Professional Documents
Culture Documents
Carrier
Otis
Hamilton Sundstrand
Research Center
UTC Power
– OnSite Solutions
Air
Cooling Electricity
conditioner
Fuel Fuel
Combustion Emissions Cost
Cost
PureCycle®
Heat Power Electricity
System
HVAC Component Synergy
Required Modifications
Diffuser Impeller Nozzle Impeller
TRANSMISSION
TRANSMISSION
Motor Generator
INLET EXIT
UTC UTC
Generator Turbine
UTC
Power Electronics UTC Supplier
Pump Inverter
• Modular Plug-n-play
• Multiple units for
larger plants UTC Supplier
• Rapidly Deployable Control Panel
UTC
Evaporator
Pump
• 16 Week Lead time
• >95% Availability UTC
Condenser
PureCycle® 225’s
(95% availability)
6,045 1,270 10.80 570
Wind
(25% availability) 1,585 335 2.86 150
Solar
(14% availability) 885 185 1.60 85
* Each acre of forest assumed to absorb 1.3 tons Carbon/acre/year (Ref: International Panel on Climate Change)
** Each car assumed to generate 38 lbm/NOx/year (Ref: US EPA)
Assumes full heat utilization
PureCycle® Potential Markets
8/23/07
250
200
Extremely stable operation: OILSUMPP (psia)
150 Pressures OILP (psia)
• Cold temp affects gross power. EVAP_P (psia)
0
0:00:00 4:48:00 9:36:00 14:24:00 19:12:00 0:00:00
Top Level Assembly
ELECTRONICS
3.2m MAX
(10’- 4”)
TURBINE
EVAPORATOR
5.1m
2.1m (16’- 10”)
(7’- 5”)
Raser Technologies
10 MW – on up
• Modular Plug-n-play
• Multiple units for
larger plants
• Rapidly Deployable
• 16 Week Lead time
• High Availability
• Expand w/ resource
• “Speed – to – Market”
PureCycle® Value Proposition Summary