Table of Contents
1. SCOPE ..................................................................................................
2. APPLICATION CATEGORIES...............................................................
3. GENERAL..............................................................................................
4. DEFINITIONS.........................................................................................
7. APPENDIX …………………………………………………………...............
6.1 Typical Drinking Water Quality................................................
6.2 Site Environmental Conditions……………..............................
6.3 General Specification of Materials ………..............................
6.4 Drawings.................................................................................
6.5 forms……………………………………………………………….
٢
1. SCOPE.
- These regulation are the requirements for the water services connection and
installation .Their purpose is to prevent misuse, waste, undue consumption or
erroneous measurement of water and, most importantly, to prevent leak of drinking
water. They replace the former [Rules & regulation guide pluming works, first
edition 1996 - MEW] which had implemented for similar purposes for many years.
- These regulation are for designers, Engineers , installer and applies in the State of
Qatar for all types of properties such as towers , multistory, complexes, commercial
& Industrial Sectors, etc) to be supplied from Kahramaa.
- Applicants of properties and anyone who wish to installs systems must ensure that
the systems comply with the regulation requirements. Application must be given of
proposed services or installations in most cases, so Kahramaa – Customers
Services Department can study and review for approval.
- If you are doing your own installation, ensure you know what requirements you
must meet. If you are employing someone else, consider using an Approved
Water Installation Plumber.
How do the regulations affect you?
- Your system must be installed and maintained to comply with these regulations.
- Your system shall prevent water leak by applying these regulations.
- You must prevent contamination of drinking water.
- You must give Application of installation work to Customers Services Department
- You may be benefit from using an Approved Water Installation Contractor or
licensed plumber
Useful contacts:
Customers Services Department
Qatar General Electricity & Water Corporation (KAHRAMAA).
-Departments's main building , Doha , Tel: 4628282 / 4628255
- Services building Doha , Tel: 49505050
- Al-Rayan office , Tel: 4819217
- Website: www.kahramaa.com.qa
٣
2. APPLICATION CATEGORIES.
In most cases, the Applicants, before any proposed installation to be started, must
submit advanced notice of the work. This applies to services connection or
installation of Multistory, complex, villa, Industrial Sector, Commercial Sectored or for
other cases such as
- Swimming pool (circulating system)
- Fire Hydrant
- pumps
- Fire systems
All of above cases will be subject to review and study by Kahramaa – Customers
Services Department, and decision, action must be followed. This should alter the
Applicants to see that obligation upon regulations is fully met.
3. GENERAL.
- All material for services connection such as MDPE (Medium Density Polyethylene)
pipes & fittings, Electronic Water meter, Water meter cabinet, etc. Shall be subject
and comply with the latest edition of Kahramaa General Specification of Mainlying
of Materials.
- Material which will be used for water services or installations system must be of a
suitable International Standard (ISO, BS EN, DIN, etc). The regulations list the
standards which Material must meet.
- No material, either alone or in combination with any other material or with the
contents of any water fitting of which it forms a part, which causes or is likely to
cause contamination of water shall be used in the installation, renewal, repair or
replacement of any water services connection which conveys or receives, or may
convey or receive, water supplied for domestic or food production purposes.
٤
4. Definitions
In this Bye –laws booklet , the following words and expressions shall have the meanings
defined as follows:
BACKFLOW means flow in a direction contrary to the intended normal direction of flow;
PREMISES means any house or building apartment or part of a house or building and
the cartilage thereof in respect of which water is supplied or applied for;
CUSTOMER means any person, persons or corporate body supplied with, or applying to
be supplied with water by Kahr Maa. Reference to "customer" in these bye- laws shall
include Applicant as defined before
CYLINDER means cylindrical closed vessel capable of containing water under pressure
greater than atmospheric pressure;
CAPACITY in relation to storage cistern or tank means the capacity of the cistern
Or tank measured to the highest level the water can reach when the float valve or other
approved device for controlling the inflow of water is fitted
CHARGE means any charge for water, any deposit or fee payable to the Kahr Maa,
The actual cost , or other works carried out by the Kahr Maa, and any other charge,
including any surcharge which is payable under these Bye-laws;
CISTERN means a fixed container for holding water at atmospheric pressure like tanks,
sectional panel GRP tank or concrete tank
CLOSED LOOP means any system of pipes and water fittings through which water
circulates in the internal network (in Residential complex) and from which water is drawn
for use, that feed or supplying water to cistern.
