You are on page 1of 34

MINOR IRRIGATION TANK SCHEME

VILLAGE-------------------------------------P.C.NO.---------R.I.C. TILDA
BLOCK TILDA DISTRICT RAIPUR
MATERIAL REQUIRED FOR CONSTRUCTION OF SLUICE

S. ITEM QTY MOO M SAND CEM METAL RUBBLE P HUME SLUICE IRON
N RUM STONE ENT STONE PIPE GATE ROD
O.
1 Filing Foundation 1:4:8 C.C. Work
40 mm metal
2 R.C.C. Work 1:2:4 work with 20
mm metal
3 Stone masonary work 1:4 C.R.
masonary
4 C.C. work with 20 mm metal
5 15 mm Thick in cm 1:3
6 Sluice Gate
7 Pipe 1' Dia
8 R.C.C. Work 1:2:4 work with 20
mm metal
9 Grouted Pitching 1:6
1
0
TOTAL

Transporting of Material
S. Item Km QTY Rate Per Amount C.S.R. Item
N No.
o.
1 Moorum
2 M Stone
3 Metal
4 Sand
5 Cement
6 Rubble
7 P. Stone
8 Pipe
9 Sluice Gate
10 Iron Rod
11 Water for C.C. Masonary

Transporting Total
Labour Only Total
Collection of Material Total
Grand Total

A.D.O. ASSISTANT SOIL CONSERVATION OFFICER


(Soil Conservation) Raipur (C.G)
Raipur (C.G.)
MINOR IRRIGATION TANK SCHEME
VILLAGE-------------------------------------P.C.NO.---------R.I.C. TILDA
BLOCK TILDA DISTRICT RAIPUR
MATERIAL REQUIRED FOR CONSTRUCTION OF Waste Weir

S. ITEM QTY MOO M SAND CEM METAL RUBBLE P HUME SLUICE IRON
NO. RUM STONE ENT STONE PIPE GATE ROD
1 Filing Foundation 1:4:8 C.C.
Work 40 mm metal
2 R.C.C. Work 1:2:4 work with 20
mm metal
3 Stone masonary work 1:4 C.R.
masonary
4 C.C. work with 20 mm metal
5 15 mm Thick in cm 1:3
6 Sluice Gate
7 Pipe 1' Dia
8 R.C.C. Work 1:2:4 work with 20
mm metal
9 Grouted Pitching 1:6
10
TOTAL

Transporting of Material
S. Item Km QTY Rate Per Amount C.S.R. Item
No. No.
1 Moorum
2 M Stone
3 Metal
4 Sand
5 Cement
6 Rubble
7 P. Stone
8 Pipe
9 Sluice Gate
10 Iron Rod
11 Water for C.C.
Masonary

Transporting Total
Labour Only Total
Collection of Material Total
Grand Total

A.D.O. ASSISTANT SOIL CONSERVATION OFFICER


(Soil Conservation) Raipur (C.G)
Raipur (C.G.)
MINOR IRRIGATION TANK SCHEME
VILLAGE-------------------------------------P.C.NO.---------R.I.C. TILDA
BLOCK TILDA DISTRICT RAIPUR
STATEMENT OF SHOWING TH COST OF Waste Weir
S. C.S.R. Item item of Work QTY Rate Unit Amount
No No.
.
1 Excavation of Earthwork in Hard P/Cum
Moorum Foundation
2 Filling Foundation C.C. 1:4:8 P/Cum
Work With 40 mm Metal
3 C.C. Work 1:2:4 With 20 mm P/Cum
Metal
4 C.R. Masonary Work With 1:4 P/Cum
cm
5 Cuping work with 1:2;4 20 mm P/Cum
Metal
6 Plastering Work with 1:3 cm P/sqm
7 1:6 Stone pitching Grouted P/sqm
Total

A.D.O. ASSISTANT SOIL CONSERVATION OFFICER


(Soil Conservation) Raipur (C.G)
Raipur (C.G.)
MINOR IRRIGATION TANK SCHEME
VILLAGE-------------------------------------P.C.NO.---------R.I.C. TILDA
BLOCK TILDA DISTRICT RAIPUR
COLLECTION OF MATERIAL FOR Waste Weir
S.No Name of Material C.S.R. item No. Qty Unit Rate Amount
1 Good Clay
2 Pitching Stone
3 Masonary Stone
4 Rubble Stone
5 40 mm Metal
6 20 mm Metal
7 Sand
8 Cement
9 Moorum
10 Sluice Gate
11 Hume Pipe
12 Water for Compaction
13 Water for pudding
14 Water for C.C. Work
15 Water for Masonry Work
16 Stone Chips
Total

