I have worked in Construction and Industrial Safety, Welding, Weld Inspecti
on, Civil Engineering, Maintenance, QA/.QC and related fields for 30+ years. I'm
very strong in Civil and Piping. I have obtained the experience and many certif
ications including ASNT Level III MT, UTT, VT, PT and RFI. I'm also certified by
ACI, ASNI and MnDot to Inspect Concrete and Bituminous along with Aggregate Pro
duction, Grading & Base, and compactions of soils. I have attended several Indus
trial classes at the North Western Missouri State University at St Joseph, Mo, a
nd have 7 years of training to manage CQC, QA, and NDE Coordinator. I also hold
the U.S. ARMY CORP OF ENGINEERS Certificate of Construction Quality Management f
or Contractors.
Most of the jobs listed below involved a lot of Civil, mass concrete pours from
100yds to 3500yds on dam projects, aggregate inspection, proctors, soils compact
ion ECT
Work History:
March 2010 to april 2010
QA/QC Manager
QC 3 LM6000, 3 7EA, 1 7FA

2031 Adams Rd

Sedalia Mo 65301
Al Simons
Off 660-829-5100
QA/QC Manager for the start of a project in Puerto Ordaz Venezuela. The project
consists of 3 LM6000 & 3 7EA & 1 7FA. My main function coming here was a favor t
o get the project up and running, to get Mass Excavations, Backfill and density
testing , From work and rebar placement of the major foundations out of the grou
nd and mass concrete pours done with embeds in place, to start to assemble the f
irst 2 LM6000 and one 7EA, lay out the GSU foundations and electrical manholes a
nd duck banks, the compressor foundation and embeds for the 1st three compressor
s. I also will train my replacement and 2 other CWI inspectors.
October 2009 to March 2010
Mechanical Superintendent Pro Energy Services EPC Div.
2031 Adams Rd
Sedalia Mo 65301
Al Simons
Off 660-829-5100
Construct 2 LM6000 & 2 LM2500 Turbines in Tacoa Venezuela
Perform the duties of the Mechanical Superintendent to include review of drawing
s at 30% 60% and 90%, installation and setup of all related equipment, installat
ion of 2 LM6000 & 2 LN2500 Gensets, all associated equipment, piping and BOP. Re
port to Project Manager. Facility built to B31.1. Moved to above project.
March 2009 to July 2009
QA/QC Manager, Murphy Construction, US Steel COGEN, Pro Energy Services LLC
2031 Adams Rd
Sedalia Mo 65301
Keith Patterson
Off 678-594-0991
US Steel Granite City Works, install steam turbine CoGen.
QC Manager for Murphy Company to get QC back on track after 3 others had been r
eplaced. Supervise 4 CWI inspectors for field welding and compliance to B31.1. S
etup and maintain all QC records, set appointments for NDE, certify welders to B
31.1 and resolve issues in regards to QC/QA.

June 2008 to March 2009


QA Construction Civil Technical Engineer, Pacific Gas & Electric, Per Pro Energy
Services LLC
2031 Adams Rd
Sedalia Mo 65301
Scotty Tweter
Off 678-594-0991
Colusa Generating Station, new construction of three GE Turbine Generators, one
steam and two gas, on 100 acre site in Maxwell Ca. Duties include but not limite
d to overseeing all pre construction activities, survey site, clear and grub, ma
ss excavation of Power Block and Switch Station, oversee soils removal and comp
action, construction of equipment foundations and Concrete pours, mechanical ins
tallation of equipment, Air Cooling Condenser, all associated piping, work direc
tly with the contractor and his subs, coordinate all NDE testing required for ci
vil, mechanical, structural and piping/welding inspections per AWS codes. I repo
rt directly to the PG&E PM Tom Miller. 55
Sept 2007 to April 2008
QA/QC Management Support, ARB Inc. per Pro Energy Services LLC
2031 Adams Rd
Sedalia Mo 65301
Al Simons
Off 678-594-0991
New construction of ISOSIV Flare Gas Recovery Unit at BP Carson Petroleum Refine
ry, Carson Ca
QA/QC Inspector of all civil concrete this site required 176 60' by 2' holes dr
illed for the placement of reinforce concrete piers and the placement of concre
te pour some in excess of 1500yds soils work, storm sewer water and oily water d
rainage systems, Structural, Mechanical, and Piping Construction.
Manage Staff of three field Inspectors.
May 2007 to August 2007
QC/QA Management Support, Irwin Industrial
Per Pro Energy Services LLC
2031 Adams Rd
Sedalia Mo 65301
Michelle Segers
Off 678-594-0991
New Construction of LM6000 for SCE / GE Stanton Ca
Duties: Manage 5 QC inspectors, keep all weld maps, build data entry for weld lo
gs and documentation for job, do all mechanical inspections and pump alignments,
make all red line drawings hold meetings with construction foreman and Superint
endents for scheduling and management of work to be done in the proper order, ke
ep records and reports of all materials received for the job, help put packages
to gather for turnover and commissioning.
Feb 2007 to April 2007
QC/QA Manager for Cunningham & Brown / Kelly Const
Kevin McManus
Ph 716-316-6555
QC/QA Manager night shift in Conoco Phillips Refinery Ferndale WA.
Oversee Night shift QC Inspectors and coordinate all NDE and PWHT for FCCU, ALKY
, SRU, and Crude units.
Get packages ready for turnover and review by QC Engineer.
July 2006 to Sept 2006
QC Inspector for Starcon Intl Aruba, QC Manager
Marland Raney
Ph 011-297-584-0555
Valero Aruba Refinery 2006 turnaround.
Worked as the night shift QC Inspector on two Furnaces.

