Availability check
1. Availability check is an integral part of the business process that determines
if the required delivery quantity can be met on a required delivery date. For
this purpose the system takes into account pre-delivery activities such as
scheduling for picking or packing times and the time taken to produce or
obtain the material. It also performs several background functions such as
Backorder processing, rescheduling and ATP quantities.
2. Backorder processing: processing of a sales order that has not been fully
confirmed or not confirmed at a certain delivery date.
5. Replenishment lead time (RLT): is the time taken for the material to
become available either internally (in house production) or externally (from a
vendor). The most important things to consider during an external
procurement are purchasing and MRP 2 (procurement) views of MMR where
the processing time for purchasing, planned delivery time and goods receipt
processing time are taken into account.
On the other hand internal procurement is based on in house production time
(MRP 2 view) goods receipt processing time or alternatively RLT time, which
is found on MRP 3 view. 6. RLT (Replenishment Lead Time) is the time taken
for the material to become available. RLT is only used when doing an ATP
check (Available To Promise). The value of RLT for a material is specified on
material master record.
4. The checking rule, in conjunction with the checking group, determines the
scope of the availability check for every business operation; that is, which
stocks, receipts and issues are to be included in the availability check and
whether the check is to be carried out with or without the replenishment lead
time.
9. Defining material block for other users – the block check box is an
indicator that enables you to block material master records of a particular
material during the availability check and restrict other users from accessing
same master record and reserve the material. If the block is not set, two users
can confirm the same material at the same time for two different orders, not
knowing if the stock is available or not. If you select this field, the material is
blocked during the availability check and other users cannot: a) Make changes
in the material master record. b) Create purchase orders for the material. C)
Create orders for the material.
10. Defining default values for checking groups - Checking groups are
introduced into the sales order based on the setting in the material master
record. However if there is no entry present in the material master record for
the checking group, a default value can be set here, depending on material
type and plant. This default value will be used by the system depending on the
material type mentioned in MMR and plant in sales order. If an entry exists,
this default value is over written by MMR.
11. Controlling Availability Check – in this section, you tell the system what
stock on hand and what inward and outward movements of stock it must take
into account when performing the availability check in addition to whether or
not to consider the replenishment lead time.
12. These settings are based on the checking group that is assigned to the
material master record and the checking rule that is predefined and assigned
to the sales and distribution transaction.
13. These settings carry out control both for sales order and delivery as well.
This is due to the fact that you may want to include specific stock or incoming
stock for the sales order, yet at the time of the delivery only include physical
stock on hand waiting to be shipped.
14. It is possible to indicate to the system that you would like the availability
check NOT TO CHECK the stock at the storage location level. This
indicator is used to set the scope of the availability check.
15. It is used to switch off the check at storage location level. You create a
reservation for a particular storage location. However, the scope of the
availability check is set in such a way as to exclude the storage location. In
this case, the system carries out the check at plant level only and does not
take the storage location into account that is specified in the reservation.
16. Should you not want the system to automatically check RLT, you may
indicate so here. RLT is the time taken for a material to become available. It is
only used when doing an ATP check and is taken from MMR.
17. Defining the elements in the availability check entirely depends on the
business needs, but a few tips are given under
– When controlling the Availability check at the time of the sales order, a
purchase requisition does not necessarily indicate by it is going to come into
the plant. A shipping notification on the other hand - a confirmed purchase
order – is a good indicator of receiving stock on a specified date. It is always
recommended not to select the shipping notifications for the delivery
requirements type as you may not actually receive the stock into plant or
warehouse for which you are creating a delivery.
apart from the above the TOR must be switched on at 1.reqt class level.
2.schedule line level 3.checking group level. 4.plant must defined at the
document item level once order is raised the requirments are transfered from
order to MRP by TOR, various reqts are identified thru reqt type,
reqt type are identified in the system thru 1. strategy group--MRP1 --mmr
2.MRP group. 3.material type. 4. ITEM category +mrp type 5.item category
once reqt type is identified it points to reqt class. reqt class contains all the
control factors suchas planing strategy,consumption strategy etc basing on
the item category group+ mrp type-- schedule line categories are identified. if
it is relevant for availability check, then the system does ATP
CHECK(warehousestock+planned orders+production orders+confirmed
receipts+confirmed goods issues) and decides whether goods are availabile
on the requested delivered date of the customer, if not system does a
backward scheduling and confirms when material is available (materual
availability date), so if material is not available then system proposes 2 dates
1.customer delivery date 2.material availability date. for availability check to
happen the following pre-requistes must be there: 1.availability check must be
swithched on at the requirment class level 2.schedule line level itmust be
switched on 3.reqt type must be defined 4.checking group must be defined.
5.plant must be defined 6. the system takes by default checking group if not
defined as material type and plant. from SD the following componenets are
importants 1.checking group:defines whether indivual orcollective req are to
be passed 2.checking rule: defines scop of the check(what type of stock+with
or without RLT) 3.schedule line category: this fine tunes whether availability
check should be carried on at the sales document level or not. 4. delivery item
category. for config: SPRO--SALES&DIST---BASIC FUNCTIONS--
TOR&AVAILABILITY CHECK. In material master the below mentioned must
be defined also 1.strategy group. 2.scheduling margin key. 3.in house
production time. 4. RLT time. 5.MRP group