DISTRIBUTING PIPE means any pipe (other than an overflow or a flushing pipe )
conveying water from a storage cistern or from a hot water apparatus supplied from, a
feed cistern, or under pressure from that cistern ;
DISTRIBUTION MAIN means a pipeline that conveys water to the premises by means of
service connection;
DOMESTIC WATER SYSTEM means the water system which includes the distributing
pipe and all associated apparatus within premises up to the point, where water is drawn
for use;
٥
FIRE SERVICE means the pipes, tanks, pumps, fittings and apparatus in any premises
installed for the purpose of fire fighting;
FLOAT VALVE means a valve, for controlling the flow of water into a cistern, the valve
being operated by the vertical movement of a float riding on the surface of the water;
FLUSHING CISTERN means a cistern provided with its discharging apparatus for
discharging the stored water rapidly into a water closet pan, urinal , drain or sewer;
HEADER means that pipe conveying water from the down stream tank ( or Roof tank)
In building through OTS(open to sky ) supplying the corresponding floor.
INSIDE SERVICE means the pipes and fittings in premises after the ground storage tank
and any pipes and fittings between the storage tanks and the termination of the
Water net work service connection, which shall normally be at the meter;
INTERNAL NETWORK means a pipeline that conveys water from the main cistern to
the individual villa or buildings and other utilities inside the Residential Complex by the
set of water pumps.
METER means any appliance or device owned and maintained by Kahramaa for the
purpose of measuring consumption;
MAIN METER means meter that water is conveyed from the distribution network to the
premises through it to the adjacent Ground Tanks.
METER CABINET means the aluminum box that design and approved by Kahra Maa in
which water meter will be install in .
METER CHAMBER means manhole under ground in which electronic sensor will install
in connected to the GRP bulk Meter Cabinet by 2 inches conducts for the sensor cord to
the EDU electronic display unit.
OVERFLOW LEVEL means the lowest level at which water can flow in to the overflow
pipe of a cistern or tank
POTABLE WATER means water supplied by Kahr Maa which is suitable for drinking
and culinary purposes;
RISER means pipe that conveying water from down stream of booster pump up to the
roof tanks on the roof floor of the building.
SUB MAIN mean those water meters in side the compound (complex). Through which
water is conveyed to the buildings from the internal network in side the complex. in case
of complex composed of villa and buildings.
SUB METERS means those individual meters downs stream of the main meter or sub
main through which water is conveyed to flats or villa in building or complex.
٦
PREMISES means any house or building apartment or part of a house or building and
the cartilage thereof in respect of which water is supplied or applied for.
SERVICE PIPE means so much of any pipe/arrangement of pipes for supplying water
from a distribution main to any premises as is subject to water pressure from that main
and ends at the water meter at the Consumes boundary provide that only one pipe be
connected to the water meter
SERVICE CONNECTION means the part of pipes and fittings between the Distribution
Main up to and including the Water Meter at the Consumers boundary;
SPILL- OVER LEVEL means the level at which the water in a cistern or vessel will first
spill over if the inflow exceeds the outflow through any outlet and any overflow pipe;
STOP VALVE means any device other than a draw-off tap, for stopping the flow of water
in a pipe;
SWIMMING POOL PLANT ROOM is the mechanical room for swimming pool in which
filtration, dosing and circulation of water is done through the surge or balance tank
STOPAGE TANK means any tank other than a flushing cistern having a free water
surface under atmospheric pressure, but does not include a drinking trough or drinking-
bowl for animals ,including poultry;
WATER BOOSTER PUMPS means set of Pumps that boosting water from the main
cistern to the villa or flat utilities.
Very important to detect the pump's Total head and the height of the premises and
relevant loses.
