You are on page 1of 12

_____(how many) years of increasingly responsible project management experience.

Acted as liaison between design engineering and production on __________(what).


Aided in the design of test equipment used to test __________(what) systems.
Aligned and calibrated ___________(what) system using specialized tools and test
equipment.
Analyzed and compiled data concerning __________(what) following__________(what
procedure).
Analyzed and evaluated systems for faults.
Analyzed and isolated computer hardware and peripheral problems.
Analyzed, diagnosed, and programmed __________(what) for __________(company) thr
ough direct customer contact.
Analyzed problems and repaired all electrical equipment including ___________(wh
at) systems.
Applied test measurements and isolated faulty assemblies and components.
Assembled mechanical components and electrical wiring to test ___________(what).
Assembled wiring, insulation, and electrical components following method layouts
.
Assessed the condition of the current power, lighting, and electrical systems at
___________(what) and recommended changes to the current system.
Assisted a licensed contractor in performing all electrical work for all contrac
tor's jobs.
Assisted and instructed ___________(who) in the use and application of the _____
______(what).
Assisted customers of __________(what) having problems with __________(what) com
munications system.
Assisted in design and structural analysis of __________(what)
Assisted in the manufacture of prototype parts for __________(what).
Assisted in training test technicians trainees and instructed manufacturing empl
oyees in the buildup of new hardware.
Assisted personnel engaged in installation and repair of ___________(what) equip
ment.
Assisted test engineers in testing new __________(what) products.
Assisted with new product research and development, and circuit and safety _____
_____(what) design.
Built a brand communications center.
Built and tested electronic circuits for feasibility in __________(what).
Built engineering prototypes, field-tested and maintained new instruments.
Built prototype machinery and made modifications to existing equipment for _____
______(what).
Built software translations that allowed equal access conversion of long distanc
e services to telephone companies.
Calibrated test station for use with ____________(what).
Carried the responsibilities of operating a dual switch node, as well as providi
ng field technician services.
Charted trend analysis of ___________(what) parameters, such as critical dimensi
ons.
Collected winding data; replaced brushes; adjusted brush rigging, dips, and bake
s; replaced bearings, assemblies, and test runs.
Completed a well-structured and comprehensive five-year engineering apprenticesh
ip at __________(where).
Completed electrical wiring and component installation from the ground up for __
________(what).
Completed evaluation and modification of equipment and component failures.
Completed operation and maintenance of various telecommunications circuits, incl
uding microwave, satellite, HF, UHF, and MF circuits.
Completed redesign of __________(what) products to qualify for safety certificat
ion
Completed rough wiring and electrical trim of residential and commercial project
s.
Completed structural analysis, cad design, manufacturing know-how, and team lead
ership skills in order to develop structural performance.
Conducted chemical reagent preparation and hazardous material handling.
Conducted complete switch audits to ensure proper billing.
Conducted in-house and on-site customer equipment orientation and training.
Conducted quality control inspections of repaired equipment.
Conducted research and development concerning design, manufacture, and testing o
f industrial components, equipment, and systems.
Conducted research and development concerning designs of __________(what).
Conducted statewide on-site testing of PBX equipment to ensure proper installati
on and operations before putting into service.
Configured and inspected electrical products before shipping to customers.
Configured system upgrades.
Connected electrical power machinery and electrical power equipment.
Consulted with engineering personnel to resolve unusual problems in system opera
tion and maintenance.
Continually updated and improved tooling to produce a superior quality product.
Contributed to the development of a communications strategy for __________(what)
.
Coordinated and performed installations, maintenance, calibrations, and repairs.

Coordinated evaluation and modification of equipment failure.


Coordinated several custom-designed __________(what) from concept, cad rendering
s, engineering, fabrication, installation, to final assembly.
Coordinated the successful simultaneous development of several projects.
Covered all aspects of aeronautical engineering, including laboratory tests, non
-destructive testing, program and production planning.
Created billing system to identify and charge telephone companies for local numb
er portability queries.
Created data and voice path connection files for new and existing cell sites.
Created detail, assembly, and installation drawings for __________(what) compone
nts.
Defined multiple brand and brand approaches.
Delivered oral and written presentations on __________(what) for divisional trai
ning.
Designed __________(what) project to increase efficiency and productivity of ___
_______(what) plant.
Designed all __________(what) systems for __________(who).
Designed all aspects of structural installations such as __________(what).
Designed and assisted with construction of a __________(what).
Designed and built electrical control systems for __________(what).
