Professional Documents
Culture Documents
112
The GUARDIAN Newsletter is published for, and proprietary to, customers worldwide with a current Benefits Guardianship contract. To visit our website, go to http://www.honeywell.com/ps.
Select Login to My Account, enter username/password info. From top menu bar select My Account. From drop down menu select My Support/Support Online. (Weblinks have been provided in
this newsletter with blue underlined text). If not yet registered, complete registration form on login page, access will be provided within 24 hours of registration.
PCC-Censeo Workflow
Source
Censeo sources data using PCC’s preconfigured data sources which can
include historians such as PHD and PI, XML Services and SQL (through the
use of SQL statements). Additionally Censeo is able to source data internally
from other approved displays. One of the key benefits is that data can be
combined from disparate sources.
Review and Value Add
Data is presented in Censeo displays such that it becomes information.
Displays are role-based so that only the right people are able to access
information that is relevant to them. Sourced data is retrieved into display
objects such as text fields and calculations are performed using Censeo’s
built-in calculation engine. Colour is used to indicate where data has been
sourced, what is calculated and which fields are configured as read-only.
PCC-Censeo In Action
Continued Back to TOC Continued Back to TOC
Production Control Center - PCC Production Control Center - PCC
Unless a display object is configured as read-only, users are able to modify display Level. This granularity of the security model enables ensure data is
the values (override may be required) and colours are updated accordingly. only available to those who should have access.
Along with the ability to add comments to most objects in a display, this allows Reports
users to add value to the information.
Censeo reports utilize the power of the Crystal Reports reporting Engine,
Context menus are supported through-out Censeo to provide the user with hence all reporting power is provided by Crystal Reports.
additional information and access to the display objects’ properties (such as After designing a Censeo Display, Censeo can produce a schema file which
the calculations performed behind the scenes). Crystal Reports are able to use as a report definition.
In addition, there is a full audit trail on all changes saved in which the user’s Within Crystal the Censeo Schema file gets used as report source, and all
ID is logged along with the date and time and what the value(s) have been design capabilities of Crystal is available to produce professional reports
changed to. This history is available as a context menu item tied to each based on Censeo Displays.
display object.
Approve
The approval cycle in Censeo is a reflection of its core functionality. A strong
workflow is enforced binding security at multiple levels. Displays may be
configured such that the information is reviewed at up to ‘n’ levels of approval.
This also introduces the extra function of rejection, in which a user at level
2 or above is able to reject the display back down to the previous level.
Once a display is approved at the final level, it becomes locked and only the
user at that final level is able to unlock it again. Typically at this final level of
approval, data is then written back out so that it is made available to other
systems. As with the saving process, there is a full audit trail whenever a PCC-Censeo Reports Design
user approves rejects or unlocks a display. The following are the PCC-Censeo report functionalities:
Publish • Reports are accessible through a web browser
Data that has been approved at the final level becomes available for reports. • Reports are designed using the powerful Crystal Reports Designer
Reports can be created using an exported xml schema file generated from • Report can be 100% tailored
the display so that an association can easily be made between report fields
• Each Report can export the underlying data to Excel
and the fields within the display.
• Each Report can be printed directly to a printer
Levels and Security
• Each Report can also provide a read-only PDF Export suitable for
Levels of approval in Censeo help mitigate human error and encourage distribution
collaboration. All displays must contain at least one level (see the figure below) Designer
but may contain up to ‘n’ levels. Typically levels reflect positions and workflow
The power of Censeo lies in the ability to create and configure displays without
within a business area. For example, the first level may be Operator, the having to write code. This is done in the Design component of Censeo, usually
second Supervisor and the final level Manager. When a level is approved, the only available to Administrators. When a display is designed, the user is able
display becomes available to the next level until it is approved and locked at to select objects such as textboxes and labels and place them anywhere on
the final level. Displays may also be rejected back down to the previous level. the display canvas. Once a display revision is ready, it needs to be committed
at which point it becomes available for use.
Did you know… the Blend Property Control (BPC) state shown on the blend Microsoft Security Updates with Profit Suite Systems…
monitoring displays provides an indication of the current phase of BPC operation Customers are generally encouraged to keep their Profit® Suite systems, including
in the blend? TPS and EPKS nodes, up to date with the monthly Honeywell approved Microsoft
Blend Property Control States: security updates found on the Honeywell Online Support website.
BPC states track the progress of the blend and indicate the status of BPC However due to problems recently identified in the Microsoft Security updates
optimization and control to the operator. October 2010 iso image, it is temporarily recommended that users not upgrade
START confirms to the operator that BPC activation has taken place. The START their Profit Suite nodes, including Server side and Client side installs (e.g. APP,
state in BPC corresponds to the Master Clear state in Blend Ratio Control (BRC). EAS, ESC, EST, etc), beyond the September 2010 iso image.
