You are on page 1of 21

Feasibility Study Report

Kholongchu HE Project

C-2-Dam
S.No.
Description
1 Site Clearance
2 Open Excavation
Open Excavation in all type of
2.1
soils/overburden
2.2 Excavation in rock
3 Concreting
3.1 C-1 : M20 A20, Filling Crevices
C-2 : Concrete grade M20 A40, u/s
3.2
face of OF, NOF, around galleries
3.3 C-3: M60 A20, HPC Spillway Glacis
C-4: M15 A150, Mass concrete, Dam
Body
C-5 : M30 A20, Pier, Bridge, Breast
3.5 Wall
3.6 C-6 : M10 Back Filling
3.4

Reinforcement steel in concrete works


3.7
4 Rock Stablization
Rock Bolts/Anchors 25/32 mm dia 6 to
4.1 9 m long
4.2 Cable Anchors 50 t capacity
4.3 100mm Thk Shotcreting on slopes
4.4 Wire mesh
4.5 Gabion walls
4.6 Tendons
5 Drilling and Grouting
Drilling of 45 mm for grouting and
5.1 drainage
5.2 PVC pipe
5.3 Grouting materials
6 Other works in Dam
Furnishing & placing PVC water stop in
6.1 expansion between blocks
Furnishing & placing 200mm dia.
6.2 Porous concrete pipe
Furnishing & placing asphalt of blown
6.3 bitumen in concrete
Construction of stair ramps etc. in the
6.4 body of dam
6.5 General lighting for dam area
6.6 Finishing architectural features
6.7 Miscellaneous
Slope protection / slope stabilization of
6.8 Reservoir Rim
6.9 Water supply & sewerage
6.10 Elevator for Dam (1 No.)
Drainage water pumping system for
6.11 Dam galleries
6.12 Road Works
6.13
SUB TOTAL
7 Instrumentation
8 Contingencies
9 Dewatering
TOTAL (civil)
10 HM Works (Spillway Gates)

Unit
LS

Rate (In
Nu.)
10000000

Qty.
1

Cum

290605.00

Cum

181220.04
8680.00

Cum

30082.40

Cum

32620.00

Cum

205560.00

Cum

93920.00

Cum

68800.00

MT

Rmt
Nos.
Cum
MT
Cum
Nos.

Rmt
Rmt
Bags

16888.24

24760.00
300.00

20
25020.00
25020.00
100080.00

m
m
LS
LS
LS
LS

LS
LS
LS
LS
LS
1% of sub total
5% of sub total
5% of sub total

Cost (In Nu
Millions)
10

KHOLONG CHU HEP (600 MW), BHUTAN


Excavation for N.O.F Blocks
Block
width

Soil Excavation

Section
C.S.Area
Quantity
Block No
Average
No.
Inclined from
C/S Area
Base
CAD
-Inclined
(m2)
(m2)
(Cum)
Left Bank NOF
504.45
1-1
Block No-1 15.73
395.42
375.71
5909.86
1-2
227.25
1-3
227.25
2-1
Block No-2 18.00
188.79
274.94
4948.84
2-2
408.77
2-3
Right Bank NOF
131.42
9-1
Block No-9 18.00 2073.40 751.46 13526.31
9-2
49.57
9-3
49.57
10-1
Block No15.00
128.78
117.99
1769.83
10-2
10
175.62
10-3
175.62
11-1
Block No17.57
188.34
178.86
3142.48
11-2
11
172.60
11-3
Excavation at Dam axis
Excavation at Flip Bucket
Sub -total (m3) =

=
=

7753.75

Rock Excavation
Quantit
C.S.Are Averag
y
a from
e C/S (Incline
CAD
Area
d
(m2)
(m2) Base)Cu
m
122.82
93.15
87.16
1370.99
45.50
45.50
550.09 919.88 16557.77
2164.04
1364.12
973.69 920.66 16571.83
424.17
424.17
758.11 600.70 9010.57
619.84
619.84
797.70 664.41 11673.75
575.71
798.80

