Country Profile of
Conventional and Renewable Energies:
Republic of Kenya
Last updated on 16 Oct 2006
Prepared by
Maria-Evangelia Kaninia
Intern from August to …, 2006
for the
1 Executive Summary
Kenya’s mix of energy resources is rather typical for an African country, relying heavily on biomass for
the energy needs of a largely rural population that does not have access to alternative fuels (or cannot afford
them) and electricity.
The electricity sector is dependent on the hydraulic resources. Kenya is a leader in exploitation of
geothermal resources, which currently provide approximately 19% of the generated electricity. Other RE
resources are also exploited, such as stand-alone small scale solar systems and wind generators (connected
to the grid).
Since there are no proved oil reserves in the country, crude oil is imported and locally refined. A
supplement of oil products is also imported.
3/18
2.1.2 Population
Total population: slightly less than 35 million ([CIA], July 2006 estimate)
Growth rate:2.6% (same source);
Kenya ranks 144th in terms of human development indices ([HDR]) but considerably higher than the
neighbouring countries, though it has declined after the mid nineties
Sector organisation: The Ministry of Energy ([MOE]) is the authority that manages the energy sector. It
is centralized and controls the following parastatal companies:
o Kenya Power and Lighting Company Ltd1
o Kenya Petroleum Refineries Ltd
o Kenya Electricity Generating Company Ltd (KENGEN), formed in 1999.
o National Oil Corporation (NOCK)
o Kenya Pipeline Company (KPC)
o Electricity Regulatory Board (ERB)
Kenya, along with Uganda and Tanzania, formed in 1999 the East African Community. Within this
context, the East African Power Master Plan was first studied in 2003 (see [EAC]).
The Kenya National Energy Policy document is still in draft form and is undergoing review. In the
absence of the National Energy Policy, statutory Acts such as the Electricity Act have provided the required
policy direction ([UNEP]).
2.2.1.1 Coal
In 2004, Kenya imported 66ktoe according to [IEA] (or 90ktoe according to [EIAc]) of coal for use in the
industrial sector. This amounts to less than 1% of total final energy consumption and approximately 2.4% of
commercial energy consumption (excluding biomass).
The timeline provided by [EIAc], Figure 2, does not show any particular trends in coal consumption.
[EIAa] reports that Kenya is exploring for coal new deposits, with a view to diversifying the fuel sources
for electricity generation.
coal consumption, ktoe ([EIAb])
120
100
80
EIAb
60
IEA
40
20
0
1980 1982 1984 1986 1988 1990 1992 1994 1996 1998 2000 2002 2004
2.2.1.2 Oil
Upstream sector: Kenya has no known hydrocarbon reserves, and all requirements are imported.
According to [EIU], several blocks (in offshore locations) will be explored after recent favourable surveys. The
exploration activities are described in [EIAa]. [CBS] reports on Chinese exploration activities (on the borders of
Sudan and Somalia and in coastal waters).
1
KPLC used to dominate the power sector as a vertically integrated power utility. Prior to 1996, there were five (in
total) parastatal organisations involved in electric power generation, transmission and distribution. Since then the sector
has been reformed and the generation of power in the country has been partially privatised. KPLC, which is 51%
Government owned, remains the sole body licensed to transmit and distribute electricity in the country ([UNEP]).
7/18
Midstream sector: Kenya Petroleum Refineries Ltd (see [MBEa]) - a joint venture between the
government and several oil majors (among which Chevron (16%) and Royal Dutch (17%)) - operates the sole
refinery of the country which is located in Mombasa. The refinery has a capacity of 4,000ktoe per year2,
although according to [EIA] (Table 1) the throughput was less then half this amount3. The refinery meets 60%
(2004) of total4 demand for petroleum products. The refinery is expected to be upgraded for production of high
value products and to set up a liquefied petroleum gas (LPG) unit ([AAF]).
