Calculation for
Earthing & Lightning System
PROJECT UNIT DIS DOC SERIAL REV
Calculation for
Earthing & Lightning System
Rev. ﻧﻮﻉ ﺍﺭﺳﺎﻝ ﺗﺎﺭﻳﺦ ﺗﻬﻴﻪ ﻛﻨﻨﺪﻩ ﺑﺮﺭﺳﻲ ﻛﻨﻨﺪﻩ ﺗﺎﺋﻴﺪ ﻛﻨﻨﺪﻩ
ﭼﺎﺭﻣﻠﻪ- ﻛﻮﻫﺪﺷﺖ48" ﭘﺮﻭژﻩ ﺍﺣﺪﺍﺙ ﺧﻂ ﻟﻮﻟﻪ ﺍﻧﺘﻘﺎﻝ ﮔﺎﺯ
(790816) ﭘﻴﻤﺎﻥ ﺷﻤﺎﺭﻩ
Calculation for
Earthing & Lightning System
PROJECT UNIT DIS DOC SERIAL REV
Revision Sheet
ﻭﻳﺮﺍﻳﺶﻫﺎ ﻭﻳﺮﺍﻳﺶﻫﺎ
ﺻﻔﺤﻪ ﺗﻮﺿﻴﺤﺎﺕ ﺻﻔﺤﻪ ﺗﻮﺿﻴﺤﺎﺕ
00 01 02 03 04 05 06 00 01 02 03 04 05 06
1 X 41
2 X 42
3 X 43
4 X 44
5 X 45
6 X 46
7 X 47
8 X 48
9 X 49
10 X 50
11 X 51
12 X 52
13 X 53
14 X 54
15 X 55
16 X 56
17 X 57
18 58
19 59
20 60
21 61
22 62
23 63
24 64
25 65
26 66
27 67
28 68
29 69
30 70
31 71
32 72
33 73
34 74
35 75
36 76
37 77
38 78
39 79
40 80
ﭼﺎﺭﻣﻠﻪ- ﻛﻮﻫﺪﺷﺖ48" ﭘﺮﻭژﻩ ﺍﺣﺪﺍﺙ ﺧﻂ ﻟﻮﻟﻪ ﺍﻧﺘﻘﺎﻝ ﮔﺎﺯ
(790816) ﭘﻴﻤﺎﻥ ﺷﻤﺎﺭﻩ
Calculation for
Earthing & Lightning System
PROJECT UNIT DIS DOC SERIAL REV
CONTENTS
1. Introduction ...................................................................................................................... 4
2. Definitions.......................................................................................................................... 4
3. Units ..................................................................................................................................... 5
4. Codes and Standards ................................................................................................... 5
5. Document Priority......................................................................................................... 5
6. Basis of Calculation ...................................................................................................... 5
7. Calculation for Grounding Resistance ................................................................ 6
8. Calculation for Cross Section of Main Grounding Cable .......................... 8
9. Tables .................................................................................................................................. 9
10. Lightning Protection Systems................................................................................ 10
ﭼﺎﺭﻣﻠﻪ- ﻛﻮﻫﺪﺷﺖ48" ﭘﺮﻭژﻩ ﺍﺣﺪﺍﺙ ﺧﻂ ﻟﻮﻟﻪ ﺍﻧﺘﻘﺎﻝ ﮔﺎﺯ
(790816) ﭘﻴﻤﺎﻥ ﺷﻤﺎﺭﻩ
Calculation for
Earthing & Lightning System
PROJECT UNIT DIS DOC SERIAL REV
1. Introduction
0B
Iranian Gas Engineering & Development Company (IGEDC) one of the subsidiaries of
1B
National Iranian Gas Company (NIGC) has intended to perform a 48" gas transmission
pipeline from KOOHDASHT to CHARMALE in order to transfer and export the natural
gas to Iraq country.
