20110623-5100 FERC PDF (Unofficial) 6/23/2011 2:58:32 PM

Transcontinental Gas Pipe Line Company, LLC 2800 Post Oak Boulevard (77056) P.O. Box 1396 Houston, Texas 77251-1396 (713) 215-2000

June 23, 2011

Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Attention: Kimberly D. Bose, Secretary Reference: Transcontinental Gas Pipe Line Company, LLC Negotiated Commodity Rate Tariff Filing Docket No. RP11-__________

Ladies and Gentlemen: Pursuant to Section 4 of the Natural Gas Act (NGA) and Part 154 of the Federal Energy Regulatory Commissions (Commission or FERC) regulations thereunder, Transcontinental Gas Pipe Line Company, LLC (Transco) hereby submits for filing with the Commission Version 5.0.0 of Part I, Section 1, Table of Contents; Version 0.0.0 of Part II, Section13, Summary of Negotiated Commodity Rates; and Version 0.0.0 of Part II, Sections 13.1 and 13.2 to its FERC Gas Tariff, Fifth Revised Volume No.1 (Tariff). The revised tariff sections are proposed to be effective June 9, 2011. Statement of Nature, Reasons and Basis The purpose of this filing is to add a new tariff section 13 to Part II of Transcos Tariff, which section will contain summaries of any negotiated commodity rate agreements entered into by Transco,1 and to submit two tariff records to be included in the new section reflecting two negotiated commodity rate agreements between Transco and a replacement shipper that acquired capacity released on a temporary basis, Hess Corporation (Hess). Southern Company Services, Inc. (Southern Company) temporarily released capacity (in two portions) to Hess that is subject to a negotiated rate service agreement under Rate Schedule FT for firm transportation service under Transcos Momentum Expansion Project
Transco submits this section pursuant to the Commissions policy that pipelines implement negotiated rate transactions by filing either the negotiated rate agreement itself or a tariff sheet describing the agreement. Nor Am Gas Transmission Co., 77 FERC 61,011, at 61,037 (1996).
1

20110623-5100 FERC PDF (Unofficial) 6/23/2011 2:58:32 PM

Federal Energy Regulatory Commission June 23, 2011 Page 2

(Momentum).2 The temporary release of capacity from Southern Company to Hess, effective May 1, 2011 through October 31, 2012, facilitates an asset management arrangement between the two companies. On June 9, 2011, Hess requested that Transco apply to Hess replacement service agreements the same negotiated commodity rate that applies to the firm transportation service for Southern Company under Momentum. In accordance with the Commissions policy that pipelines decide on a case-by-case basis whether a negotiated usage charge applies to an asset manager replacement shipper,3 Transco has determined that Hess is similarly situated to Southern Company and therefore is eligible to receive the negotiated commodity rate under its replacement service agreements. On June 20, 2011, Transco and Hess executed amendments to the replacement service agreements to include the negotiated commodity rate on Exhibit C effective June 9, 2011 subject to Transcos receipt of necessary authorization from the Commission. Accordingly, pursuant to the Commissions Alternative Rate Policy Statement and the provisions of Transco's Rate Schedule FT that permit Transco to negotiate rates,4 Transco submits herewith for filing with the Commission the tariff sections reflecting summaries of the negotiated rate agreements between Transco and Hess. The summaries include the exact legal name of the customer, the applicable charge, the applicable rate schedule for the service, the receipt and delivery points, the quantity of gas to be transported under the service agreements and the term of the negotiated rate. Transco affirms that Hess service agreements do not deviate in any material aspect from the Rate Schedule FT form of service agreement in Transcos FERC Gas Tariff. Due to the timing of the capacity release transaction and the need to execute negotiated rate agreements with Hess, Transco was unable to file the tariff sections submitted herewith prior to the effective date of the negotiated commodity rate agreements. However, Transco is submitting the required tariff sections as soon as reasonably practicable following the execution of the negotiated rate agreements. The Commission recently has found, under similar circumstances, that this approach is preferable to delaying the implementation of a capacity release transaction.5

Transcos Momentum Expansion Project was approved by Commission order issued February 14, 2001 in Docket Nos. CP01-388-000 and CP01-388-001, as amended on April 10, 2003 in Docket No. CP01388-002. 3 Texas Eastern Transmission LP, et al., 129 FERC 61,031 (2009), order denying clarification, 130 FERC 61,111 (2010). 4 Alternatives to Traditional Cost-of-Service Ratemaking for Natural Gas Pipelines and Regulation of Negotiated Transportation Services of Natural Gas Pipelines (Alternative Rate Policy Statement), 74 FERC 61,076, reh'g and clarification denied, 75 FERC 61,024, reh'g denied, 75 FERC 61,066 (1996). Transcontinental Gas Pipe Line Corp., 76 FERC 61,318 (1996) and Section 3.5 of Transcos Rate Schedule FT. 5 See Texas Eastern Transmission, LP, 130 FERC 61,189 at P 27 (2010) (Texas Eastern).