The capital, Nairobi, is supplied through a pipeline, operated by the state-run and -owned Kenya
Pipeline Company (KPC). The 450km long pipeline to Mombasa-Nairobi pipeline was the first to be
commissioned (1978), followed by expansions (446km) to towns in Western Kenya ([KPC]). KPC also owns
storage depots strategically located in different parts of the country, with a total capacity of 300,000 cubic
meters (for an interactive map of the depots, see [KPCa]). According to [EIU], because of rising fuel demand,
the pipeline throughput rose by 10% in 2004, to 3.3m cubic meters per year.
Projects: Currently, KPC is undertaking a capacity enhancement project to meet the rising demand for
petroleum products in the region. The line from Nairobi to Eldoret will also be enhanced in the following years.
The list of immediate projects comprises the construction of an oil jetty in Kisumu and the extension of the
pipeline to Uganda5. The company is also planning to venture into the liquefied petroleum (LPG) gas business
(source: [KPCb]). The objective of the LPG project is (according to [LPG]) “to enhance capacity for importation
and distribution of LPG to supplement existing local LPG production and supply chain facilities”, so that LPG
can substitute biomass fuels and prevent deforestation The project comprises ([LPG]) a jetty to receive
imported LPG cargos, a 6,000Mt storage and bottling facility in Mombasa, and a second 2,000Mt plant in
Nairobi.
Refinery output Imports Consumption
2003, 000 000 000
[EIAb] bbl/d ktoe % bbl/d ktoe % bbl/d ktoe %
Crude oil 33.0 1642.4 55.7
Gasoline 6.2 306.3 17.8 2.8 137.4 4.7 7.9 393.4 14.6
Jet fuel 4.4 220.6 12.8 6.9 345.1 11.7 10.7 532.4 19.7
kerosene 1.9 92.6 5.4 4.6 226.6 7.7 5.9 291.3 10.8
Distillate 8.4 418.8 24.3 8.7 434.8 14.7 15.1 753.5 27.9
Residual 10.0 498.0 28.9 2.4 121.0 4.1 10.3 513.4 19.0
LPG 1.4 70.2 4.1 0.0 0.0 0.0 1.4 67.2 2.5
Unspecified 2.4 117.0 6.8 0.9 43.3 1.5 3.0 148.4 5.5
Total 34.6 1723.6 59.3 2950.7 54.2 2699.7
Table 2 Shares of petroleum products, by type, in refinery output, imports and total consumption, 20036
source: [EIAb]
2.2.1.3 Electricity
Electricity constitutes approximately 3.7% ([IEA] data) of the final energy consumption. In 2004 a small
quantity of electricity was imported from the interconnection with Uganda, thus constituting the country a net
importer of electricity.
2
Or 90,000bbl/d according to [EIAa], which is equivalent to 4,500ktoe per year.
3
The refinery has been operating below capacity and has struggled financially since the 1994 liberalisation of the
oil sector, which allowed direct importation of petroleum products ([EIAa]).
4
Total demand is calculated as the sum of the final energy consumption plus input to conversion processes
(electricity generation and other transformation processes).
5
According to [EIAa], the pipeline will have a 16,500bbl/d capacity and will supply Uganda, Rwanda, Burundi,
northwestern Tanzania and eastern Congo DR.
6
It is reasonable to assume that the ratio between the types of products remained approximately the same for
2004.
8/18
The Ministry of Energy mentions that the effective power generation capacity is 1,032 MW, against a
peak demand of 920 MW, which is projected to rise by 14% per annum, consistently with the economic
recovery, to 1370 MW by July 2008 (terminal date for a capacity expansion project) ([MOEa]). This estimate is
lower than that of other sources (including [EIAc] and [EIU]); however the ministry site does not specify when it
was last updated.
[EIAc] estimates that the total capacity is 1,143MW for 2004 (36% thermal, 59% hydro, 5%
geothermal7). The evolution of the capacity by type is shown in Figure 3.
On the other hand, the Final Phase Report on the East African Power Master Plan ([EACa]) mentions that
the grid system (excluding stand-alone generators) in Kenya has a total installed capacity of 1,232 MW,
consisted of 707MW of hydro, 398MW of thermal and 127MW of geothermal (plus an insignificant quantity of
wind energy capacity). This source diversifies as to the total effective capacity which is 1,121MW (out of which
654MW hydro).