This project which is the first phase of whole is generally consist of two main section:
2B
A. The Pressure Control Station (PCS) with normal capacity of 25 MMCM/D that located
3B
at place that going to be branched off IGAT VI. This PCS Could transfer 40 MMCM/D.
B. Around 130 km, 48” nominal diameter buried gas transfer pipeline that branched off
4B
2. Definitions
5B
Within the context of this document, the following definitions are applicable.
6B
Client Consultant Means Energy & Industry Consultant engineers Co. (EIC).
The party to the contract and/or purchase order which has undertaken
Supplier the obligation to supply the goods and/or services which are ordered
and specified herein.
ﭼﺎﺭﻣﻠﻪ- ﻛﻮﻫﺪﺷﺖ48" ﭘﺮﻭژﻩ ﺍﺣﺪﺍﺙ ﺧﻂ ﻟﻮﻟﻪ ﺍﻧﺘﻘﺎﻝ ﮔﺎﺯ
(790816) ﭘﻴﻤﺎﻥ ﺷﻤﺎﺭﻩ
Calculation for
Earthing & Lightning System
PROJECT UNIT DIS DOC SERIAL REV
3. Units
Design of the earthing System shall be generally according to the following standards:
5. Document Priority
8B
In the event of any conflict between this specification, data sheet, drawing codes and
standards. The priority will be given in the following order:
a. Purchase order
b. M.T.O. (material take off) and/or drawings
c. Data sheet& calculation
d. Specification
In any case the vendor shall inform purchase and obtain clarification before proceeding with
any work.
6. Basis of Calculation
9B
The calculation for grounding resistance is carried out in accordance with the following
manner:
Calculation for
Earthing & Lightning System
PROJECT UNIT DIS DOC SERIAL REV
ρ 8L
R1 =× Ln( ) − 1
2π L D
Where:
ρ : Resistivity of soil, in Ω.m: 42.22 Ω.m
L : Length of Rod, in meter: 3 m
D : Diameter of Rod, in meter: 0.019m
The total resistance of a group of electrodes is calculated for different configurations using
the formula from BS 7430.
1 + λ a
Rn = R1
n
Where:
Rn = total electrical grounding resistance
ﭼﺎﺭﻣﻠﻪ- ﻛﻮﻫﺪﺷﺖ48" ﭘﺮﻭژﻩ ﺍﺣﺪﺍﺙ ﺧﻂ ﻟﻮﻟﻪ ﺍﻧﺘﻘﺎﻝ ﮔﺎﺯ
(790816) ﭘﻴﻤﺎﻥ ﺷﻤﺎﺭﻩ
Calculation for
Earthing & Lightning System
PROJECT UNIT DIS DOC SERIAL REV
ρ
a=
2π R1S
Where:
R1 : is earth resistance of a single rod in Ω
S : is the distance between adjacent rods in m
ρ : is the resistivity of soil in Ω.m
λ : is the factor given in table B shown in BS 7430 (Table 1, 2)
n : is the number of electrodes
Earthing network resistance for electrical system shall not be exceed 1 ohm and for
instrument system shall not be exceed 1 ohms. Table 1 shows the calculations and obtained
results.
Table 1
Location ρ L D S R1 Rn
Item Station λ n a Conclusion
(Km) (Ω.m) (m) (m) (Ω) (Ω)
PCS
1 & Less than 1
00 42.22 3 0.019 6.14 20 15 13.76 0.033 0.83
Launcher ohm
Calculation for
Earthing & Lightning System
PROJECT UNIT DIS DOC SERIAL REV
PCS
1 & Less than 1
00 42.22 3 0.019 6.14 20 9 13.76 0.054 0.92
Launcher ohm
Main loop earthing conductor shall be copper stranded cable with PVC insulation.
For fault current duration, we have been considered base on VCB open time 0.1sec.
I T
S=
K
Where,
S : The cross-sectional area, in mm 2
I : The value (rms) in A of prospective fault current for a fault of negligible impedance
which can flow through the protective device.
