Calculation for
Earthing & Lightning System
PROJECT UNIT DIS DOC SERIAL REV

‫ﻣﺸﺎﺭﻛﺖ ﻧﺼﺮ‬ KCGP PCS EL CAL 0001 00


Page 1 of 17

Calculation for
Earthing & Lightning System

00 IFC 94/03/30 E.F R.S K.L

Rev. ‫ﻧﻮﻉ ﺍﺭﺳﺎﻝ‬ ‫ﺗﺎﺭﻳﺦ‬ ‫ﺗﻬﻴﻪ ﻛﻨﻨﺪﻩ‬ ‫ﺑﺮﺭﺳﻲ ﻛﻨﻨﺪﻩ‬ ‫ﺗﺎﺋﻴﺪ ﻛﻨﻨﺪﻩ‬
‫ ﭼﺎﺭﻣﻠﻪ‬-‫ ﻛﻮﻫﺪﺷﺖ‬48" ‫ﭘﺮﻭژﻩ ﺍﺣﺪﺍﺙ ﺧﻂ ﻟﻮﻟﻪ ﺍﻧﺘﻘﺎﻝ ﮔﺎﺯ‬
(790816) ‫ﭘﻴﻤﺎﻥ ﺷﻤﺎﺭﻩ‬

Calculation for
Earthing & Lightning System
PROJECT UNIT DIS DOC SERIAL REV

‫ﻣﺸﺎﺭﻛﺖ ﻧﺼﺮ‬ KCGP PCS EL CAL 0001 00


Page 2 of 17

Revision Sheet
‫ﻭﻳﺮﺍﻳﺶﻫﺎ‬ ‫ﻭﻳﺮﺍﻳﺶﻫﺎ‬
‫ﺻﻔﺤﻪ‬ ‫ﺗﻮﺿﻴﺤﺎﺕ‬ ‫ﺻﻔﺤﻪ‬ ‫ﺗﻮﺿﻴﺤﺎﺕ‬
00 01 02 03 04 05 06 00 01 02 03 04 05 06
1 X 41
2 X 42
3 X 43
4 X 44
5 X 45
6 X 46
7 X 47
8 X 48
9 X 49
10 X 50
11 X 51
12 X 52
13 X 53
14 X 54
15 X 55
16 X 56
17 X 57
18 58
19 59
20 60
21 61
22 62
23 63
24 64
25 65
26 66
27 67
28 68
29 69
30 70
31 71
32 72
33 73
34 74
35 75
36 76
37 77
38 78
39 79
40 80
‫ ﭼﺎﺭﻣﻠﻪ‬-‫ ﻛﻮﻫﺪﺷﺖ‬48" ‫ﭘﺮﻭژﻩ ﺍﺣﺪﺍﺙ ﺧﻂ ﻟﻮﻟﻪ ﺍﻧﺘﻘﺎﻝ ﮔﺎﺯ‬
(790816) ‫ﭘﻴﻤﺎﻥ ﺷﻤﺎﺭﻩ‬

Calculation for
Earthing & Lightning System
PROJECT UNIT DIS DOC SERIAL REV

‫ﻣﺸﺎﺭﻛﺖ ﻧﺼﺮ‬ KCGP PCS EL CAL 0001 00


Page 3 of 17

CONTENTS

1. Introduction ...................................................................................................................... 4
2. Definitions.......................................................................................................................... 4
3. Units ..................................................................................................................................... 5
4. Codes and Standards ................................................................................................... 5
5. Document Priority......................................................................................................... 5
6. Basis of Calculation ...................................................................................................... 5
7. Calculation for Grounding Resistance ................................................................ 6
8. Calculation for Cross Section of Main Grounding Cable .......................... 8
9. Tables .................................................................................................................................. 9
10. Lightning Protection Systems................................................................................ 10
‫ ﭼﺎﺭﻣﻠﻪ‬-‫ ﻛﻮﻫﺪﺷﺖ‬48" ‫ﭘﺮﻭژﻩ ﺍﺣﺪﺍﺙ ﺧﻂ ﻟﻮﻟﻪ ﺍﻧﺘﻘﺎﻝ ﮔﺎﺯ‬
(790816) ‫ﭘﻴﻤﺎﻥ ﺷﻤﺎﺭﻩ‬