20110623-5100 FERC PDF (Unofficial) 6/23/2011 2:58:32 PM

Federal Energy Regulatory Commission June 23, 2011 Page 3

Effective Date and Waivers The revised tariff sections submitted herein are proposed to be effective June 9, 2011, the date that Hess requested that Transco apply the negotiated commodity rate under Momentum to its replacement service agreements. Consistent with Texas Eastern,6 Transco respectfully requests a waiver of Section 154.207 of the Commissions regulations and any other waivers that may be required for the Commission to permit the tariff sections filed herein to become effective June 9, 2011. Materials Submitted Herewith In accordance with Section 154.7(a)(1) of the Commissions regulations, the following material is submitted herewith: An eTariff XML filing package, filed as a zip (compressed) file, containing: (1) (2) (3) (4) (5) The revised tariff sections in RTF format with metadata attached; A transmittal letter in PDF format; A clean version of the revised tariff sections in PDF format for publishing in eLibrary; A marked version of the revised tariff sections in accordance with Section 154.201(a) of the Regulations; and A copy of the complete filing in PDF format for publishing in eLibrary.

Posting and Certification of Service In accordance with the provisions of Section 154.2(d) of the Commissions regulations, copies of this filing are available for public inspection, during regular business hours, in a convenient form and place at Transcos main office at 2800 Post Oak Boulevard in Houston, Texas. In addition, Transco is serving copies of the instant filing to its affected customers, interested state commissions, and other interested parties. Any communications in regard to this filing should be sent to: David A. Glenn Senior Counsel Transcontinental Gas Pipe Line Company, LLC P.O. Box 1396 Houston, Texas 77251 (713) 215-2341 david.a.glenn@williams.com

Id.

20110623-5100 FERC PDF (Unofficial) 6/23/2011 2:58:32 PM

Federal Energy Regulatory Commission June 23, 2011 Page 4

Respectfully submitted, TRANSCONTINENTAL GAS PIPE LINE COMPANY, LLC

By _________________________________ Marg Camardello Manager, Certificates & Tariffs 713-215-3380 marg.r.camardello@williams.com

20110623-5100 FERC PDF (Unofficial) 6/23/2011 2:58:32 PM

Transcontinental Gas Pipe Line Company, LLC FERC Gas Tariff Fifth Revised Volume No. 1 PART I - OVERVIEW SECTION 1 TABLE OF CONTENTS Part I Overview Section 1 Table of Contents Section 2 Preliminary Statement Section 3 Maps

Part I - Overview Section 1 - Table of Contents Version 5.0.0

Part II Statement of Rates and Fuel Section 1 Open Access Firm Transportation Rates Section 1.1 Rate Schedule FT Section 1.1.1 FT - Non-Incremental Section 1.1.2 FT - SunBelt Expansion Section 1.1.3 FT - Maiden Delivery Lateral Section 1.1.4 FT - Pocono Expansion Section 1.1.5 FT - Cherokee Expansion Section 1.1.6 FT - Southcoast Expansion Section 1.1.7 FT - Market Link Expansion Section 1.1.8 FT - Sundance Expansion Section 1.1.9 FT - Leidy East Expansion Section 1.1.10 FT - Momentum Expansion Section 1.1.11 FT - Trenton Woodbury Expansion Section 1.1.12 FT - Leidy to Long Island Expansion Section 1.1.13 FT - Potomac Expansion Section 1.1.14 FT - Sentinel Expansion Section 1.1.15 FT - 85 North Expansion Section 1.2 Rate Schedule FT-G Section 1.3 Rate Schedule FTN Section 1.4 Rate Schedule FDLS Section 2 Open Access Interruptible Transportation Rates Section 2.1 Rate Schedule IT Section 2.2 Rate Schedule IDLS Section 3 Open Access Firm Storage Rates and Fuel Section 3.1 Rate Schedule WSS-Open Access Section 3.2 Reserved Section 3.3 Rate Schedule ESS Section 3.4 Rate Schedule EESWS Section 3.5 Rate Schedule LNG Section 4 Open Access Interruptible Storage Service Rates and Fuel Section 4.1 Rate Schedule ISS Section 5 Firm 7(c) Transportation Rates Section 5.1 Reserved Section 5.2 Rate Schedules X-269, X-270, X-274 through X-276 Section 6 Interruptible 7(c) Transportation Rates Section 6.1 Certificated Interruptible Transportation Section 7 Firm 7(c) Storage Rates and Fuel Section 7.1 Rate Schedule GSS Filed: June 23, 2011 Page 1 of 5 Effective: June 9, 2011