WARNING PIPE means an overflow so fixed that its outlet, whether inside or outside the
building is in a conspicuous position where the discharge of water can e readily seen;
٧
5. PROPERTY REQUIREMENTS.
Residential complex can be compound of villa see figure (Housing Complex Drg No
1&2) or complex of buildings see figure (Building Complex) or combine of villa and
buildings
• Service cabinet must be installing on the boundary wall to the nearest point
to Kahramaa water networks either in front of the premises or at the back.
The pip line must be copper or MDPE. (15 mm up to 42 mm Water Meters)
Those meters install in regular service cabinet see figure (GIS/STD/30/04)
• If the tie in point to the residential complex will be 54 mm Water Meter then
the 54mm water meter cabinet must be install see figure (GIS/STD/30/03)
at 1.2m from the ground level(Road Level), but the gate valve must be
install between the cabinet and the ground tanks all fittings up to the
ground tanks must be soldering.
• If the Main Meter install in Chamber for big size water meter more than
80mm so chamber is required see figure ( GIS/STD/52/06/A)
There must be water tanks very close to the tie in point beneath to the meter
cabinet those ground tank must be as Kahramaa approve water tanks those water
tanks must be on concrete base 0.2 m thick. The supply inlet point to water tank
must be on top to each water tank see figure ( House complex1 ).The down stream
discharge points to each water tanks must deliver to header then to water booster
pumps minimum two working and the third one stand by.
• The capacity of the main water tanks are function of number villa and
utilities building in the complex 800 gal for each in case of main tanks that
is supply directly to the corresponding villa roof tank.
• The capacity of the main tanks will 1/4 of the total demand to be used as
break or intermediate tank see figure (House complex Drg.No.:2)
The internal water Main network inside the complex must be as approve drawing
from Installation section at Customer Services Department in building permit stage
. Also water pipe must be as Kahramaa specifications. Before the embankment of
the internal network it must be inspected by water installation engineer after filling
complex internal networks form see Forms, for detecting the pressure test under 6
٨
bar from point close to water booster pumps up to each sub meters stop valves,
also checking fire hydrant, pvc ducts (sleeves) and control valves service boxes.
Then the embankment will be 0.3 m sand on top of water pipes. Be side 0.2 m
sand bed.
Each villa, club house swimming and any other utilities buildings inside the
complex must be 22 mm water meter in separate water meter cabinet for each.
٩
12- If there is separate fire system in the complex :
• In case of separate water tanks, .Supply through meter is required.
• In case of combine water, tanks (Domestic+ fire) then the Fire Meter
install in down stream tanks line supply the fire system.
١٠
5.2. Multi Stories Buildings and Towers.
For multi stories, buildings and Towers in BP stage (Building Permit Stage):
• The consultant must attach Schematic Diagram for over all building showing the
sub meters in each floor.
• The Architecture consultant must keep in consideration in Design stage sub
Meter to be closer to OTS (open to sky) through which the 100mm Header is
Pass.
• The Consultant must consider the individual meters Cabinets to be in suitable
location for easy monitoring and handling (1.2m from the floor level).
• Non Return Valve is required at the down stream of the propose meter to be
install in.
• Drain is required at the bottom of the cabinet conveying water to (OTS) Duct.
• Distance between each pipe minimum 0.2m and 0.5 m between bottom and the
non-return valve for Meter to be install in.
For those multi stories buildings, the ground water tanks must be near to the tie in
point. The capacity of those tanks must be sufficient for the building's flats that
satisfied for 48 hours.
If it is combine tanks supply other like Fire or Irrigation or both so their Demand
must be under consideration with the domestic demand in calculating the combine
tank capacity.
١١
5.2.4 Sub meters in Multi stories Buildings :
• In case of Towers and Buildings Higher than Eleven stories : Meters will be in
each floor in suitable location for easy monitoring, handling and maintenance,
through one Header or more see figure (Multi stories building Drg.No.1 &2) as in
approved drawing in BP (building permit) stage).
2. Sub Meters in the roof floor but must fulfilled these commitments :
• Safe and easy reaching the roof floor (lift & 45degree ladder if exist).
• Reducing number roof tanks to be as combined tanks of minimum 100 gal
corresponding to the number of flats that supply from.