27567.3
###

###

Cum

KHOLONG CHU HEP (600 MW), BHUTAN


Excavation for O.F Blocks
Section
Block No
No.
3-1
3-2
3-3
4-1
4-2
4-3
5-1
5-2
5-3
6-1
6-2
6-3
7-1
7-2
7-3
8-1
8-2
8-3

Block No3
Block No4
Block No5
Block No6
Block No7
Block No8

Dam
Top
1574
1574
1574
1574
1574
1574
1574
1574
1574
1574
1574
1574
1574
1574
1574
1574
1574
1574

Block
width
Inclined
Base
12.00

13.80

13.80

13.80

13.80

13.80

Sub -total (m3) =

Soil Excavation
C.S.Area
from
CAD
(m2)
408.78
273.70
0.00
0.00
419.72
3018.46
3018.46
3248.54
4704.32
4704.32
5058.43
5015.51
5015.51
4907.31
3805.20
3805.20
1681.68
131.42

Quantity
Average
C/S Area
-Inclined
(m2)
(Cum)
227.49

2729.91

1146.06 15815.64

3657.11 50468.07

4926.08 67979.95

4576.01 63148.89

1872.77 25844.18

###

Rock Excavation
Quantit
C.S.Are Averag
y
a from
e C/S (Incline
CAD
Area
d
(m2)
(m2) Base)Cu
2164.04
m
2870.86 3077.36 36928.36
4197.19
4197.19
2023.44 2764.68 38152.57
2073.41
2073.41
656.70 1179.44 16276.32
808.23
808.23
577.34 642.05 8860.30
540.59
540.59
534.42 660.83 9119.50
907.49
907.49
1184.76 1152.12 15899.28
1364.12
###

KHOLONG CHU HEP (600 MW), BHUTAN


Backfill Concrete for NOF Blocks
(U/S Face)
Section
Block No
No.

Block
width

C.S.Area Average
C.S.Area Average
Quantity
Quantity
from
C/S Area
from CAD C/S Area
(Cum)
(Cum)
2
2
2
2
CAD (m )
(m )
(m )
(m )
Left Bank NOF
7.08

1-1
1-2

D/S Face

Block No-1

15.73

27.21

7.08
26.15

411.35

27.21

1-3

44.16

50.39

2-1

44.16

50.39

2-2

Block No-2

18.00

177.77

2-3

129.34

9-1

23.46

117.09

2107.59

266.48

28.23

444.01

179.33

3227.87

328.16

5906.80

261.35

3920.19

161.28

2833.68

221.11
Right Bank NOF

9-2

Block No-9

18.00

9-3
10-1
10-2

Block No10

15.00

10-3
11-1
11-2

Block No11

17.57

822.70

23.04
305.49

5498.90

70.33

110.62

70.33

110.62

203.49

167.39

2510.88

321.29

228.36

352.13

228.36

352.13

81.94

105.79

1858.80

7.08

11-3

850.80

124.63
7.08

Total quantity =

12387.52

16332.54

Say

12390.00

Say 16340.00

KHOLONG CHU HEP (600MW), BHUTAN


Backfill Concrete for OF Blocks
(U/S Face)
Sectio
Block No
n No.

Block
width

4-3
5-1
5-2
5-3
6-1
6-2

Block No-3

12.00

Block No-4

13.80

Block No-5

13.80

Block No-6

13.80

Block No-7

13.80

6-3
7-1
7-2
7-3
8-1
8-2
8-3

Average
C/S Area
(m2)

Quantity
(Cum)

251.69

3020.26

326.52

4505.96

607.44

8382.68

810.69

11187.57

708.27

9774.17

129.34

3-1
3-2
3-3
4-1
4-2

C.S.Area
from CAD
(m2)

D/S Face

Block No-8

13.80

213.39
412.34
412.34
119.22
448.00
448.00
603.09
771.23
771.23
841.47
819.38
819.38
804.08
501.36
501.36
181.09
11.82

C.S.Area Average
Quantity
from CAD C/S Area
(Cum)
(m2)
(m2)
194.45

231.42
Total quantity =
Say

3193.65

194.45
194.45
194.45
194.45
194.45
194.45
194.45
194.45
194.45
194.45
194.45
194.45
194.45
194.45
194.45
194.45
194.45

