You are on page 1of 9

Curriculum Vitae

OBJECTIVE:-
Seeking a position in a results-oriented project that seeks an ambitious and career
conscious person where acquired skills and education will be utilized towards continued
growth & advancement.

• Personal Data:-

Name: Adel Ragab Nationality:Egyptian Birth Date:27/05/1982


Ibrahim
Country : United Arab City :Abu Dhabi
Emirates
Gender : male Marital Status: single Military Service: exempted
E-Mail address : CellularPhone:
adoolosman@yahoo.com 00971/501085296
0020116873108

• Education:-

Degree University Graduation


B.Sc. of Ain Overal Projec Graduati Project major
mechanical shams l t on year
engineering
Universi grade grade
( power
department) ty 63.96 Very 2004 Energy
% good consumption
control within air
condition unit.

Main working fields:-


- Maintenance and troubleshooting of (heavy , pumping ,
construction , foundation , grouting ,tunneling )equipments as
maintenance engineer(site and workshop) for 3years and
half.
-Geotechnical construction activites( all cut and cover traffic
tunnels construction steps , deep foundations , excavation support
tools ,deep excavation procedure , injection ,jet grouting ,ground
anchors ,dewatering)as site mechanical and site enfgineer for
one year and half.
-Infrastructure works((Mainly micro tunneling: shafts sinking
,dewatering ,curing , operation assistance ,grouting
,troubleshooting ), sewage networks(GRP lines with open cut
installation , HDPE lines welding and preparation with HDD
installation method) as site engineer for one year.
• Work Experience:-

*ED. ZUBLIN .AG


JOB TITLE EMPLOYER PROJECT PROJECT LAYOUT WORKING
DATES
INFRASTRUCTU ED. ZUBLIN TAKREER Oil refinery located in 17/7/2010
RE/MEP .AG REFINERY abu dhabi emirate until now
ENGINEER EXPANSION going to expand with
PROJECT (NON all facilities to be
PROCESS expanded ,our duty to
BUILDINGS) build non process
buildings of this
expansion
Responsiblities
-managing and supervision of site facility activities in general .
-supervision and controlling MEP works on site .

**HIGH SLANT
Job title Employer Project Project layout Working
dates
Micro HIGH SUBAH AL Drive 3km of 1/1/2010
tunneling SLANT AHMAD CITY microtunneling until
machine COMPANY SEWAGE lines as part of 1/4/2010
operator /KUWAIT NETWORK(MICO Subah Alahmed
(under RTUNNELING city sewage
training)& site LINES) network.
mechanical
engineer

Responsiblities
-managing , supervising and perform mechanical works for
company equipments in the project (repairing , maintenance
and operation).
-operating assistance and receive operation training for the
(AVN-1000)microtunneling machine .
***SAMSUNG

Job Employer Project Project layout Working


title dates
Construc(section Salam The biggest traffic 30/3/200
tion site
-1) Street and tunnel project in the 9 to
enginee SAMSUNG Mina Road middle east with 9/8/2009
r JV SAIF BIN Developm cost of 850$
DARWEES ent million .Total amount
H of concrete 455,000
m3, re-bar 45,130
ton
Responsiblities
between our between our company Major fields
company and & consultant
subcontractors
-planning , -Coordination between - Main
coordination between project consultant excavation &
site sub contractors PARSONS and our Base slab
and project design and subcontractors, in - Diaphragm
management team drawings comments , wall ,guide wall
-supervision work method statements -Ground
progress of activities, comments ,design Anchors( for
job sequencing requirements achieving fixing the
-material control and excavation
requesting. -preparing shop support system)
-Time scheduling and drawings for future jobs. -Jet
monthly forward plan following up documents grouting( @
approval utility crossing
areas
**** BESIX

Job Empl Project Project layout Working


title oyer dates
Project BESI PALM The sewage lines serves 1/8/2008
engine X JUMIERAH palm jumierah to connect it To
er water to the sewage treatment 29/3/200
Cause of leave network station that can process 9
-with world http://www.be 230.000 m3/day of sewage
financial six.com/page. water and irrigation main
crises , our asp?id=178 lines to feed the big golf park
project stopped in dubai covering the sewage
by the owner lines.
(NAKHEEL) ,
with
termination of
stuff.
Main activities and responsibilities Some project features
• First 4 months responsible only for *3,96 km of
the subcontractor AL MANBAA ( excavation 10 m deep.
microtunneling contractor ) as *1,2 km of
maintenance , operator assistant microtunneling. Shafts
and site engineer for the main were 13 and 24 meters
line of 2.5m diameter shielded deep from the ground
concrete pipes . level. For each shaft we
• Supervision of HDPE pipes had to drive sheet piles.
welding for 2 lines ( diameter The diameter of the pipe
1000mm and 600mm)of 550 m was 1400mm.
length & supervision of HDD *Backfilling, pressure
works by these lines( started but not test, deflection test
finished caused by stopping the ( was required).
project). *43 concrete manhole
• Responsible for installation of 2 were made with a
lines of 500m length(diameter of height in between 10
600mm and 800mm)GRP pipes and 24 meters.
with 5m depth. In this process were
• Responsible of involved a lot of resources,
performing(pressure like heavy machinery,
,deflection ,compaction )tests for three subcontractors and
GRP lines. 400 peoples (3 site
• Monitoring and coordination of engineers, 4 general
suppliers. foremans, 10 foremans).
• Manholes casting for diameter of To build these manholes
3m and length of 6m. we used slip forms
• Responsible for AL NABOODAH
microtunneling subcontractor
works of pipe jacking and
repairing.