• Individual meters will in the 0.6m height fabricated aluminum cabinet
mounted on 0.8m high block wall at the center of the roof floor. For safe
and easy monitoring.
• Two pressurize pumps required in the 100mm header down stream of the
combined roof tanks that supply the corresponding sub meters each one
is 22mm pipeline.
• Sub meters will install vertically in that cabinet, with 0.1m width plywood
fixed at the back of the fabricated cabinet. Distance between pipes is
0.2m with 0.6 heights of the pipe to install the water meter.
• All of the above must be mention in the approved Schematic Diagram at
the BP (Building Permit) stage. With approved sectional view of the roof
floor showing the cabinet mounted on the block wall and sub meters.
For Commercial center, there must be main water meter cabinet closed to the tie in
point with ground tanks that sufficient for the number of flats and shops for 48
hours. The discharge down stream line from water tanks header must be minimum
54 mm that supply each corresponding shop or flat line with non return valve, all
sub meter must be 22 mm water meters. Meters shall be in ground floor in sub
meter cabinet then through each riser to individual roof tank.
١٢
5.3. Public Houses & Villa.
The water meter cabinet must be install on the boundary wall in the nearest point
to Kahramaa water networks, either in front of the premises or at the back side as
in approved drawing at the BP stage ,at 1.2m height from the road level. The Water
Meter Service Cabinet must be typical to Kahramaa specifications. MDPE pipe or
Copper pipe must passes through service cabinet from 0.3m and 90 degree bend
under the Road level ,then up passes through the 50 mm PVC duct to the cabinet .
Gate valve must be install before the ground tanks. 2 bar ball valve must be install
in side any approved Water Tanks according to Kahramaa specifications. The
capacity of water tanks must be sufficient for minimum 48 hours, 800 gal as
minimum, these ground tanks must be on base of 0.2m thick concrete base.
• In case of villa or public house, that use pressurizes system the ground
tanks must be sufficient for the he consumption.
• In case of public or villa the may have ground tanks and roof tanks
• In case of slope roof floor villa or Gobles, workshops the roof tank must be
install in steel stand to as elevated tank. See figure (work shop, labour
accommodation)
The water booster pump must be install in the down stream (out let discharge point
from that tank) with non return valve (one directional valve) then boosting water
towards roof tank of public house or villa and other utilities building roof tank . Roof
tanks must be minimum 250 gal for utilities buildings and 400 gal for the house or
villa.
١٣
5.4. MDPE Services Connection.
5.4.1.MDPE Installation :
This specification covers laying of MDPE pipes with associated fittings for
size range 20mm (1/2") up to 63mm (2") underground and aboveground.
Excavation and backfilling for MDPE service connection will be in
accordance with section 4 & 5 of this specification noting that pipe depth
shall be 600mm as detailed in the attached drawing no. GIS/STD/51B.
MDPE service pipe shall have 100mm sand bedding, 150mm sand cover
above crown of the pipe, another 150mm selected backfill material with
100% compaction, and backfill material of varied depth up to ground level,
all in accordance with Road Dept Highways Maintenance Section
requirements.
Trench marker tape with aluminum strip in the middle shall be laid at
minimum 300mm depth below ground level along route of pipe.
a. The Contractor shall tap distribution main at depth of minimum 900mm
and bring MDPE pipe from ferrule to a higher elevation without use of any
fittings, as far as possible, so that MDPE pipe could be laid at a minimum
depth of 600mm from ground level, from distribution main till it reaches
customer boundary wall.
The minimum width of trench excavation is to be service pipe duct diameter
(either 100mm or 150mm) used plus 200mm and maximum width of trench
excavation is to be service pipe duct diameter used plus 300mm.
When laid above ground along customer wall premises or elsewhere,
Polyethylene Pipe shall be protected with GRP duct of minimum thickness
3mm.
Two sizes are allowed; 2” duct for 20mm (1/2"), 25mm (3/4") & 32mm (1")
and 3”duct for 50mm (11/2") & 63mm (2").
