.768 0.0025 2.002 0.080 -0.00008 24.897
CIRCUITO I
CD 500 150 6 13.861 0.760 0.0034 1.717 0.124 -0.00008 13.861
DA 800 150 6 -20.117 1.103 0.0068 -5.476 0.272 0.00000 -20.117
∑ 0.000 0.535
FG 400 150 6 -15.780 0.865 0.0044 -1.747 0.111 -0.00008 -15.780
GA 400 150 6 -20.595 1.129 0.0071 -2.860 0.139 -0.00008 -20.595
CIRCUITO II
AD 800 150 6 20.117 1.103 0.0068 5.476 0.272 0.00000 20.117
ED 400 150 4 6.691 0.825 0.0064 2.569 0.384 -0.00008 6.691
EF 1200 150 6 -12.570 0.689 0.0029 -3.439 0.274 -0.00008 -12.570
∑ 0.000 1.179
ITERACIÓN 10
longitud diametro caudal velocidad pendiente perdida Hf/Qo ∆Q Q1
circuito tramo C
L (m) Ø (pulg) Qo (l/s) v (m/s) S (m/m) Hf (m)
AB 500 150 8 29.913 0.922 0.0035 1.758 0.059 -0.00004 29.912
BC 800 150 8 24.897 0.768 0.0025 2.002 0.080 -0.00004 24.896
CIRCUITO I
CD 500 150 6 13.861 0.760 0.0034 1.717 0.124 -0.00004 13.860
DA 800 150 6 -20.117 1.103 0.0068 -5.476 0.272 -0.00002 -20.117
∑ 0.000 0.535
FG 400 150 6 -15.780 0.865 0.0044 -1.747 0.111 -0.00002 -15.780
GA 400 150 6 -20.595 1.129 0.0071 -2.860 0.139 -0.00002 -20.595
CIRCUITO II
CIRCUITO II
AD 800 150 6 20.117 1.103 0.0068 5.476 0.272 0.00002 20.117
ED 400 150 4 6.691 0.825 0.0064 2.569 0.384 -0.00002 6.691
EF 1200 150 6 -12.570 0.689 0.0029 -3.439 0.274 -0.00002 -12.570
∑ 0.000 1.179
POBLACION FUTURA= 0 HAB CALCULO DEL CAUDAL DE DISEÑO
DOTACION= 180 LT/HAB/DIA
1. CADAL MAXIMO HORARIO
CAUDAL PROMEDIO Qp= 0 lt/seg
2. QMD+Qincendio
C= 150
ITERACION 01
longitud diametro caudal velocidad pendiente perdida
circuito tramo C
L (m) Ø (pulg) Qo (l/s) v (m/s) S (m/m) Hf (m)
AB 600 150 16 191.12 1.473 0.0037 2.236
BI 300 150 12 95.55 1.310 0.0042 1.257
CIRCUITO I
IJ 300 150 8 35.83 1.105 0.0049 1.473
JH 600 150 12 -119.44 1.637 0.0063 -3.802
HA 600 150 16 -238.88 1.842 0.0056 -3.380
∑ -2.215
BI 300 150 12 -95.55 1.310 0.0042 -1.257
BC 300 150 8 47.74 1.472 0.0084 2.506
CIRCUITO II
DI 300 150 4 -23.89 2.947 0.0678 -20.342
CD 300 150 8 35.82 1.105 0.0049 1.472
∑ -17.621
JI 300 150 8 -35.83 1.105 0.0049 -1.473
ID 300 150 4 23.89 2.947 0.0678 20.342
CIRCUITO III
DE 300 150 8 23.88 0.736 0.0023 0.695
EJ 300 150 4 -29.86 3.683 0.1025 -30.746
∑ -11.182
HJ 600 150 12 119.44 1.637 0.0063 3.802
HG 300 150 12 -71.66 0.982 0.0025 -0.738
CIRCUITO V
CIRCUITO V
JE 300 150 4 29.86 3.683 0.1025 30.746
EF 300 150 8 11.94 0.368 0.0006 0.193
GF 900 150 8 -59.72 1.842 0.0126 -11.383
∑ 22.620
ITERACION 02
longitud diametro caudal velocidad pendiente perdida
circuito tramo C
L (m) Ø (pulg) Qo (l/s) v (m/s) S (m/m) Hf (m)
AB 600 150 16 201.815 1.556 0.0041 2.474
BI 300 150 12 96.305 1.320 0.0043 1.276
CIRCUITO I
IJ 300 150 8 43.427 1.339 0.0070 2.103
JH 600 150 12 -99.182 1.359 0.0045 -2.695
HA 600 150 16 -228.185 1.759 0.0052 -3.105
∑ 0.053
BI 300 150 12 -96.305 1.320 0.0043 -1.276
BC 300 150 8 57.680 1.779 0.0119 3.558
CIRCUITO II
DI 300 150 4 -17.048 2.103 0.0363 -10.890
CD 300 150 8 45.760 1.411 0.0077 2.317
∑ -6.291
JI 300 150 8 -43.427 1.339 0.0070 -2.103
ID 300 150 4 17.048 2.103 0.0363 10.890
CIRCUITO III
DE 300 150 8 26.978 0.832 0.0029 0.871
EJ 300 150 4 -17.199 2.121 0.0369 -11.069
∑ -1.412
HJ 600 150 12 99.182 1.359 0.0045 2.695
