The cracks had been observed on this project especially on the concrete surface top of the
headstock. The good practice of proper curing and covering with the plastic sheet had been
always practiced on site but the cracks were found on the headstock of the Pier 4 and 5.
cccc
c
The crack had been observed for the top of headstock the next day morning after the concreting
work at night time. Its crack follows the line reinforcement at the center of headstock; it cracks
about 0.5-2.5 mm with 20 cm long along the reinforcement bar.
cc ! !!c
The cracking pattern was consistent. It cracks along the reinforcement at the center of the
headstock. This is typical pattern of "##$%The crack appears within 10
minutes to three hours, early thermal contraction one day to two or three weeks. It cracks about
0.5-2.5mm with 20 cm long along the reinforcement bar.
r
c c ' (c)
Plastic settlement cracks are so-called because they form while the concrete is still plastic, ie has
not set. The settling concrete is restrained and cracks form at the surface. They may become
visible very early, ie while finishing is proceeding, but are often not noticed until some hours
after placement.
They are distinguished from plastic shrinkage cracks by their distinct pattern which typically
mirrors the pattern of the restraining elements such as the reinforcement. The cracks occur while
the concrete is plastic and frequently while bleed water is still rising and covers the surface. They
tend to roughly follow the restraining element, eg reinforcing bars, or changes in the concrete
section.
,
!
c
Hand placement of per-packed mortar / filling with epoxy.
Preparation -Remove all the dirt in the cracks and clean the cracks by air blasting if is
necessary open the crack more
Material/ Application - filling with sikagrout-215 epoxy mortar
c' ' c c(!
c c ' (
! üse mixes with lower bleeding characteristics,eg lower slump and more cohesive mixes
! Increase the ratio of cover to reinforcing bar diameter, ie by increasing the cover or
decreasing the size of the bars.
! Avoiding the use of retarding admixtures is sometimes suggested as a way of minimizing
plastic settlement cracking, but in hot weather the bene¿ts of their use outweigh the
disadvantages.
! ret the subgrade before placing concrete to avoid excessive water loss from the base of
the concrete
! cet all formwork accurately and rigidly so that it will not move during concrete
placement
! Place concrete in deep sections first (including columns) and let it settle prior to placing
and compacting the top layers (ensuring that the two layers blend together)
! Ñully compact the concrete
! ure the concrete promptly and properly.