20110623-5100 FERC PDF (Unofficial) 6/23/2011 2:58:32 PM

Transcontinental Gas Pipe Line Company, LLC FERC Gas Tariff Fifth Revised Volume No. 1

Part I - Overview Section 1 - Table of Contents Version 5.0.0

Section 7.2 Rate Schedule LSS Section 7.3 Reserved Section 7.4 Rate Schedule SS-2 Section 7.5 Rate Schedule S-2 Section 7.6 Rate Schedule LG-A Section 8 Interruptible 7(c) Storage Rates and Fuel Section 8.1 Rate Schedule LG-S Section 9 Gathering Rates and List of Gathering Points Section 9.1 Firm and Interruptible Gathering Rates Section 9.2 List of Gathering Points Section 10 Aggregation and Balancing Services Rates and Fuel Section 10.1 Rate Schedule PAL Section 10.2 Trading Fees and Fuel Retention Section 11 Other Services Rates Section 11.1 Rate Schedule ICTS Section 12 Transportation Fuel Retention Factors Section 12.1 Firm and Interruptible Transportation Fuel Section 12.2 Rate Schedules FDLS and IDLS Transportation Fuel Section 13 Summary of Negotiated Commodity Rates Part III Rate Schedules Section 1 Open Access Firm Transportation Service Section 1.1 Rate Schedule FT Section 1.2 Rate Schedule FT-G Section 1.3 Rate Schedule FTN Section 1.4 Rate Schedule FDLS Section 2 Open Access Interruptible Transportation Service Section 2.1 Rate Schedule IT Section 2.2 Rate Schedule IDLS Section 3 Open Access Firm Storage Service Section 3.1 Rate Schedule WSS-Open Access Section 3.2 Reserved Section 3.3 Rate Schedule ESS Section 3.4 Rate Schedule EESWS Section 3.5 Rate Schedule LNG Section 4 Open Access Interruptible Storage Service Section 4.1 Rate Schedule ISS Section 5 Reserved Section 5.1 Reserved Section 6 Firm 7(c) Storage Service Section 6.1 Rate Schedule GSS Section 6.2 Rate Schedule LSS Section 6.3 Reserved Section 6.4 Rate Schedule SS-2 Section 6.5 Rate Schedule S-2 Section 6.6 Rate Schedule LG-A Section 7 Interruptible 7(c) Storage Service Filed: June 23, 2011 Page 2 of 5 Effective: June 9, 2011

20110623-5100 FERC PDF (Unofficial) 6/23/2011 2:58:32 PM

Transcontinental Gas Pipe Line Company, LLC FERC Gas Tariff Fifth Revised Volume No. 1 Section 7.1 Rate Schedule LG-S Section 8 Aggregation and Balancing Services Section 8.1 Rate Schedule PAL Section 8.2 Rate Schedule POOLING Section 9 Sales Service Section 9.1 Rate Schedule NS Section 10 Other Services Section 10.1 Rate Schedule ICTS

Part I - Overview Section 1 - Table of Contents Version 5.0.0

Part IV General Terms and Conditions Section 1 Application Section 2 Definitions Section 3 Quality Section 4 Measurements Section 5 Measurement Equipment Section 6 Billing Section 7 Payments Section 8 Reserved Section 9 Possession of Gas Section 10 Warranty of Title to Gas Section 11 Force Majeure Provision and Contract Entitlements Section 12 Pressures Section 13 Supply Curtailment Section 14 Duly Constituted Authorities Section 15 Refund of Cash-Out Revenues Section 16 Service Agreement Section 17 Notices Section 18 Deliveries and Receipts, Overruns, Unauthorized Takes and Penalties Section 19 Daily Delivery Point Entitlements (DPE) Section 19.1 DPE - Delivery Point Provisions Section 19.2 DPE - Facility Group Provisions Section 19.3 DPE - Maps Legend and Maps Section 19.4 DPE - Zone 4 Section 19.5 DPE - Zone 5 Section 19.6 DPE - Zone 6 Section 20 Policy for Construction of Interconnect Facilities Section 21 Rate Zones Section 22 Policy for Consolidation of Service Agreements Section 23 Restatement of Quantities in Thermal Units Section 24 Gas Research Institute Voluntary Contributions Section 25 Monthly Imbalance Resolution Section 26 Changes in Rates for Rate Schedule S-2 Section 27 Annual Charge Adjustment (ACA) Provision Section 28 Nominations, Allocations, Curtailment, and Confirmations Section 29 Best Available Operational Data Section 30 Complaint Procedures - Marketing Function Employees Section 31 Waiver Filed: June 23, 2011 Page 3 of 5 Effective: June 9, 2011