HG 300 150 12 -81.223 1.113 0.0031 -0.931
CIRCUITO V
JE 300 150 4 17.199 2.121 0.0369 11.069
EF 300 150 8 2.377 0.073 0.0000 0.010
GF 900 150 8 -69.283 2.136 0.0167 -14.987
∑ -2.144
ITERACION 03
longitud diametro caudal velocidad pendiente perdida
circuito tramo C
L (m) Ø (pulg) Qo (l/s) v (m/s) S (m/m) Hf (m)
AB 600 150 14 201.566 2.030 0.0079 4.729
BI 300 150 10 91.608 1.808 0.0094 2.826
CIRCUITO I
IJ 300 150 6 42.618 2.336 0.0275 8.247
JH 600 150 12 -100.715 1.380 0.0046 -2.772
HA 600 150 14 -228.434 2.300 0.0099 -5.963
∑ 7.068
BI 300 150 10 -91.608 1.808 0.0094 -2.826
BC 300 150 8 62.128 1.916 0.0136 4.082
CIRCUITO II
DI 300 150 6 -13.159 0.721 0.0031 -0.936
CIRCUITO II
ITERACION 04
longitud diametro caudal velocidad pendiente perdida
circuito tramo C
L (m) Ø (pulg) Qo (l/s) v (m/s) S (m/m) Hf (m)
AB 600 150 16 188.893 1.456 0.0036 2.188
BI 300 150 12 94.855 1.300 0.0041 1.241
CIRCUITO I
IJ 300 150 8 24.109 0.743 0.0024 0.707
JH 600 150 12 -125.171 1.715 0.0069 -4.147
HA 600 150 16 -241.107 1.859 0.0057 -3.439
∑ -3.449
BI 300 150 12 -94.855 1.300 0.0041 -1.241
BC 300 150 8 46.208 1.425 0.0079 2.360
CIRCUITO II
DI 300 150 4 -34.916 4.307 0.1369 -41.076
CD 300 150 8 34.288 1.057 0.0045 1.358
∑ -38.599
JI 300 150 8 -24.109 0.743 0.0024 -0.707
ID 300 150 4 34.916 4.307 0.1369 41.076
CIRCUITO III
DE 300 150 8 33.374 1.029 0.0043 1.292
EJ 300 150 4 -23.870 2.944 0.0677 -20.310
∑ 21.350
HJ 600 150 12 125.171 1.715 0.0069 4.147
HG 300 150 12 -68.157 0.934 0.0022 -0.673
CIRCUITO V
JE 300 150 4 23.870 2.944 0.0677 20.310
EF 300 150 8 15.443 0.476 0.0010 0.310
GF 900 150 8 -56.217 1.734 0.0113 -10.177
∑ 13.917
ITERACION 05
longitud diametro caudal velocidad pendiente perdida
circuito tramo C
L (m) Ø (pulg) Qo (l/s) v (m/s) S (m/m) Hf (m)
AB 600 150 16 207.281 1.598 0.0043 2.599
BI 300 150 12 96.945 1.329 0.0043 1.292
CIRCUITO I
IJ 300 150 8 48.005 1.480 0.0084 2.532
JH 600 150 12 -99.912 1.369 0.0046 -2.732
HA 600 150 16 -222.719 1.717 0.0049 -2.969
∑ 0.722
BI 300 150 12 -96.945 1.329 0.0043 -1.292
BC 300 150 8 62.506 1.927 0.0138 4.129
CIRCUITO II
DI 300 150 4 -13.110 1.617 0.0223 -6.695
CD 300 150 8 50.586 1.560 0.0093 2.790
∑ -1.068
JI 300 150 8 -48.005 1.480 0.0084 -2.532
ID 300 150 4 13.110 1.617 0.0223 6.695
CIRCUITO III
DE 300 150 8 27.866 0.859 0.0031 0.925
EJ 300 150 4 -22.507 2.776 0.0607 -18.216
∑ -13.128
HJ 600 150 12 99.912 1.369 0.0046 2.732
HG 300 150 12 -75.027 1.028 0.0027 -0.804
CIRCUITO V
JE 300 150 4 22.507 2.776 0.0607 18.216
EF 300 150 8 8.573 0.264 0.0003 0.104
GF 900 150 8 -63.087 1.945 0.0140 -12.600
∑ 7.649
ITERACION 06
longitud diametro caudal velocidad pendiente perdida
circuito tramo C
L (m) Ø (pulg) Qo (l/s) v (m/s) S (m/m) Hf (m)
AB 600 150 16 204.007 1.573 0.0042 2.524
BI 300 150 12 92.776 1.271 0.0040 1.191
CIRCUITO I
IJ 300 150 8 39.684 1.224 0.0059 1.780
JH 600 150 12 -99.283 1.361 0.0045 -2.700
HA 600 150 16 -225.993 1.742 0.0051 -3.050
∑ -0.256
BI 300 150 12 -92.776 1.271 0.0040 -1.191
BC 300 150 8 63.401 1.955 0.0141 4.239
CIRCUITO II
DI 300 150 4 -17.262 2.129 0.0371 -11.145
CD 300 150 8 51.481 1.587 0.0096 2.882
∑ -5.214
JI 300 150 8 -39.684 1.224 0.0059 -1.780
ID 300 150 4 17.262 2.129 0.0371 11.145