*****Arab Contractors
(TOTAL EXPERIENCE {23/2/2005---1/7/2008}
3.1 from 1/8/2007 to 1/7/2008
departmen Job Job reponsiblities
t title
Deep Site Injection unit Large piles section
foundation engi *Managing the site of *Maintenance of bases
s neer (SOIL-MEC105, 305, machine (Bauer BG25,Mait
departmen 405 MICRO PILE 160) & site mechanical
t MACHINES)with its equipment .
accessories . * repairing faults &
* managing material troubleshooting.
resources . * managing site in
* maintenance of the cooperation with site civil
machine & its engineer .
accessories *daily check up of base
*repairing mechanical , machine parts & site
hydraulical and components.
electronic faults.

Work history
Injection unit Large piles section
-construction of supporting wall consist of -Al Giza traffic tunnel
( 40cm diameter with depth of 12m semi (Giza) excavation support
tangent micro piles) for the foundation of system (bored & plastic
main bypass line in ABU RAWASH tunnel sides piles ) for length
SEWAGE STATION EXPANSION project of 450m.
with length of 700m. - MAIT 180 two new
- construction of 20cm diameter with machines collecting parts &
depth 18m grouted tuba manchet piles making ready to work from
as foundation ( 20 foundation)Tharwat shipping.
bridge expansion.

3.2 From : 23/8/2005 -1/8/2007


Department Job Type JOB RESPONSIBILITIES
Tunneling & Maintenan *Maintenance of mechanical equipments(
slip forms ce tunneling machines and attributes).
department engineer * repairing faults( mechanical or
hydraulically) – up of them in the site or
in the department workshop
( equipments like : microtunneling
machines , earth moving equipments ,
pentonite inj. Eqpts, ..).
* Fast treatment with tunneling sites
problems
WORK HISTORY
-AL- Maks ( Alexandria) 600mm lines shaft sinking & tunneling works in
2006 , 2007.
-AL-Ajame ( Alexandria ) 1200mm , 1500 mm & 1800 mm microtunnelling
lines& shaft sinking 2006 ,2007.
-Workshop engineer .
- Contract no 102 project : 600 mm sewage lines.
- AL- marg : 600 mm lines

3.3From 23/2/2005 - 23/8/2005


Departmen Job type JOB RESPONSIBILITIES
t
Electrical Heavy industry *Assistant engineer for workshop manager
and Steel structure in work developing
mechanical workshop *control in time & resources of the workshop
installation engineer to serve our department sites
s requirements of (steel structure, pipes
department flanges, lighting poles for widows of industrial
projects)
* workshop drawing detailing

• ENGINEERING INSTITUTIONS:-

Engineering institutions Relationship


E.T.S: Egyptian Tunneling society Member.
The Egyptian Institution of Utilities member
Construction & Repairing Without Dig
The Egyptian society of metal foundry member

• Cultural, Psychological &Computer Qualification:-

Languages Work and living


cultures
Languag Level Egyptian ,Arabian,
e Belgium ,Korean ,
Arabic Mother tongue(all) Indian ,Pakistanian
English Excellent(all) Nibalian , chinese
French Fair (reading, writing)
German Beginner(start level)
Italian Beginner( start level)
Psychological Computer skills
-Self motivated, team leader,  Windows systems: 98, nt, xp,
good motivator & good vista
developer in emergency work Machine drawing :solid works
situations. 2007,2009 AutoCAD 2004
-Willing & love of hand working Tunneling operating systems
& cooperation in team work. (Herrenknecht) for
-Willing to travel to any country machines(600mm , 1000mm, new
& learn new languages. 1500mm, 2500)
-willing to relocate. Microsoft programs:- Word
-Ability of emergency work 2003 , Excel 2003 ,Powerpoint
situations (20 hour work a day) 2003
Internet : Internet explorer , fire
fox, google chroum.
Project management
programs: Primavera

• Training courses:-
CAD mechanical engineering Management ,culture &
program
s
training work skills
- - Steam power plants course (in -I communicate (professional
Solidwork Shopra al – khiema plant)
s
communication skills course
2007,200
- KOMATSU earth moving with- logic consulting
9 equipments (3 months) management center –cairo )
- Basics of pneumatic control. Jan 2011
-cosmos - New CATERPILLAR engines
2007 -PMP(project management
technology (HEUI engines & acert
tech.)
professional authorized by
-AutoCAD MPI) (with amideast)octobre
2004 -Hydraulic circuit evaluation ,
maintenance & rehabilitation ( on 2009
site with HERRENKNECHT tunneling -primavera p3 (level 1 , level
company). 2)
- Fresh engineer preparation & - Human skills courses
habilitation course (ARAB ( leadership , communication
CONTRACTORS COMPANY: level 1, level skills , time management…)
2) -French language courses
-Italian language courses

• Hobbies, customs and refrences: -

Hoppies and customes Reference


-No wine , no smoking . SAMSUNG Mr .Richard Park
-Walking, swimming, SECTION 1 Tel :00971504282427
aerobics and fitness MANAGER
training. BESIX Mr. Andrea Garcia
- society aid committees , CONSTRUCTION Tel:009746006223
-Reading and studying MANAGER
(mechanical engineering BESIX PROJECT Mr.Adrian hollman
generally , tunneling books, MANAGER Tel:0097150481 7906
earth moving eqpts guides, ALMANBAA Mr. Tareq Al-laban ;
following huge projects PROJECT 0097150442648 5
news , social & life planning MANAGER
book , work improvement ARAB CAIRO / ADLY STREET
guides, economy& CONTRACTORS
international news ) Herrenknecht Mr Hanz Peter :
middle east 00971488 11200
general
manager

You might also like