Mr Rahul Kumar

Sub:- Quatation for Civil And Mechanical items for Bokaro LPG Bottling Plant.

Dear Sir,
It is known to reliable sources that you need a sub-Contractor for executing the above
said plant work. In this regard we are interested to execute the same with you and your
organization.

We hope you will oblige us to give a chance to work with you as in


past we have executed the similar types of jobs with the Various Organization in various plant
we may produce our all the credential if required.

Sl Item Description Rate(@ Rs)


No
01 Excavation of soil up to 1.5m depth 160 m3
02 Rain Cement Concrete 140 m2
03 Reinforcement cement concrete in foundation, column, Beem etc.. 165 m3
04 Making Shuttering for RCC Work 455 sqm3
05 Cutting, Bending, Binding and placing in position of reinforcement Rs 5 per kg
06 Fabrication of steel structures such as column,Beem, Pipe rack 11500 MT
07 Erection of steel structures in position and alignment 8500 MT
08 Fabrication of CS pipes from 1’’ to 20’ dia’ 105 inch dia
09 Erection and fabrication pipes in position alignment and welding 65 inch dia
complete
10 Fabrication and erection of G.I pipes of difft.. dia 140 inch dia
11 Erection and alignment of equipments such as motor, pump etc 12500 MT
12 Erection of bullet tank 3200 MT

Note:-
a) All other items in conection with this job such as valves, meter guage, flanges etc…
etc… will be mutually discussed and agree with the rate decided.
b) The above rate is exclusive the cost of materials such as steel, structures ,
inforcement, cement, stone chips and electricity and water etc….

c) The above quated rate in only labour rate no consumables and other materials
arrange by us.

d) The hutment for labour accommodation to be provided by you free of cost, If any
local problems will arise that has to be solve by you only.

We hope and believe that you will agreed with our rates and awarded up the
Job.