PERT

Complex projects require a series of activities, some of which must be performed


sequentially and others that can be performed in parallel with other activities. This
collection of series and parallel tasks can be modeled as a network.

In 1957 the Critical Path Method (CPM) was developed as a network model for project
management. CPM is a deterministic method that uses a fixed time estimate for each
activity. While CPM is easy to understand and use, it does not consider the time
variations that can have a great impact on the completion time of a complex project.

The Program Evaluation and Review Technique (PERT) is a network model that allows
for randomness in activity completion times. PERT was developed in the late 1950's for
the U.S. Navy's Polaris project having thousands of contractors. It has the potential to
reduce both the time and cost required to complete a project.

The Network Diagram

In a project, an activity is a task that must be performed and an event is a milestone


marking the completion of one or more activities. Before an activity can begin, all of its
predecessor activities must be completed. Project network models represent activities and
milestones by arcs and nodes. PERT originally was an activity on arc network, in which
the activities are represented on the lines and milestones on the nodes. Over time, some
people began to use PERT as an activity on node network. For this discussion, we will
use the original form of activity on arc.

The PERT chart may have multiple pages with many sub-tasks. The following is a very
simple example of a PERT diagram:

PERT Chart

The milestones generally are numbered so that the ending node of an activity has a higher
number than the beginning node. Incrementing the numbers by 10 allows for new ones to
be inserted without modifying the numbering of the entire diagram. The activities in the
above diagram are labeled with letters along with the expected time required to complete
the activity.

Steps in the PERT Planning Process

PERT planning involves the following steps:

1. Identify the specific activities and milestones.


2. Determine the proper sequence of the activities.
3. Construct a network diagram.
4. Estimate the time required for each activity.
5. Determine the critical path.
6. Update the PERT chart as the project progresses.

1. Identify Activities and Milestones

The activities are the tasks required to complete the project. The milestones are the events
marking the beginning and end of one or more activities. It is helpful to list the tasks in a
table that in later steps can be expanded to include information on sequence and duration.

2. Determine Activity Sequence

This step may be combined with the activity identification step since the activity
sequence is evident for some tasks. Other tasks may require more analysis to determine
the exact order in which they must be performed.

3. Construct the Network Diagram

Using the activity sequence information, a network diagram can be drawn showing the
sequence of the serial and parallel activities. For the original activity-on-arc model, the
activities are depicted by arrowed lines and milestones are depicted by circles or
"bubbles".

If done manually, several drafts may be required to correctly portray the relationships
among activities. Software packages simplify this step by automatically converting
tabular activity information into a network diagram.

4. Estimate Activity Times

Weeks are a commonly used unit of time for activity completion, but any consistent unit
of time can be used.

A distinguishing feature of PERT is its ability to deal with uncertainty in activity


completion times. For each activity, the model usually includes three time estimates:
• Optimistic time - generally the shortest time in which the activity can be
completed. It is common practice to specify optimistic times to be three standard
deviations from the mean so that there is approximately a 1% chance that the
activity will be completed within the optimistic time.
• Most likely time - the completion time having the highest probability. Note that
this time is different from the expected time.
• Pessimistic time - the longest time that an activity might require. Three standard
deviations from the mean is commonly used for the pessimistic time.

PERT assumes a beta probability distribution for the time estimates. For a beta
distribution, the expected time for each activity can be approximated using the following
weighted average:

Expected time = ( Optimistic + 4 x Most likely + Pessimistic ) / 6

This expected time may be displayed on the network diagram.

To calculate the variance for each activity completion time, if three standard deviation
times were selected for the optimistic and pessimistic times, then there are six standard
deviations between them, so the variance is given by:

[ ( Pessimistic - Optimistic ) / 6 ]2

5. Determine the Critical Path

The critical path is determined by adding the times for the activities in each sequence and
determining the longest path in the project. The critical path determines the total calendar
time required for the project. If activities outside the critical path speed up or slow down
(within limits), the total project time does not change. The amount of time that a non-
critical path activity can be delayed without delaying the project is referred to as slack
time.

If the critical path is not immediately obvious, it may be helpful to determine the
following four quantities for each activity:

• ES - Earliest Start time


• EF - Earliest Finish time
• LS - Latest Start time
• LF - Latest Finish time

These times are calculated using the expected time for the relevant activities. The earliest
start and finish times of each activity are determined by working forward through the
network and determining the earliest time at which an activity can start and finish
considering its predecessor activities. The latest start and finish times are the latest times
that an activity can start and finish without delaying the project. LS and LF are found by
working backward through the network. The difference in the latest and earliest finish of
each activity is that activity's slack. The critical path then is the path through the network
in which none of the activities have slack.

The variance in the project completion time can be calculated by summing the variances
in the completion times of the activities in the critical path. Given this variance, one can
calculate the probability that the project will be completed by a certain date assuming a
normal probability distribution for the critical path. The normal distribution assumption
holds if the number of activities in the path is large enough for the central limit theorem
to be applied.