CIRCUITO III
DE 300 150 8 32.913 1.015 0.0042 1.259
EJ 300 150 4 -13.557 1.672 0.0237 -7.125
∑ 3.499
HJ 600 150 12 99.283 1.361 0.0045 2.700
HG 300 150 12 -78.930 1.082 0.0029 -0.883
CIRCUITO V
CIRCUITO V
JE 300 150 4 13.557 1.672 0.0237 7.125
EF 300 150 8 4.670 0.144 0.0001 0.034
GF 900 150 8 -66.990 2.066 0.0156 -14.081
∑ -5.106
ITERACION 07
longitud diametro caudal velocidad pendiente perdida
circuito tramo C
L (m) Ø (pulg) Qo (l/s) v (m/s) S (m/m) Hf (m)
AB 600 150 16 205.256 1.582 0.0043 2.552
BI 300 150 12 90.417 1.239 0.0038 1.135
CIRCUITO I
IJ 300 150 8 42.441 1.309 0.0067 2.016
JH 600 150 12 -101.567 1.392 0.0047 -2.816
HA 600 150 16 -224.744 1.733 0.0050 -3.019
∑ -0.132
BI 300 150 12 -90.417 1.239 0.0038 -1.135
BC 300 150 8 67.008 2.066 0.0157 4.696
CIRCUITO II
DI 300 150 4 -12.147 1.498 0.0194 -5.813
CD 300 150 8 55.088 1.699 0.0109 3.267
∑ 1.015
JI 300 150 8 -42.441 1.309 0.0067 -2.016
ID 300 150 4 12.147 1.498 0.0194 5.813
CIRCUITO III
DE 300 150 8 31.405 0.968 0.0038 1.154
EJ 300 150 4 -18.597 2.294 0.0426 -12.793
∑ -7.842
HJ 600 150 12 101.567 1.392 0.0047 2.816
HG 300 150 12 -75.398 1.033 0.0027 -0.811
CIRCUITO V
JE 300 150 4 18.597 2.294 0.0426 12.793
EF 300 150 8 8.202 0.253 0.0003 0.096
GF 900 150 8 -63.458 1.957 0.0142 -12.737
∑ 2.157
ITERACION 08
longitud diametro caudal velocidad pendiente perdida
circuito tramo C
L (m) Ø (pulg) Qo (l/s) v (m/s) S (m/m) Hf (m)
AB 600 150 16 205.883 1.587 0.0043 2.567
BI 300 150 12 91.929 1.260 0.0039 1.171
CIRCUITO I
IJ 300 150 8 39.679 1.224 0.0059 1.780
JH 600 150 12 -99.697 1.366 0.0045 -2.721
HA 600 150 16 -224.117 1.728 0.0050 -3.004
∑ -0.207
BI 300 150 12 -91.929 1.260 0.0039 -1.171
BC 300 150 8 66.124 2.039 0.0153 4.582
CIRCUITO II
DI 300 150 4 -16.420 2.025 0.0339 -10.159
CIRCUITO II
ITERACION 09
longitud diametro caudal velocidad pendiente perdida
circuito tramo C
L (m) Ø (pulg) Qo (l/s) v (m/s) S (m/m) Hf (m)
AB 600 150 16 206.895 1.595 0.0043 2.590
BI 300 150 12 90.395 1.239 0.0038 1.135
CIRCUITO I
IJ 300 150 8 41.668 1.285 0.0065 1.948
JH 600 150 12 -101.225 1.387 0.0047 -2.798
HA 600 150 16 -223.105 1.720 0.0050 -2.979
∑ -0.104
BI 300 150 12 -90.395 1.239 0.0038 -1.135
BC 300 150 8 68.670 2.118 0.0164 4.914
CIRCUITO II
DI 300 150 4 -12.896 1.591 0.0216 -6.495
CD 300 150 8 56.750 1.750 0.0115 3.452
∑ 0.737
JI 300 150 8 -41.668 1.285 0.0065 -1.948
ID 300 150 4 12.896 1.591 0.0216 6.495
CIRCUITO III
DE 300 150 8 33.817 1.043 0.0044 1.324
EJ 300 150 4 -17.484 2.157 0.0380 -11.411
∑ -5.541
HJ 600 150 12 101.225 1.387 0.0047 2.798
HG 300 150 12 -74.099 1.016 0.0026 -0.785
CIRCUITO V
JE 300 150 4 17.484 2.157 0.0380 11.411
EF 300 150 8 9.501 0.293 0.0004 0.126
GF 900 150 8 -62.159 1.917 0.0136 -12.259
∑ 1.291
ITERACION 10
longitud diametro caudal velocidad pendiente perdida
circuito tramo C
L (m) Ø (pulg) Qo (l/s) v (m/s) S (m/m) Hf (m)
AB 600 150 16 207.392 1.599 0.0043 2.602
BI 300 150 12 91.506 1.254 0.0039 1.161
CIRCUITO I
IJ 300 150 8 39.754 1.226 0.0060 1.786
JH 600 150 12 -99.954 1.370 0.0046 -2.734
HA 600 150 16 -222.608 1.716 0.0049 -2.966
∑ -0.152
BI 300 150 12 -91.506 1.254 0.0039 -1.161
BC 300 150 8 68.056 2.099 0.0161 4.833