194.45

2333.41

194.45

2683.42

194.45

2683.42

194.45

2683.42

194.45

2683.42

194.45

2683.42

40064.29

15750.53

40070.00

Say 15760.00

KHOLONG CHU HEP (600 MW), BHUTAN


Computation of Quantities of Concrete filling in Crevices in Dam Blocks C-1
Block
No

Block
Length as
per
Autocad
(m)

1 Start
1
1/2
2
2/3
3
3/4
4
4/5
5
5/6
6
6/7
7
7/8
8
8/9
9
9/10
10
10/11
11
11 End

6.00
6.00
6.66
18.31
32.59
72.31
81.20
91.59
91.59
91.59
93.59
93.59
93.59
93.59
91.59
91.59
82.52
66.96
29.94
27.33
18.25
13.24
6.00

Average
Block
Length
(m)

Block
Slanting
width as
per
autocad
(m)

Averag
e
Concret
e depth
(m)

6.22

16.78

0.50

104.39

52.20

19.19

27.49

0.50

527.54

263.77

62.03

30.75

0.50

1907.35

953.67

88.12

36.06

0.50

3177.66

1588.83

92.25

19.52

0.50

1800.88

900.44

93.59

13.80

0.50

1291.47

645.74

92.92

13.80

0.50

1282.27

641.14

88.56

34.25

0.50

3033.07

1516.54

59.80

42.63

0.50

2549.25

1274.63

25.17

20.85

0.50

524.90

262.45

12.50

26.56

0.50

331.97

165.99

=
=
=

8265.38
413.27
8678.65
8680.00

Total Concrete quantity


Add 5% for slopes etc.
Total quantity
Say

Concrete Filling
Area
(m2)

Quantity
(Cum)

KHOLONG CHU HEP (600 MW), BHUTAN


U/S Face concrete Quantity in NOF Section
Block No.

Block No-1

Block No-2

Block No-9

Block No-10

Block No-11

Dam C/s
Average
Area from
Area
Autocad

Width
Volume
for
( Cu.m)
Block

Left Bank NOF


15.00
25.73
23.46
15.73
29.64
29.64
68.38
61.23
18.00
85.66
Right Bank NOF
220.03
220.03
181.97
18.00
105.83
105.83
96.42
90.15
15.00
68.20
69.20
52.06
45.42
17.57
15.00
Quantity - Sub Total
Say

368.99

1102.12

3275.41

1352.27

797.99
6896.78
6900.00

U/S Face concrete Quantity in OF Section


Block No.

Block No-3

Block No-4

Block No-5

Block No-6

Block No-7

Block No-8

C/s Area
Average Width Volume
from
Area
of block
( Cu.m)
Autocad
49.07
96.44
12.00
1157.32
113.32
126.94
0.00
45.17
13.80
623.32
58.11
77.40
77.40
104.57
99.01
13.80
1366.29
115.05
115.05
115.05
115.05
13.80
1587.69
115.05
115.05
115.05
115.05
13.80
1587.69
115.05
115.05
93.99
79.14
13.80
1092.11
28.38
Quantity Sub total
Say

7414.42
7420.00

U/S Face C-2 Total

14320.00

KHOLONG CHU HEP (600 MW), BHUTAN


D/S Face concrete Quantity in OF Section
Block No.

Foundation
Level

C/s Area
from
Autocad

1520.99

0.00

1502.68

53.69

4-3

1494.75

72.99

5-1

1494.75

72.99

1486.85

100.16

5-3

1479.65

107.64

6-1

1479.65

107.64

1479.65

107.64

6-3

1479.65

107.64

7-1

1479.65

107.64

1479.65

107.64

7-3

1483.72

107.64

8-1

1483.72

107.64

1495.06

89.57

1507.54

23.97

4-1
4-2

5-2

6-2

7-2

8-2
8-3

Block No-4

Block No-5

Block No-6

Block No-7

Block No-8

Average
Area

Width for
average
area

Volume
( Cu.m)

42.23

13.80

582.71

93.59

13.80

1291.58

107.64

13.80

1485.38

107.64

13.80

1485.39

73.73

13.80

1017.41

Quantity Sub total

5862.47

Say

5870.00

KHOLONG CHU HEP (600 MW), BHUTAN


Concrete in galleries in OF & NOF blocks

S.No.