All sources agree that the share of generating capacity owned by KenGen, the government owned
utility, is about 83% (in terms of effective capacity)8.
Electricity generation capacity, MW, source: [EIAc]
1,400
1,200
1,000
800
600
400
200
0
1980 1982 1984 1986 1988 1990 1992 1994 1996 1998 2000 2002 2004
7
Apparently, this distribution ([EIAc]) by type of the generating capacity is erroneous; 5% of a total capacity of
1,143MW equals 57MW, while the sum of the geothermal plants Olkaria I, II and III is 127MW (see page 15).
8
For more information on the share of IPP in the electricity sector, see Table 18 in [UNEP] (2002 data).
9/18
The IPP (Independent Power Producers) had the chance to enter the electricity market in the early
nineties, when a prolonged drought9 made imperative the expedited construction of oil-fueled generators.
Projects:
o Regional Power Interconnections: (source: [MOEa]) Feasibility studies of regional
interconnections towards Tanzania and Zambia have been undertaken by the MOE (in
cooperation with the governments of the respective countries). Specifically, the study for the
370km Arusha (Tanzania) - Nairobi 330kV interconnection was completed in 2002 and
preparations for its implementation (Dutch funding is considered probable) are at an advanced
stage, while the project is expected to be completed by 2009.
According to [AFR], the final goal is the creation of a regional unified grid (including Kenya,
Tanzania and Zambia), of which the abovementioned line and the 670km Pensulo (Zambia) –
Mbeya (Tanzania) 330kV line is a first stage (see [AELP]). The unified grid will allow Kenya to
tap Zambian hydroelectric power (the long term estimate by [AFR] is 800MW) through the
Tanzanian grid. This project is an extension of the Southern African Power Pool (SAPP)
programme (http://www.sapp.co.zw) launched in 1995 by the Southern African Development
Community (http://www.sadc.int) and subsequently integrated into the Pan-African Transmission
Grid initiative of the New Partnership for Africa's Development (NEPAD, http://www.nepad.org).
o Development of additional generation capacity: (source: [MOEa]) According to the National
Power Development Plan, an additional 423MW will be installed during the period July 2006-
July 2008. Out of this, the Kenya Electricity Generating Company (KenGen) will install 278 MW
of generation capacity, plus an extra 30 MW of wind powered generation in a joint venture with
an Independent Power Producer (IPP). Other IPP will install 115 MW. The KenGen plants are
detailed in Table 5.
capacity date of
type of plant location remarks
(MW) completion
70 gas turbine Coast Aug-06
2.5 geothermal Eburru Nov-06
60 hydro Sondu River Jul-07 see [KGb]
Tana Power
10 hydro Jul-07 additional capacity
station
combined cycle gas
60 Kipevu Jul-07
turbine
35 geothermal Olkaria Apr-08
additional capacity
20 hydro Kiambere Jul-08
additional capacity
20 hydro Kindaruma Jul-08
additional capacity
joint venture with
30 wind na Jul-07
EcoGen
Table 5 Planned generation capacity expansion by the public utility ([MOEa])
The Sondu project has a dedicated site ([KGb]), where it is mentioned that the construction was
to be completed by the end of 2005. It is expected to function at an average rate of
approximately 63%, producing 331GWh per year (which constitutes 6% of the 2004 electricity
generation). Funding for this project was obtained owing to a Japanese developmental
organisation (JBIC).
capacity date of
type of plant location remarks
(MW) completion
invitation for
80 diesel Nairobi Sep-07
competitive tenders
9
As to the results of this drought to the mix of various types of generation, see in the Annex.
11/18
process managed
35 geothermal Olkaria Apr-08 by the KPLC
Table 6 Planned generation capacity expansion by IPP ([MOEa])
25
20
15 National
Urban
10 Rural
0
1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002
10
A good source on the institutional background concerning the access problem in Kenya is [UNEP].
11
[WB94] mentions that in 1994, the access percentages were less than 30% for the urban and 0.5% for the rural
population.
