Mathura
Final Report
September 2006
Prepared by:
INTRODUCTION................................................................................. VIII
1 Background .............................................................................................. viii
2 Objectives of the Consultancy................................................................ viii
3. Scope of Work ............................................................................................ ix
3.1 City Assessment: Analysis of Existing Situation.................................................................. ix
3.2 Development of Strategic Agenda and a Vision for the City................................................. x
3.3 Evolving Strategies for Development ................................................................................... x
3.4 Developing a City Investment Plan and Financing Strategy................................................ xi
A2 THE CONTEXT FOR THE MATHURA CITY VISION AND ITS CDP.......... 3
A2.1 The Broader Objectives .......................................................................................................3
A2.2 The Contextual Framework..................................................................................................5
B5 ENVIRONMENTAL ISSUES....................................................................... 42
B6 HERITAGE & TOURISM ............................................................................ 43
B6.1 Existing Situation ...............................................................................................................43
B6.2 Issues & Constraints:.........................................................................................................45
B6.3 Key Heritage Actions .........................................................................................................45
B6.4 Identified Heritage Sites/Monuments .................................................................................46
List of Tables
List of Annexes
Annex A List of key officials, institutions, NGOs and citizens who were consulted for
Mathura CDP
Annex B Press cuttings and media coverage – Mathura CDP
Annex C Heritage priorities for Mathura by Braj Bhoomi, INTACH
Annex D1 Slum Zones in 45 wards of Mathura NPP
Annex D2 Slum Pockets in 45 wards – Mathura NPP
Annex E Detailed Revenue & Expenditure profile of Mathura NPP
Annex F Zone wise population for waste water generation 2039
City Development Plan of Mathura Final Report
Executive Summary
Overview
The City Development Plan (CDP) Report of Mathura has been structured into seven
section (Section A- G). The Section A covers the regional context of Mathura its importance
and heritage, vision and its CDP, the state, district and Mathura Vrindavan determinants for
the vision and CDP, the MVA Plan -2021 and Mathura city. The Section B, brings the Rapid
Appraisal of the city , with an city overview, the consultation process, city infrastructure and
services delivery, traffic and transportation, environmental issues, heritage & tourism,
housing & slums, institutional framework & governance. The Section C, details out the
SWOT analysis and the emerging Mathura vision. The section provides details of the
Mathura urban renewal area, the financial profile of Mathura NPP, SWOT analysis, livability
rate of the city, the Mathura Vision 2021 and its City Development Plan.
The Section D, provides details of the City Development Plan for Mathura NPP jurisdiction.
The section gives details regarding the broad land use pattern, the urban renewal process
through the down-top process, municipal ward as the basic urban renewal unit. The Section
E, gives details regarding the project identification for Capital Investment Plan for Mathura
NPP. The section details out the project levels, project sectors, list of projects and summary
of the projects under various sectors. The Section F, brings out the Capital Investment Plan
for Mathura NPP area. The section provides details regarding the CIP criteria, projects
investments. The last Section G, provides details regarding the Financial Operating Plan for
Mathura, NPP.
people. Rail traffic to Rajasthan via Alwar and to central UP via Hathras also converges on
Mathura. The proposed Agra-Noida Expressway east of the Yamuna would further add to
the accessibility of Mathura.
Therefore along with pilgrim convergence and related religious-cultural tourism, enhancing
the importance of the river Yamuna, national transportation dispersal of goods and people
by road and rail, the proper operation of Mathura refinery, its ancillaries and other
industries, placed on the authorities a heavy responsibility of regulated development in a
major and growing concentration of regular inhabitants and floating population within a
major district of U.P. Along with this, the growing gap in civic infrastructure required
coordinated actions by the urban and rural local bodies of Mathura District working in unison
with the Mathura Vrindavan Development Authority (MVDA) and District Authorities. These
issues were addressed in the Perspective Plan proposed for the Mathura Vrindavan Area
with a 20 year perspective (2000-21) by the MVDA.
Though the established foci of the expanded MVA are the religious settlements of a)
Mathura, b) Vrindavan and c) Govardhan requiring the footprints of these to be protected
and enhanced along with their temples, parikramas, kunds and other benchmarks along
with river Yamuna and its bunds, the proposals herein are for Mathura city and which has a
Nagar Palika Parishad (NPP) within the larger MVA region. This priority is justified due to
Mathura City being at the core of the Braj Boomi and the entreport of this group of
settlements. Accordingly its environment needs serious renewal for the benefit of both – its
residents and the accelerating floating population of pilgrims regional, national and
international to the larger Mathura-Vrindavan area and also to Goverdhan.
The preparation of the Mathura CDP involved extensive consultations, throughout its
preparation period. The consultative strategy involved interaction with various stakeholders
like: Senior Citizens, Departments, Institutions / Groups, Industrialists, Citizens at ward
level, and local elected representatives, media. The process was facilitated by the media, to
impress upon the general citizens about the objectives of JNNURM and CDP for Mathura.
During the preparation of the CDP, two workshops were held apart from regular
interdepartmental consultations, and ward level discussions. Press meetings were held
regularly during the plan preparation phase.
All the concerned government departments and institutions were consulted during the three
month CDP process. Meetings were held individually with various departments. It involved
site visits for further discussions. The ward level consultations involved discussions with
senior citizens, local residents about the issues and challenges regarding the infrastructure,
services delivery and developmental issues. Besides the consultation process, the
extensive visits to 45 wards of the city was completed by the consultants with the help of
local elected representatives and ward level senior citizens. The former elected councilors
of the municipality were also contacted about the development issues required in various
sectors (at present there are no elected representatives in place) . The ward level visits to
slum areas were also done with the help of the District Urban Development Agency
(DUDA). Slum issues were mapped and discussed with various representatives like CBOs,
RCVs, and citizens. The women’s participation and development issues were also
discussed and were sensitized about the programmes for the development process at the
ward level under JNNURM .
The press and media played an important role during the entire plan preparation. The
citizens were sensitized regularly through newspapers, local channels about the JNNURM
and city development processes. The citizens were encouraged to send suggestions and
come forward for further discussions with the team regarding their needs at local and city
level. Heritage and tourism was a basic issue of the Mathura CDP, consultations were held
with INTACH Delhi and the Braj Bhoomi Chapter of INTACH at Mathura. Several views
emerged and this has helped shape the CDP. The listing done by INTACH has 428 entries.
The open consultation process involved interaction with citizens in the municipality NPP
office for the draft CDP prepared by the consultants. The presentations regarding the city
assessment in terms of the infrastructure, service delivery , governance , urban poor and
slums were exposed along with the vision and development strategies. Based on these
consultations and the field level visits and other consultations, the projects were identified
and put for regional, city and ward level development.
Based on the city’s needs and the emerging vision and strategy, the CDP projects have
been identified and structured at three levels:
x Regional Level;
x City Level;
x Ward Level.
x Water Supply
x Sewerage
x Drainage
x Solid Waste Management
x Roads, Traffic and Transportation
x Street Lighting
x Urban Environment
x Heritage & Tourism
x Urban Governance
x Water Supply
x Sewerage
x Drainage
x Solid Waste Management
x Roads, Streets and Lanes
x Street Lighting
x Basic Amenities ( Public Conveniences, etc)
x Community Halls/ Training Centres
x Housing for BPL
x Training & Capacity Building
The following are the list of projects that have emerged out of the key consultative process,
rapid assessment, the emerging city vision and strategies for the Mathura City Six year
CDP.
Total
Yearly Investment Required (Rs. in Crores)
Investm-
Sr. ent 2006- 2007- 2008- 2009- 2010- 2011- GoI GoUP ULB
Sector
No. Required 07 08 09 10 11 12 (80%) (10%) (10%) *
(Rs. in Year Year
Crores) Year 1 Year 2 Year 3 Year 4
5 6
109.7
1 Water Supply 320.00 86.00 62.40 41.30 15.60 5.00 256.00 32.00 32.00
0
2 Sewerage 304.00 49.00 69.00 65.00 55.00 41.00 25.00 243.20 30.40 30.40
Drainage / Storm
3 228.00 78.00 63.00 44.00 25.00 10.00 8.00 182.40 22.80 22.80
Water Drainage
Solid Waste
4 76.57 15.82 29.45 28.45 1.45 0.90 0.50 61.26 7.66 7.66
Management
5 Street Lighting 56.25 12.45 14.45 13.45 6.30 6.25 3.35 45.00 5.63 5.63
Urban Roads &
6 367.30 94.07 96.56 80.31 52.01 25.30 19.05 293.84 36.73 36.73
Traffic
Heritage &
7 269.00 56.20 85.15 57.30 38.80 18.00 13.55 215.20 26.90 26.90
Tourism
Urban Poor and
8 132.56 26.51 26.51 39.77 19.88 13.26 6.63 106.05 13.26 13.26
Slums
Municipal
9 10.25 2.90 2.65 2.35 1.20 0.65 0.50 8.20 1.03 1.03
Governance
Urban
10 66.50 14.50 21.50 21.25 4.75 3.00 1.50 53.20 6.65 6.65
Environment
459.1 414.2 133.9
Total 1830.43 494.27 245.69 83.08 1464.34 183.04 183.04
5 8 6
INTRODUCTION
1 Background
The Government of India’s Jawaharlal Nehru National Urban Renewal Mission (JNNURM),
focuses on (i) improving and augmenting the economic and social infrastructure of cities; (ii)
ensuring basic services to the urban poor including security of tenure at affordable prices;
(iii) initiating wide-ranging urban sector reforms whose primary aim is to eliminate legal,
institutional and financial constraints that have impeded investment in urban infrastructure
and services; and (iv) strengthening municipal governments and their functioning in
accordance with the provisions of the Constitution (Seventy-Fourth) Amendment Act, 1992.
The objective of the JNNURM are to ensure that the following are achieved in the urban
sector:
x Focused attention to integrated development of infrastructure services in cities;
x Establishment of linkages between asset-creation and asset-management through a
slew of reforms for long term project sustainability;
x Ensuring adequate funds to meet the deficiencies in urban infrastructure services;
x Planned development of identified cities including peri-urban areas, outgrowths and
urban corridors leading to dispersed urbanization;
x Scale up delivery of civic amenities and provision of utilities with emphasis on
universal access to the urban poor;
x Special focus on urban renewal programmes for old city areas to reduce congestion;
and
x Provision of basic services to the urban poor including improved housing, water
supply and sanitation, and ensuring delivery of other existing universal services of
the government for education, health and social security.
The Government of India has proposed substantial assistance through the JNNURM to the
selected Mission cities. In Uttar Pradesh, seven cities have been identified for
assistance under the Mission viz, Lucknow, Kanpur, Allahabad, Agra, Varanasi and
Meerut. In addition Mathura has been selected as a major heritage city of India.
In order to apply for grant assistance under JNNURM, the Government of India requires
eligible cities to (i) formulate a medium term City Development Plan (CDP); (ii) prepare
project proposals based on the CDP; and (iii) draw up a time-frame for implementing the
urban sector reforms.
As one of the eligible Mission cities, Mathura has to formulate a CDP that meets the
requirements laid down in the guidelines prescribed by Government of India (Ministry of
Urban Development and Ministry of Urban Employment and Poverty Alleviation).
The City Development Plan provides the starting point for the reform by identifying core City
challenges, a Perspective and Vision for the future development of the City, its present
stage of development and current status. This lead to the directions for change.
The CDP is to focus on the development of economic and social infrastructure, policies and
The CDP also provides a direction for cities and State Governments to undertake certain
urban sector reforms which will facilitate flow of investments into city based infrastructure.
This makes it imperative for cities to systematically determine how they wish to shape their
future.
Therefore, the basic objective of the Consultancy is to formulate a City Development Plan
(CDP) for Mathura City, in consultation with all the relevant stakeholders, in accordance
with the guidelines issued by the Government of India. As the funding for infrastructure
under JNNURM is contingent upon the City having a CDP, which must be cleared by the
Government of India (GoI), an important aspect of the consultancy is to ensure that the
CDP as prepared meets the requirements and appraisal standards of the GoI. The CDP
shall, inter-alia, provide the basis within which projects will be identified for funding under
JNNURM and the details of such projects.
3. Scope of Work
This CDP prepared in the context of the toolkits, guidelines and instructions provided by the
MOUD and MOUEPA of the GoI and the Department of Urban Development (DoUD)
Government of Uttar Pradesh (GoUP)/ SRC from time to time.
These encompass:-
o The financial status of the City Government and parastatals and other agencies
dealing with the service provision including an analysis of their credit worthiness,
effectiveness and efficiency of the institutional frameworks;
o Urban poverty, characteristics of slums e.g social set up, availability of urban basic
and social services and on-going slum improvement programmes;
o Heritage conservation as the major thrust of Mathura. This encompasses both, the
natural and manmade heritage.
o Situational analysis in consultation with all the stakeholders and civil society at the
city level.
Based on the outcomes of the City Assessment, the second stage envisages:-
o Development of City Vision to guide the future development of the city highlighting
the direction of change and working out an Action agenda with a specific timeframe.
This is to be in consultation with all the stakeholders and civil society in the city. The
consultations focus also on broad assessment of municipal resources, possible
impact on the municipal budget and the proposal for reform to support development.
o A strategy identifying key strategic issues, risks and opportunities facing the city with
focus on reform and reform priorities;
o Defining outcomes and milestones on the Vision and ensure these are measurable
and have a timeframe;
This element of work involves highlighting interventions to operationalize the Vision and
future development of the city. This includes:
o Identification of options and strategies and their evaluation keeping in view their
contribution to the goals, objectives and the reform agenda of the JNNURM.
o Translating the strategies into programmes and projects and
o Identifying the programmes which have maximum / optimum contribution to the
achievement of city’s Vision and medium term perspectives.
o Evaluation of financial options and strategies for financing the Vision as enumerated
in the CDP.
o Broad strategies for financial viability of the proposed investments and improving
financial sustainability. This would includes options for PPP in service delivery and /
or O&M, wherever relevant. The investment schedule lay out the costs and revenue
estimates of all priority projects in the next seven years of the Mission period. The
preparation of CIP would be an iterative process requiring the adjustments and
rescheduling to make the whole package work financially.
Initially launched for 60 cities in 2005 as a 7-year programme, currently there are 63 cities
in the Mission. Of these 8 are classified as Heritage Cities-viz:-
o Mathura, Mysore, Puri, Bodhgaya, Ajmer-Pushkar, Ujjain, Haridwar and
Nanded (Primarily of Cultural - Historical or Pilgrimage Tourism significance).
Two others are of tourism significance-viz Srinagar and Naini Tal. Of the other
53 cities, 35 are metros (including Varanasi and Amritsar) and 18 are State
Capitals. These too have heritage to be conserved, including the metros of
Amritsar and Varanasi.
Initially a single toolkit was issued for all 63 cities. However, a supplementary toolkit is being
devised by MoUD and INTACH for heritage conservation and where.
a) Heritage conservation is the main component (as in the 8 cities above,
including Mathura)
b) Heritage enhancement is a major concern (as in the other 55 cities)
The CDP for Mathura has accordingly been restructured to fit into the draft supplementary
toolkit without losing the renewal focus of Mathura.
A1.1 Introduction
Mathura– the birthplace of Lord Krishna is one of the prime destinations for pilgrimage in
India. The contiguous settlement of Vrindavan is intrinsically related to this pilgrimage. Also
a majority of devotees visit Goverdhan in its vicinity. Accordingly, catering to a floating
population with focus on the river Yamuna is a major requirement in a plan for Mathura. At
the same time, this group of settlements is strategically located. The national expressway
(North-South corridor) cuts through the area and practically the entire southbound rail traffic
from Delhi and North West India is dispersed at Mathura Junction for both goods and
people. Rail traffic to Rajasthan via Alwar and to central UP via Hathras also converges on
Mathura. The proposed Agra-Noida Expressway east of the Yamuna would further add to
the accessibility of Mathura.
Therefore along with pilgrim convergence and related religious-cultural tourism, enhancing
the importance of the river Yamuna, national transportation dispersal of goods and people
by road and rail, placed on the authorities a heavy responsibility of regulated development
in a major and growing concentration of regular inhabitants and floating population within a
major district of U.P. Along with this, the growing gap in civic infrastructure required
coordinated actions by the urban and rural local bodies of Mathura District working in unison
with the Mathura Vrindavan Development Authority (MVDA) and District Authorities. These
issues were addressed in the Perspective Plan proposed for the Mathura Vrindavan Area
(MVA) with a 20 year perspective (2000-21) by the MVDA.