C/S area of C/S area of


Concrete
Length
the
the concrete
in
,m
opening of around the galleries,
gallery, m2 gallery, m2
m3

Particulars

Opening
of
galleries,
m3

Length of the Access Gallery


(3.00 m X 2.50 m)

67.00

19.88

6.57

440.12

1331.83

Length of the Foundation


Gallery (2.00 m X 2.50 m)

72.24

17.46

5.21

376.61

1261.31

Length of Inspection Gallery


(2.00 m X 2.50 m)

67.58

17.46

5.21

352.30

1179.90

Elevator Shaft (3.00 m X 3.00


m)

61.50

25.00

9.00

553.50

1537.50

Total Length of the Galleries

268.33 m

Say

270.00 m

Total Concrete in galleries

1722.53 m3

Say

1730.00 m3

Total opening of galleries

5310.53 m3

Training Wall
S.No.

Area in
Section

Particulars

Quantity,
m3

Width

Surface Spillway Right Wall

197.01

394.02

Sluice Spillway Right Wall

512.08

1024.16

Sluice Spillway Left Wall

512.08

1024.16

Total Concrete quantity of Training wall

2442.34 m3

Say

2450.00 m3

Parapet Wall
Area of parapet wall as per
Autocad (m2)

Area of footpath
as per Autocad
(m2)

Length of
Dam (m)

Total Area (m2)

Total
Volume
(m3)

0.50

0.27

150.16

0.77

115.93

Total Concrete quantity of Parapet wall

115.93 m

Say

120.00 m3

Apron
S.No.

Particulars

Area from
Autocad (m2)

Length (m)

Quantity (m3)

Key Wall

24.52

81.00

1986.20

Apron

20.00

81.00

1620.00

Cutoff

24.52

81.00

1986.20

Total Concrete quantity of Apron

5592.40 m

al Concrete Quantity in Galleries,Training and Parapet wall,Apron

9892.40 m3

KHOLONG CHU HEP (600 MW), BHUTAN


D/S Face concrete Quantity in OF Section
Block No Description

C.S.Area from
CAD (m2)

Width
(m)

D/S Face concrete


Quantity (m3)

Upper Tier

290.32

12.00

3483.78

Lower Tier

422.20

13.80

5826.37

Lower Tier

422.20

13.80

5826.37

Lower Tier

422.20

13.80

5826.37

Lower Tier

422.20

13.80

5826.37

Lower Tier

422.20

13.80

5826.37

Total Quantity =

32615.65

Say,

32620.00

KHOLONG CHU HEP (600 MW), BHUTAN


Around the Gate operating chamber
Area in
Section
622.95
622.95
622.95
622.95
622.95

Block No
Block - 4
Block - 5
Block - 6
Block - 7
Block - 8

Length (in
Plan)
7.80
7.80
7.80
7.80
7.80

Quantity Sub total =

Quantity
(Cum
4859.04
4859.04
4859.04
4859.04
4859.04
24295.21

Pier
Block No

Pier
1
2
3
4
5
6
7
8
9
10
11
12

Block -3
Block -4
Block -5
Block - 6
Block - 7
Block - 8

Area in
Length (in
Section
Plan)
381.35
3
419.36
3
1833.97
3
1833.97
3
1833.97
3
1833.97
3
1833.97
3
1833.97
3
1833.97
3
1833.97
3
1833.97
3
1833.97
3
Quantity Sub total =

Quantity
(Cum)
1144.05
1258.08
5501.90
5501.90
5501.90
5501.90
5501.90
5501.90
5501.90
5501.90
5501.90
5501.90
57421.14