T : The operating time of the protective device for automatic disconnection in sec.
ﭼﺎﺭﻣﻠﻪ- ﻛﻮﻫﺪﺷﺖ48" ﭘﺮﻭژﻩ ﺍﺣﺪﺍﺙ ﺧﻂ ﻟﻮﻟﻪ ﺍﻧﺘﻘﺎﻝ ﮔﺎﺯ
(790816) ﭘﻴﻤﺎﻥ ﺷﻤﺎﺭﻩ
Calculation for
Earthing & Lightning System
PROJECT UNIT DIS DOC SERIAL REV
K : The factor dependent on the material of the protective conductor, the insulation and other
parts and the initial and final temperatures. Acc. to IPS-E-EL-100 / 12.2.cable sizing-
Table 3.
I = 10 ( KA)
T = 0.3 ( Sec)
K = 115 (For PVC insulation)
I T
S=
K ⇒ S = 10000 0.3 ≅ 50 mm²
115
NOTE: Cross section of earth conductor for other equipments will be selected according to
IPS recommendations which are mentioned in grounding typical installations.
9. Tables
12B
For calculating number of essential rods the following tables are helpful.
Calculation for
Earthing & Lightning System
PROJECT UNIT DIS DOC SERIAL REV
Table 4 Factors for Vertical Electrodes Arranged in A Hollow Squar (FORM BS 7430)
Number Of Electrodes (n)
Along Each Side of The Factor λ
Square
2 2.71
3 4.51
4 5.46
5 6.14
6 6.63
7 7.03
8 7.30
9 7.65
10 7.90
12 8.22
14 8.67
16 8.95
18 9.22
Lightning network resistance for electrical system shall not be exceed 5 ohms.
Table 5
Location ρ L D S R1 Rn
Item Station λ n a Conclusion
(Km) (Ω.m) (m) (m) (Ω) (Ω)
PCS
1 & Less than 5
00 42.22 3 0.019 2.71 8 9 13.76 0.054 1.97
Launcher ohms
ﭼﺎﺭﻣﻠﻪ- ﻛﻮﻫﺪﺷﺖ48" ﭘﺮﻭژﻩ ﺍﺣﺪﺍﺙ ﺧﻂ ﻟﻮﻟﻪ ﺍﻧﺘﻘﺎﻝ ﮔﺎﺯ
(790816) ﭘﻴﻤﺎﻥ ﺷﻤﺎﺭﻩ
Calculation for
Earthing & Lightning System
PROJECT UNIT DIS DOC SERIAL REV
Lightning protection shall conform to IEC 61024, BS 6651 and consist of faraday – cage type
protection, spread all around the unit as required.
In this project the buildings/structures are protected by mesh method. The mesh method is for
general purpose and it is particularly suitable for the protection of plane surfaces.
The structures and/or facilities where should be protected against lightning in this project are:
For designing of lightning protection system for this building, the following consideration
should take into account:
1. Building containing sensitive electronic equipment and control systems so Lightning
Electromagnetic Impulse Interference (LEMP) due to lightning may be caused surges and
unwanted inductive voltages and damage to panels and devices, so we should pay more
attention in design of lightning and earthing systems for these buildings.
2. Below recommendation of IEC62305-3 for reinforced concrete structures should be
followed.
a. Steelwork within reinforced concrete structures is considered to be electrically
continuous provided that the major part of interconnections of vertical and horizontal
bars are welded or otherwise securely connected. Connections of vertical bars are to
be welded, overlapped a minimum of 20 times their diameters or otherwise securely
connected.
b. For new structures, the connections between reinforcement elements shall be
specified by the designer or installer, in co-operation with the builder and the civil
engineer.
