Collaborative decision by Users & ANSP to identify need for P-RNAV implementation. P-RNAV IMPLEMENTATION Consider - ª Benefits of Terminal Airspace optimisation using P-RNAV e.g. ATC Workload reduction, fuel A. ECIP NAV.03 reduction, ACFT equipage cost (Cost benefit analysis) ª Viability of phased implementation to ease transition from operational perspective B. EUROCONTROL: REVISED SPECIMEN AIC : OPERATION OF ª Associated ATC Procedures required to reap benefits. PRECISION RNAV (P-RNAV) AIRBORNE EQUIPMENT IN ECAC ª Impact of P-RNAV / Conventional Nav. Mix on ATC and Operators (e.g. Effects on operators TERMINAL AIRSPACE [Pending] not P-RNAV approved) ª Nav infrastructure requirements & associated RNAV flight checking C. STANDARDISED SPECIMEN AIP TEXT (TO BE PREPARED BY ª PANS-OPS Procedure design: limitations & opportunities (e.g. Training of designers) EUROCONTROL) Decision & Action - ª Time scales for all actions associated with P-RNAV implementation ª Notification of intent by operators to implement P-RNAV ( These items may only be of relevance to States regularizing their RNAV applications by implementing P-RNAV)
ª Evaluation Phase (Qualitative Analysis)
ð Proposed P-RNAV route placement [subject to NAV infrastructure availability & coverage] . ð Consider P-RNAV procedure design (PANS-OPS) D. EUROCONTROL: TERMINAL AIRSPACE DESIGN - GUIDELINES FOR ð Re-design of Terminal Airspace volume, if required . AN OPERATIONAL METHODOLOGY[Edition 1, 1998) Note: 2nd Edition ð Re-design of ATC sectorisation, if required TERMINAL Under Development, contact TATF ª Quantitative Analysis AIRSPACE E. ICAO: ATS PLANNING MANUAL - Doc. 9426 () ð ATM safety case to assess acceptability of F. ICAO: MANUAL ON AIRSPACE PLANNING METHODOLOGY FOR THE proposed routeing and airspace changes; incl MODIFICATIONS DETERMINATION OF SEPARATION MINIMA - Doc. 9689 () FTS/RTS as required. ð If acceptable, continue with PANS-OPS procedure design for P-RNAV certified aircraft . ª APPLICATION OF AVAILABLE STANDARDS G. ICAO: AIRCRAFT OPERATIONS - Doc. 8168 () AND GUIDANCE ON- s Minimum complexity H. EUROCONTROL: GUIDANCE MATERIAL FOR DESIGN OF TERMINAL s Way-point naming PROCEDURES (DME/DME, BARO-VNAV & RNP- RNAV) [Edition 3, s Validation of procedures (e.g. flight checking & JANUARY 2003] ** flyability for all ACFT. types) I. ICAO: AERONAUTICAL INFORMATION SERVICE, ANNEX 15 () 3.a ENSURE AVAILABILITY OF REQUIRED J. EUROCONTROL: DATA ORIGINATION STANDARD [1st Edition, NAVAIDS Pending ] s Determine current P-RNAV coverage . K. EUROCAE: STANDARDS FOR PROCESSING AERONAUTICAL DATA, s Establish means of flight checking RNAV PANS-OPS ED-76A 3.b ENSURE ACCURACY AND INTEGRITY OF PROCEDURES L. EUROCAE: STANDARDS FOR AERONAUTICAL INFORMATION, ED- ASSOCIATED CO-O0RDINATE DATA s Verify WGS/84 compliance and associated AIS DESIGN 77A processes M. JAA: TEMPORARY GUIDANCE LEAFLET Number 10: 3.c P-RNAV PROCEDURE PUBLICATION AIRWORTHINESS AND OPERATIONAL APPROVAL FOR PRECISION s AIP description incl. coding advice, charting, RNAV OPERATIONS IN DESIGNATED EUROPEAN AIRSPACE advice on when to engage RNAV/FMS (e.g. [November 2000]; See specifically Section 4, ANSP assumptions. LNAV); non P-RNAV procedures N. WGS SURVEYING, EUR DOC 007 (to be superceded by Ref. J) (see s Application of available standards and guidance also http://www.wgs84.com/wgs84/downloads.html)
ª IntroduceP-RNAV ATC procedures as per ICAO
(e.g. use of waypoints for tactical routeings, aircraft RNAV contingencies) supplemented by - . O. ICAO: AIR TRAFFIC MANAGEMENT, Doc. 4444 ATM/501 () s Local procedures, as required ATC PROCEDURES P. ICAO: REGIONAL SUPPLEMENTARY PROCEDURES, Doc. 7030 () s Local procedures for handling non-approved aircraft s Publication of ATC procedures in local operations manuals and related documents.
ª Adapt local FDPS for processing of aircraft P-
RNAV equipment info; ª Implement capability for automatic and systematic Q. Ref. A display of individual aircraft RNAV equipment ATC SYSTEM information to ATC; (Radar or Flight Strip) MODIFICATIONS
ª Schedule and perform
s Local ATC training, taking into account 6 R . EUROCONTROL TRAINING SUPPORT MATERIAL (Pending) s Local real-time simulations ATC TRAINING
S. EUROCONTROL: P-RNAV R. SAFETY ARGUMENT (May be used as
As required by National Authority - basis for local P-RNAV Safety Case) ª Documentation of processes and applied T. EUROCONTROL- SAFETY REGULATION COMMISSION: ESARR standards 7 LOCAL P- RNAV http://www.eurocontrol.be/src/index.html ª Address local peculiarities & local risk mitigation T.1 http://www.eurocontrol.int/safety/GuidanceMaterials_SafetyPolicy.htm where required SAFETY CASE ª Detailed requirements dependent on requirements T.2 http://www.eurocontrol.int/safety/GuidanceMaterials_SafetyAssessment set by state authority taking into account material Methodology.htm agreed through EUROCONTROL safety regulation material IMPLEMENTATION (Re H: This document incorporates two EUROCONTROL documents viz. ! EUROCONTROL: GUIDANCE MATERIAL FOR DESIGN OF TERMINAL PROCEDURES FOR DME/GME & GNSS AREA NAVIGATION. [Edition 2.2, September 2001] SYSTEM MONITORING ! EUROCONTROL: CHARTING GUIDELINES FOR RNAV PROCEDURES. [Edition 1_1, & INCIDENT REPORTING May 2002])