Below Spillway Crest


C/s Area
from
Average Area
Autocad
179.74
240.15
257.45
283.27
0.00
93.67
140.51
140.51
140.51
140.51
140.51
140.51
140.51
140.51
140.51
140.51
140.51
140.51
140.51
140.51
140.51
140.51
140.51
140.51

Block No
3 Left
3
3 right
4 Left
4
4 right
5 Left
5
5 right
6 Left
6
6 right
7 Left
7
7 right
8 Left
8
8 right

Width for
average
area
12.00

2881.84

13.80

1292.69

13.80

1939.04

13.80

1939.04

13.80

1939.04

13.80

1939.04

Quantity Sub total =


Bridge
Width
6

Slab Thickness Length


0.3

(Cum
150.16

Volume
( Cu.m)

270.29

11930.68

Quantity Sub total =

270.29

KHOLONG CHU HEP (600 MW), BHUTAN


NOF Mass Concrete
Block No.
1-1
1-2
1-3
2-1
2-2
2-3
9-1
9-2
9-3
10-1
10-2
10-3
11-1
11-2
11-3

Block No-1

Block No-2

Block No-9

Block No-10

Block No-11

Dam C/s
Average
Width of Volume
Area from
Area
block
( Cu.m)
Autocad
Left Bank NOF
22.50
38.60
35.28
15.73
555.00
44.75
44.75
177.05
171.17
18.00
3081.01
291.70
Right Bank NOF
1970.17
1700.60
1376.36
18.00
24774.56
458.33
458.33
383.86
340.98
15.00
5114.73
180.76
180.76
78.11
93.79
17.57
1647.87
22.50
Quantity - Sub Total
35173.17
Say
35180.00

OF Mass Concrete

Block No.
3-1
3-2
3-3
4-1
4-2
4-3
5-1
5-2
5-3
6-1
6-2
6-3
7-1
7-2
7-3
8-1
8-2
8-3

Block No-3

Block No-4

Block No-5

Block No-6

Block No-7

Block No-8

C/s Area
from
Autocad
236.74
596.03
1217.90
0.00
1133.83
2143.70
2143.70
2688.92
3166.88
3166.88
3166.88
3166.88
3166.88
3166.88
2806.00
2806.00
1828.77
702.02

Average
Area

Width for Volume


block
( Cu.m)

683.56

12.00

8202.68

1092.51

13.80

15076.61

2666.50

13.80

36797.70

3166.88

13.80

43702.92

3046.59

13.80

42042.89

1778.93

13.80

24549.22

Quantity Sub total


Say

170372.01
170380.00

KHOLONG CHU HEP (600 MW), BHUTAN


CALCULATION OF CONCRETE QUANTITIES OF VARIOUS GRADES IN OF BLOCKS. C2,C3,C4,C6
S.N.

Particulars

Sub Total
(m3)
1 C-1 M20, A20 in foundation for Filling Crevices

Reinforceme
nt

Quantity
Total (m3)

MT

8680.00
8680.00

2 C-2 : M-25, A-40


u/s Face (OF and NOF)
d/s Face (OF)
Galleries
Training Wall
Parapet and footpath
Key wall at Dam toe
Apron
Cutoff (End of Apron)

3 C-3 : M-60, A-20


Spillway Glacis
4 C-4 : M-30, A-20
Around the Gate operating Chamber
Piers
Below Spillway Crest
Bridge
5 C-5 : M-15, A-150
Mass Concrete NOF Blocks
Mass Concrete OF Blocks

6 C-6 : M-10 Back Filling


NOF u/s
NOF d/s
OF u/s
OF d/s

14320.00
5870.00
1730.00
2450.00
120.00
1986.20
1620.00
1986.20
30082.40

3008.24

32620.00

2609.6

93920.00

11270.4

205560.00

0.00

32620.00

24295.21
57421.14
11930.68
270.29

35180.00
170380.00

16888.24
12390.00
16340.00
40070.00
0.00
68800.00

KHOLONG CHU HEP (600 MW), BHUTAN


Computation of Dam Seat Area and Slope Stabilisation

Block No

Block Length Avereage


as per
Block
Autocad (m) Length (m)