Designed and developed hardware and wiring for production support.
Designed and developed power system backup transfer arrays for industrial power
users.
Designed and implemented a __________(what) system for __________(what).
Designed and implemented preventive maintenance program for ___________(what).
Designed and installed ducts, valves, hydraulic tubing, fittings, and components
to ensure safety per blueprint specifications.
Designed and installed uninterruptible power supplies for industrial and educati
onal users.
Designed and supervised setup of test equipment in ___________(what or where).
Designed assemblies and detail parts for the __________(what) utilizing stress a
nalysis and sizing.
Designed new and altered existing tooling for manufacturing and assembly departm
ents in __________(where).
Designed new innovative uses for equipment.
Designed positioning mechanisms for __________(what) inspection equipment.
Designed the local number portability billing procedure that established the sta
ndard for __________(what).
Designed the power, lighting, and electrical systems for ___________(what).
Designed, built, and tested __________(what) for __________(what).
Designed, implemented, and maintained layout of ___________(what) equipment.
Determined and tested power supply requirements and configuration.
Developed ___________(what) to interface with existing equipment.
Developed an extensive knowledge of component circuit operational theory and ana
lysis techniques.
Developed and documented interfaces and interconnect diagrams.
Developed and maintained systems drawings, technical description documents, and
software flow drawings.
Developed durability test procedures and fixtures for __________(what).
Developed factory authorized service center for several major brand manufacturer
s.
Developed flexible, modular, product focused teams and work cells for __________
(who).
Developed staffing plans, work schedules, budgets, and time lines.
Developed, designed, and directed construction of __________(what).
Developed, prototyped, and tested __________(what).
Developed, reviewed, and evaluated ___________(what).
Diagnosed and repaired communications equipment.
Diagnosed and repaired thermal and laser printers.
Diagnosed equipment problems using manuals, schematics, and various test equipme
nt.
Diagnosed radio altimeters and other avionics systems to the component level.
Diagnosed solid-state boards to component level, soldering and replacing parts a
s needed.
Diagnosed system hardware, software and operation problems, and implemented corr
ective action.
Directed product design review for cost effective improvements of manufacturing.
Documented product performance, availability, non-conformance issues and enginee
ring studies.
Eliminated unnecessary procedures in production by __________(what).
Employed soldering, brazing and mechanical skills.
Ensured compliance with terms and conditions of equipment sales and service agre
ements.
Ensured implementation of any product redesign necessary to qualify for safety c
ertification.
Ensured quality control on all components. Inspected, repaired, replaced and cor
rected design problems to ensure mechanical safety.
Established workload schedules and repair priorities, and assigned specific duti
es to personnel.
Expanded and developed __________(what).
Expanded tool-engineering group to support a __________(what).
Experienced in ___________(what) electronics, __________(what) interfaces, and m
icroprocessors.
Experienced in all aspects of development and research areas.
Experienced in consolidating communications functions.
Experienced in follow-up shop support, problem solving, and revising and creatin
g engineering drawings.
Experienced in layout and detail design of sheet metal and machined parts utiliz
ing stress analysis and sizing.
Experienced in providing field service, troubleshooting and installing computeri
zed __________(equipment) in a self-directed, high-paced environment.
Experienced in troubleshooting, technical control and coordination with terminal
end stations for circuit outages and reporting.
Experienced with analog, digital, timing, and displayed circuits.
Fabricated and assembled specialized test equipment.
Generated schematics, improved test procedures, and assisted with circuit design
s on new projects.
Identified and formulated solutions to engineering design and manufacturing/asse
mbly plant issues.
Identified faults, replaced parts, rewired equipment, and adjusted ___________(w
hat).
Identified problems and proposed solutions for automation software.
Implemented manufacturing, construction, and installation procedures.
Implemented preventative maintenance program in __________(what) plant.
Implemented the automated testing at each level, including environmental testing
and the final acceptance test.
Improved customer satisfaction by promptly resolving all billing questions or pr
oblems.
Incorporated the design of __________(what) to enable __________(what).
Inspected all plastic, die cast, metal stamping, and fabricated product componen
t designs for introduction into manufacturing to ensure ease of manufacturing an
d assembly.
Inspected and troubleshot circuit outages.
Inspected completed installations for conformance with design, equipment specifi
cations, and safety standards.
Inspected, maintained, tested, and repaired electrical power equipment.
Install and maintain equipment used for __________(what) communications systems.
Installed all security, fire, telephone, HVAC, and other systems that require el
ectrical power and/or wiring.