ﭼﺎﺭﻣﻠﻪ- ﻛﻮﻫﺪﺷﺖ48" ﭘﺮﻭژﻩ ﺍﺣﺪﺍﺙ ﺧﻂ ﻟﻮﻟﻪ ﺍﻧﺘﻘﺎﻝ ﮔﺎﺯ
(790816) ﭘﻴﻤﺎﻥ ﺷﻤﺎﺭﻩ
Calculation for
Earthing & Lightning System
PROJECT UNIT DIS DOC SERIAL REV
As described the best air termination system for building is meshed conductors system. The
lightning protection level (LPL) of these buildings is level II. Then in according with table 2
of IEC62305-3 as follows:
The mesh size of lightning conductors in the roof should be maximum 10*10 m.
The Size and material of air termination conductors or down conductors can be also designed
in accordance with following IEC table:
Table 8 Material, configuration and minimum cross-sectional area of air-termination conductors, air
termination rods and down-conductors
Material Configuration Minimum Cross- Comments
2
Sectional Area ( mm )
Calculation for
Earthing & Lightning System
PROJECT UNIT DIS DOC SERIAL REV
16 mm diameter
Solid round 200
In this project with considering site conditions, market availability and based on upper table
the "tin plated copper" with size 25*3 mm" is selected as both air termination roof ring and
down conductors.
Air terminations of LPS not isolated from the structure to be protected may be installed as
follows:
− If the roof is made of non-combustible material the air termination conductors
may be positioned on the surface of the roof.
− If the roof is made of readily combustible material, due to care needs to be taken
with regard to the distance between the air termination conductors and the
material.
− For thatched roofs this distance should be a minimum of 30cm. For other
combustible materials a distance not lower than 10cm is considered adequate.
ﭼﺎﺭﻣﻠﻪ- ﻛﻮﻫﺪﺷﺖ48" ﭘﺮﻭژﻩ ﺍﺣﺪﺍﺙ ﺧﻂ ﻟﻮﻟﻪ ﺍﻧﺘﻘﺎﻝ ﮔﺎﺯ
(790816) ﭘﻴﻤﺎﻥ ﺷﻤﺎﺭﻩ
Calculation for
Earthing & Lightning System
PROJECT UNIT DIS DOC SERIAL REV
Account shall also be taken of less combustible membranes such as wooden sheets.
Calculation for
Earthing & Lightning System
PROJECT UNIT DIS DOC SERIAL REV
protected area. However, if the lightning sphere does touch parts of the protected objects, the
protection is not complete at these sections (see Fig. 1).
If the configurations of the air terminals are simple, it will generally be unnecessary to
produce a model. The effectiveness of the protection system can be assessed by examinations
based on the projection of the lightning sphere.
R=20m
Figure:1
ﭼﺎﺭﻣﻠﻪ- ﻛﻮﻫﺪﺷﺖ48" ﭘﺮﻭژﻩ ﺍﺣﺪﺍﺙ ﺧﻂ ﻟﻮﻟﻪ ﺍﻧﺘﻘﺎﻝ ﮔﺎﺯ
(790816) ﭘﻴﻤﺎﻥ ﺷﻤﺎﺭﻩ
Calculation for
Earthing & Lightning System
PROJECT UNIT DIS DOC SERIAL REV
According to BS 6651, 12 tables below needed for lightning calculation suitable for all type
buildings.
Table 5 - Minimum thicknesses of sheet metal used for roofing and forming part of the air
termination network.
Table 6 –Relationship between thunderstorm days per year lightning flashes per square
kilometer per year.
Table 7 –Comparative probability of death for an individual per year of exposure (order of
magnitude only).
Calculation for
Earthing & Lightning System
PROJECT UNIT DIS DOC SERIAL REV
1 2 3 4 5 6 7 8 9 10 11 12
Recommend-dictions
Type of country (Table 12)
use of structure (table 8)
Multiplying
Collection area, Ac
Flash density,Ng
p=Ac×Ng×10-6
Overall
(Table 10)
A
D
B