1 Start
1
1/2
2
2/3
3
3/4
4
4/5
5
5/6
6
6/7
7
7/8
8
8/9
9
9/10
10
10/11
11
11 end

6.00
6.00
6.66
18.31
32.59
72.31
81.20
91.59
91.59
91.59
93.59
93.59
93.59
93.59
91.59
91.59
82.52
66.96
29.94
27.33
18.25
13.24
6.00

Block Slanting
width as per
autocad (m)

Constant
Base (m)

Area (m2)

6.22

16.78

0.00

104.39

19.19

27.49

0.00

527.54

62.03

30.75

0.00

1907.35

88.12

36.06

0.00

3177.66

92.25

19.52

0.00

1800.88

93.59

13.80

0.00

1291.47

92.92

13.80

0.00

1282.27

88.56

34.25

0.00

3033.07

59.80

42.63

0.00

2549.25

25.17

20.85

0.00

524.90

12.50

26.56

0.00

331.97

Total Dam Seat Area=


Add 5% for slopes etc.
Total quantity =
Say,

Rock bolts (Slope stabilisation)


Slope stabilisation at Left Bank (Block 1 to 2 + cutting at Left Bank) 1839.99 m2
Slope stabilisation at Right Bank (Block 9 to 11 + cutting at Right Bank)
3786.13 m2
Add 10% for L.S

562.61 m2

Total Surface Area for Slope Stabilisation

6188.72 m2

Provided 9 m long Rock bolts 32mm dia (1.5 m c/c = 2.25 m2)
Nos. Of Rock Bolts

2750.54 Nos.

Total Length of rock bolts in m

24754.89 m
Total

24760.00

Wire Mesh (Slope stabilisation)


Slope stabilisation at Left Bank

1839.99 m2

Slope stabilisation at Right Bank

3786.13 m2
Total

Add 10% for L.S

5626.11 m2
562.61 m2

Total

6188.72 m2
Say,

6190.00 m2

16530.76
826.54
17357.30
17360.00

ShotCrete W/o Wire Mesh (Slope stabilisation)


Slope stabilisation at Left Bank (1/3 of above area)

613.33 m2

Slope stabilisation at Right Bank (1/3 of above area)

1262.04 m2
1875.37 m2

100mm thick shotcrete

Total

Add 20% for L.S

187.54 m3
37.51 m3

Total

300.00 m3

Grouting
(i) Consolidation Grouting
17360.00 m2

Dam seat Area

Considered depth of the grout hole is 8.00m and one Hole will grout Area
of 2.5m X 2.5m = 6.25m2
Avg Depth

8.00 m

Number of Grout Holes

2777.60

Add 10% for Unforeseen Areas

277.76
Total

3055.36
Say,

Total
LengthGrouting
of Grout Holes
(ii)Curtain

3060.00
24480.00

Total Length of Curtain Grout (through Galleries in Dam


foundation)

72.24 m

Add 10% in Length due to Foundation Gallery in Slopes

7.22 m

Total

79.47 m
Say,

80.00 m

(ii) Curtain grout Holes proposed to be Drilled At 2m c/c


Tota Number of Grout holes
Average Depth of the Curtain Grout =

40.00 Nos.
8m

Total Length Curtain grout Holes = 40 x 8

320 m

Add 10% for Unforeseen Areas

32 m
Total

352 m
Say,

Total Length of grout holes (Consolidation+Curtain grouting )

360 m
24840.00 m

Considered 4 bags of Cement per m depth of the grout hole


Total Number of Cement bags

99360.00 Nos.

(iii) Drilling of 45mm for Grouting and Drainage Holes


In Dam seat Area
1. Total Length of grout holes (Consolidation+Curtain
grouting )

24840.00 m

Considered Depth of Drainage hole 6.0m @ 3m C/C


No. of Drainage holes

30.00

2. Total Length of Drainage hole

180.00 m
Total

25020.00 m
Say,

25020.00 m

Considered 4 bags of Cement per m depth of the grout hole


Total Number of Cement bags

100080.00 Nos.

You might also like