Professional Documents
Culture Documents
SIT488
PFT2
PMI2
NOTE 8 IMC562
NOTE 8 SIT488
IMC562
NOTE 5
XX"
NOTE 5
NOTE 6 BST35
TIME: 08:22:06
PIP5 NOTE 5 IMC560
DETAIL 'A'
SIT488 BY INSTRUMENTS BY PIPING
IMC560
45
HOOK-UP: LT-STD-003
3. INSTRUMENT TUBING TO BE FIELD ROUTED AND SUPPORTED AS REQUIRED. 2 ISSUED FOR CONSTRUCTION GC DS GN 31-Mar-10 BUBBLER
4. TUBE TRANSMITTER HIGH SIDE TO BUBBLER TUBE, TUBE LOW SIDE TO
TO ATMOSPHERE THROUGH BUG SCREEN. 1 REVISED AS NOTED KRF PMB COMM 09-Feb-09 CARTAGENA EXPANSION PROJECT
5. THE TUBE CONNECTORS TO BE SIZED FROM VENDOR DRAWINGS.
6. REFERENCE AIR HEADER DWG. #166000-000-DG-IC04-0002. 0 ISSUED FOR DESIGN KRF PMB COMM 24-Aug-09
© CBI AMERICAS LTD. 2008. ALL RIGHTS RESERVED. CONTAINS CONFIDENTIAL INFORMATION PROPRIETARY TO CB&I, OR ITS
AFFILIATES, CLIENTS OR SUPPLIERS AND MAY NOT TO BE USED, REPRODUCED OR DISCLOSED WITHOUT CB&I'S WRITTEN
FOR: Refineria de Cartagena S.A.
7. MANIFOLD & MOUNTING BRACKET SUPPLIED WITH TRANSMITTER. PERMISSION.
8. ROTOMETER & REGULATOR SUPPLIED AS TAGGED INSTRUMENTS. DRAWN: CK'D: APPD: DATE: SCALE:
2
NO. REVISION DRAWN CK'D APPD DATE
PMB RSB COMM 18-Aug-08 N/A PROJ NO: 166000 DWG NO: 000-DG-IC04-0021 REV: