You are on page 1of 16

Standard Terms & Conditions of Sale

Pre-Engineered Buildings
Standard Terms & Conditions of Sale
Index

1. Placing Orders
2. Acceptance of Orders
3. Standard Payment Terms
4. Approval of Zamil Steel Drawings
5. Design Calculations (Optional)
6. Design Certificates
7. Change Orders
8. Jobs on Hold
9. Material Dispatch
10. Erection Drawings
11. Specification Changes & Material Substitution
12. Design and Supply Exclusions
13. Permits and Fees
14. Inspection of Fabricated Materials
15. Material Dispatch Advice
16. Partial Shipments
17. Customer Pick-Up Shipments

18. Unloading of Material at the Job Site for Overland


Shipments (Supply Only Contracts)
19. Erection of Buildings (Supply Only Contracts)
20. Erection by Zamil Steel
21. Shortage of Materials
22. Field Modifications
23. Combined Shipments
24. Storage
25. Warranty
26. Force Majeure
27. Cancellation of Orders
28. Governing Law & Dispute Resolution

Pre-Engineered Buildings Standard Terms & Conditions of Sale


The following Terms and Conditions of issued by Saudi Banks - confirmation not
Sale are established by Zamil Steel Indus- required.)
tries, Saudi Arabia, hereinafter referred to
in this document as Zamil Steel, to govern 3.2 Correspondent Banks
the sale and shipment of Pre-Engineered
Buildings that are designed, manufactured Customers opening a letter of credit
and processed by Zamil Steel Industries, may choose from the following Saudi
Saudi Arabia. correspondent banks. Addresses and
Zamil Steel account numbers are also
provided for customer convenience.
1. Placing Orders
National Commercial Bank
Orders are normally placed after Zamil Steel P.O. Box 5558
submits a written proposal (also known as Dammam 31432, Saudi Arabia.
quotation or offer) to its customers. Quota- Phone (9663) 834 0088,
tions may be revised until all technical and Fax (9663) 834 7251
commercial matters are agreed upon by both Telex 801116 NWAFAD SJ
the customer and Zamil Steel. Swift Code: NCBKSASARi
Account No. 05610001040107
Once all matters are agreed upon and are IBAN No. SA4610000005610001040107
included in a final, revised Zamil Steel
proposal, both the customer’s authorized Saudi Hollandi Bank
representative and Zamil Steel’s authorized P.O. Box 70
representative must sign a standard Dammam 31411, Saudi Arabia
contract. This standard document is provided Phone (9663) 894 8001,
with and attached to all Zamil Steel proposals. Fax (9663) 894 8001 x 190
Telex 871085 BSHC SJ
Swift Code: AAALSARi
2. Acceptance of Orders Account No. 013-139-029-119 (SAR)
IBAN No. SA46 5000000001313902 9119
Only orders accompanied by signed and Account No. 013-139-029-020 (USD)
dated contracts are accepted by Zamil Steel. IBAN No. SA0350000000013139029020
Orders are reviewed and determined to Account No. 013-139-029-170 (BHD)
be complete with all required information. IBAN No. SA2750000000013139029170
Accepted orders are entered in a sales Account No. 013-139-029-500 (EUR)
register maintained by the Order Management IBAN No. SA4150000000013139029500
Department while orders that are incomplete
are placed on hold until the appropriate Banque Saudi Fransi
corrective action is taken. Customers are P.O. Box 2792
informed of the “On Hold” status of their orders Dammam 31411, Saudi Arabia
by the responsible Zamil Steel Area Office. Phone (9663) 825 1588,
Fax (9663) 898 5508
Telex 801164 SAFDAM SJ
3. Standard Payment Terms Swift Code: BSFSARIxxx
Account No. 21173800103 (SAR)
3.1 Letter of Credit IBAN No. SA565500000002117380 0103
Account No. 21173800297 (USD)
Payment of the full contract price will be IBAN No. SA5655000000021173800297
made by an irrevocable letter of credit Account No. 21173813974 (EUR)
(L/C), confirmed by the negotiating bank IBAN No. SA5655000000021173813974
in Saudi Arabia. The period of validity
for the L/C is established at the time of Saudi British Bank
contract signing. The minimum period P.O. Box 1618
of validity of the L/C is 90 days for Dammam 31411, Saudi Arabia
shipment and 111 days for negotiation. Phone (9663) 833 1553,
For example, if the deadline for ship- Fax (9663) 832 1916
ment is the 1st of January then the L/C Telex 801314 SABB SJ
will expire on the 22nd of January. (L/Cs Swift Code: SABBSARi

Standard Terms & Conditions of Sale Pre-Engineered Buildings 1


Account No. 044-054443-001 (SAR) • Commercial invoice.
IBAN No. SA4945000000044054443001 • Packing list.
Account No. 044-054443-080 (USD)
IBAN No. SA5045000000044054443080 Truck Consignment Note issued by the
Account No. 044-054443-081 (EUR) TRUCKING COMPANY confirming the
IBAN No. SA2345000000044054443081 receipt of material for further delivery to
Account No. 044-054443-082 (GBP) the job site.

Saudi American Bank Additional Terms:


P.O. Box 842
Al-Khobar 31952, Saudi Arabia a) Partial shipments must be permitted.
Phone (9663) 865 8271,
Fax (9663) 865 8277 b) The negotiating / advising bank’s
Telex 870411 SAMBA SJ charges will be applied to the
Swift Code: SAMBSARI beneficiary’s account, while the
Account No. 106202278 opening / issuing bank’s charges
IBAN No. SA3440000000000106202278 will be applied to the account of the
party opening the L/C.
Arab National Bank
P.O. Box 18 3.4 Supply CPT Job Site, Overland
Dammam 31411, Saudi Arabia Shipment (GCC)
Phone (9663) 832 3440,
Fax (9663) 834 7309 The full value of the L/C will be payable
Telex 801032 according to the following terms:
Swift Code: ANBSARI
Account No. 01160000204900 (SAR) Down payment of 25% of the L/C
IBAN No. SA0230400107000020490012 value will be paid upon the receipt of
Account No. 67008000204900 (USD) the L/C, and against presentation of the
IBAN No. SA0430406708000020490017 beneficiary’s (Zamil Steel Industries)
sight draft & commercial invoice to the
Al Rajhi Banking & Investment negotiating bank. The balance of the
Corporation value of the L/C will be paid against
Al-Khobar Main Br. No. 139 presentation of the:
P.O. Box 1362
Al-Khobar 31952, Saudi Arabia • Sight draft drawn on the confirming
Phone (9663) 864 3525, bank.
Fax (9663) 864 3525 x 225
Telex 871100 SJ • Commercial invoice.
Swift Code: RJHISARi
Account No. 139608010000556 • Packing list.
IBAN No. SA7180000139608010000556
• Truck Consignment Note issued by the
Riyadh Bank TRUCKING COMPANY, confirming the
P.O Box 274 receipt of material for further delivery
Dammam 31411, Saudi Arabia to the job site.
Phone (9663) 833 5733,
Fax (9663) 832 1056 • GCC Certificate of origin (in Arabic)
Telex 801127 RYDX SJ issued by Saudi Arabian Ministry of
Swift Code: RIBLSARi Commerce and Industry (required for
Kuwait and Qatar only).
All L/C’s opened by banks located outside
Saudi Arabia must be confirmed by a Saudi Additional Terms:
bank.
a) Partial shipments must be
permitted.
3.3 Supply CPT Job Site, Overland
Shipment (Saudi Arabian Destinations) b) The negotiating / advising bank’s
charges will be applied to the
• Sight draft. beneficiary’s account, while the

2 Pre-Engineered Buildings Standard Terms & Conditions of Sale


opening / issuing bank’s charges c) The negotiating bank must
will be applied to the account of the add its confirmation.
party opening the L/C.
d) The original documents (the
c) The negotiating bank must most common of which are the
add its confirmation. commercial invoice and certificate
of origin) are to be hand carried by
d) The original documents (the the truck driver for border customs
most common of which are the clearance. Copies of the same shall
commercial invoice and certificate be acceptable for negotiation.
of origin) are to be hand carried by
the truck driver for border customs e) Documents to be issued in English
clearance. Copies of the same shall AND / OR Arabic.
be acceptable for negotiation.
3.6 Supply Ex-Works Factory in Dammam
3.5 Supply CPT Job Site, Overland
Shipment (Arab countries other The value of the L/C will be payable
than GCC) according to the following terms: Down
payment of 25% of the value of the L/C
The full value of the L/C will be payable will be paid upon the receipt of the
according to the following terms: L/C and against presentation of the
beneficiary’s (Zamil Steel Industries)
Down payment of 25% of the L/C sight draft & commercial invoice to the
value will be paid upon the receipt of negotiating bank. The balance of the
the L/C, and against presentation of the value of the L/C will be paid against
beneficiary’s (Zamil Steel Industries) sight presentation of the:
draft & commercial invoice to the nego-
tiating bank. The balance of the value of • Sight draft drawn on the negotiating
the L/C will be paid against bank.
presentation of the:
• Commercial invoice.
• Sight draft drawn on the confirming
bank. • Packing list.

• Commercial invoice. • Material dispatch note issued by the


beneficiary and countersigned by the
• Packing list. truck driver confirming receipt of
materials. OR,
• Truck Consignment Note issued by the
TRUCKING COMPANY, confirming the Telex sent by beneficiary to openers of
receipt of material for further delivery the L/C through the negotiating bank,
to the job site. 7 to 10 days prior to the shipment date,
informing the bank that the material is
• Certificate of origin issued by Saudi ready for shipment and requesting the
Arabian Ministry of Commerce and bank to make arrangements for custom-
Industry (As per Arab league for- er pickup.
mat).
In the event that trucks do not arrive
Additional Terms: on the specified shipping date, the
beneficiary may submit copies of invoice,
a) Partial shipments must be certificate of origin (if applicable), and
permitted. packing list to the negotiating bank for
processing, along with a letter stating that:
b) The negotiating / advising bank’s
charges will be applied to the “The L/C openers have not provided
beneficiary’s account, while the trucks to collect the material. Material
opening / issuing bank’s charges will remain in the beneficiary’s custody
will be applied to the account of the to be transfered to the L/C openers on the
party opening the L/C. future date”.

Standard Terms & Conditions of Sale Pre-Engineered Buildings 3


Additional Terms: c) The negotiating / advising bank’s
charges will be applied to the ben
a) Partial shipment must be permitted. eficiary’s account, while the
opening / issuing bank’s charges
b) The negotiating / advising bank’s will be applied to the account of
charges will be applied to the the party opening the L/C.
beneficiary’s account, while the
opening / issuing bank’s charges d) The negotiating bank must
will be ap plied to the account of the add its confirmation.
party opening the L/C
3.8 Supply FOB Dammam Port, Sea
c) The negotiating bank must add its Shipment (All Destinations)
confirmation.
The value of the L/C will be payable
d) Original documents (the most according to the following terms:
common of which are the
commercial invoice, packing list, Down payment of 25% of the L/C value
and material dispatch note) are to will be paid upon the receipt of the L/C
be hand carried by the truck driver and against presentation of the
and duplicate copies of the same beneficiary’s (Zamil Steel Industries) sight
shall be acceptable for negotiation. draft & commercial invoice to the nego-
tiating bank.
3.7 Supply CFR Destination Port,
Sea Shipment (All Destinations) The balance of the value of the L/C will be
paid against presentation of:
The full value of the L/C will be pay-
able according to the following terms: • Sight draft drawn on th negotiating
bank.
Down payment of 25% of the L/C value
will be paid upon the receipt of the L/C • Commercial invoice.
and against presentation of the
beneficiary’s (Zamil Steel Industries) • Packing list.
sight draft & commercial invoice to the
negotiating bank. • Bill of lading specifying “freight
collect”.
The balance of the value of the L/C will
be paid against presentation of the: • Certificate of origin, in either English
or Arabic, issued by the Saudi Arabian
• Sight draft drawn on negotiating Ministry of Commerce.
bank.
• Trade terms must read as FOB to any
• Commercial invoice. Saudi Port.

• Packing list. Additional Terms:

• Bill of lading. a) Partial shipments must be


permitted.
• Certificate of origin, in either English
or Arabic, issued by the Saudi Arabian b) The negotiating / advising bank’s
Ministry of Commerce and Industry. charges will be applied to the ben
eficiary’s account, while the opening /
Additional Terms: issuing bank’s charges will be applied to
the account of the party opening the L/C.
a) Partial shipments must be
permitted. c) Negotiating bank must add its confirma-
tion.
b) Trans shipment must be allowed.

4 Pre-Engineered Buildings Standard Terms & Conditions of Sale


d) Openers to arrange with the shipping time drafts (dates to be determined
lines to issue bill of lading according to the erection period) all of
showing “freight collect”. which are calculated based upon the
shipment date.
3.9 Supply & Erection Contracts
(Saudi Arabian Contracts only) 4. Approval of Zamil Steel
The L/C will remain valid for a minimum Drawings
of 180 days.
4.1 When requested by the customer or
The L/C value will cover the total amount considered necessary by Zamil Steel,
of the supply and erection prices. approval drawings will be prepared
to ensure that Zamil Steel accurately
Payment for Supply: interprets the requirements and
specifications of the customer.
The supply CPT job site amount is
payable as follows: 4.2 If the building is attached to an
existing building, Zamil Steel will not issue
Down payment of 25% of the supply CPT approval drawings until a report pre-
job site amount is to be paid upon the pared by a certified surveyor is sent to
receipt of the L/C and against presentation the Zamil Steel Order Management De-
of the beneficiary’s (Zamil Steel Industries) partment.
sight draft & commercial invoice to the
negotiating bank. 4.3 When approval is required, two (2) sets
of drawings are provided to the cus-
The balance of the supply price CPT job tomer, free of charge. One set must be
site will be paid upon presentation of the signed by the customer and returned to
following documents: the responsible Zamil Steel Area Office
bearing the notation - “Approved As Is”
• Sight draft drawn on the negotiating or “Approved As Noted”. The second set
bank. may be retained by the customer for fu-
ture reference.Additional sets are avail-
• Commercial invoice. able for a fee of SR 300 (US$ 80) per set.

• Packing list. 4.4 The information presented in the


approval drawings is preliminary in
• Truck consignment note issued by the nature and is not intended for uses
TRUCKING COMPANY confirming such as setting anchor bolts, designing
receipt of material for fur ther delivery foundations and other construction
to job site. activities.

Additional Terms: 4.5 The approval of these drawings by


Zamil Steel will be accepted only
a) Partial shipments must be in the form of the customer’s (or his
permitted. authorized representative’s) signature,
appearing within the “Approval” stamp
b) Trans shipment must be allowed. placed by Zamil Steel on its approval
drawings. Approval by any other means
c) The negotiating / advising bank’s will not be accepted by Zamil Steel.
charges will be applied to the
beneficiary’s account, while the 4.6 Sets of drawings that are signed and
opening / issuing bank’s charges approved in the designated manner
will be applied to the account of the will be considered final and binding.
party opening the L/C.
4.7 Jobs that have been designated as “Out
Payment for Erection For Approval” for a period of more than
60 days will be subject to the pricing
The erection price will be paid against schedule that is in effect at the time the

Standard Terms & Conditions of Sale Pre-Engineered Buildings 5


approval drawings are returned to Zamil 5.4 Additional engineering fees may be
Steel Order Management Department. levied for the preparation of design
Zamil Steel reserves the right to cancel calculations, they require a greater level
orders that have been designated as of analysis than the standard alculations.
“Out For Approval” for more than 90 days
(The customer will be responsible for
ordinary cancellation and engineering 6. Design Certificates
costs) incurred up to that point in the
process. A certificate attesting to the structural
design integrity of a particular Zamil
4.8 Comments noted on returned approval Steel building, signed and stamped by
drawings, that change the previously a registered professional engineer, is
agreed upon scope of work, must available (at no extra cost) in lieu of the
appear in RED INK and be accompa- design calculations.
nied by a change order that is duly
signed and accepted by the customer.
7. Change Orders
4.9 Approval drawings for standard build-
ings are normally submitted within two 7.1 Once a contract is signed and
weeks of request. Approval drawings accepted, any subsequent changes to
for more complex buildings require a the order require a change order letter,
longer period of preparation time. prepared by Zamil Steel and signed by
the customer. This letter will, describes
4.10 Approval drawings should be returned the specific change(s) and indicate the
to Zamil Steel’s Area Office / Head impact these changes may have on
Office within two weeks of the price and/or delivery of the project. No
customer’s date of recipt. A delay in further action will be taken by Zamil
the return of approval drawings may Steel until the change order has been
affect the overall project cycle, includ- signed as accepted by the customer.
ing delivery of the steel to the job site (or
port of entry). 7.2 The cost of any fabricated components
that are rendered useless by a change
5. Design Calculations order initiated after the start of fabrication,
will be charged to the customer’s account.
(Optional)

5.1 For projects that require approval, the 8. Jobs on Hold


structural design calculations may be
included with the approval drawings, if 8.1 All costs that are incurred by Zamil Steel
requested. when a job is placed “On Hold” by the
customer, after the start of manufacturing,
5.2 Two (2) sets of structural design calcula- will be charged to the customer’s account.
tions are provided to the customer, free
of charge. Additional sets are available 8.2 A job that is not released for production
for a fee of SR 150 (US$ 40) per set. within 90 days from the date of its entry
in the sales register, for whatever reason
5.3 Standard structural design calculations (including lack of technical clarification),
include: will be put “On Hold”. Zamil Steel
reserves the right to adjust the price of
a) Material specifications & design such a job according to the price rates
assumptions. that are valid at the time of release from
its “On Hold” status.
b) Design of the primary & secondary
structural framing.
c) Wind bracing design. 9. Material Dispatch
d) Column reactions. 9.1 The material dispatch commitment
period is measured, in weeks, from the

6 Pre-Engineered Buildings Standard Terms & Conditions of Sale


latest date of receipt and acceptance by 10.4 By specific request only, one set of
Zamil Steel offices of all of the following “As Built” drawings will be supplied
job related documents: to the customer (free of charge) after
erection is completed. “As Built” drawings
• Signed contract. will incorporate changes made during
erection (if any), assuming that those
• Acceptable letter of credit / final changes have been communicated in
accepted amended L/C. writing to Zamil Steel after completion of
erection.
• Final change order including any
amendments to L/C price. 11. Specification Changes
• Approval drawings, signed and & Material Substitution
marked as “Approved As Is”or “Ap
proved As Noted”, where applicable. 11.1 Zamil Steel reserves the right to
substitute meterial equivalent to that
9.2 Production and dispatch schedules shall originally specified when a standard
be determined when all of the following inventory item is out of stock or when
are fulfilled: product development improvements
make substitution necessary.
• Receipt of the final “Approved As Is” or
“Approved As Noted” approval draw- 11.2 When special paint supplier is specified
ings at Zamil Steel offices, where appli- by the consultant / client, and paint is
cable (see item 4). found to have application problems and
(or) extended drying times, Zamil Steel
• Receipt and acceptance of the final will recommend to substitute it with an
change order, where applicable (see equivalent and suitable supplier, subject
item 7). to final approval by the consultant /
client.
• Release to production by the Zamil
Steel Finance Department, i.e. finan- 12. Design and Supply
cial clearance.
Exclusions
9.3 The Zamil Steel Order Management De-
partment regularly notifies all Zamil Steel 12.1 Zamil Steel supplies only materials that
Area Offices of production and are clearly described in its proposal
dispatch schedules for the jobs entered by under “Building Description” and
each individual office. “Standard Supplied Items” or covered
by written, accepted and signed Change
Orders.
10. Erection Drawings
12.2 Zamil Steel does not supply, nor does it
10.1 The standard erection drawings accept responsibility for the design or
package consists of one (1) set sent construction of column footings, ground
to the customer, via the responsible slabs, tie beams, masonry walls and
Zamil Steel Area Office, and one (1) set other concrete works.
dispatched with the materials.
12.3 Zamil Steel does not supply, nor does
10.2 When erection is completed by Zamil it accept responsibility for plumbing
Steel, the package will consist of one (1) services, electrical services, air
set of drawings sent to the customer, via conditioning services, or any other
the responsible Zamil Steel Area Office, material or service not specified in the
and one (1) set provided to the Zamil final accepted proposal, contract or
Steel erection team. Change Order.

10.3 Additional sets of erection drawings are


available upon request for SR 300 (US$
80) per set.

Standard Terms & Conditions of Sale Pre-Engineered Buildings 7


13. Permits and Fees request for such inspection by the
customer. Inspections will be arranged in
13.1 It is the customer’s sole responsibility to such a manner so as not to delay produc-
obtain and pay for all building permits, tion and/or shipment. In the event that the
licenses, public assessment, prorated customer or his representative fails to
utilities, utility connections, occupancy conduct inspections as scheduled, the
fees as well as any other fees required by applicable goods will be considered
any government authority in connection “Released By Concession”.
with the work provided for in the contract.

13.2 The customer will provide, at his ex- 15. Material Dispatch Advice
pense, all plans and specifications re-
quired to obtain the building permit, 15.1 Upon dispatch, Zamil Steel Shipping
except those plans to be furnished by Department will advise the responsible
Zamil Steel. Zamil Steel Area Office of the actual
dispatch date.
13.3 It is the customer’s responsibility to
ensure that all the plans and speci- 15.2 The customer will be notified of the
fications, including those produced actual dispatch date by the responsible
by Zamil Steel, comply with the ap- Zamil Steel Area Office, immediately
plicable requirements of all the upon the dispatch of material from
governing building authorities. Zamil Steel factory.

13.4 If erection is to be completed by the


Zamil Steel erection team, a copy of the 16. Partial Shipments
building permit must be provided to
Zamil Steel by the customer, prior to the 16.1 On large jobs, it is the standard policy of
commencement of work. If erection work Zamil Steel standard practice to make
must be deferred due to building permit partial shipments.
problems, the cost of such stoppages,
standing time or demobilization will be 16.2 When partial shipments are made,
charged to the customer’s account. Zamil Steel will endeavor to ship erect-
able steel on a schedule that enables the
14. Inspection of Fabricated erection process to proceed smoothly.
Materials 16.3 When partial shipments are requested
and accepted by Zamil Steel, each
14.1 Zamil Steel, an ISO 9001 certified shipment will be assigned a prorated
company, operates in accordance with value of the dispatched materials based
its standard Quality Plan, which specifi- upon the accepted terms of payment
cally outlines the quality control proce- covering the total job value.
dures that must be followed during the
production and shipment of its prod-
ucts. This plan describes the sampling 17. Customer Pick-Up Shipments
techniques, types of tests conducted,
control procedures and reporting for- 17.1 Zamil Steel does not permit customer
mat used in the production of all man- for overseas shipments.
ufactured components. The approved
procedures described in this Quality 17.2 Zamil Steel prefers to make all overland
Plan are maintained within the Zamil shipments by contract carrier; however,
Steel Quality Control Department. the customer may pick-up the material
provided that the procedures noted in
14.2 Inspection of Zamil Steel products at the section 17.3 to 17.5 are observed.
Zamil Steel plant by a customer, or by his
authorized representative, (if required 17.3 The customer must obtain an assigned
by a specific supply contract) may be loading date and time from the Zamil
arranged. Such inspection will be Steel Order Management Department.
scheduled upon receipt of a written

8 Pre-Engineered Buildings Standard Terms & Conditions of Sale


17.4 The customer must provide suitable carried out by the Zamil Steel erection
trailers for loading by Zamil Steel. team. Zamil Steel assumes no liability
Zamil Steel cannot load closed van for, and the customer will hold Zamil
trailers and trailers with sidings. Steel harmless in connection with any
defects in the erection of buildings
17.5 The customer’s driver must check and sign or such defects as loose connections,
a receipt for the Zamil Steel materials. missing parts, roof leaks, damaged
sheets, omission of sealer, scratched
17.6 Customers who are not familiar surfaces, poor alignment, or inadequate
with Zamil Steel’s customer pick-up drainage that are the result of the
procedures should request complete erection process.
information from the responsible Zamil
Steel Area Office. 19.2 The customer will permit Zamil Steel’s
personnel to inspect the erection work at
any time during the erection process.
18. Unloading of Material at
19.3 Although Zamil Steel appoints only
Job Site for Overland competent contractors as Certified
Shipments (Supply Only Builders, Zamil Steel is not responsible
Contacts) for the quality of erection provided by
these builders. Zamil Steel Certified
18.1 Unloading of trucks at the job site Builders are independent contractors
is the sole responsibility of the who are certified by Zamil Steel on the
customer. The customer is expected basis of knowledge and experience in
to provide suitable equipment for pre-engineered steel building erection
unloading the material. If a site and contracting practices.
is inaccessible or not ready to accept
the material, another site for unloading
must be provided by the customer. 20. Erection by Zamil Steel
18.2 The customer is solely responsible for 20.1 The Zamil Steel erection team will
the condition of the job site in terms of undertake building erection only
as the safety of the trucking company on a clear, leveled, compacted and
driver and the Zamil Steel material. unobstructed building foot print, with
suitable uninterrupted access for
18.3 The customer is responsible for unloading trucks and erection
accurately checking the materials upon equipment. A 10 meter wide access
arrival and unloading. Any discrepan- must be provided around each
cies must be indicated on the material building for cladding & accessories
dispatch note. storage. The ground surface of all
working areas must be suitably
18.4 A receiving representative of the compacted to accommodate
customer cannot refuse to accept the use of forklifts or cranes.
an entire shipment because some
portion of that shipment is damaged or 20.2 Prior to the arrival of the Zamil Steel
missing. Damaged materials must be erection team on site, the anchor
indicated on the material dispatch note bolts must be accurately set by other
and reported to the responsible Zamil personnels. All anchor bolts set in place
Steel Area Office immediately. must have the appropriate nuts and
washers installed on cleaned threads.

19. Erection of Buildings 20.3 The Zamil Steel erection team may
check the position and level of the
(Supply Only Contracts) anchor bolts prior to the pouring of the
concrete foundations. This does not
19.1 The customer will be solely responsible absolve the contractor from his
for the quality of a erection of Zamil responsibility for accuracy. Any
Steel building when the erection is not addional work or rework required

Standard Terms & Conditions of Sale Pre-Engineered Buildings 9


due to misplacement of anchor bolts or responsibility to check the materials
faulty concrete will be the responsibility before signing and dating Zamil Steel’s
of the customer. material dispatch note to indicate
acceptance.
20.4 If erection is delayed due to the
non-completion of civil works, or 21.3 Claims of shortages are only accepted
other causes, Zamil Steel will not be by Zamil Steel if received in writing
responsible for the deterioration of the within seven (7) days of the date of the
primer paint, or the cleaning of the acceptance signature.
manufactured steel after delivery to site.
21.4 If, after receipt of such claims, Zamil
20.5 Zamil Steel will not be responsible for Steel bills of materials and shipping lists
any cleaning of the steel columns or are found to be correct, replacement
cladding after pouring of the concrete material will be supplied only upon
slab. receipt written acceptance of the
additional ex-works costs and deliv-
20.6 Zamil Steel will not be responsible for ery costs from the customer or his
grouting under base plates after steel representative.
erection and alignment. The customer
will be responsible for finalizing the 21.5 Zamil Steel is not responsible for any
grouting prior to applying the design consequential claims or liabilities
loads including cladding. alleged to arise from losses or
shortages.
20.7 Zamil Steel shall not be responsible for
the repair of any damage to building
components caused by others. 22. Field Modifications
20.8 Any necessary repairs will be performed 22.1 Minor field modifications and
only upon receipt by the Zamil Steel adjustments, in any pre-engineered
erection team of written notification building, are to be anticipated. Minor
of acceptance of the charges, by the field work does not constitute grounds
customer in the form of a Change Order. for chargebacks or refunds. This field
work should be provided for within the
20.9 Any deviation from these standard contingency element of any
erection conditions will become subject construction estimate.
to price review.
22.2 Only repairs due to major fabrication
20.10 Zamil Steel reserves the right to errors may be cause for filing a claim.
subcontract part or all of its erec- Such repairs will only be undertaken
tion contract to qualified contrac- with the consultation and consent of
tors who will execute the job pro- Zamil Steel.
fessionally and in accordance with
Zamil Steel’s strict erection requirements.
23. Combined Shipments
21. Shortage of Materials Zamil Steel is occasionally obliged to
include a small quantity of material
21.1 Whenever a material consignment is (perhaps a back-order or urgent
received on site by anyone other than material request) within a shipment
the Zamil Steel erection team, the destined for another customer in the
dated signature of the customer or his same metropolitan area or territory.
designated representative constitutes a All customers stand to benefit from this
formal acknowledgment of the correct mutual cooperation.
receipt of the consignment as related to
both quality and quantity.

21.2 It is the sole responsibility of the


customer or his representative

10 Pre-Engineered Buildings Standard Terms & Conditions of Sale


24. Storage 25.5 In the event of erection by Zamil
Steel, the building maintenance is
24.1 Zamil Steel shall store, free of warranted for 12 months from the date of
charge in their open yards, any provisional acceptance by the customer.
or all the materials for a contract
for a period not exceeding 10 days
from the scheduled dispatch date. 26. Force Majeure
24.2 Should a customer delay dispatch of Zamil Steel shall not be held account-
goods for a period exceeding 10 days able for delays in material dispatch or
after the originally scheduled dispatch delivery (after dispatch) resulting from
date, STORAGE CHARGES will be circumstancesoutside its control, such
levied by Zamil Steel, at the rate of as strikes, acts of war, revolution, riot
0.1% of the ex-works selling price (of the or civil disturbance, trade sanctions or
unshipped material) per day up to a restrictions, occurrences of meteoro-
maximum of 5%. logical or geophysical nature, etc., to
the extent that these affect transport,
24.3 Zamil Steel shall not be held communications, manufacturing and/
responsible for damage caused to the or erection by Zamil Steel, its suppliers
exposed steel after it has been stored and its subcontractors.
longer than 10 days. Such damage may
include deterioration of the paint coating.
27. Cancellation of Orders
25. Warranty 27.1 In the event that a signed contract is
cancelled by a customer, the greater of
25.1 Zamil Steel warrants the materials it the following cancellation charges will
manufactures for a period of one year apply:
from the date of material dispatch. This
warranty extends only to failure due to • 10% of the total contract amount.
defective materials or workmanship,
and covers only products that are • All actual charges incurred by Zamil
utilized in the intended manner. Steel (and its sub contrac tors / s u p -
pliers) up to the time of receipt of
25.2 Zamil Steel warrants that the structure the notice of cancellation.
will support the loads described in
Zamil Steel’s drawings and contract 27.2 Cancellation charges are due
when properly erected, as part of a immediately upon the receipt by
complete structural system designed Zamil Steel of the customer’s notice of
by Zamil Steel and made up only of cancellation.
parts made by Zamil Steel, provided
that the structure is used in the manner 28. Governing Law & Dispute
and purpose for which it was designed.
Resolution
25.3 No warranties are expressed or implied
other than those described in these 28.1 This Agreement shall be governed by,
Terms and Conditions of Sale. and construed in accordance with the
Laws of the Kingdom of Saudi Arabia.
25.4 In the event of breach of warranty,
the limit of any claim shall be the 28.2 Any dispute arising hereunder or
correction or replacement of defective from or in connection herewith shall
materials and correction of defective be resolved amicably by discussion
workmanship.Under no circumstances between the parties hereto, failing
will Zamil Steel be responsible for which the parties shall submit the
consequential damages that are matter in dispute to be finally settled
alleged to arise from any such claim of pursuant to the Saudi Arbitration
breach of warranty. Regulations. The arbitration shall take
place in Dammam, Saudi Arabia.

Standard Terms & Conditions of Sale Pre-Engineered Buildings 11


No changes in these terms and conditions shall be
allowed unless agreed to, in writing, by the General
Manager of the Pre-Engineered Buildings Division at
Zamil Steel Head Office in Dammam, Saudi Arabia.

12 Pre-Engineered Buildings Standard Terms & Conditions of Sale


RECOMMENDED LETTER OF CREDIT (L/C) OPENING PROCEDURE

Thank you for choosing Zamil Steel as your building supplier. The purpose of this document is to provide you
with our recommended procedure for opening a letter of credit (L/C) for Zamil Steel.

Most letters of credit (L/C) received by Zamil Steel head office require amendments which delay the processing
of jobs. For your convenience, we have drafted a letter for you to use as a guide, when requesting your bank to
open a letter of credit for Zamil Steel.

QUOTE

Dear Sirs,

Kindly open an irrevocable and confirmed Letter of Credit (L/C) favoring:


ZAMIL STEEL INDUSTRIES
P.O. Box 877, Dammam 31421, Saudi Arabia
Phone (966 3) 847 1840 Fax (966 3) 847 1291
For the sum of SR/USD/Euro ___________ (Saudi Riyals/ US Dollars/ Euros __________ only) being _________% of the value of
Zamil Steel’s contract proposal no. __________, rev. no. _____________, dated ___________. and advise Zamil Steel,
Dammam, through any prime Saudi Bank with the clear instructions to add their confirmation to the said L/C.

Confirmation charges will be borne by openers. L/C should be payable against presentation of the following documents
(Please check applicable boxes)

1. Sight Draft drawn on negotiating bank.


2. Invoice in one original and two copies.
3. Packing List.
4. Certificate of Origin in [] English [] Arabic issued by the Saudi Arabian Ministry of Commerce.
5. Consignment Note issued by the trucking company (confirming receipt of material for delivery to opener’s job site)
marked freight pre-paid (if shipment is on CIF/C&F basis) and made out to the order of the opening bank and notify
openers. Truck Consignment note must not call for showing the carrier’s local agent name, address, etc.
Bill of lading.
6. Insurance Certificate covering all road transport risk for 110% of shipment value
Marine Insurance Certificate for 110% of shipment value.

Other Terms:

a. WAR RISK is not covered.


b. Partial shipment is allowed.
c. Stale documents are acceptable.
d. L/C must be valid for shipment for ninety (90) days from opening date.
e. L/C expiry date shall be twenty one (21) days after L/C shipping date.
f. All L/C opening, amendment and confirmation charges are for opener’s account.

Please arrange to transmit the full text of the L/C by telex, being the operative instrument, to enable the beneficiary to ship
our material at an early date and advise the beneficiary through telephone to collect the L/C from the advising bank.

UN-QUOTE

Any other documents called for may delay the fabrication of materials. If the letter of credit is opened according to
the above points, it will speed up our delivery to your jobsite by avoiding delays that may result from the necessity
of making further amendments to the letter of credit.

We assure you the best of our attention and remain.

Sincerely,

Zamil Steel

Standard Terms & Conditions of Sale Pre-Engineered Buildings 13


HEAD OFFICE AREA OFFICES
Saudi Arabia (Dammam, Riyadh & Jeddah) Kuwait (Kuwait City) Bahrain (Manama) Qatar (Doha)
PO Box 877
UAE (Dubai & Abu Dhabi) Oman (Muscat) Yemen (Sanaa) Jordan (Amman) Syria (Damascus) Iraq (Basra)
Dammam 31421 Bangladesh (Dhaka) Pakistan (Lahore) Sri Lanka (Colombo) India (Chennai & Bangalore) Greece (Athens)
Romania (Bucharest) Hungary (Budapest) Poland (Warsaw) Czech Rep. (Prague) Spain (Madrid) Luxembourg
Saudi Arabia
Egypt (Cairo) Sudan (Khartoum) Libya (Tripoli) Algeria (Algiers) Senagal (Dakar) Ethiopia (Addis Ababa)
Phone (966 3) 847 1840 Tanzania (Dar-es-Salaam) Nigeria (Lagos) Vietnam (Ho Chi Minh City, Hanoi, Haiphong & Da Nang)
Thailand (Bangkok) Malaysia (Kuala Lumpur, Johor & Kota Kinabalu) Singapore Philippines (Manila)
Fax (966 3) 847 1291
Myanmar (Yangon, Mandalay & Pyinmana) Indonesia (Jakarta & Batam) Philippines (Manila) Laos (Vientiane)
E-Mail pebmarketing@zamilsteel.com Cambodia (Phnompenh) China (Shanghai, Qingdao & Dalian) Japan (Tokyo)

Pre-Engineered Buildings Standard Terms & Conditions of Sale

www.zamilsteel.com January 2010

You might also like