EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.
LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.
SCHEDULED TEST DATE & TIME ACTUAL TEST DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?
ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.
A Test Medium
The test medium used for pneumatic test is air or inert gas. GI-002.102,
A1
(NOTE: Oxygen and other Toxic gases are not allowed.) Para. 5.3
Air shall not be used to test equipment which have been in flammable
SAES-A-004,
A2 service without the concurrence of the Manager, Loss Prevention
Para. 5.2.2
Department.
B Bubble Solution
REMARKS:
REFERENCE DOCUMENTS:
1. SA General Instruction Manual, GI-002.102, Pressure Testing Safely, (22 July, 2001)
2. SAES-A-004, General Requirements for Pressure Testing, (30 June, 2003)
3. ASME V, Nondestructive Examination, (1 July, 2001)
*Person Responsible for Implementation of Test and Analysis of Results Y = YES N = NO F = FAILED
Page 1 of 1