A.D.O. ASSISTANT SOIL CONSERVATION OFFICER


(Soil Conservation) Raipur (C.G)
Raipur (C.G.)
MINOR IRRIGATION TANK SCHEME
VILLAGE-------------------------------------P.C.NO.---------R.I.C. TILDA
BLOCK TILDA DISTRICT RAIPUR
COLLECTION OF MATERIAL FOR Sluice Gate
S.No Name of Material C.S.R. item No. Qty Unit Rate Amount
1 Good Clay
2 Pitching Stone
3 Masonary Stone
4 Rubble Stone
5 40 mm Metal
6 20 mm Metal
7 Sand
8 Cement
9 Moorum
10 Sluice Gate
11 Hume Pipe
12 Water for Compaction
13 Water for puddling
14 Water for C.C. Work
15 Water for Masonry Work
16 Stone Chips
Total

A.D.O. ASSISTANT SOIL CONSERVATION OFFICER


(Soil Conservation) Raipur (C.G)
Raipur (C.G.)
MINOR IRRIGATION TANK SCHEME
VILLAGE-------------------------------------P.C.NO.---------R.I.C. TILDA
BLOCK TILDA DISTRICT RAIPUR
"L" EARTH WORK (Abstract)
S. C.S.R. item Item of Work QTY Rate Unit Amount
No. No.
1 Ordinary shrub Jungle Clearance
involving the removal of grass & crop i/c
rooting out
2 Dagbelling double spader shaped
(100mm) deep.
3 Benching the seat of embankment to an
average depth of 15 cm & cross slope of
1:12 i/c earth work removing the rubbis
up to a distance of 50 mtr i/c dressing
4 Excavation puddle tranch for moorum
soil inbankment to proper side slope &
bed grade i/c sharing where ever
necessary dressing 50 mtr lead 1.5mtr
lift upto 3mtr.
5 Puddle filling of good clay i/c lead upto
50mtr mixing Watering & kneeding by
Tamping raming and laying etc.
6 Collection of puddle earth
7 Transportation of black cotton soil fall
puddle lead upto 50 mtr.
8 Carting of water for puddle work lead 3
km.
9 Main bund, excavation of earth work in
moorum soil for main bund with
dressing i/c 50mtr free lead & 1.5 mtr
free lift
10 Compaction of earth work
11 Extra lead of earth work for main bund
12 Excavation of earth work in moorum soil
for toe wall
13 Stone pitching u/s on main bund labour
only
14 Transportation of p/Stone with loading
& unloading
15 Pitching work with labour Charges
16 Transportation of water for compaction
main bund
17 Stone chips work
18 Collection of stone chips
19 Collection P/stone with Stocking
20 Transpatation of stone chips
21 housing work for pitching
Total

A.D.O. ASSISTANT SOIL CONSERVATION OFFICER


(Soil Conservation) Raipur (C.G)
Raipur (C.G.)
MINOR IRRIGATION TANK SCHEME
VILLAGE-------------------------------------P.C.NO.---------R.I.C. TILDA
BLOCK TILDA DISTRICT RAIPUR
GENRAL ABSTRACT
S. SUB HEAD AMOUNT
NO.
1 'A' Prelimenary
2 'B' Land (Govt. Land)
3 'C' Masonary
4 'K' Building
5 'L' Earth Work
6 'M' Plantion
7 'O' Miscellaneous
8 Total Rs.
9

10 Added 3% for Contingencies Supervision of works and


drinking water supply etc.
11 Grand Total
SAY

A.D.O. ASSISTANT SOIL CONSERVATION OFFICER


(Soil Conservation) Raipur (C.G)
Raipur (C.G.)
MINOR IRRIGATION TANK SCHEME
VILLAGE-------------------------------------P.C.NO.---------R.I.C. TILDA
BLOCK TILDA DISTRICT RAIPUR
'A' Preliminary
S. No. Item of work QTY Rate Unit Amount
C.S.R. No.
1 Chain & Campus Survey of basin
2 Levelling Survey of basin
3 Catchment survey chaining
4 Levelling survey of catchment
5 Chaining & campas survey of commond area
6 Levelling survey of commoand area
7 Fixing of bench mark & fix double levelling
survey
8 Stationary & photocopy
9 Total