The GRP duct shall start from ground level and be extended to an
appropriate height to secure exposed MDPE pipe near the water meter
service cabinet. The GRP duct shall be of semi-circular shape and be firmly
fixed to the wall with brackets.
MDPE Pipes shall be "blue color" of either solid wall or multi-layer
construction.
Installation of MDPE pipes and fittings shall be carried out by plumbers who
have been trained and certified by the manufacturers for pipes and fittings.
The Contractor shall submit copies of plumbers training certificate issued by
the Manufacturer to Kahramaa as proof of their skill and competency in
performing such installations.
All other clauses of Section 7 such as pressure testing, sterilization etc are
applicable for laying MDPE pipes and fittings.
١٤
Note. From Customer side the following requirements shall be satisfied
before giving a MDPE service connection.
1. Domestic Service cabinet shall be fixed inside the customer wall along with a
uPVC duct underneath and continued with a 90 deg bend – all to allow easy
access of MDPE service connection
2. Since KM is installing ‘lockable stop valve’ inside service cabinet which can
be operated only by KM, the customer must fix his own gate valve or stop
valve after the water meter, to control water supply in case of any leak in his
internal line. Another stop valve just before customer ground tank is optional,
which customer can fix, if he desires.
5.4.2.Materials MDPE
Polyethylene Pipes shall be MDPE, PE-80, SDR 11 and PN-12.5 bar at 20°C.
and shall be blue in colour of either solid wall or multi-layer construction.
The GRP duct shall start from ground level and be extended to an
appropriate height to secure exposed MDPE pipe near the water meter
service cabinet. The GRP duct shall be of semi-circular shape and be firmly
fixed to the wall with brackets.
-The water meter cabinet has different types, each is used for
different application depending on the case, these types are as per
the following:-
١٥
Domestic Electronic W ater Meter. (see drawings )
2 " Ø Electronic Flow Meter (Integral type). (see drawings )
2 " Ø Electronic Flow Meter (remote type). (see drawings )
2 " Bulk Electronic Meter (Integral & remote type). (see drawings )
Bulk Electronic Flow Meter (remote type) 2" to 12".(see drawings )
Bulk Electronic Flow Meter (remote type) 3" to 16".(see drawings )
Fire system used in buildings is usually either sprinkler system type or Hose Reel
type this will be authorized by CDD .So water meter is required for fire system at
the upstream of the fire if separate water tank.
Fire system in side Residential complex will be approved by CDD but if there is
separate Fire water tank the water meter at the up stream to tank is required.
If there is combined water tanks water demand required for fire must be
considered in calculation with the domestic Demand and others.
١٦
6. APPENDIX
١٧
State of Qatar is classified as being among the worlds most arid and desert
regions. The rainfall is concentrated in the Winter & Spring period (December to
March) with an average of 50 – 80mm per annum. No discernible pattern in
rainfall occurrence is apparent, but there is a tendency of rainfall to occur more
often during February & March. Rainfall can be heavy with poor natural drainage
resulting in surface flooding.
Temperature Humidity
Month Degrees Centigrade %
Mean
Mean Max. Mean Min. Mean Daily Mean Min.
Max.
January 22.3 13.1 17.5 90.7 51.9
February 22.7 12.7 17.5 82.8 38.7
March 27.5 16.8 21.8 85.3 40.9
April 31.3 20.0 25.3 80.9 37.3
May 37.6 24.3 30.7 67.6 20.8
June 41.0 26.0 33.6 64.2 20.1
July 41.5 28.3 34.6 71.0 24.6
August 40.7 28.3 34.1 77.7 30.7
September 38.3 25.9 32.0 86.5 38.9
October 35.2 23.0 29.0 83.7 37.0
November 29.8 19.5 24.5 89.9 37.6
December 24.8 14.5 19.4 86.1 46.5
The site is not subject to Industrial pollution, but due to being near
the coast; the air can be salt laden with occasional fog. During the
winter and spring periods, sever electrical storms with sheet and
forked lightning can occur.
١٨
6.3. General Specification of Materials.
1.1.4 Test Pressure for the pipes shall be 2.5 times the nominal
pressure at 20°C.