20110623-5100 FERC PDF (Unofficial) 6/23/2011 2:58:32 PM

Transcontinental Gas Pipe Line Company, LLC FERC Gas Tariff Fifth Revised Volume No. 1

Part I - Overview Section 1 - Table of Contents Version 5.0.0

Section 32 Credit Worthiness Section 33 Order of Discounts Section 34 Periodic Reports Section 35 Standards for Business Practices Section 36 Gathering Affiliate(s) Standards of Conduct Section 37 Cash Out Provisions Section 38 Fuel Retention Adjustment Section 39 Adjustments to Prior Gas Day Scheduled Quantities and PDAs Section 40 Discount Policy Section 41 Transmission Electric Power Cost Adjustment Provision Section 42 Capacity Release Section 43 System Management Gas Section 44 Extension of Service Agreement Section 45 Periodic Rate Adjustments and Surcharges Section 46 1Line Service Section 47 Transfers of Storage Inventory Section 48 Right of First Refusal Procedures Section 49 Procedures For Allocating Available Firm Capacity Section 50 Processing Rights Regarding Liquefiable Hydrocarbons Section 51 Operational Controls Section 52 Operational Flow Orders Section 53 Negotiated Rates Section 54 Penalty Revenue Sharing Section 55 Reservation of Capacity Section 56 Unauthorized Receipts Part V Forms of Service Agreement Section 1 Open Access Firm Transportation Service Section 1.1 Rate Schedule FT Section 1.2 Rate Schedule FT-G Section 1.3 Rate Schedule FTN Section 1.4 Rate Schedule FDLS Section 2 Open Access Interruptible Transportation Service Section 2.1 Rate Schedule IT Section 2.2 Rate Schedule IDLS Section 3 Open Access Firm Storage Service Section 3.1 Rate Schedule WSS Open Access Section 3.2 Reserved Section 3.3 Rate Schedule ESS Section 3.4 Rate Schedule ESSWS Section 3.5 Rate Schedule LNG Section 4 Open Access Interruptible Storage Service Section 4.1 Rate Schedule ISS Section 5 Reserved Section 5.1 Reserved Section 6 Firm 7(c) Storage Service Section 6.1 Rate Schedule GSS Filed: June 23, 2011 Page 4 of 5 Effective: June 9, 2011

20110623-5100 FERC PDF (Unofficial) 6/23/2011 2:58:32 PM

Transcontinental Gas Pipe Line Company, LLC FERC Gas Tariff Fifth Revised Volume No. 1 Section 6.2 Rate Schedule LSS Section 6.3 Reserved Section 6.4 Rate Schedule SS-2 Section 6.5 Rate Schedule S-2 Section 6.6 Rate Schedule LG-A Section 7 Interruptible 7(c) Storage Service Section 7.1 Rate Schedule LG-S Section 8 Aggregation and Balancing Services Section 8.1 Rate Schedule PAL Section 8.2 Rate Schedule POOLING Section 9 Sales Service Section 9.1 Rate Schedule NS Section 10 Other Services Section 10.1 Rate Schedule ICTS Section 10.2 1Line Service Part VI Miscellany Section 1 List of Non-Conforming Service Agreements Section 2 Volume No. 2 Tariff Table of Contents

Part I - Overview Section 1 - Table of Contents Version 5.0.0

Filed: June 23, 2011 Page 5 of 5

Effective: June 9, 2011

20110623-5100 FERC PDF (Unofficial) 6/23/2011 2:58:32 PM

PART II - STATEMENT OF RATES AND FUEL

SECTION 13 SUMMARY OF NEGOTIATED COMMODITY RATES

Page 1 of 1

20110623-5100 FERC PDF (Unofficial) 6/23/2011 2:58:32 PM

Transcontinental Gas Pipe Line Company, LLC FERC Gas Tariff Fifth Revised Volume No. 1

Part II - Statement of Rates and Fuel Section 13.1 - Summary of Negotiated Commodity Rate Version 0.0.0