A.D.O. ASSISTANT SOIL CONSERVATION OFFICER


(Soil Conservation) Raipur (C.G)
Raipur (C.G.)
MINOR IRRIGATION TANK SCHEME
VILLAGE-------------------------------------P.C.NO.---------R.I.C. TILDA
BLOCK TILDA DISTRICT RAIPUR
'B' Land
S. No. Sub Head QTY Rate Amount
1 Area under the scheme is govt. land
2 Private Land
Total

A.D.O. ASSISTANT SOIL CONSERVATION OFFICER


(Soil Conservation) Raipur (C.G)
Raipur (C.G.)
MINOR IRRIGATION TANK SCHEME
VILLAGE-------------------------------------P.C.NO.---------R.I.C. TILDA
BLOCK TILDA DISTRICT RAIPUR
Unit 1 Head Work 'C' Masonary work
S. Particulars QTY Rate Per Amount
No.
1 Construction of sluice gate as per detailed
attached
2 Construction of waste weir as per detailed
attached
Total

A.D.O. ASSISTANT SOIL CONSERVATION OFFICER


(Soil Conservation) Raipur (C.G)
Raipur (C.G.)
MINOR IRRIGATION TANK SCHEME
VILLAGE-------------------------------------P.C.NO.---------R.I.C. TILDA
BLOCK TILDA DISTRICT RAIPUR
'O' Miscellaneous Abstract
S. No. Item of work QTY Rate Amount
1 Fixation of chainage stone
2 Provision for temporary hutment
3 provision of medical first aid box
4 Provision of store room for
cement & survey Instrument
5 provision of drinking water
6 Sing board
Total

A.D.O. ASSISTANT SOIL CONSERVATION OFFICER


(Soil Conservation) Raipur (C.G)
Raipur (C.G.)
MINOR IRRIGATION TANK SCHEME
VILLAGE-------------------------------------P.C.NO.---------R.I.C. TILDA
BLOCK TILDA DISTRICT RAIPUR
'P' Maintenance
S. No. Sub Head Amount % Amount
1 'C' Masonary
2 'L' Earth Work
Total

A.D.O. ASSISTANT SOIL CONSERVATION OFFICER


(Soil Conservation) Raipur (C.G)
Raipur (C.G.)
MINOR IRRIGATION TANK SCHEME
VILLAGE-------------------------------------P.C.NO.---------R.I.C. TILDA
BLOCK TILDA DISTRICT RAIPUR
'A' Preliminary Details
S. Item of Work Details Running QTY
no Mtr.
.
1 Dam Seat & Basin Survey
(i) Chaining

(ii) Levelling

2 Catchment Survey
(i) Chaining

(ii) Levelling

3 Commond area Survey


(i) Chaining

(ii) Levelling

4 Fly Levelling

A.D.O. ASSISTANT SOIL CONSERVATION OFFICER


(Soil Conservation) Raipur (C.G)
Raipur (C.G.)
MINOR IRRIGATION TANK SCHEME
VILLAGE-------------------------------------P.C.NO.---------R.I.C. TILDA
BLOCK TILDA DISTRICT RAIPUR
STATEMENT SHOWING DETAILS WORK FOR SLUICE GATE
SLUICE GATE
S. Sub Head Measurement QTY
No.
No. L. W. D/H
1 Excavation of earth worth in moorum soil for
foundation
(i) Wing wall – AB
CD Head Structure
EF Head Structure
Toe wall –U/S
D/S
For U/S Pitching
(ii) Excavation of earth work in
moorum soil for pipe supports pilar
(iii) Pipe joint level of pipe line
Total
2 Filling foundation C.C. 1:4:8 Work With 40 mm
Metal
(i) Head structure
(ii) Wing wall
(iii) Return bar
(iv) pillar for pipe line
(v) Toe wall
(vi) Apron
Total
3 Filling foundation with 1:5:8
4 Super Structure of masonary work in 1:6 cm
(i) Head structure
(ii) Wing wall
(iii) Return Wall
(iv) Toe wall Structure
Total
R.C.C. Work 1:2:4 with 20 mm Metal
(i) Head structure
(ii) Wing wall – Step
Total
5 C.C. 1:2:4 cooping work
(i) Wing wall
(ii) Return Wall
(iii) Head structure
Total
6 25 mm thick 1:3 cm plaster work on stone
(i) Wing wall
(ii) Return Wall
(iii) D/S Structure
Total
7 providing one sluice gate
8 Providing hume Pipe 1' dia 2.5 mtr. leanth
9 Stone pitching U/S R/S & L/S of sluice gate
10 Grouted stone pitching D/S 1.6 cm
U/S 1.6 cm