Since the critical path determines the completion date of the project, the project can be
accelerated by adding the resources required to decrease the time for the activities in the
critical path. Such a shortening of the project sometimes is referred to as project
crashing.

6. Update as Project Progresses

Make adjustments in the PERT chart as the project progresses. As the project unfolds, the
estimated times can be replaced with actual times. In cases where there are delays,
additional resources may be needed to stay on schedule and the PERT chart may be
modified to reflect the new situation.

Benefits of PERT

PERT is useful because it provides the following information:

• Expected project completion time.


• Probability of completion before a specified date.
• The critical path activities that directly impact the completion time.
• The activities that have slack time and that can lend resources to critical path
activities.
• Activity start and end dates.

Limitations

The following are some of PERT's weaknesses:

• The activity time estimates are somewhat subjective and depend on judgement. In
cases where there is little experience in performing an activity, the numbers may
be only a guess. In other cases, if the person or group performing the activity
estimates the time there may be bias in the estimate.
• Even if the activity times are well-estimated, PERT assumes a beta distribution
for these time estimates, but the actual distribution may be different.
• Even if the beta distribution assumption holds, PERT assumes that the probability
distribution of the project completion time is the same as the that of the critical
path. Because other paths can become the critical path if their associated activities
are delayed, PERT consistently underestimates the expected project completion
time.

The underestimation of the project completion time due to alternate paths becoming
critical is perhaps the most serious of these issues. To overcome this limitation, Monte
Carlo simulations can be performed on the network to eliminate this optimistic bias in the
expected project completion time.

Analyzing the Project Network Diagram

One of the most satisfying accomplishments in IT project management is to step back


and, looking at the PND, follow the project conception through each task to the final
deliverable of the project. Don’t get too infatuated—this network diagram will likely
change.

Now that the PND has been constructed, you can find the critical path. The critical path
is the sequence of events that determine the project completion date. The critical path is
the longest duration from project start to project completion. For example, imagine that
you have created and analyzed your network diagram. Most likely there are multiple
paths from project start to completion. One of the project paths will take longer than any
of the other paths. This is the critical path. It’s called the critical path because if any
activities on it are delayed, the project completion date is also going to be late.

Calculating Project Slack

Given you know that activities on the critical path cannot be delayed, what about
activities that are not on the critical path? Can these projects be delayed? Yes, usually
they can—but there is a limit to the amount of time an activity not on the critical path can
be delayed. This limit is called slack. Sometimes you might see slack as “float,” but it’s
the same business. There are three different flavors of slack, or float:

• Free slack This is the total time a single activity can be delayed without delaying
the early start of any successor activities.
• Total slack This is the total time an activity can be delayed without delaying
project completion.
• Project slack This is the total time the project can be delayed without passing the
customer expected completion date.

Most project managers allow their project management software to calculate the available
slack on each activity, but it’s really not that hard to do manually. To find the slack for
each activity, you’ll first find the earliest possible start date and the earliest possible
finish date for each activity by completing what’s called the “forward pass.” Once you’ve
got this info, you do just the reverse through the “backward pass”—you’ll find the latest
possible start and latest possible finish date for each activity. There are a few different
methods for calculating project slack. Here’s one of the most common approaches.

For this example, we’ll be using a simple network diagram as seen in Figure 7-7. (You
can print out Figure 7-7 from the CD if you’d like; it’s in Adobe Acrobat format.) If you
examine the network diagram, you’ll see there are two simple paths to completion:
ABDF and ACEF. The number over each node represents the duration of the activity. If
you add up the duration of each path, you’ll find the critical path— the longest path to
completion. In this example, it’s ACEF because it takes 17 days while ABDF only takes
15 days.

Figure 7-7: The longest path to completion is the critical path.

Now let’s try the forward pass. (Again, there are different methods of completing this
science, so don’t be alarmed if you’ve been exposed to a different one). Follow these
steps:

1. Make the Early Start (ES) for Activity A one because you’ll start on Day one.
Add the duration of the activity to the ES and you’ll have three. Now this part
trips some folks up: you’ll subtract one day from the value of the ES and the task
duration to arrive at the Early Finish (EF) of the activity. The reason is that the
duration of Activity A is only two days, not three, right? In other words, if you
start on Day one, you should have two days of work to get to Day two. The EF for
Activity A is two.
2. The next activities are Activity B and Activity C. The ES for both of these will be
three. Why? Because Day three is the next day in the schedule, the earliest
possible day to begin either activity.
3. Let’s finish the ES for activities B, D, and F first. The EF for Activity B is the ES,
plus the duration, minus one, for an ES of five. The ES for Activity D is six and
the EF for Activity D is eight. The ES for Activity F is 9 and the EF for Activity F
is 15.
4. Now let’s do activities C, E and F. The ES for Activity C is three and the EF is
seven. The ES for Activity E is eight and the EF is ten. Activity F is the last
activity in the project so you can bet it’ll be on the critical path—with no slack.
The ES for Activity F is actually 11. It’s 11 because Activity F cannot begin until
your project team completes Activity E. So, the EF for Activity F is actually 17.
Figure 7-8 shows the project updated with all of the ES and EF dates.