Calculation for
Earthing & Lightning System
PROJECT UNIT DIS DOC SERIAL REV

‫ﻣﺸﺎﺭﻛﺖ ﻧﺼﺮ‬ KCGP PCS EL CAL 0001 00


Page 4 of 17

1. Introduction
0B

Iranian Gas Engineering & Development Company (IGEDC) one of the subsidiaries of
1B

National Iranian Gas Company (NIGC) has intended to perform a 48" gas transmission
pipeline from KOOHDASHT to CHARMALE in order to transfer and export the natural
gas to Iraq country.
This project which is the first phase of whole is generally consist of two main section:
2B

A. The Pressure Control Station (PCS) with normal capacity of 25 MMCM/D that located
3B

at place that going to be branched off IGAT VI. This PCS Could transfer 40 MMCM/D.
B. Around 130 km, 48” nominal diameter buried gas transfer pipeline that branched off
4B

IGAT VI, located around KOOHDASHT city.

2. Definitions
5B

Within the context of this document, the following definitions are applicable.
6B

Owner Means National Iranian Gas Company (NIGC)

Client Means Iranian Gas Engineering & Development Company (IGEDC).

Client Consultant Means Energy & Industry Consultant engineers Co. (EIC).

Means Nasr Consortium


EPC Contractor (NASR-E-MISHAGH AHWAZ Co. , HARAZ RAH Consultant
Engineers Co. AND OMRAN GOSTAR JAHAD-E-NASR Co.)

Consortium Consultant Means HARAZ RAH Consultant engineers Co.


Engineers

Is the encompassing term for Detailed Engineering, Procurement,


Project Construction pre- Commissioning and assistant to Commissioning and
Start-up of all of the facilities.

Means approved in writing, including subsequent confirmation of


Approved
previous verbal approvals.

Means a statutory body responsible for the regulation of specific codes,


Authority
standards and practices.

The party to the contract and/or purchase order which has undertaken
Supplier the obligation to supply the goods and/or services which are ordered
and specified herein.
‫ ﭼﺎﺭﻣﻠﻪ‬-‫ ﻛﻮﻫﺪﺷﺖ‬48" ‫ﭘﺮﻭژﻩ ﺍﺣﺪﺍﺙ ﺧﻂ ﻟﻮﻟﻪ ﺍﻧﺘﻘﺎﻝ ﮔﺎﺯ‬
(790816) ‫ﭘﻴﻤﺎﻥ ﺷﻤﺎﺭﻩ‬

Calculation for
Earthing & Lightning System
PROJECT UNIT DIS DOC SERIAL REV

‫ﻣﺸﺎﺭﻛﺖ ﻧﺼﺮ‬ KCGP PCS EL CAL 0001 00


Page 5 of 17

3. Units

All units in this project are based on SI unit.

4. Codes and Standards


7B

Design of the earthing System shall be generally according to the following standards:

Standard/Doc No. Description


BS 7430 Code of Practice for Earthing
IEC 60364 Code of Practice for Earthing

5. Document Priority
8B

In the event of any conflict between this specification, data sheet, drawing codes and
standards. The priority will be given in the following order:
a. Purchase order
b. M.T.O. (material take off) and/or drawings
c. Data sheet& calculation
d. Specification

e. Codes and Standards

In any case the vendor shall inform purchase and obtain clarification before proceeding with
any work.