A.D.O. ASSISTANT SOIL CONSERVATION OFFICER


(Soil Conservation) Raipur (C.G)
Raipur (C.G.)
MINOR IRRIGATION TANK SCHEME
VILLAGE-------------------------------------P.C.NO.---------R.I.C. TILDA
BLOCK TILDA DISTRICT RAIPUR
'C' Masonary Waste Weir
S. Particulars No. L W D/H QTY
No.
1 Excavation of earth work in moorum soil
for foundation
Wing wall U/S
D/S
Pitching U/S
D/S
Total
2 Filling foundation with 40 mm metal
1:4:8 C.C. work
Head Wall
Wing wall
Total
3 Filling foundation with 20 mm metal
1:2:4 C.C. Work
Total
4 C.R. Masonry work in 1;4 cm
Head Wall
Wing wall
Total
5 Cooping work 1:2:4 with 20 mm metal
Head Wall
Wing wall
Total
6 Plastering in 1:4 cm
Head Wall
Wing wall
Total
7 Grouted Pitching U/S
D/S
Total
A.D.O. ASSISTANT SOIL CONSERVATION OFFICER
(Soil Conservation) Raipur (C.G)
Raipur (C.G.)
MINOR IRRIGATION TANK SCHEME
VILLAGE-------------------------------------P.C.NO.---------R.I.C. TILDA
BLOCK TILDA DISTRICT RAIPUR
TOTAL REQUIRED OF MATERIAL

S. Particular MOO CEMENT SAND METAL 40 METAL 20 SIZE IRON ROD HUME PIPE P STONE SLUICE
NO. RUM MM MM STONE & COLUM GATE
1 Sluice Gate

2 Waste Weir

TOTAL

A.D.O. ASSISTANT SOIL CONSERVATION OFFICER


(Soil Conservation) Raipur (C.G)
Raipur (C.G.)
MINOR IRRIGATION TANK SCHEME
VILLAGE-------------------------------------P.C.NO.---------R.I.C. TILDA
BLOCK TILDA DISTRICT RAIPUR
STATEMENT SHOWING DETIALS WORK FOR THE
BENCHING WORK
S. no. Change width of SUM Mean Lenth Area in Avg. depth QTY
bund Sqft in inch
1 0
2 100
3 200
4 300
5 400
6 500
7 600
8 700
9 800
10 900
11 1000
12 1100
13 1200
14 1300
15 1400
16 1500
17 1600
18 1700
19 1800
20 1900
21 2000
22 2100
23 2200
24 2300
25 2400
26 2500
27 2600
28 2700
29 2800
30 2900
31 3000
32 3100
33 3200
34 3300
35 3400
36 3500
37 3600
38 3700
Total

1- Site Clearance...................................................................................................................

2- Dag belling........................................................................................................................

A.D.O. ASSISTANT SOIL CONSERVATION OFFICER


(Soil Conservation) Raipur (C.G)
Raipur (C.G.)
MINOR IRRIGATION TANK SCHEME
VILLAGE-------------------------------------P.C.NO.---------R.I.C. TILDA
BLOCK TILDA DISTRICT RAIPUR
STATEMENT SHOWING THE EARTH WORK FOR MAIN BUND

S. no. Change C.S. AREA SUM Mean Lenth QTY


1 0
2 100
3 200
4 300
5 400
6 500
7 600
8 700
9 800
10 900
11 1000
12 1100
13 1200
14 1300
15 1400
16 1500
17 1600
18 1700
19 1800
20 1900
21 2000
22 2100
23 2200
24 2300
25 2400
26 2500
27 2600
28 2700
29 2800
30 2900
31 3000
32 3100
33 3200
34 3300
35 3400
36 3500
37 3600
38 3700
Total

Extra E/W due to filling to benching..............................................................................................


