SAUDI ARAMCO ID/PID - 2/19/05 - REV 0 (Standards Cutoff - August 2004)

SATR NUMBER DATE APPROVED QR NUMBER


SAUDI ARAMCO TEST REPORT
Verification of Pneumatic Testing Media (Air, Nitrogen &
SAIC-A-2004 25-May-05 MECH-
Inert Gas Receipt)
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.

LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.

SCHEDULED TEST DATE & TIME ACTUAL TEST DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?

SAUDI ARAMCO INSPECTION LEVEL CONTRACTOR INSPECTION LEVEL

ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.

A Test Medium

The test medium used for pneumatic test is air or inert gas. GI-002.102,
A1
(NOTE: Oxygen and other Toxic gases are not allowed.) Para. 5.3

Air shall not be used to test equipment which have been in flammable
SAES-A-004,
A2 service without the concurrence of the Manager, Loss Prevention
Para. 5.2.2
Department.

B Bubble Solution

The bubble forming solution shall produce a film


that does not break away from the area to be tested,
and the bubbles formed shall not break rapidly due to
SAES-A-004,
B1 air drying or low surface tension.
Para. 6.3.2
(NOTE: Household soap or detergents are not permitted as substitutes
for bubble testing solutions.)
(Reference: ASME V, Article 10, Para. I-1032 a)

The bubble forming solution shall be compatible


SAES-A-004,
B2 with the temperature of the test conditions.
Para. 6.3.2
(Reference: ASME V, Article 10, Para. I-1032 b)

REMARKS:

REFERENCE DOCUMENTS:
1. SA General Instruction Manual, GI-002.102, Pressure Testing Safely, (22 July, 2001)
2. SAES-A-004, General Requirements for Pressure Testing, (30 June, 2003)
3. ASME V, Nondestructive Examination, (1 July, 2001)

Contractor / Third-Party Saudi Aramco


Technician Performing Test* PMT Representative
Name, Title, Department, Test Performed Successfully and Results are Acceptable: T&I Witnessed QC Record Reviewed Work Verified
Company, Initials and Name, Initials and Date:
Date:
QC Inspector PID Representative
Witnessed Test Work / Rework May Proceed T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Supervisor Proponent and Others


Quality Record Approved: T&I Witnessed QC Record Reviewed Work Verified
Name, Organization,
Name, Sign and Date:
Initials and Date:

*Person Responsible for Implementation of Test and Analysis of Results Y = YES N = NO F = FAILED

Page 1 of 1