SUMMARY OF NEGOTIATED COMMODITY RATE 1/

Shipper: Hess Corporation Contract Number: 9110812 Rate Schedule: FT Momentum Expansion MDQ (Dth): 3,000 Reservation Rate per dt: $0.00000 2/ Negotiated Commodity Rate per dt: $0.00000 3/ Primary Receipt Point(s): 1000065 Pooling-Station 65 Primary Delivery Point(s): 1006163 Lexington Contract Term: May 1, 2011 October 31, 2012 Rate Effective Date: The term of the negotiated commodity rate is June 9, 2011 October 31, 2012

1/ This negotiated rate agreement does not deviate in any material respect from the Form of Service Agreement contained in Sellers Tariff. 2/ This daily reservation rate is not a negotiated rate, and is the pre-arranged, non-biddable daily reservation rate for this capacity release implementing an asset management arrangement. 3/ Buyer shall be responsible for compressor fuel and line loss make-up retention and Buyer shall pay the electric power charges and all applicable surcharges for Sellers Rate Schedule FT service to Buyer under the Momentum Expansion Project. The fuel and line loss make-up retention, electric power charges and applicable surcharges are subject to change from time to time as approved by the FERC.

Filed: June 23, 2011 Page 1 of 1

Effective: June 9, 2011

20110623-5100 FERC PDF (Unofficial) 6/23/2011 2:58:32 PM

Transcontinental Gas Pipe Line Company, LLC FERC Gas Tariff Fifth Revised Volume No. 1

Part II - Statement of Rates and Fuel Section 13.2 - Summary of Negotiated Commodity Rate Version 0.0.0

SUMMARY OF NEGOTIATED COMMODITY RATE 1/

Shipper: Hess Corporation Contract Number: 9110813 Rate Schedule: FT Momentum Expansion MDQ (Dth): 28,500 Reservation Rate per dt: $0.00000 2/ Negotiated Commodity Rate per dt: $0.00000 3/ Primary Receipt Point(s): 1001748 Shubuta-Destin M3576 Primary Delivery Point(s): 1006062 Danville Contract Term: May 1, 2011 October 31, 2012 Rate Effective Date: The term of the negotiated commodity rate is June 9, 2011 October 31, 2012

1/ This negotiated rate agreement does not deviate in any material respect from the Form of Service Agreement contained in Sellers Tariff. 2/ This daily reservation rate is not a negotiated rate, and is the pre-arranged, non-biddable daily reservation rate for this capacity release implementing an asset management arrangement. 3/ Buyer shall be responsible for compressor fuel and line loss make-up retention and Buyer shall pay the electric power charges and all applicable surcharges for Sellers Rate Schedule FT service to Buyer under the Momentum Expansion Project. The fuel and line loss make-up retention, electric power charges and applicable surcharges are subject to change from time to time as approved by the FERC.

Filed: June 23, 2011 Page 1 of 1

Effective: June 9, 2011

20110623-5100 FERC PDF (Unofficial) 6/23/2011 2:58:32 PM

Transcontinental Gas Pipe Line Company, LLC FERC Gas Tariff Fifth Revised Volume No. 1 PART I - OVERVIEW SECTION 1 TABLE OF CONTENTS Part I Overview Section 1 Table of Contents Section 2 Preliminary Statement Section 3 Maps

Part I - Overview Section 1 - Table of Contents Version 5.0.0

Part II Statement of Rates and Fuel Section 1 Open Access Firm Transportation Rates Section 1.1 Rate Schedule FT Section 1.1.1 FT - Non-Incremental Section 1.1.2 FT - SunBelt Expansion Section 1.1.3 FT - Maiden Delivery Lateral Section 1.1.4 FT - Pocono Expansion Section 1.1.5 FT - Cherokee Expansion Section 1.1.6 FT - Southcoast Expansion Section 1.1.7 FT - Market Link Expansion Section 1.1.8 FT - Sundance Expansion Section 1.1.9 FT - Leidy East Expansion Section 1.1.10 FT - Momentum Expansion Section 1.1.11 FT - Trenton Woodbury Expansion Section 1.1.12 FT - Leidy to Long Island Expansion Section 1.1.13 FT - Potomac Expansion Section 1.1.14 FT - Sentinel Expansion Section 1.1.15 FT - 85 North Expansion Section 1.2 Rate Schedule FT-G Section 1.3 Rate Schedule FTN Section 1.4 Rate Schedule FDLS Section 2 Open Access Interruptible Transportation Rates Section 2.1 Rate Schedule IT Section 2.2 Rate Schedule IDLS Section 3 Open Access Firm Storage Rates and Fuel Section 3.1 Rate Schedule WSS-Open Access Section 3.2 Reserved Section 3.3 Rate Schedule ESS Section 3.4 Rate Schedule EESWS Section 3.5 Rate Schedule LNG Section 4 Open Access Interruptible Storage Service Rates and Fuel Section 4.1 Rate Schedule ISS Section 5 Firm 7(c) Transportation Rates Section 5.1 Reserved Section 5.2 Rate Schedules X-269, X-270, X-274 through X-276 Section 6 Interruptible 7(c) Transportation Rates Section 6.1 Certificated Interruptible Transportation Section 7 Firm 7(c) Storage Rates and Fuel Section 7.1 Rate Schedule GSS Filed: June 23, 2011 Page 1 of 5 Effective: June 9, 2011