6. Basis of Calculation
9B

The calculation for grounding resistance is carried out in accordance with the following
manner:

for grounding resistance BS 7430 "code of practice for earthing


for grounding conductor size IEC 60364 "code of practice for earthing"
‫ ﭼﺎﺭﻣﻠﻪ‬-‫ ﻛﻮﻫﺪﺷﺖ‬48" ‫ﭘﺮﻭژﻩ ﺍﺣﺪﺍﺙ ﺧﻂ ﻟﻮﻟﻪ ﺍﻧﺘﻘﺎﻝ ﮔﺎﺯ‬
(790816) ‫ﭘﻴﻤﺎﻥ ﺷﻤﺎﺭﻩ‬

Calculation for
Earthing & Lightning System
PROJECT UNIT DIS DOC SERIAL REV

‫ﻣﺸﺎﺭﻛﺖ ﻧﺼﺮ‬ KCGP PCS EL CAL 0001 00


Page 6 of 17

• Resistivity of soil in Ω.m :


42.22 Ω.m at 3meter Depth (According to Document No.KCGP-PLN-CV-REP-
0002)
• Resistance of electrical earthing system shall be less than 1 ohm.
• According to IPS standard, the resistance of instrument earthing system shall be less
than 1 ohm.

7. Calculation for Grounding Resistance


10B

7.1 Calculation Basis

For grounding resistance, the resistance of rod is obtained by following equation


(As per clause 10 of BS 7430):

Resistance of one rod:

ρ  8L  
R1 =×  Ln( )  − 1
2π L  D  

Where:
ρ : Resistivity of soil, in Ω.m: 42.22 Ω.m
L : Length of Rod, in meter: 3 m
D : Diameter of Rod, in meter: 0.019m

The total resistance of a group of electrodes is calculated for different configurations using
the formula from BS 7430.

1 + λ a 
Rn = R1 
 n 
Where:
Rn = total electrical grounding resistance
‫ ﭼﺎﺭﻣﻠﻪ‬-‫ ﻛﻮﻫﺪﺷﺖ‬48" ‫ﭘﺮﻭژﻩ ﺍﺣﺪﺍﺙ ﺧﻂ ﻟﻮﻟﻪ ﺍﻧﺘﻘﺎﻝ ﮔﺎﺯ‬
(790816) ‫ﭘﻴﻤﺎﻥ ﺷﻤﺎﺭﻩ‬

Calculation for
Earthing & Lightning System
PROJECT UNIT DIS DOC SERIAL REV

‫ﻣﺸﺎﺭﻛﺖ ﻧﺼﺮ‬ KCGP PCS EL CAL 0001 00


Page 7 of 17

ρ
a=
2π R1S
Where:
R1 : is earth resistance of a single rod in Ω
S : is the distance between adjacent rods in m
ρ : is the resistivity of soil in Ω.m
λ : is the factor given in table B shown in BS 7430 (Table 1, 2)
n : is the number of electrodes

7.2 Calculation for Electrical Earthing System

Earthing network resistance for electrical system shall not be exceed 1 ohm and for
instrument system shall not be exceed 1 ohms. Table 1 shows the calculations and obtained
results.
Table 1
Location ρ L D S R1 Rn
Item Station λ n a Conclusion
(Km) (Ω.m) (m) (m) (Ω) (Ω)

PCS
1 & Less than 1
00 42.22 3 0.019 6.14 20 15 13.76 0.033 0.83
Launcher ohm

Which is less than 1ohm, and it is in accordance to project requirements.


‫ ﭼﺎﺭﻣﻠﻪ‬-‫ ﻛﻮﻫﺪﺷﺖ‬48" ‫ﭘﺮﻭژﻩ ﺍﺣﺪﺍﺙ ﺧﻂ ﻟﻮﻟﻪ ﺍﻧﺘﻘﺎﻝ ﮔﺎﺯ‬
(790816) ‫ﭘﻴﻤﺎﻥ ﺷﻤﺎﺭﻩ‬

Calculation for
Earthing & Lightning System
PROJECT UNIT DIS DOC SERIAL REV

‫ﻣﺸﺎﺭﻛﺖ ﻧﺼﺮ‬ KCGP PCS EL CAL 0001 00


Page 8 of 17

7.3 Calculation for Instrument Grounding System (Clean Earth):


Earthing network resistance for instrument system shall not be exceed 1 ohms. Table 2 shows
the calculations and obtained results.
Table 2 Instrument Earthing System
Location ρ L D S R1 Rn
Item Station λ n a Conclusion
(Km) (Ω.m) (m) (m) (Ω) (Ω)

PCS
1 & Less than 1
00 42.22 3 0.019 6.14 20 9 13.76 0.054 0.92
Launcher ohm

Which is less than 1ohm, and it is in accordance to project requirements.