CIRCUITO II
DI 300 150 4 -15.922 1.964 0.0320 -9.595
CD 300 150 8 56.136 1.731 0.0113 3.383
∑ -2.539
JI 300 150 8 -39.754 1.226 0.0060 -1.786
ID 300 150 4 15.922 1.964 0.0320 9.595
CIRCUITO III
DE 300 150 8 36.228 1.117 0.0050 1.504
EJ 300 150 4 -14.298 1.764 0.0262 -7.862
∑ 1.451
HJ 600 150 12 99.954 1.370 0.0046 2.734
HG 300 150 12 -74.874 1.026 0.0027 -0.801
CIRCUITO V
JE 300 150 4 14.298 1.764 0.0262 7.862
EF 300 150 8 8.726 0.269 0.0004 0.108
GF 900 150 8 -62.934 1.941 0.0139 -12.543
∑ -2.640
ITERACION 11
longitud diametro caudal velocidad pendiente perdida
circuito tramo C
L (m) Ø (pulg) Qo (l/s) v (m/s) S (m/m) Hf (m)
AB 600 150 16 208.132 1.605 0.0044 2.619
BI 300 150 12 90.407 1.239 0.0038 1.135
CIRCUITO I
IJ 300 150 8 41.127 1.268 0.0063 1.902
JH 600 150 12 -100.999 1.384 0.0046 -2.787
HA 600 150 16 -221.868 1.710 0.0049 -2.948
∑ -0.079
BI 300 150 12 -90.407 1.239 0.0038 -1.135
BC 300 150 8 69.895 2.155 0.0169 5.078
CIRCUITO II
DI 300 150 4 -13.450 1.659 0.0234 -7.021
CD 300 150 8 57.975 1.788 0.0120 3.592
∑ 0.513
JI 300 150 8 -41.127 1.268 0.0063 -1.902
ID 300 150 4 13.450 1.659 0.0234 7.021
CIRCUITO III
DE 300 150 8 35.595 1.098 0.0049 1.455
EJ 300 150 4 -16.716 2.062 0.0350 -10.500
∑ -3.925
HJ 600 150 12 100.999 1.384 0.0046 2.787
HG 300 150 12 -73.089 1.002 0.0026 -0.766
CIRCUITO V
CIRCUITO V
JE 300 150 4 16.716 2.062 0.0350 10.500
EF 300 150 8 10.511 0.324 0.0005 0.152
GF 900 150 8 -61.149 1.886 0.0132 -11.892
∑ 0.781
ITERACION 12
longitud diametro caudal velocidad pendiente perdida
circuito tramo C
L (m) Ø (pulg) Qo (l/s) v (m/s) S (m/m) Hf (m)
AB 600 150 16 208.514 1.607 0.0044 2.628
BI 300 150 12 91.203 1.250 0.0038 1.154
CIRCUITO I
IJ 300 150 8 39.794 1.227 0.0060 1.789
JH 600 150 12 -100.135 1.372 0.0046 -2.743
HA 600 150 16 -221.486 1.707 0.0049 -2.939
∑ -0.111
BI 300 150 12 -91.203 1.250 0.0038 -1.154
BC 300 150 8 69.480 2.143 0.0167 5.022
CIRCUITO II
DI 300 150 4 -15.580 1.922 0.0307 -9.217
CD 300 150 8 57.560 1.775 0.0118 3.544
∑ -1.805
JI 300 150 8 -39.794 1.227 0.0060 -1.789
ID 300 150 4 15.580 1.922 0.0307 9.217
CIRCUITO III
DE 300 150 8 37.310 1.151 0.0053 1.588
EJ 300 150 4 -14.518 1.791 0.0270 -8.088
∑ 0.928
HJ 600 150 12 100.135 1.372 0.0046 2.743
HG 300 150 12 -73.572 1.008 0.0026 -0.775
CIRCUITO V
JE 300 150 4 14.518 1.791 0.0270 8.088
EF 300 150 8 10.028 0.309 0.0005 0.139
GF 900 150 8 -61.632 1.900 0.0134 -12.067
∑ -1.871
ITERACION 13
longitud diametro caudal velocidad pendiente perdida
circuito tramo C
L (m) Ø (pulg) Qo (l/s) v (m/s) S (m/m) Hf (m)
AB 600 150 16 209.055 1.612 0.0044 2.641
BI 300 150 12 90.423 1.239 0.0038 1.135
CIRCUITO I
IJ 300 150 8 40.740 1.256 0.0062 1.869
JH 600 150 12 -100.851 1.382 0.0046 -2.779
HA 600 150 16 -220.945 1.703 0.0049 -2.925
∑ -0.060
BI 300 150 12 -90.423 1.239 0.0038 -1.135
BC 300 150 8 70.802 2.183 0.0173 5.200
CIRCUITO II
DI 300 150 4 -13.853 1.709 0.0247 -7.415
CIRCUITO II
ITERACION 14
longitud diametro caudal velocidad pendiente perdida
circuito tramo C
L (m) Ø (pulg) Qo (l/s) v (m/s) S (m/m) Hf (m)
AB 600 150 16 209.345 1.614 0.0044 2.647
BI 300 150 12 90.987 1.247 0.0038 1.148
CIRCUITO I
IJ 300 150 8 39.811 1.228 0.0060 1.791