INIT appears when BPC is initializing. BPC reads and validates the blend recipe Figure 1
and configuration data from the LCN. The BPC cycle number indicated on reports Microsoft Security Updates Approved for Honeywell Systems
and displays is zero.
If BPC encounters an error during initialization, the BPC state changes to
INIT_ERR. In this case, BPC shuts off after 30 seconds and the operator must
correct the error before BPC can be restarted. Messages are sent to the Operator
Message Summary describing the error condition.
If the BPC state is OFF, no property control is taking place and the BPC monitor
program has been turned off. BPC can be turned on using an operator target at
any time during the blend.
During WT_STEDY, analyzers come on line and issue the first valid readings. All
analyzers complete their warm-up cycle and the dead time and transient periods
of the slowest analyzers expire.
WT_OFFST follows WT_STEDY. Raw offsets, estimated offsets, property averages
and calculated properties are now calculated periodically. This allows a
representation of the model offset to be determined before BPC proceeds to
ON_CTL. This problem is found specifically with the MS10-70 Microsoft KB2416473
security update for Microsoft .NET Framework 3.5 Service Pack 1. This update
ON_CTL appears when BPC is monitoring the blend and operator changes, and may cause Profit Suite URT and related applications to stop working.
is waiting for its next optimization cycle.
The problem becomes apparent after rebooting the system. On Server side nodes,
CALC_PCT occurs at the beginning of each BPC cycle. The BPC monitor program the URTService will not restart and the c:\Documents and Settings\All
has called the optimizer to calculate the new optimized recipe for the next cycle. Users\Application Data\Honeywell\URT\Logs\URTServiceLog.txt file will contain
If the BPC state shows OFFSPEC, the blend is predicted to be off-spec (with TPC an error similar to the following.
off), or off-spec at the end of the TPC target volume (with TPC on). The BPC Figure 2
Summary display can provide more information on the cause of the OFFSPEC
indication. Potential URT Server Error after applying KB2416473
NO_SOLN appears when BPC has encountered errors or failed to reach a solution.
Check the BPC Summary Report and the BPC Blend Report for possible
recommendations.
SKIP_OPT occurs when the equipment constraints do not overlap with the
component cycle limits, when the sum of the low cycle limits is greater than
100%, or when the sum of the high cycle limits is less than 100%. Check to
make sure the Equipment Constraints (based on flow controller configuration)
are reasonable. On machines running the client side software, the user may see the following
In SUSPEND, BPC continues with its normal optimization calculations, and BPC messages depending on if PSOS.exe or PSOS.htm is being used.
reports are generated, but the optimized recipe is not sent to BRC. Figure 3
For more information on BPC, BRC or any of the Blending and Movement Potential Profit Suite Client Side Error for PSOS.exe
Automation (BMA) applications, please contact your Honeywell Account Manager
or your local Application Support center.
Application Support Contact Information:
The Americas: rac.support@honeywell.com
Europe, Middle East and Africa: bma.support.emea@honeywell.com
Asia Pacific: bflex.support.ap@honeywell.com
Back to TOC Continued Back to TOC
Profit Suite Courses
Following is a partial listing of courses available. For these and other course
Figure 4 offerings, please visit the Automation College website
Potential Profit Suite Client Side Error for PSOS.htm (with EPKS) www.automationcollege.com or call 1-800-822-7673 or 1-602-293-1864.