20110623-5100 FERC PDF (Unofficial) 6/23/2011 2:58:32 PM

Transcontinental Gas Pipe Line Company, LLC FERC Gas Tariff Fifth Revised Volume No. 1

Part I - Overview Section 1 - Table of Contents Version 5.0.0

Section 7.2 Rate Schedule LSS Section 7.3 Reserved Section 7.4 Rate Schedule SS-2 Section 7.5 Rate Schedule S-2 Section 7.6 Rate Schedule LG-A Section 8 Interruptible 7(c) Storage Rates and Fuel Section 8.1 Rate Schedule LG-S Section 9 Gathering Rates and List of Gathering Points Section 9.1 Firm and Interruptible Gathering Rates Section 9.2 List of Gathering Points Section 10 Aggregation and Balancing Services Rates and Fuel Section 10.1 Rate Schedule PAL Section 10.2 Trading Fees and Fuel Retention Section 11 Other Services Rates Section 11.1 Rate Schedule ICTS Section 12 Transportation Fuel Retention Factors Section 12.1 Firm and Interruptible Transportation Fuel Section 12.2 Rate Schedules FDLS and IDLS Transportation Fuel Section 13 Summary of Negotiated Commodity Rates Part III Rate Schedules Section 1 Open Access Firm Transportation Service Section 1.1 Rate Schedule FT Section 1.2 Rate Schedule FT-G Section 1.3 Rate Schedule FTN Section 1.4 Rate Schedule FDLS Section 2 Open Access Interruptible Transportation Service Section 2.1 Rate Schedule IT Section 2.2 Rate Schedule IDLS Section 3 Open Access Firm Storage Service Section 3.1 Rate Schedule WSS-Open Access Section 3.2 Reserved Section 3.3 Rate Schedule ESS Section 3.4 Rate Schedule EESWS Section 3.5 Rate Schedule LNG Section 4 Open Access Interruptible Storage Service Section 4.1 Rate Schedule ISS Section 5 Reserved Section 5.1 Reserved Section 6 Firm 7(c) Storage Service Section 6.1 Rate Schedule GSS Section 6.2 Rate Schedule LSS Section 6.3 Reserved Section 6.4 Rate Schedule SS-2 Section 6.5 Rate Schedule S-2 Section 6.6 Rate Schedule LG-A Section 7 Interruptible 7(c) Storage Service Filed: June 23, 2011 Page 2 of 5 Effective: June 9, 2011

20110623-5100 FERC PDF (Unofficial) 6/23/2011 2:58:32 PM

Transcontinental Gas Pipe Line Company, LLC FERC Gas Tariff Fifth Revised Volume No. 1 Section 7.1 Rate Schedule LG-S Section 8 Aggregation and Balancing Services Section 8.1 Rate Schedule PAL Section 8.2 Rate Schedule POOLING Section 9 Sales Service Section 9.1 Rate Schedule NS Section 10 Other Services Section 10.1 Rate Schedule ICTS

Part I - Overview Section 1 - Table of Contents Version 5.0.0

Part IV General Terms and Conditions Section 1 Application Section 2 Definitions Section 3 Quality Section 4 Measurements Section 5 Measurement Equipment Section 6 Billing Section 7 Payments Section 8 Reserved Section 9 Possession of Gas Section 10 Warranty of Title to Gas Section 11 Force Majeure Provision and Contract Entitlements Section 12 Pressures Section 13 Supply Curtailment Section 14 Duly Constituted Authorities Section 15 Refund of Cash-Out Revenues Section 16 Service Agreement Section 17 Notices Section 18 Deliveries and Receipts, Overruns, Unauthorized Takes and Penalties Section 19 Daily Delivery Point Entitlements (DPE) Section 19.1 DPE - Delivery Point Provisions Section 19.2 DPE - Facility Group Provisions Section 19.3 DPE - Maps Legend and Maps Section 19.4 DPE - Zone 4 Section 19.5 DPE - Zone 5 Section 19.6 DPE - Zone 6 Section 20 Policy for Construction of Interconnect Facilities Section 21 Rate Zones Section 22 Policy for Consolidation of Service Agreements Section 23 Restatement of Quantities in Thermal Units Section 24 Gas Research Institute Voluntary Contributions Section 25 Monthly Imbalance Resolution Section 26 Changes in Rates for Rate Schedule S-2 Section 27 Annual Charge Adjustment (ACA) Provision Section 28 Nominations, Allocations, Curtailment, and Confirmations Section 29 Best Available Operational Data Section 30 Complaint Procedures - Marketing Function Employees Section 31 Waiver Filed: June 23, 2011 Page 3 of 5 Effective: June 9, 2011