8. Calculation for Cross Section of Main Grounding Cable


1B

8.1 According to IPS Standard


2
The main earthing conductors shall be 70 mm copper stranded cable with PVC insulation.

8.2 According to IEC Standard

Main loop earthing conductor shall be copper stranded cable with PVC insulation.
For fault current duration, we have been considered base on VCB open time 0.1sec.

I T
S=
K
Where,
S : The cross-sectional area, in mm 2
I : The value (rms) in A of prospective fault current for a fault of negligible impedance
which can flow through the protective device.
T : The operating time of the protective device for automatic disconnection in sec.
‫ ﭼﺎﺭﻣﻠﻪ‬-‫ ﻛﻮﻫﺪﺷﺖ‬48" ‫ﭘﺮﻭژﻩ ﺍﺣﺪﺍﺙ ﺧﻂ ﻟﻮﻟﻪ ﺍﻧﺘﻘﺎﻝ ﮔﺎﺯ‬
(790816) ‫ﭘﻴﻤﺎﻥ ﺷﻤﺎﺭﻩ‬

Calculation for
Earthing & Lightning System
PROJECT UNIT DIS DOC SERIAL REV

‫ﻣﺸﺎﺭﻛﺖ ﻧﺼﺮ‬ KCGP PCS EL CAL 0001 00


Page 9 of 17

K : The factor dependent on the material of the protective conductor, the insulation and other
parts and the initial and final temperatures. Acc. to IPS-E-EL-100 / 12.2.cable sizing-
Table 3.

8.3 Main Earth Conductor Size

I = 10 ( KA)

T = 0.3 ( Sec)
K = 115 (For PVC insulation)

I T
S=
K ⇒ S = 10000 0.3 ≅ 50 mm²
115
NOTE: Cross section of earth conductor for other equipments will be selected according to
IPS recommendations which are mentioned in grounding typical installations.

9. Tables
12B

For calculating number of essential rods the following tables are helpful.

Table 3 Factors for Parallel Electrodes Arranged in Line (Form Bs 7430)

Number of Electrodes (n) Factor λ


2 1.00
3 1.66
4 2.15
5 2.54
6 2.87
7 3.15
8 3.39
9 3.61
10 3.81
‫ ﭼﺎﺭﻣﻠﻪ‬-‫ ﻛﻮﻫﺪﺷﺖ‬48" ‫ﭘﺮﻭژﻩ ﺍﺣﺪﺍﺙ ﺧﻂ ﻟﻮﻟﻪ ﺍﻧﺘﻘﺎﻝ ﮔﺎﺯ‬
(790816) ‫ﭘﻴﻤﺎﻥ ﺷﻤﺎﺭﻩ‬

Calculation for
Earthing & Lightning System
PROJECT UNIT DIS DOC SERIAL REV

‫ﻣﺸﺎﺭﻛﺖ ﻧﺼﺮ‬ KCGP PCS EL CAL 0001 00


Page 10 of 17

Table 4 Factors for Vertical Electrodes Arranged in A Hollow Squar (FORM BS 7430)
Number Of Electrodes (n)
Along Each Side of The Factor λ
Square
2 2.71

3 4.51

4 5.46

5 6.14

6 6.63

7 7.03

8 7.30

9 7.65

10 7.90

12 8.22

14 8.67

16 8.95

18 9.22

10. Lightning Protection Systems


13B

10.1 Calculation for Electrical Earthing System

Lightning network resistance for electrical system shall not be exceed 5 ohms.
Table 5
Location ρ L D S R1 Rn
Item Station λ n a Conclusion
(Km) (Ω.m) (m) (m) (Ω) (Ω)