Though the 3 established foci of the expanded MVA are the religious settlements of a)
Mathura, b) Vrindavan and c) Govardhan requiring the footprints of these to be protected
and enhanced along with their temples, parikramas, kunds and other benchmarks along
with river Yamuna and its bunds, the proposals herein are for Mathura city and which has a
Nagar Palika Parishad (NPP) within the larger MVA region. This priority is justified due to
Mathura City being at the core of the Braj Boomi and the entreport of this group of
settlements. Accordingly its environment needs serious renewal for the benefit of both – its
residents and the accelerating floating population of pilgrims-regional, national and
international to the larger Mathura-Vrindavan area and also to Goverdhan. However, the
census considers the Mathura NP and Mathura Cantonment as a common Urban
Agglomeration (UA). Thus for purposes of bulk urban services, the cantonment would also
be considered in this programme.
The religious city of Mathura has a railway junction, which is the entry point to this group of
settlements. A long line of ghats with their steps leading to the edge of the Yamuna,
arched gateways and temple spires extending along the western bank of the River Yamuna,
emphasize the sacred character of Mathura. An ancient settlement with origins embedded
in history, Mathura was strategically located at the cross roads of various trade routes that
went to West Asia and the Roman Empire; to Central Asia, via Taxila, Pushkalavati and
Purushapur and the Silk Route and eastwards to China. This ensured its position as a
centre of trade and a meeting point for varied cultures.
Today, it is a city of temples and shrines with thousands of devotees who come each day to
visit the city of Lord Krishna. An imposing temple at the Katra Keshav Dev marks the spot
that is believed to be the Shri Krishna Janmasthan – the birthplace of Lord Krishna. Another
impressive shrine, the Gita Mandir located on the Mathura-Vrindavan Road has a fine
image of Lord Krishna in its sanctum. The whole of the Bhagwad Gita is inscribed on the
walls of the temple. A popular shrine is the
Dwarikadhish Temple to the north of the town,
dedicated to Lord Krishna and built in 1815.
The settlement stretches along the west bank
of the Yamuna and the continuous line of
ghats along the river are best viewed from the
opposite bank. The ghats are believed to
have been built at the sites of ancient
ashrams, where the great sages performed
their penances on both the west and east
banks. These are pilgrimage spots today
especially the west bank which are centres of
religious and cultural activity, where the Holi Gate ( Tilak Dwar) : 1847
people come to have their ritual dips in the
holy river. Of 37 identified Ghats in Mathura
24 are of significance of which the most important is the Vishram Ghat, where according to
legend, Lord Krishna took his rest after killing Kansa.
It is at Vishram Ghat that the traditional Braja Mandala parikrama (circumambulation of all
the important religious and cultural spots of the settlement) starts and ends. The 12 ghats to
the north of Vishram Ghat include the Ganesh Ghat, Dashashwamedh Ghat with its
Neelakantheshwar Temple, Saraswati
Sangam Ghat, Chakratirtha Ghat,
Krishnaganga Ghat, Somatirth or Swami
Ghat, Ghantagharan Ghat, Dharapattan Ghat,
Vaikuntha Ghat, Navtirtha or Varahkshetra
Ghat, Asikunda Ghat, and Manikarnika Ghat.
To the south, there are 11 ghats - the
Guptatirth Ghat, Prayag Ghat marked by the
Veni Madhav Temple, Shyam Ghat, Ram
Ghat, Kankhal Ghat, the site of the
Janmashtami and Jhula festivals, Dhruva
Ghat, Saptrishi Ghat, Mokshatirth Ghat, Surya
Ghat, Ravan Koti Ghat, and Buddha Ghat.
Some of Mathura's most important shrines Potra Kund : Krishna Janam Bhoomi
are found around Vishram Ghat - the Mukut,
Radha-Damodar, Murli Manohar,
Neelkantheshwar, Yamuna-Krishna, Langali Hanuman and Narasimha temples. The
baithak of the great Vaishnava, Shri Chaitanya, is also near by.
The Parikramas of Goverdhan and Vrindavan are of equal importance. They all come within
the larger Braja Mandala Parikrama. Of these religious historical areas, only the Mathura
Nagar Palika Parishad area of the Mathura UA area is currently part of the JNNURM. It is
therefore analyzed for urban services, urban renewal projects, basic services for the urban
poor, urban reforms and strengthening of the local body through a Vision Plan and City
Development Plan (CDP) and City Investment Plan (CIP).
A city development plan for Mathura NPP area has to sit within a 20 year spatial
vision that is different from that of other metropolitan areas or state capitals.
Conservation becomes a central part of the development process in Mathura. Thus a
synergy emerges between a cultural-historical tourism magnet as a pilgrim centre
catering to an increasing number of pilgrims of modest to low income levels. In this
process the relationship of Mathura NPP, Mathura Cantonment, the Mathura MVDA
and Mathura district assumes significance.
A2 THE CONTEXT FOR THE MATHURA CITY VISION AND ITS CDP
With the 73rd (rural) and 74th (urban) constitution amendment acts (CAA’s), several states
have focussed on State Development Vision Plans (20 years) e.g. Jharkhand, Chattisgarh.
In the State of Uttar Pradesh (UP) however a state vision gets blurred due to the sheer size
of the state. Nonetheless, several state level sectoral vision documents have been prepared
notably in terms of agriculture, tourism, housing and transport. These would undoubtedly
be integrated in the State Spatial Strategy Plan when prepared. In the meanwhile, the
Development Authorities of the large urban agglomerations of UP have prepared Vision
Plans for their operational areas. It is envisaged that such vision or guidance plans would
be processed as broad brush Spatial Strategy Plans for the development authority areas.
For the MVDA jurisdiction, within Mathura district, this is of particular significance as it looks
at three municipalities (nagar palikas), eight Nagar Panchayats and one cantonment, within
all the three Tehsils of Mathura District and in all its 10 Blocks. Therefore the Draft District
Development Plan (DDP) as required under the 73rd CCA and legislatively catered to
under State Acts, can advantageously be addressed so as to make its interface with
the MVA Prespective Plan meaningful. The specific vision plan for Mathura City
would fit well in this DPC framework. It would also facilitate the Mathura CDP. This
fact is underlined upfront in this report as unlike a majority of the other 63
settlements in the mission, Mathura UA would not be a candidate for a Metropolitan
Planning Committee (MPC) for a very long time.
Thus Mathura UA and NPP within Mathura DPC has to deal with several negative impacts.
These include:
These impacts are broadly addressed in the approved MVDA Plan 2021 through.
x A viable spatial framework for social and economic investments over a 20-
year period.
x To a recognition and building on the distinctive characteristics of the MVA
particularly in terms of its religious and cultural values, history and natural
systems.
x Stress on a continual improvement for good governance through
transparency, participation, accountability and effective management.
Thus in the MVDA Plan 2021 implicitly for Mathura UA (NPP + Cant.), the key focus has
been on:
In the case of the MVA, assessment of the District and its three Tehsils were the essential
starting points for a development strategy for the MVA. In this process the MVDA mobilised
and engaged the state and its offices, central government departments pertaining to rail,
road, defence needs, refinery, etc., the various participating local bodies, the religious,
social, cultural and business, trade and manufacturing interests, the community, NGOs,
CBOs and other stakeholders within a wider participatory process. The rapid appraisal of
the Mathura Nagar Palika had taken into account this contextual framework by the MVDA
for the Braj region.
Also, over the last decade there has been a critical change in the roles and functions of
urban development agencies. This has led to serious concerns about the functioning of
urban local bodies in people centric programmes and for which there are no alternatives to
local government and their disaggregated wards as a basic unit of urban governance. For
this, urban local bodies have to set themselves with a vision for the development of their
geographic area. For this, the Mathura Vrindavan Development Authority’s (MVDA) 20-year
perspective plan 2021, programmed into five yearly phases for a balanced and integrated
urban development of the wider Mathura Vrindavan area provides the basis. On this the
Mathura NPP is to flesh out its vision plan over a 20 year framework and enfold its City
Development Plan (CDP) for 5 years to be extended by another 2 years. Therefore, unlike
other exercises under JNNURM, the Vision, CDP, CIP and projects for the Heritage
City of Mathura has perforce to sit into the larger perspective for Braj as projected in
the perspective plan 2021 for the MVDA and which has undergone an intensive
consultative process over the past two years. In this exercise, the basic urban
services needs of the cantonment is also considered.
In a subsequent exercise a vision and CDP for Vrindavan could be enmeshed in this form of
synergetic sustainable development for this prime cultural historical area of Braj.
A3. THE STATE, DISTRICT AND MVA DETERMINANTS FOR THE MATHURA
VISION AND CDP
one of the few states where the decadal growth rate has been higher in 1991-2001 than in
the previous decade of 1981-91 (25.55 per cent – UP but 23.86 per cent – All India). Also,
the sex-ratio of 898 in 2001 has been lower than the All India average of 933 and the
literacy rate in this period was just 57.36 per cent against the national average of 65.38 per
cent. Worse still, the female literacy rate has been a low 42.98 per cent against the all India
average of 54.16 per cent. These disadvantageous comparisons offer a challenge to the
State and which has nearly a 17 per cent representation in the National Parliament (nearly
one in every seven).
In 2001, barely 20.78 per cent of the population of the State were in urban areas (against
27.78 per cent at the All India level). However, this population spread over 633 urban
settlements, accounted for 12.72 per cent of the national urban population and which was
just behind Maharashtra with 14.38 per cent (largely round the Mumbai region). Primarily
population shifts in UP are intra-state from rural to urban. There is also substantial
movements outside the state notably to the mega city of Delhi and even Mumbai.
air connectivity, tourism infrastructure, small scale industries, tertiary sector activities and
other forms of social and physical infrastructure. Laterly, the State Government has
spearheaded the Agra-Noida expressway as the Taj Expressway. This is going to have a
major impact on the growth of the division.
Mathura District is bounded by the State of Rajasthan to its west, the State of Haryana to its
north and the Agra division districts of Aligarh to its east, Etah and Firozabad to its south-
east and Agra to its south (Refer Map No.A4).The district has an area of 3,329.40 sq. kms
and its population was 20.70 lakhs in 2001. In 1991, its population was 16.49 lakhs giving a
decennial increase of 20.00 percent against 25.80 percent for the state as a whole.
As shown on Map A4 the district comprises of three tehsils and ten blocks (Refer table 1A):
A3.4.1 The river Yamuna meanders through the district. The district has 734 inhabited
villages; these are grouped into 89 rural panchayats. It has 16 urban settlements of which
three have nagar palikas viz. Mathura, Vrindavan and Chhata. The other 13 have nagar
panchayats. In 2001, the average density of the District was 622 persons per sq. km (689
for the State). In 1991 the sex ratio was 816 females per 1000 males. In the same period,
the literacy rate was 35.28 percent (approximately 67 percent male and 23 percent female).
In 2001, the literacy rates have improved to be nearly at par with the state but yet, it is far
below the national average, especially the female rate. Thus, though the district is
heavily transversed by train and road, its rural component in particular remains
underdeveloped both socially and economically. The main urban areas however are
comparatively better off due to the large floating (pilgrimage) population throughout the year
and its related economic activities.Table 1B indicates the estimated Tehsil and blockwise
population and density of the District as estimated from the census of 2001 and by the
MVDA.
Apart from the urban concentration of Mathura-Vrindavan in Mathura block, the overall
density is highest in Mant tehsil and lowest in Chhata tehsil. This indicates that growth is
geared eastwards towards the other districts of UP rather than towards Haryana and
west towards Rajasthan. However, the road and rail system as emerging are at present
governing the growth of the district through the expanded MVA under the MVDA. This
favours Chhata tehsil rather than Mant tehsil east of the Yamuna. However, the proposed
Agra- Noida expressway would
change the growth profile of the
district, towards Mant block of the
District
A3.4.2 Climate
A3.4.3 Vegetation
According to the forest department less than 100 sq. kms of land is occupied by forests.
However, vegetation along the river is increasing and the refinery and its townships has
undertaken large forestation programmes to arrest pollution to monuments especially the
Taj Mahal – some 50 kms to its south. It has to be borne in mind that the belt around
Vrindavan was at one time the forest associated with Lord Krishna and the need to reforest
this wide tract of land through expertise in natural historical heritage needs to be stressed.
A3.4.4 Agriculture
The soil of the district is reasonably fertile. Substantial agriculture land prevails, where
wheat, maize and barley are mainly grown. The recently announced State Agriculture Vision
requires that land under cultivation, orchards, horticulture, floriculture, pisiculture and dairy
and poultry farming be retained and enhanced in production. Despite this, Mathura District
over the years witnessed a steady decline in produce and resultant outward migration.
A3.4.5 Transportation
Mathura District is one of the most important Districts of India in terms of both destination
and transit of people as also for the transit of goods. This established the centrality of
Mathura City (Refer Map A6). The busy broad guage double track electrified rail line from
Delhi to South India bifurcates at Mathura between west bound (Mumbai) and south bound
(Chennai) transit. Also the line from Agra to Jaipur via Mathura and Alwar has been
converted to broad guage single track. It is expected that this would become an electrified
double track line in due course.
The metre guage from Agra to Hathras / Barielly via Mathura is also expected to convert to
broad guage over the next 10 years. Thus Mathura would not only be a junction for transit
transportation for goods and people
but also a major rail traffic monitoring
centre. It has also to be underlined
that it is a destination for pilgrims from
not only North India but also from
East, West and South India. In fact,
there is a railway surcharge on fares
for Mathura; this is meant for
improving pilgrim facilities in and
around the station.
A3.4.6 Services
At the district level, water supply is most crucial. The district relies mainly on ground water.
The Yamuna should have offered a perennial source. Unfortunately Delhi sends the surface
water downstream in a highly polluted state. The industrial belt of Faridabad-Balabgarh-
Palwal in Haryana further compounds the problem. Thus Mathura-Vrindavan receives
unusable water and for which the Central Control Pollution Board (CPCB) has not yet been
able to propose and enforce implementable corrective actions. The district therefore is
heavily dependent on ground water and for which water tables are receding and salinity is
fast creeping in. Agriculture and allied activities are already adversely affected and new
industries are not being attracted. A water management plan is therefore required at the
national and state level with the MVDA as active partners for settlement development. To
increase surface water intake, a barrage across Yamuna, north of Vrindavan is on the anvil,
on lines of Gokul barrage.
Electricity is through the grid and this is regulated at the State level. The refinery and its
township have a captive standby system. For settlements development, the MVDA is
required to seek an enhanced supply.
A3.4.7 Industries
The UP State Industrial Corporation estate in the Kosi Kalan-Nandgaon and Chhata belt
took off well but has now slowed down as Haryana is better placed vis-à-vis the NCT of
Delhi and the central NCR area through the Faridabad-Palwal belt. The refinery is now
programmed for its maximum utilisation. It has generated some ancillaries but household
and cottage industries are a major source of employment in the District. In general,
industrial growth in the district has reached saturation levels; but there is scope for
household and cottage industries. Some hope emerges with the Agra-Noida expressway for
The UP Urban Planning and Development Act, 1973 (UPUPD Act’73) under which the
MVDA was established as a Planning and Development Authority for the MVA ensures that
the Authority is vested with the responsibility of preparing and enforcing the development
plan for the MVA. The MVDA is in addition empowered to declare any area within its
jurisdiction as a “Development Area” for
providing serviced land and for carrying
out and permitting development.
A4.2 The Statutory Master Plan for The MVA – 1981-2001 as Extended to 2021
The State Town and Country Planning Department prepared a plan for Mathura-Vrindavan
for the period 1981-2001 for the MVD Authority. This was processed as an approved plan
by the MVDA covering the nagar palikas of Mathura and Vrindavan, the cantonment of
Mathura and part of the block of Farah (due to the location of the Oil Refinery in Mathura
District). 79 adjoining villages (a few of which are east of the Yamuna) complete the Master
Plan area of approx 215 sq. kms.
Map A8 shows approximately the area covered by the Master Plan. It incorporate 4 of the
10 blocks of the district.