Installed and configured computer systems for __________(customer).
Installed and repaired data communications lines and equipment for computer syst
em.
Installed and tested conveyors, shuttle vehicles, and automatic storage and retr
ieval systems.
Installed new ___________(what) and ___________(what) for all the ___________(wh
at) systems.
Installed new wiring and services in homes and commercial businesses.
Installed power and lighting circuits.
Installed required modifications in accordance to FAA specifications.
Installed telephone equipment to provide efficient, error-free communications.
Installed, maintained, and repaired telecommunications equipment.
Installed, repaired, and maintained __________(what) in a __________(what) envir
onment.
Integrated and tested electronic interfaces. Installed Engineering Change Order
modifications of US proprietary electronic and electromechanical components.
Integrated test equipment to function with automated test fixtures.
Interacted with engineers, technicians, and production personnel regarding testi
ng procedures and results.
Interpreted electrical sketches, diagrams, and blueprints.
Interpreted maintenance manuals, schematics, and wiring diagrams; repaired equip
ment utilizing knowledge of electronics; used standard test instruments.
Interpreted schematic drawings, blueprints, and written shop instructions to ens
ure design accuracy.
Interpreted test information in the form of test work requests, manufacturing pr
ocedures, drawings, schematics and verbal instructions from engineers and superv
isors
Interpreted wiring diagrams and schematics. Computed voltage, amperage, and resi
stance.
Invented a __________(what) device that improved __________(what).
Investigated and resolved customer billing questions for accounting and central
office departments that resulted in recovered revenues and customer satisfaction
.
Maintained __________(what) maintenance records and produced reports for supervi
sors.
Maintained a large inventory of parts and tools.
Maintained accurate records of replacement and upgrades, and conducted operation
al tests to evaluate performance and reliability.
Maintained all engineering documents and schematic updates for field repairs
Maintained and operated complex ___________(what) electronic equipment and _____
______(what).
Maintained and repaired automatic ___________(what) equipment.
Maintained and repaired test facilities and grounds.
Maintained detailed paperwork and test logs for ___________(what).
Maintained electrical equipment including ___________(what) systems, diesel and
gasoline powered generators, converters, and fire-fighting equipment.
Maintained equipment associated with over _____(how many) communications circuit
s.
Maintained operating efficiency of distribution panels, switches, switchboard, c
ontrollers, voltage regulators, and current transformers.
Maintained operating efficiency of electrical motors.
Maintained test equipment, hardware, software, and procedure updates.
Managed all design change implementation and data release according to _________
_(what).
Managed customer brand relationships through integration of _____________(what).
Managed design and engineering team for the production of __________(what) struc
ture.
Measured, cut, and installed wires and cables.
Modified existing work instructions to streamline __________(what) assembly and
manufacturing processes.
Observed operation of installation for conformance with operational standards.
Operated electrical power generating distribution centers, AC/DC.
Operated, diagnosed, repaired, and aligned ___________(what).
Optimized production operations by __________(what).
Optimized the operation of __________(what) by training and coordinating a team
of equipment technicians.
Participated in the development and design of new experimental ___________(what)
.
Performed a variety of electronic, mechanical, and electromechanical tests on el
ectronic systems.
Performed complex maintenance and testing on all __________(what).
Performed electrical assembly, wire wrapping, and production of ___________(what
).
Performed electrical inspections and repairs on various ___________(what) and po
wer supplies.
Performed electronic repair to board and component level equipment.
Performed failure analyses and provided recommendations to management for correc
tive action.
Performed fault isolation, testing, troubleshooting, adjustments, and alignments
of ___________(what).
Performed field investigations of reported material problems and provided viable
solutions.
Performed field verifications of system maps (primary and secondary) and equipme
nt.
Performed initial and final checkout and performance testing utilizing precision
instruments and test equipment.
Performed integration, modification, and installation of ___________(what) compo
nents.
Performed maintenance and installed heavy equipment, including parts washers, wa
ve solders, pumps, and wire bonders.
Performed pre-installation site inspections, estimating cost and materials requi
red for equipment installation process.
Performed preventative maintenance, bench and field repair, diagnosis and parts
ordering.
Performed sales, service and installation of all computer, electronics, and inst
rumentation in ___________(what).
Performed subsystem component fault isolation, replacement and refurbish of ____
_______(what).
Performed system and component maintenance and alignment on ___________(what).
Performed testing and logging of data on prototype electronic equipment being in
troduced to ___________.
Performed water chemistry analysis on nuclear reactor and steam plant systems.