12
[UNEP] mentions (page 34) that the detachment of the rural electrification program from KPLC jurisdiction and
the creation of a semi-autonomous electrification agency with the aim of increasing national electrification levels to 40% is
a possibility.
12/18
3.1 Hydro
3.1.1 Resource potential
[MOEc] reports that the current known potential specifically for mini and micro hydro is estimated to be
300MW. No estimation concerning large-scale potential has been found.
3.2 Solar
3.2.1 Resource potential
According to the map published in [SWAa], Kenya has very good solar energy potential, with an
average radiation of 5kWh/m2/day, sufficient for small-scale PV or other projects.
13
See also page 7.
13/18
An older (1994) report ([WB94]) mentions that 1MW of PV power was installed in Kenya at the time,
divided among 20,000 households (50W per household). The use of solar systems for electrical uses was
expanded since the mid-eighties, when it was realised that they were cost efficient for lighting or powering of
electronic devices.
[SOL] mentions that by 1999 3-4% of the rural population had acquired a PV system; while the peak
installed PV capacity was 480MW. Out of this, more than 250MW came from micro-modules of 20W or less.
The most recent source ([OECD]) mentions that some 150,000 PV solar home systems operate in rural
and peri-urban areas, providing 1.3MW of power in total.
Therefore, as long as demand in rural households remains low, solar systems are a viable option, when
compared to the alternatives of connection to the grid (unfeasible) or kerosene or batteries (increase cost).
[SOL] mentions, though, that when given the choice, the rural population prefers the grid over the solar
systems.
21000
20000
19000
18000
17000
16000
15000
14000
13000
12000
1980 1982 1984 1986 1988 1990 1992 1994 1996 1998 2000 2002 2004
Figure 5 Wood fuel production, source: [WRI], assumed average wood density 0.5t/cubic meter
wood fuel consumption, per capita total fuelwood consumption
[MOEc], 2000 consumption (kg) percentage (000 t)
rural 741 80 20748
urban 691 20 4837
(total population) (m) 35 25585
Table 7 Wood fuel consumption, [MOEc], 2000
charcoal consumption, per capita total fuelwood
[MOEc], 2000 consumption (kg) percentage consumption (000 t)
rural 156 80 4368
14
The reason it was included was to depict the steady rate of increase in consumption.
14/18
3.3.2 Constraints
The demand is growing faster than the sustainable supply (2.7% versus 0.6% per year), according to
[MOEc]. This imbalance exerts considerable pressure on the remaining forest and vegetation stocks and poses
a threat to competing land use systems such as agriculture, forestry and human settlements.
3.4 Wind
3.4.1 Achievements/ Projects
A total of 550kW of wind electricity generation capacity are installed in Ngong and Marsabit, generating
about 0.4GWh (source: [MOEc], no reference to specific year).
Two units with a total capacity of 350KW were installed in 1995 as prototypes by TurboWind of Finland.
[KGa] also reports that the wind power potential at Ngong is substantial for further exploitation.
The UNDP has also financed mini-project for mechanical wind applications or electricity generation
(see [UNDPa-b]).
To promote investment in wind energy generation, the Ministry of Energy recently completed
preparation of a broad National Wind Atlas. In addition, the Government is promoting the development of wind-
diesel hybrid systems for electricity generation under rural electrification programme in areas remote from the
national grid ([MOEc]).
3.5 Geothermal
3.5.1 Resource Potential
Kenya is endowed with geothermal resources mainly located in the Rift Valley. According to [MOEb],
the potential of the sites of the region (of which twenty have been earmarked for further investigation) is
2,000MWe or 3,000MWe if advanced systems were to be used.
15
The equivalent of this quantity in terms of thermal energy content is 7.5kWh.
16
The unused bagasse is either burned or piled away, in both cases producing greenhouse effect gases.
15/18
3.5.3 Constraints
The major constraint is the lack of means to finance exploration projects. The government aims to
undertake the exploration phase with the help of donors, and subsequently have the generating plants
constructed by IPP.