Nearly half the area is shown as an ‘agricultural belt’. Of the rest, only about a third
comprises of the 1981 existing settlements of Mathura, Vrindavan, Civil Lines and villages -
as mixed uses zones. Large areas have been shown for residential use. The refinery, the
Cantonment and the railways occupy sizable lands. The reserved forest north of Vrindavan
has sparse tree cover but is part of the heritage of the area. The smaller reserved forest
near the refinery has dense foliage through finances primarily by Indian oil. Services,
programmes, projects and financial
Land Use Distribution of MVA, 2001
implications are not pointedly Exist ing Built up area
2% Industries
geared towards NH-2 (now the north- 49% 2% Public and Semi Public
south national expressway) and for 1% Public Open Space
which the plan had proposed a bye- 7% Transportat ion-Road & Rail
Reserved Forest
pass to its west but not found 2% Sewage Farm
1%
necessary now. 3%
1%
Floof Plains
2% Agricult ural belt
8%
x Set limits for urbanisation for the period ending 2021, with links to the
existing surrounding urban settlements, central place villages and other
growth centres;
x Create a stable economic base for urban level activities;
x Remove congestion in the older parts of the city through an integrated
approach of clearance, conservation and rehabilitation;
x Upgrade or resettle slums;
x Improve basic infrastructure (water, sanitation, drainage etc.) and urban
facilities in terms of
education, health, lung
spaces etc. in existing
areas; and
x Improve the
transportation network
in relation to land uses,
so that traffic in the
inner city gets better
organised.
The government of U.P. has further decided that the MVA would be again extended
so as to include the nagar panchayats of Govardhan and Radhakund and 11
adjoining villages up to Mathura Vrindavan. Thereby, the responsibility of integrated
pilgrim wellbeing is to vest fully with the MVDA. This gives a planned development area
of approximately 350 sq. kms (refer Map No.A11). For this extended area too, no plan has
yet been approved.
in transportation profile only estimates were possible to the extended MVA proposals. The
State TP Department and the MVDA would be making the population projections on the
basis of definite population projections for this area and on the basis of definite
development boundaries to emerge in due course. Therefore empirically it is envisaged that
a population of around 20.00 lakhs by 2021 within about 450 sq. kms. of development plan
area would be a reasonable target to aim at. This excludes floating population round the
year and especially during the several festival and auspicious occasions. This is indicated in
table 1E below.
In this scenario, Mathura NPP would cater primarily for natural increase and some in-
migration as it is almost exclusively an urban renewal area. There is scope for new
growth in Vrindavan, the cantonment and rest of the MVDA area.
The above indicates the framework through which the vision for Mathura City (NPP) and its
CDP is to be generated. The MVDA has an approved perspective plan for 2021. An
update of this plan is on the anvil based on extensive consultants with the concerned
authorities, institutions, NGOs and individuals. These are very relevant in the current
exercise for the Mathure City Vision and its CDP through a fresh set of supportive data and
discussions in a form of a rapid assessment as indicated in the subsequent section.
x Mathura NPP has a jurisdiction of 28.5 sq. km. straddled between River Yamuna
(East) and NH2 bye-pass (West)
x Mathura tehsil (incorporating Mathura NPP, Vrindavan NPP and the contonment)
has the highest density in the district. Refer maps A5 and A8.
x It is at the core of the “Braj” religious node incorporating Mathura, Vrindavan &
Govardhan.
x For this jurisdiction, MVDA is to be expanded to about 450sq.km. (out of 3,340
sq.km. Mathura District).
x The regional exercise gives credence to this contextual equation through urban
renewal of Mathura city as the core of the Mathura-Vrindavan region and of which
Vrindavan is an equally important focus for the next traunch of renewal projects.
The analysis of the existing situation is the first stage in the formulation of a CDP. The
purpose of the analysis is to make a realistic assessment of where the city is, the direction
in which it has been moving and its strengths and weaknesses. This stage is meant to
make an in-depth analysis of the demographic, economic, financial, infrastructural,
physical, environmental, and institutional aspects of the city and the implications thereof for
services delivery, management and governance. As a first step in preparation of City
Development Plan (CDP) for Mathura, the team was mobilized at head office and a series
of discussions were held about the approach and methodology for conducting the
exercise.
Based on the identified issues, the second step involved meetings and discussions with all
the stakeholders. The Expert Team visited the key departments and line agencies involved
and met senior officials for feedback on the preliminary issues confronting the city of
Mathura. A general feedback on various issues emerged through discussions, interactions
and official facts and figures provided during the meetings and discussions. The relevant
data related primarily to infrastructure and governance and for which proper records were
not available with the respective agencies especially the municipal body. The discussions
held with the key officials was in accordance to the requirements for the city assessment.
Mathura is also a transport node for the agglomeration and district, by both rail and road.
Segregation and interface of inter and intracity road and rail movements of people is a
crucial component of an environmentally acceptable Mathura and which is to facilitate
pilgrim tourism.
The city of Mathura is among the seven most important holy cities of India and is one of
the oldest inhabited sites of Uttar Pradesh. For more than a millennium and even prior to
the medieval period (about the twelfth century A.D), the place had been an important
centre simultaneously of the three chief Indian religious systems, the Brahmanical, the Jain
and the Buddhist. Subsequently, it became a stronghold of the Krishna-bhakti cult. It is
believed that Krishna was born in the city of Mathura and passed his early life in its
neighbourhood. Most of the important places in the district are associated with one or
another event connected with the Krishna legend. There is ample evidence to believe that
the district was far more pastoral than agricultural in early times, as indicated by many of
its place names such as Braj (herd of cattle) and Mathura (town of churns).
Mathura continued to hold a prime position in Indian history throughout. The celebrated
poet Kalidas praised the city of Mathura, the river Yamuna, the Goverdhan hill and the
Vrindavan grove. It found mention in the records of Fahien who stayed there. It continued
to hold its religious importance in one of the greatest centres of artistic activity during the
golden age of Indian history, the Gupta age. It again found mention in the records of Hiuen
Tsang (629-645 AD) who stayed there. Mathura then fell in the hands of Mahmood of
Ghazni. It found specific mention in the accounts by Alberuni who came in the wake of
Mahmud’s invasions. Though Mathura lost its political importance in the 12th century, it
was still a city of religious significance. Mahaban was the gathering place for the armies of
Iltutmish (1211-36) in his expeditions against Kalanjar. The jungles of Mathura were the
favourite hunting grounds of the Mughal emperors. It is connected with some important
events in Aurangzeb’s life. His eldest son was born there in 1639. In 1666, Shivaji after
escaping from Aurangzebs army in Agra had come to Mathura. After Mughal rule it came
under the Jats who gave refuge to many from Delhi during Nadirshah’s invasion and also
during the invasion of Ahmad Shah Abdali. Mathura’s environs were important battlefields
when East India Company started coming into power and also during the military moves of
the British forces to take over Bharatpur, Indore, etc. The Jats of Mathura district gave a
good fight to the British forces. Mathura also played an important part in the independence
movement.
Mathura has had a Municipality from the late 19th century. This is now called the
Nagar Palika Parishad (NPP) and which is divided into 45 wards, each with a ward
councilor. Currently, the Councilors are not in place due to an issue in court.
However, the ward comprises a legal municipal unit for development, conservation,
and maintenance. Their jurisdictions are shown in Map B1 below:
The Agglomeration also incorporates the cantonment which is about 9 kms in area. This
includes an operation area for oil distribution near the railway junction apart from other
operational areas. The sub-area commander is head of the Cantonment Planning Board
(CPB), operating under the Cantonment Board Act, 1924. The development is low
intensity with well appointed education and health facilities. In 1991, the CPB had less
than 7,400 persons but by 2001 it grew to around 20,500. It is now projected to hold about
41,000 people in 2011 and about 72,000 persons in 2021. Therefore, urban services are
to be provided in unison with the NPP. These populations do not include military personal,
emunerated at their command level.
The population of Mathura Agglomeration in 1991 was 2.36 lakhs which increased to 3.23
lakhs in the year 2001.This included the cantonment but not the daytime floating
population which puts additional pressure on the city infrastructure. Refer table 2A below:
The UA has witnessed a rapid growth over the past five decades with an average decadal
growth rate of 28.04%. During the period 1981-91 the decadal growth rate has been about
47.90% attributed to a large influx of rural population to the city. However during the past
decade 1991-2001, the growth rate has stabilized with a decadal population growth of
35.30%.
Table 2B shows the population projections for the Mathura UA comprising of the NPP and
the Cant.
The normal day time floating population based on entries by UP Dept. of Tourism and local
police is about 1.00 lakh per day in 2001. This is projected to be 1.50 lakhs in 2011 and
2.00 lakhs in 2021. On auspicious occasions, the floating population could exceed 5 lakhs
and even 10 lakhs on certain days. For this, special arrangements are made for transport,
traffic control, camping, food, water and other ablutions.
Based on the above, the population projections for Mathura UA are as below:
The component of floating population that require overnight stay each day is included in
the census.
The infrastructure requirements for the day time floating population is estimated at half that
of the other population.
In the above projections, the fact is also underlined that for Mathura NPP area, the decadal
growth rate between 2001-11 is 30 percent and between 2011-21 it is 28 percent. For the
Cantonment however, the decadal growth rates are 100 per cent and 75 percent
respectively in these periods. The Cantonment Board however are involved only in
infrastructure upgrading and not in urban renewal, heritage conservation, poverty
alleviation and local body capacity building.
Therefore services were required for 3.73 lakhs in 2001 (3.23 + 0.50) and are required
for 5.03 lakh persons by 2011 (4.28 + 0.75) and for 6.52 lakh persons by 2021 (5.52 +
1.00)
Being primarily a pilgrim city as the birth place of Lord Krishna, religious tourism generates
the economic base of Mathura. The UPSIDC had set up an industrial estate in Mathura
along NH.2. Now that Mathura has come under Taj Trapezium Zone (TTZ), power starved
industries using generators or coal have been banned. This has led to industries shifting
out of Mathura to Kosi Kalan, Chatta and Nandgaon and to other states with good
infrastructure. The water supplied to industries is brackish in nature and is not potable
without treatment.
Related to tourism as the main economic base, Mathura’s household industries provide its
main economic base, with a market that extends not only beyond the state of Uttar
Pradesh, but even national boundaries. However the District level industries include heavy,
medium and small scale produce, like: manufacture of taps and cocks, petroleum
products, packaging material, cottage industry, readymade garments etc. Manufacturing
activities are concentrated in four industrial estates spread in the district. In addition many
small units are scattered through the city.
The small scale and household based industry function primarily in the inner city of
Mathura. They cater primarily to the floating population and inner city needs. The main
economic activities are based on cottage industries, sari printing, manufacturing of
garments (temple related), artificial jewellery, copper utensils, stone engraving, statues,
paintings, sweets and offerings. Their percentages are shown in Table 2C below:
The inner city also has several printing presses whereas metal curios and sari printing are
subject to bulk orders from other states. These activities largely cause inner city pollution.
They could therefore receive incentives for shifting to identified industrial estates.
The preparation of the Mathura CDP involved extensive consultations, throughout its
preparation period. The consultative strategy involved interaction with various stakeholders
like: Senior Citizens, Departments, Institutions / Groups, Industrialists, Citizens at ward
level, and local elected representatives and the media. The process was facilitated by the
media, to impress upon the general citizens about the objectives of JNNURM and CDP for
Mathura. During the preparation of the CDP, two workshops were held apart from regular
interdepartmental consultations, and ward level
discussions. Press meetings were held
regularly during the plan preparation phase.
workshop. Thereafter practical suggestions emerged from the participants, including the
women folk.
The high level meetings were chaired by District Magistrate by coordinating all the key
departments and stakeholders about the development strategies and project
identifications. The final meeting was presided by District Magistrate in which all the
stakeholders were present, viz - departments, institutions as organizations, industrialists,
NGOs, press & media, senior citizens etc. All the important issues discussed and
emerging from the meetings were incorporated in the final documents. The departments
consulted during the exercise for preparation of CDP is at in Annex A.
The key issues and challenges faced at ward level included: street lighting, water supply,
sewerage and drainage, solid waste management, traffic congestion, unauthorized usage,
heritage issues and public-private participation.
However, the issues varied based on the terrain,
location, area and land use. Priorities
accordingly varied.
As this was a basic issue of the Mathura CDP, consultations were held with INTACH Delhi
and the Braj Bhoomi Chapter of INTACH at Mathura. Several views emerged and this has
helped shape the CDP. The listing done by INTACH has 428 entries. The Braj Bhomi
Chapter have agreed to reduce this list to an implementable number. In the meantime key
entries were endorsed by them to kick-start the conservation of heritage as an on-going
process.
The open consultation process involved interaction with citizens in the municipality NPP
office for the draft CDP prepared by the consultants. The presentations regarding the city
assessment in terms of the infrastructure, service delivery , governance , urban poor and
slums were exposed along with the vision and development strategies. Based on these
consultations and the field level visits and other consultations, the projects were identified
and put for regional, city and ward level development.
In 2001, for 3.23 lakh persons and 50% for day time population, the water requirements
were for 3.73 lakh persons. Thus at 140 lphd,
the requirement works out to 3.73 x 140 = 52.22
mld – say, 53 mld. The availability of water is
the greatest long term problem facing Mathura
UA. The main source for the city is through
ground water and then surface water. At
present the surface water production is 100
MLD at Gokul Barrage, some 15 Kms
downstream from Mathura. However, the
quantity drawn by the NPP is only 10 MLD due
to NPP’s insufficient capacity for storage and
distribution of water. Around 25 MLD of water
is being supplied from ground water. Even the
combined 35 mld is at reduced levels due to
evaporation losses, pilferage and wrong usage.
Due to shortage of funds, the city network has
not been able to tap the full potential of the
Barrage. Around 75% of the population
receives water at varied intervals and durations.
This is partly due to the city’s undulating terrain.
The average per capita water supply received is
therefore around 80 litres per capita per day
(lpcd). The UA really needs about 70 mld by
2011 and 90 mld by 2021 at 140 lpcd. Through
evaporation and other losses the requirement
could be around 80 mld by 2011 and around
105 mld by 2021. Therefore Gokul Barrage would have to be developed at full
capacity primarily for Mathura UA in combination with controlled ground water
usage and better management. A new Barrage is accordingly required for Vrindavan
and other areas. The proposed site for this is upstream of Vrindavan.
There are mainly two agencies involved in the water supply production and distribution for
the city of Mathura a) the Uttar Pradesh Jal Nigam (UPJN) which is responsible for
construction and production, and b) Nagar Palika Parishad, which is responsible for
distribution, operation and maintenance of the schemes handed over to them by UPJN.
The distribution system for the city is being maintained by the Water Works section of the
NPP. The present setup is run by a Junior Engineer and a staff of 177 including pump
operators and fitters.
The average depth of the water table is around 27 meters as per 2001 records. This has
since reduced by around 3.7 metres in the last five years. There are around 73 bore wells
of varying horsepower and around 25 MLD of water is supplied through this system.
Around 25% of the population is not able to receive, any potable water supply.
There are around 22,000 water connections in Mathura NPP area. The connections are
not metered and there is no categorization of water connections like: residential,
institutional, commercial, industrial, to account for the exact number of connections for
each sector. The actual consumption of water for the respective categories is not
maintained or recorded.
After water is brought from Gokul Barrage, it is further treated at the water works at
Bhuteshwar. The desired level of chlorination is done daily to supply water to end users.
There are 39 tube wells which are on contract out of 73 tube wells. The underground
circular Water Reserver’s (CWR) has capacity of around 3000 KL, with around 1500 KL
capacity of CWR at Sadar. The total distribution length of water supply which includes all
size distribution lines accounts for around 250 kms pipeline length. 50% of the city area
has fixed timings for water supply, the rest of the areas do not have any fixed timings, and
receives water sporadically. These details are summarized in tabular form below – Refer
TABLE 2D.
Table 2D: Details and Performance Indicators, for water - Mathura NPP.
Sr. Description Details
No.
1 Total Population of the UA (2001 Census) 3.23 lakhs (required for 3.73 lakhs)
2(a) Surface Water Source Capacity 100 MLD Gokul Barrage
(b) Quantity Drawn 10 MLD
3(a) Ground Water Source Capacity Not assessed
(b) Quantity Drawn 25 MLD
4 Water Table (2001) 27 m.
5 Number of Bore wells 73 ( 7.5 to 30 HP)
6 Total Quantity of Water Supplied 35 MLD (evaporation, leakages etc,
not accounted for)
7 Actual Per Capita Water received About 60 lpcd
8 Water Quality Monitoring Mechanism Chlorination
9 Overhead Water Tanks 21
10 Fully Functional 4
11 Distribution Network (Kms) 250
12 Distribution Coverage 75% (approx)
13 Storage Capacity Adequacy (CWR UG) 3000 KL
14 Water Supply Frequency 50% area has fixed timings, the
rates have
2 hours (average)
50% morning & evening
The total wastewater flow reaching Yamuna river from Mathura UA is about 26.5 mld
which contributes a pollution load of about 5000 kg/day of BOD to the river.