JH 600 150 12 -100.261 1.374 0.0046 -2.749
HA 600 150 16 -220.655 1.701 0.0049 -2.918
∑ -0.081
BI 300 150 12 -90.987 1.247 0.0038 -1.148
BC 300 150 8 70.528 2.175 0.0172 5.163
CIRCUITO II
DI 300 150 4 -15.346 1.893 0.0299 -8.963
CD 300 150 8 58.608 1.807 0.0122 3.664
∑ -1.283
JI 300 150 8 -39.811 1.228 0.0060 -1.791
ID 300 150 4 15.346 1.893 0.0299 8.963
CIRCUITO III
DE 300 150 8 38.124 1.176 0.0055 1.653
EJ 300 150 4 -14.663 1.809 0.0275 -8.237
∑ 0.587
HJ 600 150 12 100.261 1.374 0.0046 2.749
HG 300 150 12 -72.614 0.995 0.0025 -0.756
CIRCUITO V
JE 300 150 4 14.663 1.809 0.0275 8.237
EF 300 150 8 10.986 0.339 0.0006 0.165
GF 900 150 8 -60.674 1.871 0.0130 -11.722
∑ -1.326
ITERACION 15
longitud diametro caudal velocidad pendiente perdida
circuito tramo C
L (m) Ø (pulg) Qo (l/s) v (m/s) S (m/m) Hf (m)
AB 600 150 16 209.741 1.617 0.0044 2.657
BI 300 150 12 90.436 1.239 0.0038 1.136
CIRCUITO I
IJ 300 150 8 40.464 1.248 0.0062 1.845
JH 600 150 12 -100.753 1.381 0.0046 -2.774
HA 600 150 16 -220.259 1.698 0.0048 -2.909
∑ -0.045
BI 300 150 12 -90.436 1.239 0.0038 -1.136
BC 300 150 8 71.475 2.204 0.0176 5.292
CIRCUITO II
DI 300 150 4 -14.142 1.744 0.0257 -7.704
CD 300 150 8 59.555 1.836 0.0126 3.775
∑ 0.228
JI 300 150 8 -40.464 1.248 0.0062 -1.845
ID 300 150 4 14.142 1.744 0.0257 7.704
CIRCUITO III
DE 300 150 8 37.867 1.168 0.0054 1.632
EJ 300 150 4 -15.807 1.950 0.0316 -9.468
∑ -1.977
HJ 600 150 12 100.753 1.381 0.0046 2.774
HG 300 150 12 -71.726 0.983 0.0025 -0.739
CIRCUITO V
JE 300 150 4 15.807 1.950 0.0316 9.468
EF 300 150 8 11.874 0.366 0.0006 0.191
GF 900 150 8 -59.786 1.844 0.0127 -11.406
∑ 0.287
ITERACION 16
longitud diametro caudal velocidad pendiente perdida
circuito tramo C
L (m) Ø (pulg) Qo (l/s) v (m/s) S (m/m) Hf (m)
AB 600 150 16 209.960 1.619 0.0044 2.662
BI 300 150 12 90.833 1.245 0.0038 1.145
CIRCUITO I
IJ 300 150 8 39.816 1.228 0.0060 1.791
JH 600 150 12 -100.350 1.375 0.0046 -2.754
HA 600 150 16 -220.040 1.696 0.0048 -2.903
∑ -0.059
BI 300 150 12 -90.833 1.245 0.0038 -1.145
BC 300 150 8 71.298 2.199 0.0176 5.268
CIRCUITO II
DI 300 150 4 -15.186 1.873 0.0293 -8.790
CD 300 150 8 59.378 1.831 0.0125 3.754
∑ -0.913
JI 300 150 8 -39.816 1.228 0.0060 -1.791
ID 300 150 4 15.186 1.873 0.0293 8.790
CIRCUITO III
DE 300 150 8 38.734 1.194 0.0057 1.702
EJ 300 150 4 -14.756 1.820 0.0278 -8.335
∑ 0.366
HJ 600 150 12 100.350 1.375 0.0046 2.754
HG 300 150 12 -71.910 0.986 0.0025 -0.743
CIRCUITO V
CIRCUITO V
JE 300 150 4 14.756 1.820 0.0278 8.335
EF 300 150 8 11.690 0.360 0.0006 0.185
GF 900 150 8 -59.970 1.849 0.0127 -11.471
∑ -0.940
ITERACION 17
longitud diametro caudal velocidad pendiente perdida
circuito tramo C
L (m) Ø (pulg) Qo (l/s) v (m/s) S (m/m) Hf (m)
AB 600 150 16 210.250 1.621 0.0044 2.669
BI 300 150 12 90.444 1.240 0.0038 1.136
CIRCUITO I
IJ 300 150 8 40.266 1.242 0.0061 1.829
JH 600 150 12 -100.688 1.380 0.0046 -2.771
HA 600 150 16 -219.750 1.694 0.0048 -2.896
∑ -0.034
BI 300 150 12 -90.444 1.240 0.0038 -1.136
BC 300 150 8 71.975 2.219 0.0179 5.361
CIRCUITO II
DI 300 150 4 -14.348 1.770 0.0264 -7.913
CD 300 150 8 60.055 1.852 0.0128 3.834
∑ 0.146
JI 300 150 8 -40.266 1.242 0.0061 -1.829