Puddle Core (-) ..............................................................................................................................
Due to W.W. E/W (-) .....................................................................................................................
Net E/W Required for main bund..................................................................................................

A.D.O. ASSISTANT SOIL CONSERVATION OFFICER


(Soil Conservation) Raipur (C.G)
Raipur (C.G.)
MINOR IRRIGATION TANK SCHEME
VILLAGE-------------------------------------P.C.NO.---------R.I.C. TILDA
BLOCK TILDA DISTRICT RAIPUR
STATEMENT SHOWING THE EARTH WORK FOR PUDDLE
S. no. Change C.S. AREA SUM Mean Lenth QTY
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
Total

1 Excavation of work in moorum soil for puddle trench................................................................


2 Earth work for Puddle Core.........................................................................................................
3 Puddle filling with good clay soil with puddle core....................................................................

A.D.O. ASSISTANT SOIL CONSERVATION OFFICER


(Soil Conservation) Raipur (C.G)
Raipur (C.G.)
MINOR IRRIGATION TANK SCHEME
VILLAGE-------------------------------------P.C.NO.---------R.I.C. TILDA
BLOCK TILDA DISTRICT RAIPUR
STATEMENT SHOWING THE QUANTITY OF PITCHING STONE

S. no. Change width of SUM Mean Lenth depth in QTY


bund inch
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Total

1- Excavation of E/W in moorum soil for toe wall..........................................................................

2- Toe wall pitching ........................................................................................................................

3- Pitching in main bund.................................................................................................................

Total -----------------------------------------------------------
4- Pitching work L X W....................................................................................................................

5- Housing work for main bund .....................................................................................................

6- Total Qty of stone ......................................................................................................................

7- Stone Chips ...............................................................................................................................

A.D.O. ASSISTANT SOIL CONSERVATION OFFICER


(Soil Conservation) Raipur (C.G)
Raipur (C.G.)
MINOR IRRIGATION TANK SCHEME
VILLAGE-------------------------------------P.C.NO.---------R.I.C. TILDA
BLOCK TILDA DISTRICT RAIPUR
"L" EARTH WORK
EXTRA LEAD CALCULATION

Length of bund -....................


Total Earth Work-..................

A Calculation for free lead up 50 mtr.


LXWXD

Free lead earth work -..............................


Total earth work -.....................................

Earth work for free lead -............................


Balance earth work-....................................

Lead earth work-.......................................

A.D.O. ASSISTANT SOIL CONSERVATION OFFICER


(Soil Conservation) Raipur (C.G)
Raipur (C.G.)
MINOR IRRIGATION TANK SCHEME
VILLAGE-------------------------------------P.C.NO.---------R.I.C. TILDA
BLOCK TILDA DISTRICT RAIPUR
QUARRY CHART

A.D.O. ASSISTANT SOIL CONSERVATION OFFICER


(Soil Conservation) Raipur (C.G)
Raipur (C.G.)
MINOR IRRIGATION TANK SCHEME
VILLAGE-------------------------------------P.C.NO.---------R.I.C. TILDA
BLOCK TILDA DISTRICT RAIPUR
DESIGN OF SLUICE

TAKING DUTY OF CANAL - Acre/Cusec.


Discharge = Area/Duty = 75/72 = 1.04 Cusec
Added 25% loss = 0.26
-----------------
1.30 Cusec

Added 15 % Further Expansion = 0.15/1.45 Cusec

Taking 1' Drive Head

Velocity V = C(2gh)½
= 2/3 (2 X32.2 x 0.5)½
= 2/3 (32.2)½
= 3.74 ft/Cusec

Area of vent required = Q/V


=1.45/3.74
=0.38 Sqft

But provided gatr size 1'X1' = 1' size at pipe


2" dia hume pipe for clear fluising

A.D.O. ASSISTANT SOIL CONSERVATION OFFICER


(Soil Conservation) Raipur (C.G)
Raipur (C.G.)
MINOR IRRIGATION TANK SCHEME
VILLAGE-------------------------------------P.C.NO.---------R.I.C. TILDA
BLOCK TILDA DISTRICT RAIPUR
DESIGN OF WASTE WIER

Catchment area : --------------------------------------------------


Intensity of rain fall : 4"
Coefficient of run off : 0.40 Cum.
Q = CIA
=
=
= Cum/Sec.
Q = CLH 3/2
= 3.33 X ( ) 3/2 X L
= 3.33 X L X
L = /3.33 X
=
=