PCS
1 & Less than 5
00 42.22 3 0.019 2.71 8 9 13.76 0.054 1.97
Launcher ohms
‫ ﭼﺎﺭﻣﻠﻪ‬-‫ ﻛﻮﻫﺪﺷﺖ‬48" ‫ﭘﺮﻭژﻩ ﺍﺣﺪﺍﺙ ﺧﻂ ﻟﻮﻟﻪ ﺍﻧﺘﻘﺎﻝ ﮔﺎﺯ‬
(790816) ‫ﭘﻴﻤﺎﻥ ﺷﻤﺎﺭﻩ‬

Calculation for
Earthing & Lightning System
PROJECT UNIT DIS DOC SERIAL REV

‫ﻣﺸﺎﺭﻛﺖ ﻧﺼﺮ‬ KCGP PCS EL CAL 0001 00


Page 11 of 17

Which is less than 5ohms, and it is in accordance to project requirements.

Lightning protection shall conform to IEC 61024, BS 6651 and consist of faraday – cage type
protection, spread all around the unit as required.
In this project the buildings/structures are protected by mesh method. The mesh method is for
general purpose and it is particularly suitable for the protection of plane surfaces.
The structures and/or facilities where should be protected against lightning in this project are:

Table 6 Building Specification


Length Width Height
Item Structure Roof Walls
(m) (m) (m)
Communication
1 7 5 3 Nonmetallic concrete
Building

For designing of lightning protection system for this building, the following consideration
should take into account:
1. Building containing sensitive electronic equipment and control systems so Lightning
Electromagnetic Impulse Interference (LEMP) due to lightning may be caused surges and
unwanted inductive voltages and damage to panels and devices, so we should pay more
attention in design of lightning and earthing systems for these buildings.
2. Below recommendation of IEC62305-3 for reinforced concrete structures should be
followed.
a. Steelwork within reinforced concrete structures is considered to be electrically
continuous provided that the major part of interconnections of vertical and horizontal
bars are welded or otherwise securely connected. Connections of vertical bars are to
be welded, overlapped a minimum of 20 times their diameters or otherwise securely
connected.
b. For new structures, the connections between reinforcement elements shall be
specified by the designer or installer, in co-operation with the builder and the civil
engineer.
‫ ﭼﺎﺭﻣﻠﻪ‬-‫ ﻛﻮﻫﺪﺷﺖ‬48" ‫ﭘﺮﻭژﻩ ﺍﺣﺪﺍﺙ ﺧﻂ ﻟﻮﻟﻪ ﺍﻧﺘﻘﺎﻝ ﮔﺎﺯ‬
(790816) ‫ﭘﻴﻤﺎﻥ ﺷﻤﺎﺭﻩ‬

Calculation for
Earthing & Lightning System
PROJECT UNIT DIS DOC SERIAL REV

‫ﻣﺸﺎﺭﻛﺖ ﻧﺼﺮ‬ KCGP PCS EL CAL 0001 00


Page 12 of 17

As described the best air termination system for building is meshed conductors system. The
lightning protection level (LPL) of these buildings is level II. Then in according with table 2
of IEC62305-3 as follows:

Table 7 Maximum Values of Mesh Corresponding to the Type of LPS


Type of LPS Mesh size (m x m)
I 5*5
II 10*10
III 15*15
IV 20*20

The mesh size of lightning conductors in the roof should be maximum 10*10 m.
The Size and material of air termination conductors or down conductors can be also designed
in accordance with following IEC table:

Table 8 Material, configuration and minimum cross-sectional area of air-termination conductors, air
termination rods and down-conductors
Material Configuration Minimum Cross- Comments
2
Sectional Area ( mm )