ID 300 150 4 14.348 1.770 0.0264 7.913
CIRCUITO III
DE 300 150 8 38.573 1.189 0.0056 1.689
EJ 300 150 4 -15.544 1.917 0.0306 -9.178
∑ -1.405
HJ 600 150 12 100.688 1.380 0.0046 2.771
HG 300 150 12 -71.282 0.977 0.0024 -0.731
CIRCUITO V
JE 300 150 4 15.544 1.917 0.0306 9.178
EF 300 150 8 12.318 0.380 0.0007 0.204
GF 900 150 8 -59.342 1.830 0.0125 -11.250
∑ 0.172
ITERACION 18
longitud diametro caudal velocidad pendiente perdida
circuito tramo C
L (m) Ø (pulg) Qo (l/s) v (m/s) S (m/m) Hf (m)
AB 600 150 16 210.415 1.622 0.0045 2.672
BI 300 150 12 90.722 1.243 0.0038 1.142
CIRCUITO I
IJ 300 150 8 39.815 1.228 0.0060 1.791
JH 600 150 12 -100.411 1.376 0.0046 -2.757
HA 600 150 16 -219.585 1.693 0.0048 -2.892
∑ -0.043
BI 300 150 12 -90.722 1.243 0.0038 -1.142
BC 300 150 8 71.863 2.216 0.0178 5.346
CIRCUITO II
DI 300 150 4 -15.077 1.860 0.0289 -8.674
CIRCUITO II
ITERACION 19
longitud diametro caudal velocidad pendiente perdida
circuito tramo C
L (m) Ø (pulg) Qo (l/s) v (m/s) S (m/m) Hf (m)
AB 600 150 16 210.627 1.624 0.0045 2.677
BI 300 150 12 90.449 1.240 0.0038 1.136
CIRCUITO I
IJ 300 150 8 40.125 1.237 0.0061 1.817
JH 600 150 12 -100.644 1.379 0.0046 -2.769
HA 600 150 16 -219.373 1.691 0.0048 -2.887
∑ -0.026
BI 300 150 12 -90.449 1.240 0.0038 -1.136
BC 300 150 8 72.347 2.231 0.0180 5.412
CIRCUITO II
DI 300 150 4 -14.494 1.788 0.0269 -8.063
CD 300 150 8 60.427 1.863 0.0129 3.878
∑ 0.091
JI 300 150 8 -40.125 1.237 0.0061 -1.817
ID 300 150 4 14.494 1.788 0.0269 8.063
CIRCUITO III
DE 300 150 8 39.092 1.205 0.0058 1.731
EJ 300 150 4 -15.359 1.894 0.0299 -8.977
∑ -0.999
HJ 600 150 12 100.644 1.379 0.0046 2.769
HG 300 150 12 -70.949 0.972 0.0024 -0.725
CIRCUITO V
JE 300 150 4 15.359 1.894 0.0299 8.977
EF 300 150 8 12.651 0.390 0.0007 0.214
GF 900 150 8 -59.009 1.820 0.0124 -11.133
∑ 0.102
ITERACION 20
longitud diametro caudal velocidad pendiente perdida
circuito tramo C
L (m) Ø (pulg) Qo (l/s) v (m/s) S (m/m) Hf (m)
AB 600 150 16 210.751 1.625 0.0045 2.680
BI 300 150 12 90.643 1.242 0.0038 1.140
CIRCUITO I
IJ 300 150 8 39.810 1.228 0.0060 1.790
JH 600 150 12 -100.453 1.377 0.0046 -2.759
HA 600 150 16 -219.249 1.690 0.0048 -2.884
∑ -0.032
BI 300 150 12 -90.643 1.242 0.0038 -1.140
BC 300 150 8 72.278 2.229 0.0180 5.403
CIRCUITO II
DI 300 150 4 -15.003 1.851 0.0286 -8.595
CD 300 150 8 60.358 1.861 0.0129 3.870
∑ -0.463
JI 300 150 8 -39.810 1.228 0.0060 -1.790
ID 300 150 4 15.003 1.851 0.0286 8.595
CIRCUITO III
DE 300 150 8 39.531 1.219 0.0059 1.767
EJ 300 150 4 -14.854 1.832 0.0281 -8.437
∑ 0.134
HJ 600 150 12 100.453 1.377 0.0046 2.759
HG 300 150 12 -71.016 0.973 0.0024 -0.726
CIRCUITO V
JE 300 150 4 14.854 1.832 0.0281 8.437
EF 300 150 8 12.584 0.388 0.0007 0.212
GF 900 150 8 -59.076 1.822 0.0124 -11.157
∑ -0.474
ITERACION 21
longitud diametro caudal velocidad pendiente perdida
circuito tramo C
L (m) Ø (pulg) Qo (l/s) v (m/s) S (m/m) Hf (m)
AB 600 150 16 210.905 1.626 0.0045 2.684
BI 300 150 12 90.452 1.240 0.0038 1.136
CIRCUITO I
IJ 300 150 8 40.024 1.234 0.0060 1.808
JH 600 150 12 -100.615 1.379 0.0046 -2.767
HA 600 150 16 -219.095 1.689 0.0048 -2.880
∑ -0.019
BI 300 150 12 -90.452 1.240 0.0038 -1.136