Chrological Background
Year Description
1923 The egg shaped brick trunk sewer (22” x 33” size) was laid along the
right bank of river Yamuna in the year 1923. it starts from a lane (Khirki
Bishati) in Shahganj Darwaja area and ends at Bangali Ghat. The
sewer discharges into main pumping station at Bangali Ghat from
where it is pumped to sewage farm located in Trans Yamuna area.
1952-1972 In the year 1952-1972 some sewerage works to tap the three Nalas
namely Ambhakhar Nala, Satrangi Nala and Mahadeo Ghat Nala were
done. Due to inadequate maintenance the pumping station and sewers
became non functional.
1984 In the year 1984, renovation works related to Bengali Ghat pumping
station, Intermediate pumping station of Vrindavan Gate, laying of rising
main from Vrindavan gate pumping station to Lal Darwaza crossing and
to clean sewers and Nalas were done.
Post 1990 Against Yamuna action plan to check the flow of 18 existing Nalas in
the river Yamuna some works of pumping stations, rising mains and
treatment plants were done. The following works exist:
14.6 mld (oxidation pond type) sewage treatment plant was constructed in Trans Yamuna
area. Sewage is pumped into it from Bengali Ghat and Dairy farm main pumping station.
The related effluent is used for farming. A sewage of 124 hectare is available off Sadabad
road and is being maintained by Nagar Palika Parishad, Mathura.
A sewage treatment plant (oxidation type) of 13.59 mld capacity was constructed on
Mathura-Vrindavan road near Van Chetna Kendra behind PMV Polytechnic. Mathura
Sewage from Masani Nala main pumping station is being pumped in to this treatment
plant. The treated effluent from this STP is used for irrigation purpose and the excess
quantity is discharged into Yamuna river.
Additional Schemes
Type of Works Parameters Original Schemes
(Extended Phase)
Interception & Diversion Length of Sewers Additional Facilities &
3
works (in Km) Rehabilitation Works
Pumping Stations Nos. 5 1
Sewage Treatment 2 (14.5 MLD + 12.5
No. / Capacity STP Pond Lining
Plants MLD)
Low Cost Toilet
No. of Units / Seats 10 / 100 & 30/300 10 / 100
Complex
Crematorium Improved Wood based 8 Platforms Additional Facilities
Plantation Area (in Hectares) Being Implemented Continues
Public Participation and
Various Activities Being Implemented Continues
Awareness
PMIS (Project Computer hardware
Computer Networking
Management Nil installation with web
System
Information System) enabled application
Source: UPJN
Considering the existing Sewage Treatment Plant (STP), topography of the town and
location of existing railway lines, the whole city is divided in seven sewerage zones. Refer
Map B2. These zones are described as below:
Zone I
This zone consists of Jaisinghpura, Mahavidya colony (part), Arjunpura, ranimandi , Matia
gate, Manoharpura (part) and Gaughat area (part). The design population of this zone
including floating population of 6750 comes out to 1,06,849. The required capacity of STP
for this population is 13.25 mld. About 0.32 mld waste water is expected to come into
sewers from dying industries existing in this area. Thus the existing STP of 13.57 mld will
be sufficient to cater the requirement of this zone upto the design year.
The major Nala of Mathura, Masani Nalla, falls in this zone and a pumping station is
considered for tapping this nala to check its flow into river Yamuna under Yamuna action
plan. Other two number sewage pumping stations of this zone are Vrindavan Gate
pumping station and Krishnaganga pumping station from where sewage is discharged into
Masani Nala through rising mains and ultimately goes to masani main pumping station.
From this pumping station sewage is being pumped into the existing STP of 13.59 mld
behind PMV polytechnic Mathura. these sewage pumping station and treatment plant shall
be used for this zone. Present area of this zone is 271.17 hectare which may go upto 500
hectare at the end of design period.
Zone II
This zone consists of Manoharpura (part), Gali Kanoongoyan (Part), Gaughat 9part), Ghati
Bahalrai, Nagla paisa, Hanuman Tila, Gatashram Tila, Dalpat Khidaki, Chah Khatoti,
Satgharha, Gopalpura (part), Generalganj (part), Dampier Nagar (part) and Ambakhar
(part). The population of this zone including the floating population of 13900 comes as
140257. The total waste water generation of this zone will be 17.42 mld. The discharge of
this zone is being treated at STP of Trans Yamuna having a capacity of 14.60 mld. This is
being pumped to treatment plant through Bengali Ghat main pumping station and Dairy
Farm main pumping station. The capacity of pumping plants and rising main shall be
enhanced as and when required. The present area of this zone is 242.88 hectares which
will remain the same upto the end of design period as there is no scope for its expansion.
The same STP shall be used for this zone.
Zone III
This zone consists of Laxminagar which comes in Trans Yamuna area. Design population
of this zone is worked out as 46576 in the year 2039. development is taking place in this
area very rapidly along Hatras road, therefore, an additional population of 30000 has also
been considered in this zone which is likely to be include as and when the municipal limits
of Mathura are extended. The sewage of this zone i.e 9.51 mld along with the sewage of
zone II and zone VI shall be treated as Trans Yamuna treatment works by enhancing its
capacity to 35.60 mld from present capacity of 14.60 mld. The land for construction of an
unit of 21.0 mld treatment plant (UASB type) is available at the site of existing STP. The
present area of this zone is 232.88 hectare which may go upto 600 hectare at the end of
design period.
Zone IV
The present municipal limit of Mathura is upto the present bye pass road, national Highway
No.2. But the development is taking place very rapidly in the trans highway area on urban
pattern. Various colonies have been developed on Goverdhan road, Sonkh road, and at
other places between Gokul restaurant on National Highway no. 2 to refinery township.
The population of this zone is also expected as 72000 in the year 2039. A main sewer of
required size shall be proposed along the NH with some intermediate pumping stations.
Finally the discharge of this zone shall be carried to the proposed UASB type sewage
treatment plant of 9.0 mld near Narholi. Total waste water generation in this zone has been
assessed as 8.94 mld. At present no area is this zone falls within municipal limits but it
may be as 907.12 hectares at the end of design period because many colonies are
developing in this trans highway area which is in about 12 km length. The treated effluent
from this STP shall be used for irrigation purpose in the fields of Narhauli village or near by
village.
Zone V
This zone consists of Shanti Nagar, Sukhdeo Nagar, Pannapur (part) Krishna Nagar,
Radha Nagar, Dampier Nagar (part), Harizan Basti (part), Mahavidya (part) and Naya
Nagla. The population of this zone in the year 2039 has been projected as 256463 and it
includes a floating population of 7600. The sewage of this zone i.e 31.86 mld, is proposed
to carry through sewer of required size at proposed 52 mld UASB STP near the Gokul
barrage w/s treatment works. The present area of this zone within the municipal limits is
824.55 hectare which may increase upto 900 hectare up to the end of design year.
Mathura junction railway station and some industries also fall in this zone. Waste water
generation from these institutions have been taken as 1.20 mld and 1.25 mld respectively
making a total waste water generation of this zone as 34.31 mld.
Zone VI
This zone consists of Maliyan, civil line (part), Gopalpura (part), Generalganj (part) and
Ambakhar (part). The population of this zone is projected as 60228 including the floating
population of 800. The sewage of this zone i.e 8.48 mld including 1.0 mld from Cantt. Area
is proposed to be treated at trans Yamuna STP along with the sewage of Zone II and III.
The area of this zone within present municipal limits is 154.77 hectare which may increase
upto 250 hectare at the end of the design year.
Zone VII
This zone consists of civil lines (part), Pannapur (part), Harijan Basti (part) abd Dhauli
Piyau area. The area between present municipal limit and NH 2 is partly developed on
urban pattern and balance area is in process of development. Sewage facilities shall be
required to this population also. The expected population of this area is assessed as
40000. Thus, the total population of this zone will be 107627 including a floating population
of 950. The total quantity of sewage for this zone is 16.87 mld including 3.50 mld from
Cantt. area shall be treated along the sewage of zone V at the newly proposed sewage
treatment plants. The area of this zone within municipal limits is 379.47 hectare which may
go upto 600 hectare at the end of the design year. The treated effluent from the proposed
52 mld STP shall be carried to the proposed sewage farm near village Koyla Alipur through
pipe line.
The entire city consisting of trans Yamuna area and trans Highway area (regulated area as
proposed in Master Plan 2021 by MVDA) has been divided into six drainage zones. Refer
Map B3.
Sr. Name of Name of existing Area included Area
No. Zone main drains covered
(ha)
1 Zone – I Masani Nala, Mandi Samiti, Sonkh road, Buteshwar, 606.32
Masani Mahavidya Nala, Jaganathpuri, Deeg Gate, Manoharpura,
Zone Jaisinghpura Nala, Arjanpura, Rani Mandi, Lal Darwaja,
Chakratirath Nala, Krishan Ganga, Jaisinghpur, Gokul
Shahganj Nala, Restaurant, Sarswatikund, Gokul
Octrai Post Nala, Restaurant to Mandi Choraha, Govindpur,
Krishan Ganga Nala Laxmi Nagar, Mahavidya, Ram Nagar,
Bank Colony, Krishna Nagar
2 Zone – II Gaughat Nala, Kachchi sarak, Chauk, Mandi ramdas, 289.80
Bangali Chintaharan Nala, Bharatpur Gate, Manoharpur, Giya Mandi,
Ghat Zone Daula Maula Nala, Shitala Ghati, lala Ganj, Kushak Gali, Gau
Swami Ghat Nala, Ghat, Chintaharan, Swami Ghat, Askunda
Askunda Ghat Nala, Dwarikadeesh, Vishram Ghat,
Vishram Ghat Nala, Bharampura, Chatta Bazar, Bangali Ghat,
Bangali Ghat Nala Dhruv Ghat, Arya Samaj Road, Vali Ka
teela.
3 Zone – III Abmhakhar Nala, Radhika Vihar, Azad Nagar, Sukhdev 741.44
Ambakhar Satrangi Nala, Nagar, Hanuman Nagar, Mansa Puri,
Zone Mahadev Ghat Nala Vishnupur, Pofessor Colony, Mahavir
Nagar, badri Nagar, Bharatpur Gate,
Harijanvasti, Kotwali Road, Holi Gate,
Anta Para, General Ganj, GIC, Barpura,
Ambhakhar, Gali Ahooja, Mahadev Cantt.
Station, Mayur Vihar, Dhauli Piyau,
Chandrapuri, Jai Gurudev, Madhavpuri,
Krishna Vihar
4 Zone – IV Dairy Farm Nala, Cantt. station to Aurangabad, 236.28
Dairy Farm Cantt. Nala Damodarpura, civil lines, officers colony
Zone and all Cantonment area.
5 Zone – V - Laxmi Nagar, Pratap Nagar, Ayodhya 232.88
Trans Nagar, Shivpuri, Ram Nagar, Vinod Vihar,
Yamuna Painth and Trans Yamuna area.
Zone
6 Zone –VI - Sray Azmabad colony, Vishwa Laxmi 600.00
Trans Nagar, Radha nagar, Ganeshra Pulish
Highway Colony, Yamuna Dham, Sriji Dham,
Zone Goverdhan Road, Sonkh Road,
Narohaoli, RTO office, Birjapur, Navada,
Township Tiraha
The system is better organized in the Cant. but they are required to combine with the NPP
to exploit a common landfill site. Also due to the inefficient SWM handling system, the
wastes often get into the drains. There are more than 200 dairies in the city which
contribute to cow dung waste in large quantities, being directly disposed in open drains
and nallas. There are no other proper landfill sites and presently the waste is dumped in
open sites, away from city outskirts. There are more than 30 nursing homes, and no
arrangement is provided for collection of the biomedical waste from these nursing homes /
hospitals.
The junctions require improvement and at all places where there are level crossings, road
over bridges (ROB’s) or road under bridges (RUB’s) are required, especially as by 2011 all
rail movements would be by Broad gauge (double or single track). The single motor coach
operated by the Railways between Mathura and Vrindavan is uneconomical due to level
crossings. It is best that the system becomes road based for buses. One suggestion is to
make the present Mathura-Vrindavan road as one way and the rail track converted as a
one way road from Vrindavan to Mathura. Buses could thereby ply and the system could
be a toll system with the Railways sharing in profits.
Table 2Ib shows that nearly 2/3 rds of the roads have R/W’s of upto 3.00 m whereas Table
2Ic shows that expenditure on the maintenance of roads has been varying.
Table 2J below shows the registered vehicles plying on different roads of Mathura:
B4.3 Parking
Mathura has 13 modes of motorized transport – inter and intra – both for transportation of
goods and people. In addition it caters to traffic from outside the city. Therefore traffic
management and channelisation assumes significance. Citizens say that in particular the
inter city bus stands need being relocated. However, 2 new inter-state bus stations are
required-one near NH2 and one in trans-Yamuna. Transport nagars as part of the Stations
would help in segregating inter and intra city traffic.
Citizens also say that parking of vehicles at Railway Stations and Bus Stations – both
personal and on hire, plus intracity transport and which is through a variety of modes need
being better organized. In particular, parking in relation to religious nodes and inner-city
needs have also to be better organized. A park and ride system and a Bus Rapid Transit
System would help in easing the present chaotic system. Zoning regulations also require
being strengthened so as to ensure parking within plots, including basements and high
deterrent fees for on-street parking. As the city is congested, multi-level parking lots are
required and several spots were identified where these are possible. These could earn
revenue.
Due to festivals, religious fairs and Melas being celebrated throughout the year, the local
More than 500 complaints are being received per month on street lighting issues like no
light, wire breakage etc, which are being redressed within 3 – 15 days time period due to
the inadequate infrastructure and technical staff. Some of the cross roads and other
important locations have been provided with high mast lighting system.
At present the local body does not have adequate infrastructure like cranes with ladder
facilities. They have only two street lighting ladders, and inadequate safety gloves and
other electric repair and maintenance equipment.
No survey has been done to decide about the provision of adequate street lighting facility
as per the adequate norms for distribution, illumination, lux level, savings in electric
consumptions etc.
B5 ENVIRONMENTAL ISSUES
Mathura City, suffers from pollution of air, water, ground and noise. The UP Pollution
Control Board (UPPCB) is the key monitoring authority in this regard. The main cause of
air pollution is vehicular emissions. The status of pollution measuring parameters as
against their permissible limits has been given in Table 2L below:
The main concentration zones of air pollution are the mixed use zones and congested
traffic nodes. The office of the RTO conducts pollution checks in the city with the
assistance of the UPPCB. However, to curb air pollution by industries, the UPPCB grants
the NOC for their operations only when the industries have an air pollution control device.
Main causes of water pollution are domestic sewage, garbage, cattle waste and some
industrial effluents. Noise pollution has also increased in the city in the recent past with the
increase in vehicular traffic. The Ambient Noise Level (dBA) for basic landuses has been
given in table 2M below: -
The main zones of noise pollution are the mixed use zones. However, the RTO with the
assistance of UPPCB conducts quarterly checks where horns of vehicles exceeding the
permissible limits are seized. Moreover, an area of 100 m radius around hospitals and
main nursing homes fall under the category of Silence Zone. However, no substantial
efforts have been made to cut down the pollution levels around educational institutes and
religious sites.
The slaughter house in the inner city is very unhygienic. An alternate site has been
earmarked south of Mathura Cant, but is yet to be developed.
The city has 12 ASI protected monuments and 3 state protected mouments. It has a good
collection of artifacts in the Government Museum. Refer Table 20(a). The Museum has
collection of artifacts which date back to 200 BC. The collection includes coins, terracotta,
sculptures, etc. covered in 18 galleries featuring Kushan and Gupta periods. The first
Budha statue found in the world is in these galleries. The museum is world famous. The
building complex is in disrepair and badly located. The citizens are asking for a new
location and building. The city is also famous for its art and culture. There are more than 5
excavation sites where artifacts have been found dating back to first century AD. Around,
only one fourth of the excavation has been completed till date. The ghats like Vishram
ghat, the kunds, temples, kilas, tilas (excavated sites) and heritage buildings within and
outside the city limits are tourist attractions.
