Professional Documents
Culture Documents
Three U.S. Services, Eight Partners, One FMS Customer Lethal Survivable Supportable Interoperable
2
F-35 Characteristics
Key Attributes: Stealth Integrated Avionics A/G Munitions Intraflight DL Adv A/C Survivability General Features: Single seat Speed: 750 kts or 1.6M Ceiling: 50,000 ft+ Engine: PW F135 Sensors Fully integrated open architecture system A/G A/A radar/SAR Electro Optical A/G Targeting system A/A IRST Electronic Support Measures (ESM) Short range EO spherical coverage
CTOL
(AF)
Length: 51.4 ft Wing Area: 460 ft2 Weight (Empty): 29,036 lb Internal Fuel: 18,480 lb Range: 600 + nm
STOVL
(BF) Length: 51.1 ft Wing Area: 460 ft2 Weight (Empty): 32,161lb Internal Fuel: 14,003 lb Range: 500 + nm
CV
(CF) Length: 51.4 ft Wing Area: 668 ft2 Weight (Empty): 32,072 lb Internal Fuel: 20,085 lb Range: 600 + nm
JSF CDP
JSF SDD
FMS
F-35 PRECURSOR PROGRAMS: Advanced Short Takeoff Vertical Landing Multi-Role Fighter Advanced Tactical Aircraft Naval Advanced Tactical Fighter Advanced Attack Joint Advanced Strike Technology / Concept Demonstration Phase
LRIP
2011 Progress
Six Aircraft Delivered to Flight Test First Two Production Aircraft Delivered to Edwards
CF-3
Flew Most Flights on One Day in Program History (10) May 25 Passed 400 SDD Flights for 2011
BF-2/BF-3
Passed 110 VLs for Program CTOL Passed 300 Flight Mark at EAFB
AF-6
CF-1
DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited.
BF-2
5
Flights
CTOL 174 CV 58 STOVL 161
Test Points
CTOL 1,376 CV 621 STOVL 1,476
1000 900 800 700 600 500 400 300 200 100 0
Planned 3500 Overall Cumulative Test Points 3000 2500 2000 1500 1000 500 0 Jan-11 Feb-11 Mar-11
Apr-11
May-11
Jun-11
Planned
Actual
Data as of 31 May 2011
BF-4
120 Vertical Landings 100 80 60 40 20 0 Nov-10 May-10 May-11 Mar-10 Jun-10 Feb-11 Mar-11 Jul-10 Sep-10 Dec-10 Oct-10 Jan-11 Apr-11 Apr-10 Aug-10 Short Takeoffs
250 200 150 100 50 0 Nov-10 May-11 May-10 Mar-10 Sep-10 Dec-10 Mar-11 Jun-10 Feb-11 Jul-10 Oct-10 Jan-11 Apr-10 Aug-10 Apr-11
Data as of 31 May 2011 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited.
Mission Systems
BF-4, BF-5
AF-3/AF-4 at Edwards
CF-3 AF-6/AF-7/AF-8/AF-9
10
Training Preparation
On Track to Field ~ 50 Aircraft by the End of CY12
Expecting First F-35A Deliveries to Eglin AFB This Month
11
Aircraft Production
Aircraft on Order
SDD (19 A/C) LRIP 1 (2 A/C) LRIP 2 (12 A/C) LRIP 3 (17 A/C) LRIP 4 (32 A/C) LRIP 5 (35 A/C)
In Assembly Rolled Out
Canada (65) Australia (100) Turkey (100) Italy (69 CTOL 62 STOVL)
United Kingdom (138 CV) Netherlands (85) Denmark (30) Norway (48)
Israel
Singapore
Japan
South Korea
Spain
June 2011-15 Paris Air Show
Key Tenets
Counters Current and Future Threats Economies of Commonality and Scale
FMS Partners U.S.
Global Security
Lower Life-Cycle Costs
Industrial Cooperation
An Effective Coalition
Questions