Feb 2006 to April 2006


NDE Level III Inspector contracted to Young Technical Group
Brain Blair
1054 Florida Street
Memphis, Tn 38106
Valero Oil Refinery 2006 Turn Around.
I worked as Level III Inspector doing NDE MT, UTT, VT, PT, and RFI. I did train
ing of entry level personnel and Level I, and II techs, QC/QA, data entry and co
nsulting on projects on an 8 week contract.

Sept 2005 to Nov 2005


NDE Level II Inspector contracted to Mechanical Integrity Solutions
Marcel Lazada
787-501-3759
33 Resolution St 4th Floor
San Juan, Puerto Rico, 00920
Shell Oil Refinery, 2005 Turn Around, at Yabacoa, PR
I worked as Level II Inspector doing all forms of NDE, MT, UTT, VT, PT, and RFI
I did reports and Consulting on an 8 week contract.
April 2005 to may 2005
CQC Inspector and Alternate CQC Manager, Granite Construction Inc
Todd Bitter
1-501-605-0836
Watsonville Calif.
Corp of Engineers, Grand Prairie Pump Station, at De Valls Bluff Ar,
I set up CQC offices, filing systems, lab and establishing a Radiation safety p
rogram along with other inspection procedures for the project.
Sept 2004 to April 2005
Inspector / Technician, Granite Construction Inc
George Harvey
Watsonville Calif.
Mn I-Dot I-494 Design Build,
I worked as Inspector/Technician inspecting and testing welding on bridges, Bit
uminous Paving, soils Gradations and compaction and Concrete placements, setup f
iles and data entry, work in laboratory testing concrete to ACI standards and tr
ain to be QC manager
April 2003 to Sept 2004
Inspector / Technician, Granite Construction Inc.
Ken Bess
Watsonville Calif.
Minnesota Light Rail Transit System,
I inspected and tested soils for proper gradation and compaction prior to the p
lacement of forms and concrete. Inspected all concrete Forms for alignment and c
oncrete pours for proper mix design and placement in accordance to ACI and contr
act specifications. Inspected 9 train stations and 3 bridges welding to AWS D1.
5 and inspected sandblasting for proper shade, then paint for correct mill thick
ness. I did data entry for the project and the two assistants I had, and trained
to become QC Manager
July 2001 to April 2003
Welding Inspector CQC, Granite Construction Inc.
Ted Kooman
Watsonville Calif.
The Corp of Engineers, Table Rock Lake Spillway Project Branson Mo.
I was approved by the Corp as the on site CWI and placed in charge of setting u
p the weld program and inspections for an 8 gated spillway. Testing welders for
certification, inspecting all welding, mapping all the welds for the project and
establishing the procedures that where used. I made all the arrangements for RT
and UT to be conducted and did all the VT, MT, PT and RFI myself. I also did al
l the paint and Hydraulic Inspections. I kept all the files for the welding, pai
nt, hyd, elec and materials for CQC. I started training to become a QC Manager o
n this project.
June 1993 to July 2000
Maintenance Mechanic, Nestle USA, Friskies Pet Care Div.
Vernon Stanton
St Joseph, Mo.
I worked as lead maintenance and welding design and inspection of equipment. Ove
rsee installation of new equipment and start up, and modifications that were req
uired. Worked as Emergency Response Coordinator and Du Pont Stop program Safety
Instructor/Officer.
July 1985 to 1990
Millwright, Nickerbocker Construction
Nick Nickenbocker
Des Moines Ia
Welding Foreman, Enter Industrial plants and for in house construction and insta
llation of new equipment.

Education and Certification


ASNT Level III
Ultrasonic Thickness Testing Level II, 2002 Level III 2006
Visual Weld Inspection Level II 2002, Level III 2006
Dye Penetrant Inspection Level II 2002, Level III 2006
Magnetic Particle Testing Level II 2002, Level III 2006
Radiograph Film Interpretation Level II 2002, Level III 2006
Civil Certs
Field Concrete I & II 2003
Bituminous Street I 2003 Bituminous Plant 2003
Aggregate Production 2003
Grading and Base I & II 2003
Concrete Strength Testing 2003
Troxler Nuclear Gage Certification 2003
Radiation Safety Officer 2005
Industrial Certs
OSHA 1910.120 - 40 Hour Safety and Health 1991
OSHA 29CFR 1910.120 HAZMAT Technician 1995
Material handling Safety and Consulting 1993
Solid State Motor Controls 1995
Digital Electronics 1995
Programmable Logic Controls 1
Hanes Industrial Gearbox Training 1994

You might also like