Schedule

Sub : Shifting of boulder lying on West End of Azimganj Juction by the side of existing running track in connection with
the construction of new line of Azimganj-Monigram executed by Construction Department.

Schedule-A

Sl. No. Description of Work Unit Quantity Rate Amount Chapter -Item
of L& M
Schdule,
2005

1 Ballast / Sand / Surkhi / Ashes / Moorum/ Khoa/ Brick bats/Stone Chips/ m3 950 13.62 12939.00 XIX-7
Boulders/ Laterite/ Dry mortar/ Coal/ Lime /Rubbish/ Earth/ Cowdung,
manure, sludge mixed with earth or similar materials leading by mazdoors
including picking up and stacking with lead upto 30 m.

2 Loading ballast, surki, bats, lime, sand mortar, stonechips earth, moorum, m3 950 35.97 34171.50 XVII-1
ashes, stone-boulders, block-kankar, coal, rubbish, earth, cowdung mixed
with earth, manure of sludge etc. including loosening where necessary.

3 Transporting Ballast / Sand / surkhi / Ashes / Moorum / Khoa / Brick bats/ m3 950 81.14 77083.00 XIX-12(b)
Stone chips/ Boulders/ Laterite/ Dry mortar/ Coal/ Lime/ Rubbish/ Earth/
Cowdung, manure, sludge mixed with earth or similar materials other than
head lead upto 2 km.

4 Unloading ballast, surkhi, bats, lime, sand, mortar, stonechips earth, m3 950 35.97 34171.50 XVIII-1
moorum, ashes, stone, boulders, block-kankar, coal, rubbish, earth,
cowdung mixed with earth etc.

Total of Sl. No. 1-4 = 158365.00


Considering 5% escalation per annum, so add 25% escalated rate of Sl. No. 1-4 = 39591.25
Total = 197956.25
Say Rs. = 197956.00
Schedule

Sub : Quotation for transporting boulder from between track km 177/18-178/6 to Loco siding for monsoon loading.

Sl. No. Description of Work Unit Quantity Rate Amount Chapter -Item
of L& M
Schdule,
2005
1 Ballast / Sand / Surkhi / Ashes / Moorum/ Khoa/ Brick bats/Stone Chips/ m3 950 13.62 12939.00 XIX-7
Boulders/ Laterite/ Dry mortar/ Coal/ Lime /Rubbish/ Earth/ Cowdung,
manure, sludge mixed with earth or similar materials leading by mazdoors
including picking up and stacking with lead upto 30 m.

2 Loading ballast, surki, bats, lime, sand mortar, stonechips earth, moorum, m3 950 35.97 34171.50 XVII-1
ashes, stone-boulders, block-kankar, coal, rubbish, earth, cowdung mixed
with earth, manure of sludge etc. including loosening where necessary.
3 Transporting Ballast / Sand / surkhi / Ashes / Moorum / Khoa / Brick bats/ m3 950 81.14 77083.00 XIX-12(b)
Stone chips/ Boulders/ Laterite/ Dry mortar/ Coal/ Lime/ Rubbish/ Earth/
Cowdung, manure, sludge mixed with earth or similar materials other than
head lead upto 2 km.

4 Unloading ballast, surkhi, bats, lime, sand, mortar, stonechips earth, m3 950 35.97 34171.50 XVIII-1
moorum, ashes, stone, boulders, block-kankar, coal, rubbish, earth,
cowdung mixed with earth etc.

Total of Sl. No. 1-4 = 158365.00


Considering 5% escalation per annum, so add 25% escalated rate of Sl. No. 1-4 = 39591.25
Total = 197956.25
Say Rs. = 197956.00

Signature of Signature of
SSE/AZ. AEN/AZ.
Schedule

Sub : Quotation for transporting boulder from between track km 177/18-178/6 to Loco siding for monsoon loading.

Sl. No. Description of Work Unit Quantity Rate Amount Chapter -Item
1 Ballast / Sand / Surkhi / Ashes / Moorum/ Khoa/ Brick bats/Stone Chips/ Boulders/ m3 950 13.62 12939.00 Ch. XIX-7
Laterite/ Dry mortar/ Coal/ Lime /Rubbish/ Earth/ Cowdung, manure, sludge mixed
with earth or similar materials leading by mazdoors including picking up and
stacking with lead upto 30 m.

2 Loading ballast, surki, bats, lime, sand mortar, stonechips earth, moorum, ashes, m3 950 35.97 34171.50 Ch. XVII-1
stone-boulders, block-kankar, coal, rubbish, earth, cowdung mixed with earth,
manure of sludge etc. including loosening where necessary.
3 Transporting Ballast / Sand / surkhi / Ashes / Moorum / Khoa / Brick bats/ Stone m3 950 81.14 77083.00 Ch. XIX-12(b)
chips/ Boulders/ Laterite/ Dry mortar/ Coal/ Lime/ Rubbish/ Earth/ Cowdung,
manure, sludge mixed with earth or similar materials other than head lead upto 2
km.

4 Unloading ballast, surkhi, bats, lime, sand, mortar, stonechips earth, moorum, ashes, m3 950 35.97 34171.50 Ch. XVIII-1
stone, boulders, block-kankar, coal, rubbish, earth, cowdung mixed with earth etc.

Total of Sl. No. 1-4 = 158365.00


Add 25% above of Sl. No. 1-4 = 39591.25
Total = 197956.25