20110623-5100 FERC PDF (Unofficial) 6/23/2011 2:58:32 PM

Transcontinental Gas Pipe Line Company, LLC FERC Gas Tariff Fifth Revised Volume No. 1

Part I - Overview Section 1 - Table of Contents Version 5.0.0

Section 32 Credit Worthiness Section 33 Order of Discounts Section 34 Periodic Reports Section 35 Standards for Business Practices Section 36 Gathering Affiliate(s) Standards of Conduct Section 37 Cash Out Provisions Section 38 Fuel Retention Adjustment Section 39 Adjustments to Prior Gas Day Scheduled Quantities and PDAs Section 40 Discount Policy Section 41 Transmission Electric Power Cost Adjustment Provision Section 42 Capacity Release Section 43 System Management Gas Section 44 Extension of Service Agreement Section 45 Periodic Rate Adjustments and Surcharges Section 46 1Line Service Section 47 Transfers of Storage Inventory Section 48 Right of First Refusal Procedures Section 49 Procedures For Allocating Available Firm Capacity Section 50 Processing Rights Regarding Liquefiable Hydrocarbons Section 51 Operational Controls Section 52 Operational Flow Orders Section 53 Negotiated Rates Section 54 Penalty Revenue Sharing Section 55 Reservation of Capacity Section 56 Unauthorized Receipts Part V Forms of Service Agreement Section 1 Open Access Firm Transportation Service Section 1.1 Rate Schedule FT Section 1.2 Rate Schedule FT-G Section 1.3 Rate Schedule FTN Section 1.4 Rate Schedule FDLS Section 2 Open Access Interruptible Transportation Service Section 2.1 Rate Schedule IT Section 2.2 Rate Schedule IDLS Section 3 Open Access Firm Storage Service Section 3.1 Rate Schedule WSS Open Access Section 3.2 Reserved Section 3.3 Rate Schedule ESS Section 3.4 Rate Schedule ESSWS Section 3.5 Rate Schedule LNG Section 4 Open Access Interruptible Storage Service Section 4.1 Rate Schedule ISS Section 5 Reserved Section 5.1 Reserved Section 6 Firm 7(c) Storage Service Section 6.1 Rate Schedule GSS Filed: June 23, 2011 Page 4 of 5 Effective: June 9, 2011

20110623-5100 FERC PDF (Unofficial) 6/23/2011 2:58:32 PM

Transcontinental Gas Pipe Line Company, LLC FERC Gas Tariff Fifth Revised Volume No. 1 Section 6.2 Rate Schedule LSS Section 6.3 Reserved Section 6.4 Rate Schedule SS-2 Section 6.5 Rate Schedule S-2 Section 6.6 Rate Schedule LG-A Section 7 Interruptible 7(c) Storage Service Section 7.1 Rate Schedule LG-S Section 8 Aggregation and Balancing Services Section 8.1 Rate Schedule PAL Section 8.2 Rate Schedule POOLING Section 9 Sales Service Section 9.1 Rate Schedule NS Section 10 Other Services Section 10.1 Rate Schedule ICTS Section 10.2 1Line Service Part VI Miscellany Section 1 List of Non-Conforming Service Agreements Section 2 Volume No. 2 Tariff Table of Contents

Part I - Overview Section 1 - Table of Contents Version 5.0.0

Filed: June 23, 2011 Page 5 of 5

Effective: June 9, 2011

20110623-5100 FERC PDF (Unofficial) 6/23/2011 2:58:32 PM

PART II - STATEMENT OF RATES AND FUEL

SECTION 13 SUMMARY OF NEGOTIATED COMMODITY RATES

Page 1 of 1

20110623-5100 FERC PDF (Unofficial) 6/23/2011 2:58:32 PM

Transcontinental Gas Pipe Line Company, LLC FERC Gas Tariff Fifth Revised Volume No. 1