Apart from monuments protected by the ASI, there are 3 no mouments protected under the
state Archaeology Act. Refer Table 20(b) below.
There are around 150 recognized hotels, guest houses, dharamshalas and ashrams in
Mathura and around 80 establishments in Vrindavan, and around 50 in Govardan. The
following important Fairs and Festivals have been identified. Also the Mathura parikrama
is world famous and needs being enhanced in value.
In fact, INTACH have conducted an exercise of listing sites, remains, ruins and buildings of
archeological, architectural, historical, religious, cultural and ecological significance in
Mathura. There are over 400 entries in this list. They include the above protected
monuments. This list is being reduced to a manageable number for legal mapping and for
recognition of heritage precincts.
The Ghats are all part of the parikrama. Also the temples, entries B 5 to 17 are part of the
parikrama, sites and buildings. Based on this list, heritage precints are to be identified so
that projects for heritage precincts can be prepared. In this consultancy, a heritage project
area is identified for the entire parikrama of Mathura and another project for the Mathura
religious water-front. These require the help of conservation architects. The 12 identified
Kunds for restoration and environmental beautification is also another priority as part of
JN-NURM.
B7.1 Housing
Nearly 60% of the residential area is located in the old core city where houses are situated
along narrow lanes of 1.5 to 2.0 m widths. The density in this area is over 600 persons per
hectare and at an average of 6.25 persons per dwelling unit. There are many unauthorized
additions and alterations to the housing stock with their accompanying problems. Nearly
75% of the housing is owner occupied, and approx. 40% is inherited. People prefer to buy
developed plots to built houses but in any case want and expect the requisite infrastructure
to be fully operational. Owing to the low elasticity of incomes, the preference as per MVDA
is for smaller plots as the following preference pattern with them shows:-
x 20% less than 100 sq.m
x 26% , 100 -200 sq.m
x 30%, upto 200 sq. m
x 13%, 200-400 sq.m
x 11%, more than 400 sq.m
There is captive demand for housing from NRIs and from residents of States like Gujarat
and Bengal who wish to settle in Mathura / Vrindavan. There are 6 corridors in Mathura
namely Dehi, Agra, Vrindavan, Goverdhan, Aligarh and Baharatpur. Since Vrindavan is, for
all practical purposes an extension of Mathura (in religious terms it is referred to as the
soul of Mathura), it was logical for new housing and other developments to first come up
along or near these corridors. The new developments have shifted along Delhi –Agra
corridor which is NH-2.
For all income groups except those below the poverty line (BPL), there are 3 agencies
providing developed plots/ built housing namely: Mathura Vrindavan Development
Authority (MVDA), UP State Housing Board and private developers. The authority acquires
land from the farmers, develops it and sells it as a developed colony for HIG, MIG, LIG &
EWS categories. It pays compensation to the farmers through the land acquisition officer
under the District Magistrate. The sources of MVDA’s income are proceeds from sale of
developed plots/ built houses, registration fees from architects and engineers, penalties for
violation of building byelaws and stamp duties. In case of requirement of funds the MVDA
borrows it from HUDCO (Housing and Urban Development Corporation).
At present UP State Housing Board does not have any housing project in Mathura. The
organization also acquires land from farmers and pays them compensation. The land
acquired is developed as per MVDA regulations and sold as plots/ built housing. Private
developers are the major players in the field of providing developed plots/ built housing.
They also buy land from farmers in areas approved as residential land use in the Master
Plan and then get their layouts and
drawings approved by MVDA. The lack of
proper infrastructure i.e drainage, good
roads, drinking water, inadequate electric
power, encroachment etc act as
impediments to housing demand as also
willingness to shift out from the old to the
new areas.
The Mathura city has been divided into 18 slum zones within which 68 slum pockets have
been identified. As per statistics from District Urban Development Agency (DUDA), the
total slum population in the city was around 1.44 lakh in 2001. This accounts for more than
40% of the total population of the city. More than 50% of the population in these slums
belong to SC/CT categories.
Refer Map B4 and B5
The slums are mainly concentrated in the north-eastern part of the city limits. They are
also spread along the Yamuna banks and on Trans- Yamuna side. There is a huge gap of
basic physical and social infrastructure in the slums and which requires immediate
attention at policy and programme level.
Literacy
The literacy rate of slum population in Mathura Urban Agglomeration as reported by DUDA
office as per census 2001 was about 55%. There has not been any studies or reports
about the dropout rates in the schools in the vicinity of slums. Further, there is not any
available source / information about the percentage of slum dwellers into the labour
market. This is an area to be studied in further depth at detailed project feasibility level.
Communities
Majority of the slum dwellers are Hindus, but Mathura UA is heterogeneous in character
with other communities like Muslims and Christians living there since several decades. A
majority have migrated from different neighboring villages and districts in search of better
Land Status
Slums in the Mathura UA are located on private as well as government lands. Around 50%
of the slums in the 18 slum zones, have land/ownership on private lands, the rest is based
on spontaneous structures on government lands. These spontaneous slum areas have no
legal land status and are therefore suffering from lack of physical as well as social
amenities. With the support from DUDA, it is necessary for these spontaneous settlements
to be given in-situ tenural rights by cooperatising the squatter settlements. Initially these
encourage them to be upgraded in-situ. Over a period of time they could emerge in the
form of in-situ reconstructed units.
There is no sewer line as well as no adequate storm water drainage facility in these slums.
Around 40% of the slums have partial coverage of roads and drainage along the roads.
Only, around 5% of the slums have more than 50% adequate road and drain coverage
infrastructure. Around 10% of the slums are affected by water logging due to inadequate
facility for drains. More than 40% of the slums have dilapidated structures. Around 60% of
the slums are covered with water supply facilities. Most of the people have individual hand
pumps rather than piped water connection. Only 1% of the slums are adequately covered
by street lighting facilities. There are however around 9564 pukka buildings in these slums.
The community facilities in the slums comprise of schools, community halls, etc. No other
amenities are available in the slum areas. The existing community infrastructure facilities in
the slums are presented in table 2Rb below.
Additional Requirements
Sr. No. Description Community Halls Night Shelters Community Toilets
1 Mathura City 10 5 12
and constraints in order to address the basic social and physical infrastructure in the slum
areas.
The following are some of the key challenges, issues & constraints regarding the slum
development and poverty alleviation:
x No proper listing of slum dwellers
x Lack of basic physical and social infrastructure
x Basic services are not affordable.
x No access to primary health care.
x Livelihood options not adequate.
x Affordable shelter and land tenure security is lacking.
x Literacy rate is low
x Community empowerment is weak,
x Institutional coordination is also weak.
There are several agencies and parastatals involved in the urban service delivery process
for Mathura City. These include the state government departments, parastatals and local
bodies. While the departments are part of the government, parastatals are created through
the Acts of legislature or government orders. Local bodies are also created through
legislation. Thus Mathura City has a Nagar Palika Parishad. The NPP is the nodal
agency for this urban renewal project.
At present Mathura city does not have an elected council as the subject is sub-judice in the
state. The Municipality is headed by an Administrator, who is being assisted by an
Executive Officer. A separate post of Executive Officer (JNNURM) has been created by
Government of Uttar Pradesh for the JNNURM project in Mathura. The elected council was
dissolved in Dec. 2005, and presently the entire administration is being handled by an
Administrator and an Executive Officer. The municipality has around 1200 staff, which
looks after day to day activities related to the service delivery and general administration
and management.
Revenue: Handles tax, tehbazari, parking, sewage farm, mangal bazaar, redis, etc;
Nazul: Nagar Palika Land, NOC for construction ( New) , Maps records;
Tax: Collection of taxes from hotels, guest houses, commercial tax, house tax,
water tax, sewer tax, assessment tax (new buildings);
Water Works: Water supply, line maintenance, dug wells maintenance, STP’s;
City Administrator
Executive Officer
Street Lighting
Street lighting facilities
CEO
TCPD- Town and Country Planning UPPC – Uttar Pradesh Power Corporation
Department, DUDA- District Urban Development Agency
NPP- Nagar Palika Parishad Mathura ASI - Archeological Survey of India
MVDA- Mathura Vrindavan Development SDA State Department of Archeology
Authority INTACH – Indian National Trust for
UPJN - Uttar Pradesh Jal Nigam Architectural and Cultural Heritage
PWD- Public Works Department (UP) UPTDC-Uttar Pradesh Tourism Development
RTO- Regional Transport Office Corporation
UP SPCB - Uttar Pradesh State Pollution UPSHB-Uttar Pradesh State Housing Board
Control Board
The functional overlaps are mainly seen in the roads and side walks construction,
maintenance of roads and drainage. The governance of the city is characterized by
multiplicity of agencies. The critical issues that emerge from the existence of multiple
agencies include : spatial and functional fragmentation, overlapping functions, multiple
accountability lines, high service delivery gaps, and increasing urban poverty. This results
in the lack of inter departmental coordination which is a serious roadblock plaguing local
bodies. Coordination is largely left to the District Magistrate, who has a large number of
other functions and responsibilities.
The growth of Mathura has been stunted in spite of the fact that various plans and reports
have been prepared over the years to address the problems of the area. The master plan
that has been prepared for the Mathura-Vrindavan area and upgraded have also been
silent on most urban renewal issues. After discussions with several stakeholders, the
following issues emerged:-
Among the citizen concerns has also been the lack of coordination between the various
sectoral agencies. Water supply is woefully short. It is largely through ground extraction
as the Yamuna is heavily polluted. Water Management is lacking. Sewerage is in worse
shape. There is a sewerage system for
about 30 percent of the city area - with 2
sewerage disposal works - both
underutilized. However there are better
services in civil lines. Power is largely from
the grid but is also in short supply.
Organisational and financial management by the NPP also needs being strengthened as
part of a vision for Mathura City 2001-2021.
The consultation process that led to the rapid assessment was highlighted in the previous
chapter. The entire Mathura NPP area is an urban renewal area and as an ‘inner city’ is
within the larger agglomeration known as the MVA (MVDA being the planning and
development authority). Refer Map C1 for the approved Master Plan for the MVDA – 2021
and within which the Mathura NPP area is highlights.
C2. FINANCIAL PROFILE – MATHURA NPP Map C1: Mathura NPP with the
MVDA plan area
The financial profile of the city indicates the state of the city’s finances and the capacity of
the city to be able to manage its finances and mobilize resources for maintaining
infrastructural service at prescribed norms and standards. Therefore financial capacity of
Mathura NPP has been assessed on income, expenditure, debt service and performance.
The financial accounts of the Mathura NPP is being maintained on “Cash Basis” i.e single
entry system. The following are the various sources of income of Mathura NPP: House tax,
tax on rickshaws, boats, parking fees, taxes from traders and shopkeepers, water tax,
water charges, sewer tax, show tax, transaction tax on house sale, advertisement tax,
tonga fee, energy operated sources, rent from assets, thakta fee, income from nazul
property, income from sewage farm, income from premium, tehbazari, maps, penalties,
interest from savings, etc. Besides this the other sources of income include State Finance
Commission sources, and other sources like MP funds, MLA funds.
It is observed that house tax, water tax, and revenue generated from registration and sale
of property accounts for the largest share of the revenue income generated by the
municipality. For 2005-06, the house tax accounted for 17 % of the total income generated
from own sources, sewer tax accounted for 26%, and registration and sale of property
(fees) accounted for 32% of the total income generated from own sources.
The municipality spends its resources for establishment, operation and maintenance and
debt servicing of obligatory and discretionary services provided by it. The major heads of
revenue expenditure include general administration, water works, drainage, roads etc.
Most of the capital works are financed by way of loans, grants from State and Central
Government. The expenditure incurred on the water works accounts for around 18% of the
total expenditure, and drainage works accounts for also around 18% of the total
expenditure. Refer table 3A.
Primarily the NPP is dependent on the State Government for meeting its running costs. It
is now necessary for them to increase revenue and to undertaken major renewal projects
under the JNNURM.
The assessment of the status of the various sectors in the city has brought in a set of
issues for city development. While all issues are important, it was considered necessary to
prioritize them in order to address them more effectively. The prioritization of the issues
has been done based on several criteria including stakeholder perception and technical
assessment.
OPPORTUNITIES THREATS
1. Heritage City of Pilgrimage; can be 1. Floating population is increasing due to the
exploited.; increase in tourism;
2. Expressways, Power Infrastructure; can 2. Pressure on existing infrastructure;
be explored; 3. Delays in implementation of effective plans;
3. International linking for tourism; can be 4. Higher level of traffic congestion due to
explored; urban expansion and floating population;
4. Higher technical educational hub; can be 5. Weak Sustainability of projects.
established;
5. Investments in tourism, education, health,
bio-technology; can be promoted.
4. Financial sustenance.
Goal 4 Strategies
Comprehensive 1. To provide and increase the carrying capacity of the existing road
Traffic Management right-of-ways
System 2. To provide adequate parking facilities for floating and non-floating
population.
3. To increase the multilevel parking system.
4. To facilitate intercity transport around the city including by – pass,
expressways and relocation of inter-settlement activities in relation to
such nodes.
5. To expedite Road Over Bridges and eliminate rail crossings in the
NPP area.
6. To provide a para-transit transport system for city needs.
7. To improve a rapid transit accessibility between Mathura and
Vrindavan by replacing the rail car route with a fast bus route.
Goal 5 Strategies
Logistics and 1. To prepare a comprehensive master plan for the city to tackle the
planning for SWM SWM deficiencies.
System 2. To provide and facilitate the door to door collection system and
segregation of waste at source.
3. To provide proper treatment of bio-medical wastes.
4. To establish and provide with private sector assistance for recycling
waste.
5. To manage the entire system effectively with the help of modern
technology and concepts like GIS / MIS.
6. To provide an effective redressal system in sanitation and solid waste
management.
Goal 6 Strategies
Establishing Higher 1. To provide the state of art higher level technical educational
technical education institutions;
capacity / city as an 2. To compete with the national scenario by investing and attracting
educational hub private sector participation;
3. To promote and provide job oriented small scale industry linked
programmes;
4. To provide affordable education to all.
Goal 7 Strategies
Basic Services & 1. Slum free city.
Infrastructure for 2. 100% basic services to urban poor.
Urban Poor / 3. Community based and access to services.
Slums 4. In-situ slum reconstruction programmes
Based on the perception of citizens and achievable goals and strategies, the livability rate
of Mathura NPP is rated on a scale of 1 (poor) to 10 (excellent) against each of the criteria
is as below. Refer table 3E below:
Based on the above, the average rating for livability for Mathura city could improve from
below 4 at present to above 6 over the next 7 years.
The required plan 2001-21, for Mathura NPP is not to be in the form of a Master Plan and
which has a constricted objective as hitherto in U.P. Nor is it to be in the form of a
development Plan and which does not give due weightage to conservation as part of a
development process. It is, in fact best approached as a 'sustainable development plan'
where services, transport and land use are considered in tandem as an integrated
development opportunity; this however is to be only after looking at forestation, protection
of rivers, water bodies and wetlands, settlement/urban level agriculture and market
gardens and all forms of organized greenery, socio-cultural and religious heritage - both
manmade and natural, as 'positive constraints'. This exercise of 'opportunities and
constraints' in tandem is best addressed through Environmental Management Plans. It
can however for this exercise be called a ‘Comprehensive Development Plan’ so that it is
better understood by all stakeholders. For Mathura this plan has been prepared for the
MVDA area through a perspective plan for 2021
The City Development Plan (CDP) for Mathura NPP through annual budgets that fits into
the MVDA perspective plan is proposed for 6 years, i.e. 2006-07 to 2011-12.
The above arrangements would be in conformity with the 73rd and 74th CAA. Largely for
Mathura NPP, the plans and programmes would be in the form of urban renewal
incorporating environmental and urban upgrading with enhancement of its urban footprints.
The above issues are to take cognisance of the large pilgrim influx the year round to
Mathura-Vrindavan-Govardhana and largely through Mathura.