1.2.2 The Pipes & Fittings used for conveying potable water or
likely to come into contact with potable water shall not
constitute a toxic hazard, shall not support microbial growth
١٩
and shall not give rise to unpleasant taste, or odor,
cloudiness or discoloration of water.
Specification Value
Min density measured 949 Kg/m3
according to ISO 1872
Melt flow rate measured @ 2.16 Kg. Load=
according to ISO 1133 0.18g/10min.
@ 5 Kg. Load = 0.18/10min.
Tensile Strength at yield 18 Mpa
Elongation at break 600 %
Elongation 10 %
Thermal conductivity 0.32 W/mº K
Vicat Softening point at 1 kg. 122ºC
load
Flexural Modulus- ASTM 900 MPa
D790
Tensile strength ASTM D638 30 MPa
HDT @ 0.46 MPa – ASTM 90ºC
D648
HDT @ 1.82 MPa – ASTM 58ºC
D648
٢٠
Min. Wall Max. Wall Max. Coil
Nom. Ø Min. Ø Max. Ø
Thickness Thickness Length
20 20 20.30 2.30 2.80 500
25 25 25.30 2.30 2.80 400
32 32 32.30 3.00 3.50 300
40 40 40.30 3.70 4.30 300
50 50 50.30 4.60 5.30 300
63 63 63.40 5.80 6.70 200
1.3.3 The ovality of the pipe in coils after relaxation and straight
pipe shall not exceed the value of “1 + (0.008 of the nominal
size of the pipe).
1.4 FITTINGS
٢١
Properties Test Method Value
Flexural Modulus ASTM D790 900 MPa
Tensile Strength ASTM D638 30 MPa
Elongation ASTM D638 10 %
HDT @ 0.46 MPa ASTM D648 90ºC
HDT @ 0.46 MPa ASTM D648 58ºC
Density ASTM D792 0.9g/cc
Chemical Resistance Excellent
Water absorption None
-Stop valve shall be made of Gunmetal suitable in connecting MDPE Pipes. For
underground installation - Stop Valve shall be made of Gunmetal BS 5433
crutch head with gunmetal ended compression couplings to fit MDPE pipe both
sides for all size range from 20mm up to 63mm.
٢٢
For aboveground installation inside/outside service cabinet before water meter –
Stop valve shall be of brass tamper proof lockable type as per discretion of
the concerned Engineer. Suitable size of gunmetal or polypropylene (PPR)
compression couplings at both sides shall be used in connecting MDPE Pipe of
all size range from 20mm up to 63m
1.4.10 Ferrule and saddles shall be suitable to suit MDPE and shall
be manufactured of gunmetal for Underground installation
application.
1.5.1 Saddle straps for service connections shall be flat boss type
suitable for tapping up to 2” diameter ferrule. The strap shall
be suitable for making service connections under pressure or
dry using approved tapping machine into DI, AC Steel or
PVC pipes. The saddle shall be of two parts fitted with
EPDM sealing gasket in a groove on the underside of the flat
boss.
1.5.2 The flat boss shall be cast with a hole or marking through the
boss to facilitate the drilling and tapping process. The straps
shall be supplied un-drilled.
٢٣
1.6 FERRULE
1.6.1 Ferrules shall be the screw down valve type allowing for the
shut off of the flow by means of Ω” square head spindle
extending from the top cap for opening and closing. The
valve shall close clockwise.
1.6.3 The ferrule stern, banjo, spindle, inner plug and top cap shall
be of gunmetal to BS 1400-LG2. The washers shall be of
EPDM and shall provide the sealing between the outer body
and the ferrule stem. A polyethylene top plug shall prohibit
the ingression of dirt.
1.7 JOINTS
1.8 MARKING
٢٤
7. Pipes shall have blue stripe to distinguish potable water.
8. Body of the fittings should have Manufacturer’s name/ logo.
1.9 PACKAGING
1.9.3 If only one type of product is packed all cartoon boxes shall
have a label showing the manufacturer identification, the
description of the product, the drawing of the product, the
relevant size and the quantity.
٢٥
6.4. Drawings.
See Appendix
٢٦