I have worked in Construction and Industrial Safety, Welding, Weld Inspecti
on, Civil Engineering, Maintenance, QA/.QC and related fields for 30+ years. I'm
very strong in Civil and Piping. I have obtained the experience and many certif
ications including ASNT Level III MT, UTT, VT, PT and RFI. I'm also certified by
ACI, ASNI and MnDot to Inspect Concrete and Bituminous along with Aggregate Pro
duction, Grading & Base, and compactions of soils. I have attended several Indus
trial classes at the North Western Missouri State University at St Joseph, Mo, a
nd have 7 years of training to manage CQC, QA, and NDE Coordinator. I also hold
the U.S. ARMY CORP OF ENGINEERS Certificate of Construction Quality Management f
or Contractors.
Most of the jobs listed below involved a lot of Civil, mass concrete pours from
100yds to 3500yds on dam projects, aggregate inspection, proctors, soils compact
ion ECT
Work History:
March 2010 to april 2010
QA/QC Manager
QC 3 LM6000, 3 7EA, 1 7FA
2031 Adams Rd
Sedalia Mo 65301
Al Simons
Off 660-829-5100
QA/QC Manager for the start of a project in Puerto Ordaz Venezuela. The project
consists of 3 LM6000 & 3 7EA & 1 7FA. My main function coming here was a favor t
o get the project up and running, to get Mass Excavations, Backfill and density
testing , From work and rebar placement of the major foundations out of the grou
nd and mass concrete pours done with embeds in place, to start to assemble the f
irst 2 LM6000 and one 7EA, lay out the GSU foundations and electrical manholes a
nd duck banks, the compressor foundation and embeds for the 1st three compressor
s. I also will train my replacement and 2 other CWI inspectors.
October 2009 to March 2010
Mechanical Superintendent Pro Energy Services EPC Div.
2031 Adams Rd
Sedalia Mo 65301
Al Simons
Off 660-829-5100
Construct 2 LM6000 & 2 LM2500 Turbines in Tacoa Venezuela
Perform the duties of the Mechanical Superintendent to include review of drawing
s at 30% 60% and 90%, installation and setup of all related equipment, installat
ion of 2 LM6000 & 2 LN2500 Gensets, all associated equipment, piping and BOP. Re
port to Project Manager. Facility built to B31.1. Moved to above project.
March 2009 to July 2009
QA/QC Manager, Murphy Construction, US Steel COGEN, Pro Energy Services LLC
2031 Adams Rd
Sedalia Mo 65301
Keith Patterson
Off 678-594-0991
US Steel Granite City Works, install steam turbine CoGen.
QC Manager for Murphy Company to get QC back on track after 3 others had been r
eplaced. Supervise 4 CWI inspectors for field welding and compliance to B31.1. S
etup and maintain all QC records, set appointments for NDE, certify welders to B
31.1 and resolve issues in regards to QC/QA.