Copper Solid tape 50 2 mm min. thickness

Solid tound 50 8 mm diameter

1.7 mm min. diameter of each strand


Stranded 50
16 mm diameter
Solid round 200

Tin Plated Solid tape 50 2 mm min. thickness

Copper Solid tound 50 8 mm diameter

1.7 mm min. diameter of each strand


Stranded 50

Aluminium Solid tape 70 3 mm min. thickness

Solid tound 50 8 mm diameter

1.7 mm min. diameter of each strand


Stranded 50

Aluminium Solid tape 50 2.5 mm min. thickness


‫ ﭼﺎﺭﻣﻠﻪ‬-‫ ﻛﻮﻫﺪﺷﺖ‬48" ‫ﭘﺮﻭژﻩ ﺍﺣﺪﺍﺙ ﺧﻂ ﻟﻮﻟﻪ ﺍﻧﺘﻘﺎﻝ ﮔﺎﺯ‬
(790816) ‫ﭘﻴﻤﺎﻥ ﺷﻤﺎﺭﻩ‬

Calculation for
Earthing & Lightning System
PROJECT UNIT DIS DOC SERIAL REV

‫ﻣﺸﺎﺭﻛﺖ ﻧﺼﺮ‬ KCGP PCS EL CAL 0001 00


Page 13 of 17

Alloy Solid tound 50 8 mm diameter

Stranded 50 1.7 mm min. diameter of each strand

16 mm diameter
Solid round 200

Hot Dip Solid tape 50 2.5 mm min. thickness

Galvanized Solid tound 50 8 mm diameter

Steel 1.7 mm min. diameter of each strand


Stranded 50
16 mm diameter
Solid round 200

Stainless Solid tape 50 2 mm min. thickness

Steel Solid tound 50 8 mm diameter

1.7 mm min diameter of each strand


Stranded 70
16 mm diameter
Solid round 200

In this project with considering site conditions, market availability and based on upper table
the "tin plated copper" with size 25*3 mm" is selected as both air termination roof ring and
down conductors.

10.2 Construction Considerations (IEC62035):

Air terminations of LPS not isolated from the structure to be protected may be installed as
follows:
− If the roof is made of non-combustible material the air termination conductors
may be positioned on the surface of the roof.
− If the roof is made of readily combustible material, due to care needs to be taken
with regard to the distance between the air termination conductors and the
material.
− For thatched roofs this distance should be a minimum of 30cm. For other
combustible materials a distance not lower than 10cm is considered adequate.
‫ ﭼﺎﺭﻣﻠﻪ‬-‫ ﻛﻮﻫﺪﺷﺖ‬48" ‫ﭘﺮﻭژﻩ ﺍﺣﺪﺍﺙ ﺧﻂ ﻟﻮﻟﻪ ﺍﻧﺘﻘﺎﻝ ﮔﺎﺯ‬
(790816) ‫ﭘﻴﻤﺎﻥ ﺷﻤﺎﺭﻩ‬

Calculation for
Earthing & Lightning System
PROJECT UNIT DIS DOC SERIAL REV

‫ﻣﺸﺎﺭﻛﺖ ﻧﺼﺮ‬ KCGP PCS EL CAL 0001 00


Page 14 of 17

− Easily combustible parts of the structure to be protected shall not remain in a


direct contact with the components of external LPS and shall not remain directly
under any roofing membrane that might be punctured by a lightning stroke.

Account shall also be taken of less combustible membranes such as wooden sheets.

10.3 External Lightning Protection System


According to BS7430 standard, Lightning protection if scaffolding is associated with an
existing structure which has an external lightning protection system (LPS), it should be
bonded to the earth termination network and the air termination network of the LPS.
Lightning protection should otherwise be provided where indicated by risk assessment
performed in accordance with BS EN 62305-2.
Other temporary tall metallic structures might require separate earthingelectrodes to afford
adequate lightning protection, which will depend on the construction of the temporary
foundations and footings; BS EN 62305-3 should be consulted for further guidance and
expert opinion should be obtained if necessary.
Other temporary structures:
There are no recommendations for special earthing or bonding arrangements,i.e. structures
that do not require lightning protection, which are not in the vicinity of electric overhead lines
and which do not carry electrical circuits operating at a voltage in excess of 25 V A.C. to
earth.