The key planning and development issues that have accordingly emerged during
discussions with the concerned government officials and other stakeholders are:
The fact is underlined that the entire Mathura NPP area of 28.50 sq. km. comprises of the
urban renewal zone of the larger Mathura Vrindavan Development Area Plan as approved
for the period 2021. This is also true of the adjoining Vrindavan NPP area. Thus the two
twin NPP jurisdictions are the core of the Braj heritage; with Mathura serving as the
entreport to the entire Braj sacred ambience. It is also necessary to consider a combined
basic service for Mathura Cant. with the NPP as they are part of a common urban
agglomeration.
Map D-1 shows the geographic area of the Map D1: The Mathura NPP Jurisdiction
Mathura NPP. The jurisdiction is divided
into 45 wards catering to 3.02 lakh people
in 2001 in congested environs. Inmigration
to this area is reducing (unlike inmigration
to neighbouring Vrindavan). The
population of the UA was 3.23 lakh in this
period. However the floating population is
large and estimated at an average of over
1.00 lakh persons per day in 2001.
Therefore for services, the population of
Mathura UA was estimated at 3.73 (at 50
per cent of estimated daily floating
population). On auspicious days, it is
estimated to exceed even ten lakhs. This
puts organizational pressure for additional
services on the District administration and
the Nagar Palika Parishad.
Map D2 shows the broad land use pattern for the Mathura NPP as determined in the
approved MVDA Plan 21. It would be seen from this plan that the most sacred stretch of
From Map D2, it would also be seen that a single large industrial area along the NH2 bye-
pass is now being transformed into small scale service units in place of larger polluting
units which have shifted to Koshi-Kalan, Nandgaon and the Chatta State Industrial Estates
with better production and infrastructure facilities. Thus the city apart from small-scale and
services production and facilities also offers employment through household production in
the inner city. This primarily caters to religious purchases in terms of confectionery,
garments, metal, wooden and other articles. Several inner-city units producing metal
curios and printed sarees could move to these vacated paces with incentives for such
spitning. Packaging and disposal of waste is unorganized and is part of JN-NURM funding
for improvements. Wholesale fruit, vegetable and flower markets are also along NH2.
Even here and in small outlets within the city, waste disposal is an issue. The MVDA plan
2021 does address the broader shifting and inner city renewal aspects but translating such
visions/ perspectives/ projections into implementation projects is part of this exercise.
Accordingly, key projects are addressed sectorally in the sub-sections below.
Under the 73rd and 74th amendments, the third tier of government cannot easily be
superseded. In the state of U.P., elections for the new local bodies are due within a
stipulated period. In such an event, the NPP should be having 45 newly elected/re-elected
ward councilors,each responsible for his or her ward. Map D3 shows the approximate
Wards in Mathura are of 2 district typologies. The smaller high density core wards, all with
mixed uses, and the more spread out wards of medium density between the core wards
and NH2. Some of these larger wards also have mixed use zones. 9 of the wards (all
core wards) are along the water front. One ward where the District administration is
located is engulfed by the cantonment and at least 9 of the larger wards are along NH2.
The industrial zone along NH2 is in one ward as is Mathura Rail Junction. The sewage
farm in trans-Yamuna is also in one ward. Thus an intrinsic equation envelopes between
the master plan land use zones and the wards. Ground surveys had also shown that
though governance through wards is not very strong in Mathura as in most of urban and
rural areas of the state, yet, remarkably, local leadership and interests narrate and relate
their woes and aspirations in terms of wards. This happens in several settled urban
communities rooted to given locations, kith and kin and therefore are very vocal in
neighborhood deficiencies and needs. If resources are strengthened by and through the
NPP, the participatory process through wards could be strengthened in Mathura through
consistent capacity building in the NPP. The fact has to be underlined that the ward
councilor is the single elected ward representative. It is for him to constitute his
own ward committee and for which NPP level guidelines are required to make such
groups representative of all or most neighborhood views. This applies in equal
measure to Vrindavan NPP as well but not to Mathura Cant. and where the Sub Area
Commander and the Cant. Board understandable dictate local decisions.
Based on the city’s needs and the emerging vision and strategy, the CDP projects have
been identified and structured at three levels:
x Regional Level;
x City Level;
x Ward Level.
The following are the sectors identified for projects as part of the Capital Investment Plan
for Mathura city:
x Water Supply
x Sewerage
x Drainage
x Solid Waste Management
x Roads, Traffic and Transportation
x Street Lighting
x Urban Environment
x Heritage & Tourism
x Urban Governance
x Water Supply
x Sewerage
x Drainage
x Solid Waste Management
x Roads, Streets and Lanes
x Street Lighting
x Basic Amenities ( Public Conveniences, etc)
x Community Halls/ Training Centres
x Housing for BPL
x Training & Capacity Building
The following are the list of projects that have emerged out of the key consultative process,
rapid assessment, the emerging city vision and strategies for the Mathura City Six year
CDP.
Map E1
Map E2
Map E3
E4.2 Sewerage
Sr. No. Projects
1 Cost of Works for Zone I
Main & branch sewer lines, Rising Main for IPS, Road cutting and reinstatement,
Crossing of railway line by rising main, Nala crossing (Masani Nala), Renovation and
Strengtheining of existing SPS, Renovation of existing Sewage Treatment Plants,
Pumping Plant for New IPS, Electic Transmission line, DG Set 100 KVA, Replacement of
Pumping Plants of existing sewage pumping station.
2 Cost of Works for Zone II
Main & branch sewer lines, Rising Main for IPS, Road cutting and reinstatement,
Crossing of railway line by rising main,Strengthening of Bengali Ghat MPS and Rising
Main and two other existing sewage pumping station, Provision and replacement of
pumping plants Bengali Ghat MPS and other two existing sewage pumping station,
Pumping Plant for New IPS, Electic Transmission line, DG Set 100 KVA.
3 Cost of Works for Zone III
Main & branch sewer lines, Rising Main for IPS, Road cutting and reinstatement, IPS &
MPS, Crossing of railway line by rising main (Mathura- Hathras) ,Nala Crossing,
Pumping Plant for new IPS and MPS, Electic Transmission line, DG Set 100 KVA,
Special T&P for O&M of sewerage system, Building Works.
4 Cost of Works for Zone IV
Main & branch sewer lines, Rising Main for IPS, Road cutting and reinstatement, IPS &
MPS, Crossing of railway line by rising main ,Nala Crossing, Pumping Plant for new IPS
and MPS, Electic Transmission line, DG Set 100 KVA, Special T&P for O&M of
sewerage system, Building Works.
5 Cost of Works for Zone V
Main & branch sewer lines, Rising Main for IPS, Road cutting and reinstatement, IPS &
MPS, Crossing of railway line by rising main ,Nala Crossing, Pumping Plant for new IPS
and MPS (Dairy farm MPS, Cantt. SPS) , Electic Transmission line, DG Set 100 KVA,
Special T&P for O&M of sewerage system, Building Works.
6 Cost of Works for Zone VI
Main & branch sewer lines, Rising Main for IPS, Road cutting and reinstatement, IPS &
MPS, Crossing of railway line by rising main ,Nala Crossing, Pumping Plant for new IPS
and MPS, Electic Transmission line, DG Set 100 KVA, Special T&P for O&M of
sewerage system, Building Works.
7 Cost of Works for Zone VII
Main & branch sewer lines, Rising Main for IPS, Road cutting and reinstatement, IPS &
MPS, Crossing of railway line by rising main ,Nala Crossing, Pumping Plant for new IPS
and MPS , Electic Transmission line, DG Set 100 KVA, Special T&P for O&M of
sewerage system, Building Works.
8 Cost of MPS & Sewage Treatment Plants
Sewage Treatment Plant of following categories (UASB Type) : for Zone II,III, IV,V,VI,VII,
Cost of land for treatment plant for zone II,III,IV,V,VI,VII, Out fall drain for zone II,III,IV,VI
lined, unlined, for zone V and VII (PSC pipe), Special T&P for O&M of sewerage system,
Building Works.
Mahadev Ghat Nala, Satrangi Nala, Ambhakhar Nala, Dhurb Ghat Nala, Bangali Ghat
Nala, Shahganj Nala, Masani Nala, Proposed New Drains, Pumping Station including
rising main, railway crossing / Highway crossing
Dairy farm Nala, Cantt Nala, Mahavidya Nala
Aurangabad Nala, Trans Highway Nala, Rising mains , Highway / Rly. Crossings
Pumping Stations, Treatment Plants ( Decentralized Level)
45 wards of the city, which comprises of 18 zones and 68 slum pockets, besides the areas
up to : Bakalpur, Ganeshra, Satoh, Mandi choraha upto Narholi, Tantura, Damodarpur ,
Aurangabad, Gokul Barrage, Yamunapar, Laxminagar, upto Gokul barrage , Aligarh road
upto Sayyed, Vrindavan road , Dhorera, Akrur, Koel Alipur , Mathura Refinery township,
Saraiazampur.
Sr.
Projects
No.
Short Term Projects
1 Water Supply
Handpumps, upgradation works, distribution lines etc
2 Sewerage
Desilting, construction, community based sewerage system
3 Storm Water Drainage
Desilting, Construction, Upgradation of UG drains, Storm Water Drains
4 Roads
Upgradation of existing roads and construction of new roads, streets, lanes, sub-lanes
5 Street Lighting
Installation of light poles,light points and upgradation of street lighting points
6 Solid Waste Management
Medium Term Projects
7 Community Halls/ Centres, Training Centres
8 Public Conveniences / Community Toilets, Night Shelters
9 In situ construction of housing for BPL
Long Term Projects
10 Training & Capacity Building / Infrastructure
The Capital Investment Plan (CIP) has been framed looking at the level of investment’s
that would be required to implement the CDP.
The capital investment has been made as a multi-year schedule of improvements of the
existing assets/ infrastructure and of new infrastructure. The phasing of the investments
has been done on the basis of the city’s requirements and the resources that could be
generated from the potential projects to sustain the assets and investments over a period
of years. Though the programme is for 7 years from 2005-06 to 2011-12, the phasing
through the consultative process has been shown for the 5 year period of 2006-07 to
2010-11, anticipating an overspill into 2011-12 but not beyond.
x Project Identification
x Project Prioritization
x Capital Investment and Phasing
F2 PROJECT INVESTMENTS
The projects as identified have been assessed to require phased out investments between
2006-07 to 2011-12, as below. This is shown in tabular form in each of the ten sectors.
Total
Investment Yearly Investment Required (Rs. in Crores)
Sr.
Sector Required
No. 2006-07 2007-08 2008-09 2009-10 2010-11 2011-12
(Rs. in
Crores) Year 1 Year 2 Year 3 Year 4 Year 5 Year 6
1 Water Supply 320.00 109.70 86.00 62.40 41.30 15.60 5.00
2 Sewerage 304.00 49.00 69.00 65.00 55.00 41.00 25.00
Drainage / Storm
3 228.00 78.00 63.00 44.00 25.00 10.00 8.00
Water Drainage
Solid Waste
4 76.57 15.82 29.45 28.45 1.45 0.90 0.50
Management
5 Street Lighting 56.25 12.45 14.45 13.45 6.30 6.25 3.35
Urban Roads &
6 367.30 94.07 96.56 80.31 52.01 25.30 19.05
Traffic
7 Heritage & Tourism 269.00 56.20 85.15 57.30 38.80 18.00 13.55
Urban Poor and
8 132.56 26.51 26.51 39.77 19.88 13.26 6.63
Slums
Municipal
9 10.25 2.90 2.65 2.35 1.20 0.65 0.50
Governance
10 Urban Environment 66.50 14.50 21.50 21.25 4.75 3.00 1.50
Total 1830.43 459.15 494.27 414.28 245.69 133.96 83.08
5 Supply and laying of additional conveyance system 20.00 7.00 5.00 4.00 3.00 1.00 0.00 UPJN NPP
6 Replacement of existing tubewells 10.00 3.50 3.00 2.00 1.50 0.00 0.00 UPJN NPP
7 Additional tube wells in Zone IX B 3.00 1.00 2.00 0.00 0.00 0.00 0.00 UPJN NPP
Modernization and automation of existing / proposed
8 5.00 1.00 1.00 1.00 1.00 1.00 0.00 UPJN NPP
works
9 Leak detection equipments 5.00 2.00 2.00 1.00 0.00 0.00 0.00 UPJN NPP
Laying of feeder main from take off point of Ganga Jal
10 10.00 3.50 2.50 2.00 1.50 0.50 0.00 UPJN UPJN
Project upto existing 100 mld WTP
11 Construction & Repair of Over Head Water Tanks 15.00 5.00 5.00 5.00 0.00 0.00 0.00 UPJN NPP
12 Rain Water Harvesting & Recharging 20.00 7.00 5.00 4.00 3.00 1.00 0.00 UPJN NPP
Feasibility studies for new barrage for water source
13 10.00 0.00 5.00 5.00 0.00 0.00 0.00 UPJN
augmentation
14 Construction and laying of feeder mains 75.00 26.25 18.75 15.00 11.25 3.75 0.00 UPJN UPJN
15 Internal ward level additional conveyance system 50.00 17.50 12.50 10.00 7.50 2.50 0.00 UPJN NPP
Total 320.00 109.70 86.00 62.40 41.30 15.60 5.00
Proposed Agency
Sr. Investments for Agency
Projects Investments Required under JNNURM (Rs. in Crores)
No. (Rs.in Capital for O&M
crores) Works
2006-07 2007-08 2008-09 2009-10 2010-11 2011-12
Year 1 Year 2 Year 3 Year 4 Year 5 Year 6
1 Cost of Works for Zone I 30.00 5.00 10.00 10.00 5.00 0.00 0.00 UPJN NPP
Main & branch sewer lines, Rising Main for IPS, Road
cutting and reinstatement, Crossing of railway line by
rising main, Nala crossing (Masani Nala), Renovation
and Strengtheining of existing SPS, Renovation of
existing Sewage Treatment Plants, Pumping Plant for
New IPS, Electic Transmission line, DG Set 100 KVA,
Replacement of Pumping Plants of existing sewage
pumping station.
2 Cost of Works for Zone II 20.00 0.00 5.00 5.00 5.00 2.50 2.50 UPJN NPP
Main & branch sewer lines, Rising Main for IPS, Road
cutting and reinstatement, Crossing of railway line by
rising main,Strengthening of Bengali Ghat MPS and
Rising Main and two other existing sewage pumping
station, Provision and replacement of pumping plants
Bengali Ghat MPS and other two existing sewage
pumping station, Pumping Plant for New IPS, Electic
Transmission line, DG Set 100 KVA.
3 Cost of Works for Zone III 20.00 0.00 5.00 5.00 5.00 2.50 2.50 UPJN NPP
Main & branch sewer lines, Rising Main for IPS, Road
cutting and reinstatement, IPS & MPS, Crossing of
railway line by rising main (Mathura- Hathras) ,Nala
Crossing, Pumping Plant for new IPS and MPS,
Electic Transmission line, DG Set 100 KVA, Special
T&P for O&M of sewerage system, Building Works.
4 Cost of Works for Zone IV 32.00 5.00 5.00 5.00 5.00 5.00 7.00 UPJN NPP
Main & branch sewer lines, Rising Main for IPS, Road
cutting and reinstatement, IPS & MPS, Crossing of
railway line by rising main ,Nala Crossing, Pumping
Plant for new IPS and MPS, Electic Transmission
line, DG Set 100 KVA, Special T&P for O&M of
sewerage system, Building Works.
Proposed Agency
Sr. Investments for Agency
Projects Investments Required under JNNURM (Rs. in Crores)
No. (Rs.in Capital for O&M
crores) Works
5 Cost of Works for Zone V 30.00 5.00 5.00 5.00 5.00 5.00 5.00 UPJN NPP
Main & branch sewer lines, Rising Main for IPS, Road
cutting and reinstatement, IPS & MPS, Crossing of
railway line by rising main ,Nala Crossing, Pumping
Plant for new IPS and MPS (Dairy farm MPS, Cantt.
SPS) , Electic Transmission line, DG Set 100 KVA,
Special T&P for O&M of sewerage system, Building
Works.
6 Cost of Works for Zone VI 18.00 6.00 5.00 4.00 2.00 1.00 0.00 UPJN NPP
Main & branch sewer lines, Rising Main for IPS, Road
cutting and reinstatement, IPS & MPS, Crossing of
railway line by rising main ,Nala Crossing, Pumping
Plant for new IPS and MPS, Electic Transmission
line, DG Set 100 KVA, Special T&P for O&M of
sewerage system, Building Works.