UniSim
Process Modeling Using UniSim Design - Course # 4526
March 8-9, 2011 Calgary, Canada
March 21-22, 2011 Manchester, UK
April 12-13, 2011 Houston, Texas USA
June 20-21, 2011 Amsterdam, The Netherlands
September 12-13, 2011 Manchester, UK
September 13-14, 2011 Calgary, Canada
October 18-19, 2011 Houston, Texas USA
November 14-15, 2011 Brussels, Belgium
Advanced Process Modeling Using UniSim Design - Course # 4527
March 10-11, 2011 Calgary, Canada
The problem appears to be due to the fact that the patch is modifying the
April 14-15, 2011 Houston, Texas USA
C:\WINDOWS\Microsoft.NET\Framework\v2.0.50727\CONFIG\machine.conf
ig file with the <system.servicemodel> node without having previously May 10-11, 2011 Manchester, UK
included <sectionGroup name="system.serviceModel"> in the September 15-16, 2011 Calgary, Canada
<configSections> node. This error is not happening on all machines and October 18-19, 2011 Brussels, Belgium
reproducibility seems to depend on how the Microsoft .NET Framework 3.5 October 20-21, 2011 Houston, Texas USA
Service Pack 1 program was previously installed. Dynamic Modeling Using UniSim Design Suite - Course # 4528
Please note that once KB2416473 has been applied, it is not sufficient to Dec. 1-3, 2010 Brussels, Belgium
role back this patch since rolling back does not restore the original March 14-16, 2011 Calgary, Canada
machine.config file. Honeywell is currently following up with Microsoft on March 23-25, 2011 Manchester, UK
this issue but in the meantime has a manual work around in place. April 18-20, 2011 Houston, Texas USA
If you are experiencing this problem, please contact your local APC AppTech June 22-24, 2011 Amsterdam, The Netherlands
support team to resolve. September 14-16, 2011 Manchester, UK
APC Application Support Contact Information: September 19-21, 2011 Calgary, Canada
October 24-26, 2011 Houston, Texas USA
apc.apptech@honeywell.com for North and South America regions;
November 16-18, 2011 Brussels, Belgium
apc.support.emea@honeywell.com for Europe, Middle East region, and Uniformance
Africa; Uniformance PHD – Fundamentals System Administration – Course #UNI-5747
January 24 – 27, 2011 Houston, Texas USA
apc.support.ap@honeywell.com for the Asia Pacific region.
Uniformance - Click here to access Uniformance course offerings...
e-Learning Courses - No Travel Needed - Click here to access our e-learning offerings.
Back to TOC
Experion Current & Upcoming Product Releases Contact Information
Experion® Process Knowledge System (PKS) unifies people with process, business and asset management to help process Please indicate company, site location and products covered by your Benefits Guardian program. To contact product
manufacturers increase profitability and productivity.The Experion platform embeds Advanced Applications with expert services service groups directly, choose from the listing below:
to deliver Asset Effectiveness, People Effectiveness, Business Agility and Process Performance solutions.
Americas Support Centre Contact Information
Advanced Applications:
Asset Effectiveness – Asset Manager Advanced Alarm Management opshelp@honeywell.com 1-800-822-7673
• Asset Manager R330 Alarm Scout Service alarmscout@honeywell.com 1-800-822-7673
Asset Effectiveness – Mobility Solutions Advanced Planning and Scheduling (APS) rac.support@honeywell.com +1- 289-333-1500
• Field Advisor 110 Business FLEX - Blending & Movement
• IntelaTrac PKS 4.0
Automation Solutions Support (OM&S) rac.support@honeywell.com +1-289-333-1500
Advanced Alarm Management (AAM)
• Alarm Configuration Manager (ACM) R310 or via TAC +1-800-822-7673
• UserAlert R310 Business FLEX - Planning & Scheduling rac.support@honeywell.com +1-289-333-1500
• Alarm and Event Analysis (AEA) R310 or via TAC +1-800-822-7673
• AAM Suite (ACM, UserAlert, AEA) R310
Business FLEX - Production Management
• Event Analyst for TPS R130.6 (PHD R300) R130.5 (PHD R215)
• Event Analyst for TPS R130.4 (PHD R210) & Operations Management support@honeywell.com +1-403-216-2870
Advanced Planning and Scheduling (APS) Loop Scout Service loopscout@honeywell.com +1-800-822-7673
• BLEND OM Pro Support support@honeywell.com +1-403-216-2870
• RPMS Operator Training Simulation (OTS) Support OTS.Support@honeywell.com 1-800-822-7673
• SAND
OptiVision Help Desk optihelpgroup@honeywell.com +1-513-595-8944
• ASSAY
• Production Analyst POMS Support_USA@poms.com 1-703-793-4450
OM Pro 310 Profit Suite Support apc.apptech@honeywell.com 1-800-822-7673
• Integrated suite includes Advanced Alarm Management R310 products and Business FLEX R220 products: Technical Assistance Centre (TAC) – Americas 1-800-822-7673
Alarm Configuration Manager, UserAlert, Alarm and Event Analysis, Event Analyst for TPS Operating Instructions, Uniformance Help Desk support@honeywell.com +1-403-216-2870