Persuasively related new communications concepts and ideas to an entire organiza
tion.
Planned, directed, and coordinated activities of designated projects.
Prepared and analyzed telephone switch traffic studies on central office and PBX
equipment, and submitted them to management for capital expenditure planning.
Prepared detailed documentation concerning the condition of equipment, repairs n
eeded, and repairs completed.
Prepared reports, analysis, and configuration detail on supplier parts for _____
_____(what)
Provided analysis of substation vulnerability for potential outage and institute
d new computer methods for computation.
Provided conceptual analysis and design of __________(what).
Provided coordination with terminal end stations and technical control for world
wide intelligence distribution.
Provided on-site and in-house training and service.
Provided on-the-job training and evaluation to the ___________(who).
Provided superior service to customers of leading manufacturer of __________(typ
e of machine).
Provided support to __________(what) network operations center.
Provided technical analysis of various construction applications including both
electrical and mechanical evaluations.
Provided technical support for product design feasibility and tooling cost estim
ates.
Provided technical support to engineers and architects.
Rearranged and redesigned circuit board architecture per customer application.
Received patent for __________(what).
Recruited, screened, and trained in-house technicians to fill service department
needs.
Redesigned and directed construction of all __________(what).
Repaired a variety of __________(type of equipment) at the customer's location.
Repaired and aligned floppy drives.
Repaired distribution circuits.
Repaired electrical equipment and appliances.
Repaired, replaced and aligned A/D converters, 1200 watt transmitters and Beam s
teering units.
Replaced defective wiring and components using hand tools and a soldering iron.
Researched and installed all new service test and support equipment.
Resolved a problem with a __________(type of equipment) that failed, saving the
customer the cost of a replacement.
Responsible for a team of _____(how many) communications technicians.
Responsible for daily testing and maintenance of __________(type) equipment.
Responsible for the proper operation and maintenance of various telecommunicatio
ns circuits including HF, UHF, MF, and satellite communications.
Reviewed and prepared weekly project status reports for management.
Reviewed current products for materials and manufacturing cost improvements.
Scheduled and supervised performance of preventive maintenance and repair.
Serviced fax machines, printers, and personal computers manufactured by leading
manufacturers.
Set up and operated electronic instrumentation and photographic equipment to rec
ord test results.
Specialized in research and development of __________(what)
Successfully completed industrial __________(what).
Supervised _____(how many) electricians and all work contracts, as well as all m
aterial requisitions.
Supervised all engineering aspects of __________(what) regarding program status
and field problem updates.
Supervised and maintained various communications systems.
Supervised electrical installations, diagnosed hardware problems, configured sof
tware settings, modified and updated electrical drawings, and made mechanical ad
justments as required.
Supervised repairmen, counseled mid-level supervisors, and reduced department wo
rkload.
Supported and demonstrated effective and consistent technical support to compani
es with communications assistance.
Supported and installed computers utilizing _____(what) technology.
Supported Internet providers by providing technical assistance with routers and
all Internet equipment.
Tested and analyzed modules used in communications equipment.
Tested and diagnosed __________(what) system at component level.
Tested assembled components for circuit continuity and operational reliability u
sing test instruments.
Tested switches for all new product features to ensure accurate performance and
billing.
Tested transformer ballasts for __________(company).
Tested, analyzed, and adjusted ___________(what).
Tested, analyzed, and replaced circuit components of ___________(what).
Tested, evaluated, and repaired ___________(what).
Trained __________(what) technicians on the operation and repair of tools.
Trained and assisted technicians on test procedures and ____________(what).
Trained customers on operation of installed equipment.
Trained technicians on equipment and procedures.
Traveled to customers' location to troubleshoot hardware and software problems;
made all necessary repairs onsite.
Used computer-assisted engineering and design software to perform engineering ta
sks.
Utilized signal generators, AC/DC volt, ohm and amp meters (fluke), oscilloscope
, and other precision measuring instruments.
Verified dimensions using precision measuring instruments.
Verified switch automatic message accounting (AMA) for new central offices and e
qual access conversions to ensure accurate billing revenues.
Worked closely with customers and other communications facilities to maintain co
mmunications links.
Worked with a licensed contractor; performed customer service calls, and install
ed all electrical work.
Wrote and modified test procedures for ___________(what) electrical system.
Wrote engineering orders as needed to assist the manufacturing manager.
Wrote engineering orders as needed to solve manufacturing problems.
Wrote technical procedure manuals to comply with __________(what).
Wrote the operational sequences for __________(what) programs.

You might also like