7 Cost of Works for Zone VII 21.00 5.00 5.00 4.00 3.00 3.00 1.00 UPJN NPP
Main & branch sewer lines, Rising Main for IPS, Road
cutting and reinstatement, IPS & MPS, Crossing of
railway line by rising main ,Nala Crossing, Pumping
Plant for new IPS and MPS , Electic Transmission
line, DG Set 100 KVA, Special T&P for O&M of
sewerage system, Building Works.
8 Cost of MPS & Sewage Treatment Plants 38.00 13.00 9.00 7.00 5.00 2.00 2.00 UPJN NPP
Sewage Treatment Plant of following categories
(UASB Type) : for Zone II,III, IV,V,VI,VII, Cost of land
for treatment plant for zone II,III,IV,V,VI,VII, Out fall
drain for zone II,III,IV,VI lined, unlined, for zone V and
VII (PSC pipe), Special T&P for O&M of sewerage
system, Building Works.
9 Sewerage lines & connections at ward level 95.00 10.00 20.00 20.00 20.00 20.00 5.00 UPJN NPP
Total 304.00 49.00 69.00 65.00 55.00 41.00 25.00
1 SWM Master Plan 0.15 0.15 0.00 0.00 0.00 0.00 0.00 NPP
2 Containerized tricycle carts (200 Nos.) 0.20 0.05 0.05 0.05 0.05 0.00 0.00 NPP NPP
3 Containerized handcarts 0.25 0.05 0.05 0.05 0.05 0.05 0.00 NPP NPP
4 Seamless handcarts for drain cleaning 0.02 0.02 0.00 0.00 0.00 0.00 0.00 NPP NPP
5 Garbage Bins (2000 Nos.) 0.20 0.10 0.10 0.00 0.00 0.00 0.00 NPP NPP
6 Containers for waste handling (4000 Nos.) 0.20 0.05 0.05 0.00 0.05 0.05 0.00 NPP NPP
Small vehicles for direct collection of waste (Tempo
7 0.25 0.05 0.10 0.10 0.00 0.00 0.00 NPP NPP
Dumper - 15 Nos.)
Closed dumper placer type containers of 4.5 cu.m
8 0.55 0.00 0.10 0.20 0.15 0.10 0.00 NPP NPP
capacity (40 Nos.)
9 Containers for harzadous wastes 0.20 0.00 0.10 0.10 0.00 0.00 0.00 NPP NPP
Dumper placer machine for 4.5 / 7.0 cu. M containers
10 1.20 0.15 0.30 0.30 0.30 0.15 0.00 NPP NPP
(8 Nos.)
11 4.5 cu.m skips for construction waste 0.03 0.03 0.00 0.00 0.00 0.00 0.00 NPP NPP
12 Skip filters 0.02 0.02 0.00 0.00 0.00 0.00 0.00 NPP NPP
Small vans for hospital/ garden / hotels waste/
13 0.25 0.05 0.05 0.05 0.05 0.05 0.00 NPP NPP
collection
14 Inceneration plants 1.00 0.00 0.50 0.50 0.00 0.00 0.00 NPP NPP
15 Bulldozer 0.40 0.00 0.20 0.20 0.00 0.00 0.00 NPP NPP
16 Asphalt / concrete flooring under the bins 1.50 0.00 0.75 0.75 0.00 0.00 0.00 NPP NPP
17 Landfill Site of 150-200 MT waste per day 50.00 10.00 20.00 20.00 0.00 0.00 0.00 PVT PVT
Equipments and T&P required for landfill site
18 5.00 1.00 2.00 2.00 0.00 0.00 0.00 NPP NPP
development of 200 MT per day
19 Public Awareness 2.00 0.50 0.50 0.25 0.25 0.25 0.25 NPP NPP
20 Provision for supervision and control , MIS etc 2.00 0.50 0.50 0.25 0.25 0.25 0.25 NPP NPP
Provision for construction of sheds for vehicles,
21 5.00 1.00 2.00 2.00 0.00 0.00 0.00 NPP NPP
workshops etc
22 Provision for communication system etc 1.00 0.25 0.25 0.25 0.25 0.00 0.00 NPP NPP
JCB Backhoe Machine with rear and front bucket (4
23 1.00 0.25 0.25 0.50 0.00 0.00 0.00 NPP NPP
Nos.)
24 Tractors (14 Nos.) 0.60 0.20 0.20 0.20 0.00 0.00 0.00 NPP NPP
25 Hydraulic Trolley for Tractors (16 Nos.) 0.20 0.05 0.05 0.10 0.00 0.00 0.00 NPP NPP
26 Septic Tank Cleaning Machines (4 os.) 1.00 0.50 0.50 0.00 0.00 0.00 0.00 NPP NPP
Litter Bins around markets and important places of
27 0.35 0.10 0.10 0.10 0.05 0.00 0.00 NPP NPP
tourist interest (1000 Nos. )
28 Cattle/ Stray Animal Catcher (3 No.s) 0.20 0.10 0.10 0.00 0.00 0.00 0.00 NPP NPP
29 Fogging Machine ( 2 Nos.) 0.30 0.15 0.15 0.00 0.00 0.00 0.00 NPP NPP
30 Sewer Cleaning Jet Machine ( 4 No.s ) 1.50 0.50 0.50 0.50 0.00 0.00 0.00 NPP NPP
Proposed Agency
Sr. Investments for Agency
Projects Investments Required under JNNURM (Rs. in Crores)
No. (Rs. In Capital for O&M
crores) Works
Development of approach roads & flyover crossings /
junctions along NH-2 (Bharatpur road crossing,
4 50.00 10.00 10.00 10.00 10.00 5.00 5.00 PWD PWD
Sonkh road crossing, Goverdhan road crossing, Delhi
road crossing, Raya Aligarh road crossing) – 5 Nos.
RUB / ROB / Flyovers, Sub-ways and Railway
Crossings (Murga Phatak, Naya Bus Adda, Purana
5 Bus Adda, Bhuteshwar Tiraha, Daulipiyau Crossing, 40.00 10.00 10.00 5.00 5.00 5.00 5.00 PWD PWD
Cantonment – State Bank, General Ganj, Deeg Gate
Janam Bhumi) – 7 Nos.
Multi-Storied Parking & Parking Bays ( Holigate,
Chowk Bazar, Bharatpur Gate, Deeg Gate,
6 50.00 10.00 15.00 10.00 10.00 5.00 0.00 PVT PVT
Bhuteshwar, Jaysingpura, Birla Mandir, Methodist
Hospital, Trans Yamuna)
Relocation of Old & New Bus Terminals ( New Inter
7 30.00 10.00 10.00 10.00 0.00 0.00 0.00 PVT PVT
State Bus Terminal ) - 2 no.s
8 Transport Nagar (Cys Highway, Trans Yamuna) 10.00 3.00 3.00 3.00 1.00 0.00 0.00 PVT PVT
Replacement of rail route between Mathura and
9 30.00 5.00 10.00 10.00 5.00 0.00 0.00 PVT PVT
Vrindavan with frequent bus system
10 Traffic / Transportation Infrastructure
Street furniture, signages, hoardings, parking bays/
shelters, Bus stops/ shelters, Auto/ taxi stands/
10.00 2.00 2.00 2.00 2.00 1.00 1.00 TRAFFIC TRAFFIC
parking bays,Stoppers, Icones, Speed Aanlysers,
Breath Analysers, etc
11 Traffic Cranes ( 5 Nos.) 0.75 0.20 0.20 0.20 0.05 0.05 0.05 TRAFFIC TRAFFIC
12 PCR Vans (5 Nos.) 0.50 0.10 0.10 0.10 0.20 0.00 0.00 TRAFFIC TRAFFIC
13 Traffic Contol Bikes (10 Nos.) 0.05 0.02 0.01 0.01 0.01 0.00 0.00 TRAFFIC TRAFFIC
Total 367.30 94.07 96.56 80.31 52.01 25.30 19.05
Proposed Agency
Sr. Investments for Agency
Projects Investments Required under JNNURM (Rs. in Crores)
No. (Rs. In Capital for O&M
crores) Works
Audio Video visual system at information and display
17 1.00 0.30 0.20 0.20 0.10 0.10 0.10 PVT PVT
centres.
Training and development centre for local guides UP UP
18 1.00 0.30 0.20 0.20 0.10 0.10 0.10
trainings. TOURISM TOURISM
Youth Hostel, camping facilities for Pilgrims,
19 temporary parking facilities, boarding/ loadging 15.00 5.00 5.00 5.00 0.00 0.00 0.00 PVT PVT
facilities with cloak rooms
20 Working womens hostel 2.00 0.00 1.00 1.00 0.00 0.00 0.00 NPP NPP
21 Recreational, sports and cultural complex 15.00 0.00 5.00 5.00 5.00 0.00 0.00 PVT PVT
22 Age old homes / hospitality 1.50 0.00 0.50 0.50 0.50 0.00 0.00 NPP NPP
Feasibility study for infrastructure provision in new
23 1.50 0.00 0.00 0.00 1.50 0.00 0.00 NPP
township
Total 269.00 56.20 85.15 57.30 38.80 18.00 13.55
Training /
Total Project Street Community Basic Housing
Zones Water Supply Sewerage Drainage Roads SWM Capacity
Cost Lighting Halls Amenities BPL
Building
Zone 1 9.16 0.26 0.84 1.35 1.85 1.25 0.15 0.25 0.20 2.96 0.05
Zone 2 5.97 0.15 0.48 1.15 0.98 1.16 0.15 0.25 0.45 1.15 0.05
Zone 3 5.66 0.26 0.83 0.40 1.70 0.85 0.15 0.25 0.40 0.77 0.05
Zone 4 6.99 0.34 1.08 0.65 1.95 1.05 0.15 0.50 0.40 0.82 0.05
Zone 5 2.63 0.15 0.48 0.45 0.45 0.45 0.15 0.00 0.20 0.25 0.05
Zone 6 9.00 0.38 1.20 0.52 2.95 1.35 0.15 0.25 0.30 1.85 0.05
Zone 7 7.13 0.32 1.02 0.95 2.45 1.14 0.15 0.25 0.40 0.40 0.05
Zone 8 5.12 0.24 0.77 0.55 1.65 0.65 0.15 0.25 0.20 0.61 0.05
Zone 9 6.14 0.19 0.60 1.60 1.55 0.60 0.15 0.25 0.20 0.95 0.05
Zone 10 7.01 0.33 1.06 0.78 1.75 0.75 0.15 0.50 0.75 0.89 0.05
Zone 11 7.86 0.28 0.90 1.80 2.45 0.35 0.15 0.25 0.65 0.98 0.05
Zone 12 7.77 0.34 1.10 0.30 2.60 0.70 0.15 0.50 0.65 1.38 0.05
Zone 13 10.31 0.31 0.98 2.50 2.15 0.55 0.15 0.50 0.60 2.52 0.05
Zone 14 8.81 0.27 0.88 1.85 2.10 0.68 0.15 0.00 0.60 2.23 0.05
Zone 15 6.62 0.29 0.93 1.45 1.15 0.50 0.15 0.75 0.45 0.90 0.05
Zone 16 2.95 0.10 0.37 0.50 0.68 0.40 0.15 0.15 0.15 0.40 0.05
Zone 17 9.28 0.28 0.90 1.95 1.45 0.95 0.15 0.75 0.80 2.00 0.05
Zone 18 14.15 0.39 1.25 2.35 2.85 1.85 0.15 1.25 1.50 2.51 0.05
Total 132.56 4.88 15.67 21.10 32.71 15.23 2.70 6.90 8.90 23.57 0.90
The proposed Capital Investment Plan (CIP) for Mathura is summarized in tabular form below:
Total
Investment Yearly Investment Required (Rs. in Crores)
Sr. GoUP ULB
Sector Required %age GoI (80%)
No. 2006-07 2007-08 2008-09 2009-10 2010-11 2011-12 (10%) (10%) *
(Rs. in
Crores) Year 1 Year 2 Year 3 Year 4 Year 5 Year 6
1 Water Supply 320.00 109.70 86.00 62.40 41.30 15.60 5.00 17.48 256.00 32.00 32.00
2 Sewerage 304.00 49.00 69.00 65.00 55.00 41.00 25.00 16.61 243.20 30.40 30.40
Drainage / Storm Water
3 228.00 78.00 63.00 44.00 25.00 10.00 8.00 12.46 182.40 22.80 22.80
Drainage
4 Solid Waste Management 76.57 15.82 29.45 28.45 1.45 0.90 0.50 4.18 61.26 7.66 7.66
5 Street Lighting 56.25 12.45 14.45 13.45 6.30 6.25 3.35 3.07 45.00 5.63 5.63
6 Urban Roads & Traffic 367.30 94.07 96.56 80.31 52.01 25.30 19.05 20.07 293.84 36.73 36.73
7 Heritage & Tourism 269.00 56.20 85.15 57.30 38.80 18.00 13.55 14.70 215.20 26.90 26.90
8 Urban Poor and Slums 132.56 26.51 26.51 39.77 19.88 13.26 6.63 7.24 106.05 13.26 13.26
9 Municipal Governance 10.25 2.90 2.65 2.35 1.20 0.65 0.50 0.56 8.20 1.03 1.03
10 Urban Environment 66.50 14.50 21.50 21.25 4.75 3.00 1.50 3.63 53.20 6.65 6.65
Total 1830.43 459.15 494.27 414.28 245.69 133.96 83.08 100.00 1464.34 183.04 183.04
Total Investment
Sr.
Sector wise department wise allocation Required (Rs. in Yearly Investment Required (Rs. in Crores)
No.
Crores)
2006-07 2007-08 2008-09 2009-10 2010-11 2011-12
Year 1 Year 2 Year 3 Year 4 Year 5 Year 6
1 Water Supply
UPJN 320 109.7 86 62.4 41.3 15.6 5
2 Sewerage
UPJN 304 49 69 65 55 41 25
3 Drainage / Storm Water Drainage
UPJN 228 78 63 44 25 10 8
4 Solid Waste Management
NPP 26.57 5.82 9.45 8.45 1.45 0.9 0.5
PVT 50 10 20 20 0 0 0
5 Street Lighting
NPP 56.25 12.45 14.45 13.45 6.3 6.25 3.35
6 Urban Roads & Traffic
NPP 146 43.75 36.25 30 18.75 9.25 8
PWD 90 20 20 15 15 10 10
PVT 120 28 38 33 16 5 0
TRAFFIC 11.3 2.32 2.31 2.31 2.26 1.05 1.05
7 Heritage & Tourism
NPP 5 0 1.5 1.5 2 0 0
PVT 116 24.3 34.2 27.2 14.6 8.35 7.35
UP TOURISM 148 31.9 49.45 28.6 22.2 9.65 6.2
8 Urban Poor and Slums
DUDA 132.56 26.51 26.51 39.77 19.88 13.26 6.63
9 Municipal Governance
NPP 10.25 2.9 2.65 2.35 1.2 0.65 0.5
10 Urban Environment
NPP 36.5 5.5 15.5 15.25 0.25 0 0
PVT 30 9 6 6 4.5 3 1.5
1830.43 459.15 494.27 414.28 245.69 133.96 83.08
A summary of department-wise allocation of the Rs.1830.43 crores which has been envisaged
for achieving the sectoral goals is tabulated hereunder.
The section on Capital Investment Plan details the basis on how the projects have been
allocated. Department Wise Allocation (Rs. Crores)
UPJN, 852
Some of the projects which full under the
ambit of the Nagar Palika Parishad but NPP w ith PVT sector
can be taken up with private sector support, 316
In case of Housing Stock for the poor it is assumed that 10% of the project cost will be borne by
the beneficiaries. Taking into account the above the proposed means of financing for the Rs
1830.43 crores is as under.
As illustrated above Rs1462.46 Crores will be the contribution of the GoI, Rs 274.36 Crores will
come from GoUP and it’s departments. The balance will come from Nagar Palika Parishad
(Rs.28.06 Crores), Private Sector (Rs 63.20 Crores) and Rs 2.36 Crores from the beneficiaries
of low cost housing.
The GoUP will make provision for Rs. 274.36 crores towards its share over the period of 6 years
till financial year 2011-12. The Nagar Palika Parishad would required financial assistance of
Rs.23 crores as under to meet its contribution (The balance will be from internal sources in the
later years, possible because of fiscal reforms).
The above funds will be required to be provided to the NPP from the revolving Fund Scheme of
the Urban Development Department of GoUP and will be repaid in 10 equal yearly installments.
