MILESTONE 1
Project
Management
e.g. Administration
Infostructure set-
up
e.g. Purchase of
hardware
e.g. System set-up
Content
Development
e.g. Content research
and
e.g. data
Web gathering
development
Community
Development
e.g. Training to art
students
e.g. Awareness
program
SUB TOTAL
MILESTONE 2
SUB TOTAL
MILESTONE 3
SUB TOTAL
MILESTONE 4
SUBTOTAL
GRAND TOTAL
Funding Allocation
Internal Funding
DAGS Funding
GRAND TOTAL
Note :
i) The applicant is required to read and comply with the guideline when preparing the ABC table.
ii) The activities of the proposed project as per ABC table above, must be in a chronological order throughout the milestone.
iii) Each milestone shall cover 3 months period of the proposed project.
Total Cost
*Status of Rate per No. of Man
Total Cost per Position of Staff Milestone per Milestone Milestone Milestone Milestone
No. Activity Name of Staff Involved Employment individual / Months taken by
Activity (RM) Involved Involvement individual 1 2 3 4
(PT/FT) month (RM) each individual
(RM)
(b) (c) (d=f+g+h+i) (e=cxd) (f) (g) (h) (i)
Example:
1 Project Management Plan 54,000
e.g. Content Organisation Shariff Dole Technical Coordinator FT 1,2,3,4 2,500 12.00 30,000 3.00 3.00 3.00 3.00
e.g. Web Portal Development Zainal Abidin Web Dev. Leader FT 1,2,3,4 2,800 12.00 33,600 3.00 3.00 3.00 3.00
Osman Ali Snr. Programmer FT 1,2,3,4 2,500 10.00 25,000 1.00 3.00 3.00 3.00
Phua Chu Kang Programmer FT 1,2,3,4 1,800 10.00 18,000 1.00 3.00 3.00 3.00
e.g. Graphic Design Noor Malik Hasri Snr. Graphic Designer FT 1,2,3,4 2,500 10.00 25,000 3.00 3.00 3.00 1.00
Megat Rambai Graphic Designer FT 1,2,3,4 1,800 10.00 18,000 3.00 3.00 3.00 1.00
e.g. Video/Audio Editing & Animation Ahmad Che' Mat Snr. Animator FT 1,2,3,4 2,500 9.00 22,500 1.00 3.00 3.00 2.00
e.g. Programming Marry Silvera Raj Programmer FT 2,3,4 2,200 6.50 14,300 2.00 2.50 2.00
Kenny Remy Martin Programmer FT 2,3,4 1,800 8.00 14,400 3.00 3.00 2.00
e.g. Event Management Romli Sarip Executive PT 2,3,4 2,000 3.50 7,000 1.00 1.50 1.00
e.g. Training / Seminar / Workshop Ruhil Awang Trainer/facilitator PT 2,3,4 2,000 6.00 12,000 2.00 2.00 2.00
Milestone 1
Activity 1
Details
Details
Activity 2
Details
Details
Activity 3
Details
Details
etc.
Total M1
Milestone 2
Activity 1
Details
Details
Activity 2
Details
Details
Activity 3
Details
Details
etc.
Total M2
Milestone 3
Activity 1
Details
Details
Activity 2
Details
Details
Activity 3
Details
Details
etc.
Total M3
Milestone 4
Activity 1
Details
Details
Activity 2
Details
Details
Activity 3
Details
Details
etc.
Total M4
GRAND TOTAL
Note:
i) The notes must provide detailed assumptions and computations of the costs/expenses that are directly related
to the proposed activity of the project.
ii) From these details, please state whether costs/expenses per items are funded by the applicant (internally) or DAGS .
iii) The total must correspond to the total of respective costs/expenses in the ABC table.
Note:
i) The total must correspond to the total of respective costs/expenses in the ABC table.