Figure 7-8: The ES and EF dates are found by completing the forward pass.

Now that the forward pass has been completed, it’s time to do the backward pass. It’s a
cinch; just follow these steps:

1. You’ll begin with the last activity in the Network Diagram, Activity F, which has
an EF of 17. You’ll make the Late Finish (LF) the same as the EF value: 17. This
is because Day 17 is the latest day the project can finish without being late.
2. The Late Start (LS) for Activity F is the LF value, minus the duration of the
activity, plus one. Yes, plus one. Because you’re going backward in the network
you’ll add one rather than subtract one. This accounts for the full day of work you
have completed on the first activity and the last activity. So, Activity F has an LF
value of 17, less the duration of seven, plus one, which equals an LS of 11. It’s no
coincidence that the EF and the LF have the same value of 17. It’s also no
coincidence that the ES and LS have the same value of 11. It is because this
activity is on the critical path.
3. Next let’s do activities D, B, and A. The LF for Activity D is ten—one day prior
to the ES of Activity F’s LS. You get the LS for Activity D by subtracting the
duration of the activity, plus one, which equals eight. The LF for Activity B is
seven and the LS for Activity is five. The LS for Activity A is, well, it’s the first
activity in the project. Do you think it’ll have any float? Hey! You’re right—it’s
on the critical path so we can skip it for now.
4. Let’s go back and complete the backward pass for E, C, and A. The LF for
Activity E is ten and the LS for Activity E is eight. The LF for Activity C is seven
while its LS is three. The LF for Activity A is two and it’s LS is one. Figure 7-9
shows the completed backward pass.
Figure 7-9: The backward pass reveals the LF and the LS.

To finalize the process of finding slack, you’ll subtract the LF from the EF and the ES
from the LS on each activity. Wherever there’s a zero, you have a task on the critical
path; wherever there’s a number, the activity has slack. In this example, activities B and
D have two days of slack. Okay, technically they both don’t have two days of slack;
there’s two days of slack on the whole project. Or you could say, Activity B and Activity
D can each have one day of slack, or either day can have two days of slack. However you
slice it, if either activity goes two days beyond its expected completion time this project
is late.

Adjusting the Project Schedule

Once you’ve found the critical path information, you can then apply this time to a
calendar and, after accounting for holidays and weekends, a target completion date can be
predicted based on the project start date. Chances are the target completion date your
network diagram predicts and the target completion date requested by management or
your client won’t be the same. The date that you have computed will typically be beyond
the date management has requested. (Funny how it always seems to work out that way.)

What you will now have to do is adjust and readjust the critical path. This is known as
schedule compression. By making adjustments to when tasks begin or by adding
additional resources, you can complete the same work in less time.

There are four processes you can do to affect the flow of project schedule:

• Fast tracking This method allows activities to be done in parallel that would
normally be done in sequence. For example, you may allow two phases of the
project to overlap slightly where normally you’d have quality control events,
walkthroughs, or other events scheduled before the second phase of the project
would be allowed to begin. This approach usually increases project risk.
• Crashing Crashing allow the project manager to add more resources to effort-
driven activities in an attempt to shorten their duration. For example, if you have
to physically install 1,000 workstations and you’ve only eight people assigned to
the task, it may take them months to complete. If you crash the project, you might
assign 16 more people to this task to complete it in a matter of weeks. Crashing
doesn’t always work because some activities are a fixed duration and additional
labor won’t ensure the activities will finish faster. Crashing usually increases
project costs because of the expense of the labor.
• Lead time Lead time is negative time because it brings activities closer together
—even allowing them to overlap. For example, you may have to install a new
network cable throughout a campus. Your schedule calls for all of the network
cables to run before any PCs plug into the new network. To speed up the
schedule, you elect to allow the activity to connect the PCs to the new network as
soon as half of the new cables are ready. The first activity, to run the network
cables, does not have to be complete for the second activity, connecting to the
new network, to begin.
• Lag time Lag time is waiting time. It’s often applied to activities where there
must be an added duration between the tasks. For example, after installing a
database, you have to wait four hours for all of the records from other databases in
the network to recognize the database and synch with this database server. Lag
time adds time to the project schedule.

To begin schedule compression, do the following:

• Analyze the critical path to move tasks earlier in the workflow—where possible.
• Consider relationships between tasks to change FS to SS.
• Identify tasks that require lag time and evaluate the predecessor task to move it
earlier in the workflow.
• Consider any tasks and the level of acceptable risks by changing relationship
types.
• Consider adding additional resources to tasks to shorten the duration required to
complete tasks. (Not all tasks can be shortened with additional resources.)