BC 300 150 8 72.623 2.239 0.0182 5.451
CIRCUITO II
DI 300 150 4 -14.598 1.801 0.0272 -8.171
CD 300 150 8 60.703 1.872 0.0130 3.911
∑ 0.055
JI 300 150 8 -40.024 1.234 0.0060 -1.808
ID 300 150 4 14.598 1.801 0.0272 8.171
CIRCUITO III
DE 300 150 8 39.471 1.217 0.0059 1.762
EJ 300 150 4 -15.228 1.878 0.0295 -8.836
∑ -0.711
HJ 600 150 12 100.615 1.379 0.0046 2.767
HG 300 150 12 -70.700 0.969 0.0024 -0.720
CIRCUITO V
CIRCUITO V
JE 300 150 4 15.228 1.878 0.0295 8.836
EF 300 150 8 12.900 0.398 0.0007 0.222
GF 900 150 8 -58.760 1.812 0.0123 -11.046
∑ 0.059
ITERACION 22
longitud diametro caudal velocidad pendiente perdida
circuito tramo C
L (m) Ø (pulg) Qo (l/s) v (m/s) S (m/m) Hf (m)
AB 600 150 16 210.998 1.627 0.0045 2.686
BI 300 150 12 90.587 1.241 0.0038 1.139
CIRCUITO I
IJ 300 150 8 39.804 1.227 0.0060 1.790
JH 600 150 12 -100.483 1.377 0.0046 -2.761
HA 600 150 16 -219.002 1.688 0.0048 -2.878
∑ -0.023
BI 300 150 12 -90.587 1.241 0.0038 -1.139
BC 300 150 8 72.582 2.238 0.0181 5.445
CIRCUITO II
DI 300 150 4 -14.952 1.844 0.0285 -8.542
CD 300 150 8 60.662 1.871 0.0130 3.906
∑ -0.330
JI 300 150 8 -39.804 1.227 0.0060 -1.790
ID 300 150 4 14.952 1.844 0.0285 8.542
CIRCUITO III
DE 300 150 8 39.784 1.227 0.0060 1.788
EJ 300 150 4 -14.877 1.835 0.0282 -8.462
∑ 0.078
HJ 600 150 12 100.483 1.377 0.0046 2.761
HG 300 150 12 -70.739 0.969 0.0024 -0.721
CIRCUITO V
JE 300 150 4 14.877 1.835 0.0282 8.462
EF 300 150 8 12.861 0.397 0.0007 0.221
GF 900 150 8 -58.799 1.813 0.0123 -11.060
∑ -0.337
ITERACION 23
longitud diametro caudal velocidad pendiente perdida
circuito tramo C
L (m) Ø (pulg) Qo (l/s) v (m/s) S (m/m) Hf (m)
AB 600 150 16 211.111 1.627 0.0045 2.689
BI 300 150 12 90.453 1.240 0.0038 1.136
CIRCUITO I
IJ 300 150 8 39.951 1.232 0.0060 1.802
JH 600 150 12 -100.594 1.379 0.0046 -2.766
HA 600 150 16 -218.889 1.687 0.0048 -2.875
∑ -0.014
BI 300 150 12 -90.453 1.240 0.0038 -1.136
BC 300 150 8 72.828 2.246 0.0183 5.479
CIRCUITO II
DI 300 150 4 -14.672 1.810 0.0275 -8.247
CIRCUITO II
ITERACION 24
longitud diametro caudal velocidad pendiente perdida
circuito tramo C
L (m) Ø (pulg) Qo (l/s) v (m/s) S (m/m) Hf (m)
AB 600 150 16 211.181 1.628 0.0045 2.691
BI 300 150 12 90.546 1.241 0.0038 1.138
CIRCUITO I
IJ 300 150 8 39.798 1.227 0.0060 1.789
JH 600 150 12 -100.503 1.377 0.0046 -2.762
HA 600 150 16 -218.819 1.687 0.0048 -2.874
∑ -0.017
BI 300 150 12 -90.546 1.241 0.0038 -1.138
BC 300 150 8 72.804 2.245 0.0183 5.476
CIRCUITO II
DI 300 150 4 -14.918 1.840 0.0284 -8.505
CD 300 150 8 60.884 1.877 0.0131 3.932
∑ -0.235
JI 300 150 8 -39.798 1.227 0.0060 -1.789
ID 300 150 4 14.918 1.840 0.0284 8.505
CIRCUITO III
DE 300 150 8 39.972 1.233 0.0060 1.804
EJ 300 150 4 -14.892 1.837 0.0283 -8.477
∑ 0.043
HJ 600 150 12 100.503 1.377 0.0046 2.762
HG 300 150 12 -70.536 0.967 0.0024 -0.717
CIRCUITO V
JE 300 150 4 14.892 1.837 0.0283 8.477
EF 300 150 8 13.064 0.403 0.0008 0.227
GF 900 150 8 -58.596 1.807 0.0122 -10.989
∑ -0.240
ITERACION 25
longitud diametro caudal velocidad pendiente perdida
circuito tramo C
L (m) Ø (pulg) Qo (l/s) v (m/s) S (m/m) Hf (m)
AB 600 150 16 211.263 1.629 0.0045 2.692
BI 300 150 12 90.453 1.240 0.0038 1.136
CIRCUITO I