OR Say length of Waste Weir

A.D.O. ASSISTANT SOIL CONSERVATION OFFICER


(Soil Conservation) Raipur (C.G)
Raipur (C.G.)
MINOR IRRIGATION TANK SCHEME
VILLAGE-------------------------------------P.C.NO.---------R.I.C. TILDA
BLOCK TILDA DISTRICT RAIPUR
CAPACITY TABLE

S. R.L. In Area Area of Sum Mean Diff. Capacity Prog.


No Mtr. between each Capacity
to Counter
Counter
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15

A.D.O. ASSISTANT SOIL CONSERVATION OFFICER


(Soil Conservation) Raipur (C.G)
Raipur (C.G.)
MINOR IRRIGATION TANK SCHEME
VILLAGE-------------------------------------P.C.NO.---------R.I.C. TILDA
BLOCK TILDA DISTRICT RAIPUR
Water planning
Catchment Area :
Type of catchment : Field
RAIN FALL
(A) Mean Annual = 48"
(B) Mean Mansoon = 44.16
75% Dependable Annual = 36.24 (By Series)
(C) 75% Dependable Mansoon = 33.24
YIELD
(A) Mean Annual --------------------------------------------------MCF
(B) 75% Dependable Annual
-----------------------------------------= MCF
(C) Mean Mansoon = MCFT
90% of Mean Annual
(D)75% Dependable Mansoon = MCFT

DISTRIBUTION OF YIELD
S. Month % Mean Yield 75% Yield
No. Depenable
1 June
2 July
3 Aug.
4 Sept.
Total
Fixation of Principle levels :-
L.S.L. :- 0.5 Acre height /sqmile of C.A. /Year for 50 X

Available at R.L. = ---------


Aviailable Capacity= ---------
Probable Kharif Irrigation
75 % depenable mansoon yield =
Water requirement of minor head =
Probable irrigation =
Proposed irrigation =
REQUIREMENT OF WATER
Month Fort Night From Requirement of Requirement in mcft
Jan water in Inchs
June

July

Aug.

Sept.

OCT.

Nov.

Total

WORKING TABLE
S. Month Carried Yield Total Irrigation Evaporation Balance
No. over Release Losses
1 June
2 July
3 Aug.
4 Sept.
5 Oct.
6 Nov.

Live Storage of Kharif only is greater of following –


1. Balance the end of august + 50% yield of September =
2. Balance the end of september + 50% yield of October =
3. 120% requirement of september +october+Nomber =
It is live Storage
Gross storage of capacity is dead storage + live storage =
available at R.L. = ---------------- Available capacity = ----------------
L.S.L. R.L. = ---------------- F.T.L. R.L. = ----------------
M.W.L R.L. = ---------------- T.B.L. R.L. = ----------------
Dead Storage = ---------------- live storage = ----------------
Gross storage = ----------------

A.D.O. ASSISTANT SOIL CONSERVATION OFFICER


(Soil Conservation) Raipur (C.G)
Raipur (C.G.)
MINOR IRRIGATION TANK SCHEME
VILLAGE-------------------------------------P.C.NO.---------R.I.C. TILDA
BLOCK TILDA DISTRICT RAIPUR
STATEMENT SHOWING DETAIL COST OF SLUICE GATE
LABOUR ONLY
S. C.S.R. ITEM PARTICULAR QUNTITY RATE UNIT AMOUNT
NO. NO.
1 Excavation of earth work in
hard moorum for foundation
50 mtr free lead & 1.5 mtr
free lift with dressing
2 Filling foundation C.C. 1:4:6
work with 40 mm metal
3 R.C.C. 1:2:4 with 20 mm
metal
4 C.R. masonry work in CM 1:4
with super struture
5 Coping work 1:2:4 C.C. with
20 mm metal
6 20 mm thick
Plastering CM 1:3
7 providing 1 sluice gate
complete
8 Providing 1 dia pipe 2X½ M
lenth
9 Dry stone pitching
10 22 cm thick grouted stone
pitching with individual stone
22 cm depth & minimum size
0.014 cm in 1:6 cm
11 Transportation charges with
stacking, loading & unloading
Total

A.D.O. ASSISTANT SOIL CONSERVATION OFFICER


(Soil Conservation) Raipur (C.G)