While we have explained the sources of funding for the Rs.1830.43 Crores investment the
important aspect is of sustenance of this investment. The financial capacity of the Mathura NPP
is very low. A brief description of the financial situation is detailed hereunder.
In the fiscal year 2005-06 the review sources for the NPP were as under :
Property Tax (House tax/ Water Tax/ Sewerage Tax) Rs.154 lacs
Other Income Rs.162 lacs
Surcharge from Stamp Duty Rs.174 lacs
Premium from Sale of Property Rs.123 lacs
Government Grants Rs.714 lacs
Income from own sources is only Rs 316 lacs (not considering premium from sale of property)
out of the total revenue of Rs.1327 lacs i.e. 23.8%.
To meet the above drastic action has to be taken to improve the fiscal capacity of the NPP. At
present only 35940 households properties in the Nagar Palika Area are assessed and the water
supply requirement that is met is less than 50%. The coverage of sewerage/ drainage is also
only 10% of the NPP Area. Considering that under JNNURM we are envisaging to provide vastly
enhanced coverage of water supply sewerage and drainage we can recover enhanced tax, water
and sewerage tax and water charges.
The assumptions and calculations on this basis for property tax and water charges are as under.
Water/Sewerage Tax
2006 - 07 2007 - 08 2008 - 09 2009 - 10 2010 - 11 2011 - 12
Recovery % of O&M through user
charges/metering 20% 30% 50% 50% 70% 80%
O&M Costs to be recovered 973.42 1890.07 2627.345 3110.345 3389.12
Collection 0 292.026 945.035 1313.673 2177.242 2711.296
Water/Sewerage Charges
2006 - 07 2007 - 08 2008 - 09 2009 - 10 2010 - 11 2011 - 12
Estimated Dwelling Units 75000 80000 80000 85000 85000 90000
Coverage 20% 30% 40% 50% 70% 80%
Average Annual Charges per
Dwelling unit in rupees 500 500 750 750 1000 1000
Total Water Charges Collection per
year in Rs in Lakhs 75 120 240 318.75 595 720
The following assumptions have been made for projecting future expenditure
1. Establishment & O&M (Existing) has been assumed to increase by 10% annually.
2. Salaries have been assumed to increase by 2% annually
3. O&M of assets created under JN-NURM has been assumed as assets that will be
the responsibility of the Municipality and it increases with the influx of the
investment.
4. Other expenses have been assumed to increase by 5% annually
5. Since the Municipality is able to improve its financial portion they are able to
undertake enhanced capital expenditure which has been assumed to increase by
15% annually.
Based on the above assumptions, the cash flow for Mathura NPP, based on actuals for the
period starting in F.Y. 2002-03 and ending in F.Y. 2005-06 and projected for the period starting
in F.Y. 2006-07 and ending 2011-12, is presented in tabular form below:
Rs in Lakhs
2002- 2003 - 2004 - 2005 - 2006 - 2007 - 2008 - 2009 - 2010 - 2011 -
Income 03 04 05 06 07 08 09 10 11 12
Opening Cash
Balance 48 165 64 19 28 606 580 629 30 438
Property Tax 130 113 109 154 316 743 1430 1845 2955 3519
Other Tax 7 5 6 6 7 8 10 12 15 17
Surcharge on stamp
duty 0 16 77 174 174 174 174 174 174 174
Non Tax Income 28 17 38 43 127 182 314 408 702 848
Premium from Sale of
Property 40 0 1 123 0 0 0 0 0 0
Other Income 50 21 68 113 124 136 150 165 182 200
Government Grants 669 446 542 714 714 714 714 714 714 714
Loans 65 5 304
Loan from revolving
fund for NURM 800 700 800
Income from New
Projects 81 276 368 460 460 460
Total Income 1036 789 1207 1346 2371 3540 4540 4407 5231 6371
2002- 2003 - 2004 - 2005 - 2006 - 2007 - 2008 - 2009 - 2010 - 2011 -
Expenditure 03 04 05 06 07 08 09 10 11 12
Establishment 71 58 61 98 98 108 119 130 143 158
Salaries 683 592 656 1035 756 771 787 803 819 835
O&M 28 24 25 37 41 45 50 55 60 66
O&M New Projects 973 1890 2627 3110 3389
Others 14 13 187 52 54 57 60 63 66 69
Capital Expenditure 76 38 258 97 111 128 147 169 194 223
Municipalities
Investment in NURM 704 798 710 300 171 124
Repayment of Loan 80 150 230 230 230
Total Expenditure 871 725 1188 1318 1765 2960 3912 4377 4794 5095
Balance Cash 165 64 19 28 606 580 629 30 438 1276
Conclusion
By undertaking prudent fiscal measures and reforms the NPP is able to enhance its revenue
from the current level of Rs.1376 lacs to Rs.6371 lacs in 2011-12, out of which income from own
sources amounts to 86%. In this scenario it is able to meet the O&M cost of the assets created
under NURM.
Mathura district spread over 3780 sq km with population of over a million. A historic city at the cross
roads of important ancient trade routes extending westwards to West Asia & the Roman Empire,
northwards, via Taxila, Pushkalavati and Purushapur to Central Asia & Silk Route & eastwards to China
stands today at the junction of modern India's major road & rail routes connecting north to west, south &
east.
Mathura - the birthplace of revered Lord Krishna, manifestation of Lord Vishnu, 5000 years back is part of
Brajbhoomi region. The Braj area is a loosely defined geographic region with its distinct culture, language
& heritage considered to be playground of Lord Krishna. Located approx 150 kms from the national
capital Delhi on way to Agra, Mathura is the epicenter of Brajbhoomi. Other areas include Gokul,
Mahavan, Baldeo, Vrindaban, Goverdhan & Nandgaon etc located within 30-50 kms of Mathura. The
language spoken is Hindi with a distinct Braj dialect.
The capital of Surasena Kingdom, during the times of Buddha, in 5th century BC, Mathura was ruled by
Kushanas - Kanishka, Huvishka & Vashiska. During Emperor Ashoka's reign in Mauryan era(3rd century
BC) Mathura witnessed economic & cultural revival. Subsequently ruled by Shunga dynasty(2nd centu~
BC), Indo-Greeks(180 BC) Indo-Scythians(1st century BC) & Gupta dynasty(4t century AD). Xuanzang,
Chinese explorer, visited Mathura in 634 during his travel through India ..
The relics of history are scattered all over the brajbhoomi region. Temples, forts, ponds (sarovars),
statues of Lord Buddha (from Kushana period) & thousands of sculptures (3rd century BC to 12th century
AD) in Mathura museum etc. Mathura draws millions of tourists every year.
Mathura has a lot of heritage sites which has prompted a steady flow of tourists in the city. These tourists
mainly visit religious and cultural places. International Tourists are intrigued by the sculptures and other
art forms in the Mathura Museum and in the Krishnajanmabhoomi where a beautiful temple stands at the
birthplace of Lord Krishna. Mathura, today is an important place for pilgrimage and receives thousands of
religious tourists every year. The Dwarkadhish Temple built in 1814, with its temple carvings and fine
paintings is Mathura's most visited shrine.
Mathura has contributed a lot towards Indian Culture through its rich heritage. The ethos of Mathura, and
in fact the whole of Braj, is centered on Krishna and his tales. Mathura sees heightened activities during
the major festivities dedicated to the lord.
The Braj culture has been expressed widely through various practices.
The Raaslilas of Mathura have become an integral part of Indian Folklore. According to popular belief,
Shri Krishna had danced the Raas with the gopis on the banks of the Yamuna. When the gopis felt
slightly conceited about Lord Krishna dancing with them, he disappeared from their midst. In the pain of
separation from Lord Krishna, the gopis enacted his liIas (divine episodes of his life) which in course of -
time came to be known as the Raaslilas. The childhood pranks of Shri Krishna constitute the main theme
of these dramas.
Rasiya too is a tradition that is integral to Mathura's Culture. It is the tradition of folk-songs that describe
the love of the divine couple Radha and Shri Krishna. It is an inseparable part of the Holi celebrations and
all other festive occasions at Mathura.
Charkula is a traditional folk dance of the Brij. In this dance a woman balances a column of deepikas on
her head and dances to the accompaniment of Rasiya songs by the men folk.
The language spoken in the Brij district is mainly Hindi which is spoken in a different dialect. This dialect
is characteristic with the Brij region and has come to be known as Brijbhasha.
Mathura is steeped in Hindu tradition, which is visible everywhere. The temples, riverfront and ponds are
all centres of religious activity. From early morning till dusk devotees throng the holy places. In their quest
for salvation, the numerous Brahmin priests who conduct prayers guide pilgrims.
The renewal of this city steeped in history & cultural heritage has to be all encompassing for effective
development & tourism promotion-
Heritage Preservation-
All heritage cities around Mathura to be identified including old city in Mathura, Vrindavan, Goverdhan,
Gokul, Barsana, Nandgaon etc to preserve their identity.
All development activity should be governed by a centralized body with representation from
INTACH,cultural bodies etc.
Areas within old city shall be converted into pedestrian zones & only pollution free vehicles be allowed to
operate.
Waterfront of the city shall be developed to provide for smooth flow of pilgrims. Riverfront can also
become a tourist attraction.
Identification, preservation & development of heritage structures including temples, ponds etc shall be
undertaken.
Activities at religious places of worship shall be regulated to prevent harassment & exploitation of
devotees.
Orientation & training of tourist guides .
Cultural Preservation -
Promotion of local cultural activities including Raslila, dances etc - Training schools can be set up - this
kind of activity can be self-sustaining as it can generate employment & can be a major tourist attraction.
Promotion of Brajbhasha - An institute for brajbhasha research with library for preservation of manuscripts
can go a long way in this effort.
Infrastructure Development-
Development of neo-urban areas to reduce pressure on old city.
Development of world-class infrastructure including road network, water supply, drainage etc.
Tax incentives for development of boarding facilities for tourists from all economic strata .
. Adequate signage display for directions, historical significance etc at all relevant sites.
Mathura's significance in Indian Culture is parallel to that of Jerusalem and the Vatican in the Western
world. It is a seat of India's cultural and religious history. Therefore, the tourist's current Golden Triangle
consisting of New Delhi, Agra and Jaipur ought to include Mathura & be called the Golden Quadrangle.
Thanking you,
Deepak Goel,
Convener, Brijbhoomi regional Chapter-INT ACH Mathura – 3
Mob. 9359508690
Annex D1
Slum Zones in 45 wards - Mathura NPP
The slums in Mathura city has been categorized into 18 zones within 45 wards and comprises 68 slum pockets. There are around
4-6 slum pockets in each zone.
Sr. Name of the Slums Number
No. of Slum Total SC/ST
Pockets Population Population Infrastructure Details
Sewer Line Storm Water
Drain
1 Radheshyam Colony, Avagadh Farm, Concor Tila 3 14600 8250 56.51 No No
2 Jaysinghpura, Mohannagar Ashanagar, Kanhaiya 6
Kunj 4250 2260 53.18 No No
3 Chamunda Colony, Saraswati Kund, 4
Govindnagar, Azampur 3760 1900 50.53 No No
4 Sanjaynagar, Aumnagar, Ramnagar 4 5650 2950 52.21 No No
5 Mallpura, Govind Ashram 2 1500 850 56.67 No No
6 Ambedkarnagar, Rambarosi colony, Bodhnagar, 6
Sukhdev Nagar, Navneet nagar, Rajiv Gandhi
Nagar 12300 6800 55.28 No No
7 Janakpuri Mohali Road 2 2350 1620 68.94 No No
8 Devnagar, Gopalnagar, Nagla Chandrabag, 4
Shankarpuri 3550 1850 52.11 No No
9 Narayanpuri, Dholipiyau 3 5250 2850 54.29 No No
10 Baadpura, Sadar, Dadra 3 2860 1450 50.70 No No
11 Antapada, Ambakhar, General Ganj, Roti Godam, 7
Menagarh,Compughat 12150 6560 53.99 No No
12 Vankhandi, Khatothi Kua, Baesbhori, Chaganpura 4
10250 5150 50.24 No Yes
13 Bharatpurgate, Thakela Gali, Machli Mandi, Haiza 5
Hospital 15650 8260 52.78 Partial No
14 Manoharpura, Goalkua,Matiyagate 3 13450 6560 48.77 No No
15 Arjunpura, Rani ki Mandi,Theknarnol 3
5720 2950 51.57 No No
16 Mayatila, Halanganj, 1 2820 1850 65.60 No No
17 Naya Nagla, Ghingurpura, Bahadurpura, Khatik 4
Basti, Choki Chandmari Gate 12650 9850 77.87 No No
18 Yamuna par, Laxmi Nagar, Shehzadpur, Shivpuri, 4
Sonie Tappa 14780 7960 53.86 No No
68 143540 79920
Sr. Name of the Slums
No. Infrastructure Details Existing Status of Buildings Land
Ownership
Road & Drains Piped Street Pukka Partially Juggi & BPL
Water Light Buildings Constructed Jhompidies Families
1 Radheshyam Colony, Avagadh Farm, Partially
Concor Tila covered No No 1026 494 58 1165 Private Land
2 Jaysinghpura, Mohannagar Partially
Ashanagar, Kanhaiya Kunj covered No No 348 157 27 455 Private, Govt.
3 Chamunda Colony, Saraswati Kund, Partially
Govindnagar, Azampur covered No No 362 175 302 Private, Govt.
4 Sanjaynagar, Aumnagar, Ramnagar Partially
covered Partial No 316 154 8 321 Private, Govt.
5 Mallpura, Govind Ashram 60% No No 94 48 95 Private, Govt.
6 Ambedkarnagar, Rambarosi colony, Water Logged
Bodhnagar, Sukhdev Nagar, Navneet Area
nagar, Rajiv Gandhi Nagar No No 742 398 9 745 Private, Govt.
7 Janakpuri Mohali Road Partially
covered No No 198 97 159 Private
8 Devnagar, Gopalnagar, Nagla Partially
Chandrabag, Shankarpuri covered No No 325 120 238 Private
9 Narayanpuri, Dholipiyau Old No No 386 198 376 Govt.
10 Baadpura, Sadar, Dadra Old Dilapidated No No 198 87 116 Private, Govt.
11 Antapada, Ambakhar, General Ganj,
Roti Godam, Menagarh,Compughat Old Yes Partial 166 69 12 188 Private
12 Vankhandi, Khatothi Kua, Baesbhori, Old Dilapidated
Chaganpura Yes No 742 336 545 Private
13 Bharatpurgate, Thakela Gali, Machli Old Dilapidated
Mandi, Haiza Hospital Yes No 1098 547 998 Private, Govt.
14 Manoharpura, Goalkua,Matiyagate Old Dilapidated Yes No 986 447 878 Private
15 Arjunpura, Rani ki Mandi,Theknarnol Old Dilapidated Yes No 422 196 355 Private
16 Mayatila, Halanganj, Old Dilapidated
Yes No 242 114 162 Private
17 Naya Nagla, Ghingurpura, Old Dilapidated
Bahadurpura, Khatik Basti, Choki
Chandmari Gate Yes No 838 421 8 787 Private, Govt.
18 Yamuna par, Laxmi Nagar, Partially
Shehzadpur, Shivpuri, Sonie Tappa Covered Yes No 1075 426 25 836 Private
9564 4484 147 8721
Annex D2
Slum Zone Name of the Slum Ward No. Household Population BPL
Pocket Population
No.
Zone wise population projection for waste water generation in MLD for the year 2039
Name Population Water Waste Other waste generation Total Existing Balance
of in design requirement water MLD waste capacity Quantity
Zone year 2039 in MLD @ @ 80% of water of STP required
Railway Industrial MES Other Total
135 lpcd + water generation available
15% requirement in MLD
I 106849 16.59 13.27 - 0.32 - - 0.32 13.59 13.59 -
II 140257 21.77 17.42 - - - - - 17.42 - 17.42
III 76576 11.89 9.51 - - - - - 9.51 14.60 -
IV 72000 11.18 8.94 - - - - - 8.94 - 8.94
V 256463 39.82 31.86 1.20 1.25 - - 2.45 34.31 - 34.31
VI 60228 9.35 7.48 - - 1.0 - 1.0 8.48 - 8.48
VII 107627 16.71 13.37 - - 3.50 - 3.50 16.87 - 16.87
Total 86.59 28.19 58.40