IJ 300 150 8 39.899 1.230 0.0060 1.798
JH 600 150 12 -100.581 1.378 0.0046 -2.766
HA 600 150 16 -218.737 1.686 0.0048 -2.872
∑ -0.011
BI 300 150 12 -90.453 1.240 0.0038 -1.136
BC 300 150 8 72.980 2.250 0.0183 5.500
CIRCUITO II
DI 300 150 4 -14.723 1.816 0.0277 -8.301
CD 300 150 8 61.060 1.883 0.0132 3.953
∑ 0.017
JI 300 150 8 -39.899 1.230 0.0060 -1.798
ID 300 150 4 14.723 1.816 0.0277 8.301
CIRCUITO III
DE 300 150 8 39.954 1.232 0.0060 1.802
EJ 300 150 4 -15.070 1.859 0.0289 -8.666
∑ -0.361
HJ 600 150 12 100.581 1.378 0.0046 2.766
HG 300 150 12 -70.376 0.965 0.0024 -0.714
CIRCUITO V
JE 300 150 4 15.070 1.859 0.0289 8.666
EF 300 150 8 13.224 0.408 0.0008 0.233
GF 900 150 8 -58.436 1.802 0.0121 -10.934
∑ 0.017
k2= 1.8 2.5
QMH= 0.00000
k1= 1.3
0
30
0
+ −
Hf/Qo ∆Q Q1
Hf/Qo ∆Q Q1
Hf/Qo ∆Q Q1
Hf/Qo ∆Q Q1
Hf/Qo ∆Q Q1
0.013 -3.27384 204.007
0.013 -4.16877 92.776
0.053 -8.32096 39.684
0.027 0.62923 -99.283
0.013 -3.27384 -225.993
0.119
0.013 4.16877 -92.776
0.066 0.89493 63.401
0.511 -4.15219 -17.262
0.055 0.89493 51.481
0.645
0.053 8.32096 -39.684
0.511 4.15219 17.262
0.033 5.04712 32.913
0.809 8.95019 -13.557
1.406
0.027 -0.62923 99.283
0.011 -3.90307 -78.930
0.809 -8.95019 13.557
0.012 -3.90307 4.670
0.200 -3.90307 -66.990
1.059
Hf/Qo ∆Q Q1
Hf/Qo ∆Q Q1
Hf/Qo ∆Q Q1
Hf/Qo ∆Q Q1
Hf/Qo ∆Q Q1
0.013 0.73996 208.132
0.013 -1.09850 90.407
0.045 1.37283 41.127
0.027 -1.04467 -100.999
0.013 0.73996 -221.868
0.111
0.013 1.09850 -90.407
0.071 1.83846 69.895
0.603 2.47133 -13.450
0.060 1.83846 57.975
0.747
0.045 -1.37283 -41.127
0.603 -2.47133 13.450
0.042 -0.63287 35.595
0.550 -2.41750 -16.716
1.239
0.027 1.04467 100.999
0.011 1.78464 -73.089
0.550 2.41750 16.716
0.012 1.78464 10.511
0.199 1.78464 -61.149
0.800
Hf/Qo ∆Q Q1
Hf/Qo ∆Q Q1
Hf/Qo ∆Q Q1
Hf/Qo ∆Q Q1
Hf/Qo ∆Q Q1
0.013 0.21970 209.960
0.013 0.39699 90.833
0.046 -0.64756 39.816
0.028 0.40360 -100.350
0.013 0.21970 -220.040
0.112
0.013 -0.39699 -90.833
0.074 -0.17729 71.298
0.545 -1.04455 -15.186
0.063 -0.17729 59.378
0.695
0.046 0.64756 -39.816
0.545 1.04455 15.186
0.043 0.86726 38.734
0.599 1.05116 -14.756
1.232
0.028 -0.40360 100.350
0.010 -0.18390 -71.910
0.599 -1.05116 14.756
0.016 -0.18390 11.690
0.191 -0.18390 -59.970
0.844
Hf/Qo ∆Q Q1
Hf/Qo ∆Q Q1
Hf/Qo ∆Q Q1
Hf/Qo ∆Q Q1
Hf/Qo ∆Q Q1
0.013 0.15444 210.905
0.013 -0.19106 90.452
0.045 0.21350 40.024
0.027 -0.16120 -100.615
0.013 0.15444 -219.095
0.111
0.013 0.19106 -90.452
0.075 0.34550 72.623
0.573 0.40456 -14.598
0.064 0.34550 60.703
0.724
0.045 -0.21350 -40.024
0.573 -0.40456 14.598
0.045 -0.05906 39.471
0.568 -0.37470 -15.228
1.231
0.027 0.16120 100.615
0.010 0.31564 -70.700
0.568 0.37470 15.228
0.017 0.31564 12.900
0.189 0.31564 -58.760
0.811
Hf/Qo ∆Q Q1
Hf/Qo ∆Q Q1
Hf/Qo ∆Q Q1
Hf/Qo ∆Q Q1
Hf/Qo ∆Q Q1
0.013 0.05179 211.315
0.013 0.06458 90.517
0.045 -0.10686 39.792
0.027 0.06281 -100.518
0.013 0.05179 -218.685
0.111
0.013 -0.06458 -90.517
0.075 -0.01279 72.967
0.564 -0.17145 -14.895
0.065 -0.01279 61.047
0.716
0.045 0.10686 -39.792
0.564 0.17145 14.895
0.045 0.15865 40.112
0.575 0.16967 -14.900
1.229
0.027 -0.06281 100.518
0.010 -0.01102 -70.387
0.575 -0.16967 14.900
0.018 -0.01102 13.213
0.187 -0.01102 -58.447
0.817