4 Sources
[EIU] Economist Intelligence Unit, http://www.eiu.com/, Country profile and data
[UNDPa] Utilising wind energy for pumping community water - Labura dam, link
[UNDPb] Wind energy blows a bright future for Tsagwa village, link
[AFR] “NEPAD, Regional electricity grids expanding”, Africa Recovery, Vol.18 #1, April 2004, link
[SWA] Solar and Wind Energy Resource Assessment, Kenya, http://swera.unep.net/, link
o [SWAa] Kenya Global Horizontal Solar Radiation, link
[KPC] Kenya Pipeline Company, http://www.kpc.co.ke/
o [KPCa] Interactive map of storage facilities, http://www.kpc.co.ke/depot.php
o [KPCb] 03/08/06, from http://www.eastandard.net/, link
[KPLC] Kenya Power and Lighting Company Ltd, http://www.kplc.co.ke
o [KPCLa] Transmission network map, link
[MBEa] Mbendi profile for Kenya Petroleum Refinery Ltd (KPRL), http://www.mbendi.co.za/remo.htm
[KG] Kenya Electricity Generating Company Limited, http://www.kengen.co.ke/
o [KGa] Power Plants, link
o [KGb] Sondu Miriu Hydro power project, link
[LPG] “Government LPG Policy Translates to Projects”, Jul-06, http://www.petroleum.co.ke/, link
[WB94] “Solar energy answer to rural power in Africa”, Robert van der Plas, Public policy for the Private
sector, FPD note No.6, April 1994, link
[CIA] World Factbook, https://www.cia.gov/cia/publications/factbook/geos/ke.html
[HDR] UN Human Development Reports, http://hdr.undp.org/statistics/data/countries.cfm?c=KEN
[IEA] Energy Balances of non-OECD countries, 2006
o [IEAa] Evolution of Electricity Generation by Fuel from 1971 to 2003, graph, link
[EAC] East African Community, http://www.eac.int/programme.htm
o [EACa] East African Power Master Plan , Final Phase report , document last reviewed in May 2004, link
[EIAa] Region Energy Profile, updated in Feb-07, http://www.eia.doe.gov/emeu/cabs/eafrica.html#oil
[EIAb] Energy balance table for 2003, http://www.eia.doe.gov/emeu/world/country/cntry_KE.html
[EIAc] International data timelines, http://www.eia.doe.gov/emeu/international/contents.html
[ERB] Electricity Regulatory Board, http://www.erb.go.ke/
[AELP] African Energy Legacy Projects, link
[CBS] “Chinese President Finalizes Kenya Oil Deal”, Apr-28 2006, CBS news, link
[AAF] “Kenya: Oil Refinery Seeks Sh21bn for Upgrade”, Oct-6 2006, link
[SOL] A case study on private provision of photovoltaic systems in Kenya, Mark Hankins, link
17
Olkaria II is a state-of-the-art plant, co-financed by the World Bank, the European Investment Bank, KfW of
Germany and the Kenyan Government.
16/18
[OECD] Identifying Complementary Measures to Ensure the Maximum Realisation of Benefits from the
Liberalisation of Trade in Environmental Goods and Services, Case Study: Kenya, OECD, Jul-13 2006,
link
[UNEP] Energy Access Theme Results, Energy services for the poor in Eastern Africa, Sub-regional
technical report by AFREPREN/FWD, Kenya, Apr-14 2004, GNESD, www.gnesd.org/, UNEP, link
[WRI] http://earthtrends.wri.org/, World Resources Information, Earthtrends
[ESR] World Bank Energy Sector Recovery Project, 2004, link
[BAG] Charcoal Fuel From Bagasse- Chardust Ltd in Kenya, excerpt from: Village Power Newsletter,
Issue #23, June 6, 2002, link
[MOE] Ministry of Energy, http://www.energy.go.ke/
o [MOEa] Electrical Department, http://www.energy.go.ke/electrical.php
o [MOEb] Geothermal Potential, http://www.energy.go.ke/geothermal.php
o [MOEc] Renewable Energy Department, http://www.energy.go.ke/renewable.php
17/18
5 Annex
Figure 6 Locations of the generating plants operated by the public utility, KenGen, source: [KGa]
18/18