10.4 Code of Practice for Protection of Structures against Lightning


According to BS6651 standard this lightning protection calculation is based on Lightning
sphere method. The lightning sphere method ensures complete lightning protection.
The contours of the objects that are to be protected and the planned interception devices are
modeled - e.g. at a scale of 1:100 to 1:500. Then a sphere is made with a scale radius of 10,
20 or 40 m depending on the requirements, which corresponds to the flashover distance to
earth. The lightning sphere is then rolled around the model on a flat surface. If the lightning
sphere only touches the interception devices, the protected objects are completely in the
‫ ﭼﺎﺭﻣﻠﻪ‬-‫ ﻛﻮﻫﺪﺷﺖ‬48" ‫ﭘﺮﻭژﻩ ﺍﺣﺪﺍﺙ ﺧﻂ ﻟﻮﻟﻪ ﺍﻧﺘﻘﺎﻝ ﮔﺎﺯ‬
(790816) ‫ﭘﻴﻤﺎﻥ ﺷﻤﺎﺭﻩ‬

Calculation for
Earthing & Lightning System
PROJECT UNIT DIS DOC SERIAL REV

‫ﻣﺸﺎﺭﻛﺖ ﻧﺼﺮ‬ KCGP PCS EL CAL 0001 00


Page 15 of 17

protected area. However, if the lightning sphere does touch parts of the protected objects, the
protection is not complete at these sections (see Fig. 1).
If the configurations of the air terminals are simple, it will generally be unnecessary to
produce a model. The effectiveness of the protection system can be assessed by examinations
based on the projection of the lightning sphere.

R=20m

Figure:1
‫ ﭼﺎﺭﻣﻠﻪ‬-‫ ﻛﻮﻫﺪﺷﺖ‬48" ‫ﭘﺮﻭژﻩ ﺍﺣﺪﺍﺙ ﺧﻂ ﻟﻮﻟﻪ ﺍﻧﺘﻘﺎﻝ ﮔﺎﺯ‬
(790816) ‫ﭘﻴﻤﺎﻥ ﺷﻤﺎﺭﻩ‬

Calculation for
Earthing & Lightning System
PROJECT UNIT DIS DOC SERIAL REV

‫ﻣﺸﺎﺭﻛﺖ ﻧﺼﺮ‬ KCGP PCS EL CAL 0001 00


Page 16 of 17

According to BS 6651, 12 tables below needed for lightning calculation suitable for all type
buildings.

Table1 - Recommended fixing centres for conductors.

Table2 - Recommended materials for the manufacture of lightning protection components.

Table3 - Some characteristic of typical materials listed in table 2.

Table 4- Minimum dimensions of component parts.

Table 5 - Minimum thicknesses of sheet metal used for roofing and forming part of the air
termination network.

Table 6 –Relationship between thunderstorm days per year lightning flashes per square
kilometer per year.

Table 7 –Comparative probability of death for an individual per year of exposure (order of
magnitude only).

Table 8 –Weighting factor A (use of structure).


‫ ﭼﺎﺭﻣﻠﻪ‬-‫ ﻛﻮﻫﺪﺷﺖ‬48" ‫ﭘﺮﻭژﻩ ﺍﺣﺪﺍﺙ ﺧﻂ ﻟﻮﻟﻪ ﺍﻧﺘﻘﺎﻝ ﮔﺎﺯ‬
(790816) ‫ﭘﻴﻤﺎﻥ ﺷﻤﺎﺭﻩ‬

Calculation for
Earthing & Lightning System
PROJECT UNIT DIS DOC SERIAL REV

‫ﻣﺸﺎﺭﻛﺖ ﻧﺼﺮ‬ KCGP PCS EL CAL 0001 00


Page 17 of 17

Table 9-Weighting factor B (type of construction).

Table 10 - Weighting factor C (contents of consequential effects).

Table 11 - Weighting factor D (degree of isolation).

Table 12 - Weighting factor E (type of terrain).

1 2 3 4 5 6 7 8 9 10 11 12

Overall risk (Product of columns5and 11)


Risk of structure , Weighting factors

Factor(Product of columns 6to10)


Contents or consequential effects
Description of structure

Degree of isolation (Table 11)


Type of construction (table 9)

Recommend-dictions
Type of country (Table 12)
use of structure (table 8)

Multiplying
Collection area, Ac

Flash density,Ng

p=Ac×Ng×10-6

Overall
(Table 10)
A

D
B

Communication 1.27x10-4 3.05x10-5


Protection
212.087 0.6 1.2 0.4 1.0 2.0 0.3 0.24 required
Building