Operations Logbook, Operations Monitoring UniSim Support UniSim.Support@honeywell.com 1-800-822-7673
UniSim Workcenter support@honeywell.com +1-403-216-2870
• UniSim Design Suite R400
Asia Pacific (AP) Technical Assistance Centre (TAC) for Advanced Solutions contacts
• UniSim Operation Suite R330
TurboSuite Advanced Process Control Support apc.support.ap@honeywell.com
• Turbo Suite Loop Scout Service loopscout@honeywell.com
Documint/DocuMint Rx OptiVision Help Desk p3its_oncall@honeywell.com + 358 20752 2300
• Documint 2.0A4
UniSim Support unisim.support@honeywell.com
• Documint Rx1.1
Business FLEX UniSim Operations Suite (USO) unisim.support.ap@honeywell.com
• Blend Management, KPI Manager, Operations Management, Production Balance, Production Scheduler, Manufacturing Execution Solutions bflex.support.ap@honeywell.com
Workcenter, and other applications have been globalized (Includes APS, BMA, MES, OMPro, AAM and Uniformance PHD)
• Uniformance PHD 215 and PHD 300 are supported Honeywell Asia Pacific regional GCCC hotlines:
• Several applications that use a historian now support PI and other OPC HDA-compliant historians in addition to PHD Australia GCCC.Pacific.HPS@Honeywell.com 1 300 301 135
• Plant Reference Model (PRM) and other common infrastructure components are now distributed with Business China: 400-820-0386
FLEX instead of Uniformance
800-820-0237
• Production Scheduler has new scheduling capabilities for several new types of process units in continuous and
India: 1-800 2335051
semi-continuous industries
• Blending and Movement Automation software including Experion Blend Controller, Blend Instructions, Inventory Indonesia: 0018-03-440-212
Monitor, and Movement Automation are all available as standard products with the current release R330.1 New Zealand 0800 855 663
supporting Experion R310.3 Malaysia: 1 800-812-674
• Well Test Manager Pacific (outside Australia and New Zealand) : +65 6787 1788
• Capacity & Distribution Planner (CDP) is now part of Business FLEX and released with it Philippines: 1-800-1441-0223
• Enhancements to Workcenter, LIMS, KPI Manager, the Operations Management Suite, and Production Balance Singapore: 6823-2215
• Production Control Center (PCC) has received numerous changes to align it with other Business FLEX products. Taiwan: 0800-666-051
• Support for the Instrumentation System and Automation (ISA) Society’s ISA S95 standard, which enables communication Thailand: 0018-004-415-283
between the plant and corporate systems using industry-standard, open XML communication services.
Workcenter
Europe and Middle East and Africa, (EMEA) Technical Assistance Centre (TAC) for Advanced Solutions contacts
Web-Based Visualization Analysis Solutions
AMS Leader, EMEA - Daren Lewis daren.lewis@honeywell.com 1 +44 117 377 9029
• Workcenter Release 240 – coming 4Q2010
Loop Scout Service loopscout@honeywell.com
• Workcenter Release 230
OptiVision Help Desk p3its_oncall@honeywell.com + 358 20752 2300
Loop Management and Alarm Management Service - Scout Suite
EMEA Advanced Solutions Helpline +32 (0)2 728 2200
• Scout Suite R310 – released January 2010
Advanced Planning & Scheduling aps.support.emea@honeywell.com
(Scout Suite is the collective name for Loop Scout & Alarm Scout services)
Advanced Process Control apc.support.emea@honeywell.com
• Loop Scout & Optimization
• Alarm Scout Blending & Movement Automation bma.support.emea@honeywell.com
OptiVision MES BusinessFlex, OMPro and AAM mes.support.emea@honeywell.com
• OptiVision Release 520 Operator Training Simulation ots.support.emea@honeywell.com
• OptiVision Optional Modules UniSim Support unisim.support@honeywell.com
• Web Order – Order Entry/Status Production Control Centre kunde@honeywell.com +47 6676 2180
• OptiVision R520 for Pulp Automation College www.automationcollege.com 1-800-822-7673
• OptiVision R520 for Tissue
For general inquiries emal globalacmarketing@honeywell.com
• OptiVision R520 for CWS
Experion®, BusinessFLEX®, OptiVision®, POMSnet®, Profit®, Uniformance®, UniSim®,Experion® are registered trademarks
• Raw Materials Management R600
• Quality Optimiser R520 of Honeywell International Inc.
Profit Suite © 2009 Honeywell International Inc.
* Profit Suite R400- TPS/Non Honeywell For More Information
* R400 - Experion Implementation For questions, comments or archived copies of the Guardian newsletter, please contact Elaine Harris at
Uniformance
• Advance Formula Manager Release 200 elaine.harris@honeywell.com or via telephone +1-289-333-1216.
• Uniformance PHD Automation & Control Solutions
• Release 300 – current release Process Solutions
• Release 215 – supported release Honeywell
• Release 210 – limited support
• Uniformance Process Studio 1860 W. Rose Garden Lane Phoenix, AZ 85027
• Release 300 – released 12/2010 Tel: 800-822-7673
• Uniformance System Monitor Release 101 www.honeywell.com/ps