Part II - Statement of Rates and Fuel Section 13.1 - Summary of Negotiated Commodity Rate Version 0.0.0

SUMMARY OF NEGOTIATED COMMODITY RATE 1/

Shipper: Hess Corporation Contract Number: 9110812 Rate Schedule: FT Momentum Expansion MDQ (Dth): 3,000 Reservation Rate per dt: $0.00000 2/ Negotiated Commodity Rate per dt: $0.00000 3/ Primary Receipt Point(s): 1000065 Pooling-Station 65 Primary Delivery Point(s): 1006163 Lexington Contract Term: May 1, 2011 October 31, 2012 Rate Effective Date: The term of the negotiated commodity rate is June 9, 2011 October 31, 2012

1/ This negotiated rate agreement does not deviate in any material respect from the Form of Service Agreement contained in Sellers Tariff. 2/ This daily reservation rate is not a negotiated rate, and is the pre-arranged, non-biddable daily reservation rate for this capacity release implementing an asset management arrangement. 3/ Buyer shall be responsible for compressor fuel and line loss make-up retention and Buyer shall pay the electric power charges and all applicable surcharges for Sellers Rate Schedule FT service to Buyer under the Momentum Expansion Project. The fuel and line loss make-up retention, electric power charges and applicable surcharges are subject to change from time to time as approved by the FERC.

Filed: June 23, 2011 Page 1 of 1

Effective: June 9, 2011

20110623-5100 FERC PDF (Unofficial) 6/23/2011 2:58:32 PM

Transcontinental Gas Pipe Line Company, LLC FERC Gas Tariff Fifth Revised Volume No. 1

Part II - Statement of Rates and Fuel Section 13.2 - Summary of Negotiated Commodity Rate Version 0.0.0

SUMMARY OF NEGOTIATED COMMODITY RATE 1/

Shipper: Hess Corporation Contract Number: 9110813 Rate Schedule: FT Momentum Expansion MDQ (Dth): 28,500 Reservation Rate per dt: $0.00000 2/ Negotiated Commodity Rate per dt: $0.00000 3/ Primary Receipt Point(s): 1001748 Shubuta-Destin M3576 Primary Delivery Point(s): 1006062 Danville Contract Term: May 1, 2011 October 31, 2012 Rate Effective Date: The term of the negotiated commodity rate is June 9, 2011 October 31, 2012

1/ This negotiated rate agreement does not deviate in any material respect from the Form of Service Agreement contained in Sellers Tariff. 2/ This daily reservation rate is not a negotiated rate, and is the pre-arranged, non-biddable daily reservation rate for this capacity release implementing an asset management arrangement. 3/ Buyer shall be responsible for compressor fuel and line loss make-up retention and Buyer shall pay the electric power charges and all applicable surcharges for Sellers Rate Schedule FT service to Buyer under the Momentum Expansion Project. The fuel and line loss make-up retention, electric power charges and applicable surcharges are subject to change from time to time as approved by the FERC.

Filed: June 23, 2011 Page 1 of 1

Effective: June 9, 2011

20110623-5100 FERC PDF (Unofficial) 6/23/2011 2:58:32 PM

Transcontinental Gas Pipe Line Company, LLC 2800 Post Oak Boulevard (77056) P.O. Box 1396 Houston, Texas 77251-1396 (713) 215-2000

June 23, 2011

Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Attention: Kimberly D. Bose, Secretary Reference: Transcontinental Gas Pipe Line Company, LLC Negotiated Commodity Rate Tariff Filing Docket No. RP11-__________

Ladies and Gentlemen: Pursuant to Section 4 of the Natural Gas Act (NGA) and Part 154 of the Federal Energy Regulatory Commissions (Commission or FERC) regulations thereunder, Transcontinental Gas Pipe Line Company, LLC (Transco) hereby submits for filing with the Commission Version 5.0.0 of Part I, Section 1, Table of Contents; Version 0.0.0 of Part II, Section13, Summary of Negotiated Commodity Rates; and Version 0.0.0 of Part II, Sections 13.1 and 13.2 to its FERC Gas Tariff, Fifth Revised Volume No.1 (Tariff). The revised tariff sections are proposed to be effective June 9, 2011. Statement of Nature, Reasons and Basis The purpose of this filing is to add a new tariff section 13 to Part II of Transcos Tariff, which section will contain summaries of any negotiated commodity rate agreements entered into by Transco,1 and to submit two tariff records to be included in the new section reflecting two negotiated commodity rate agreements between Transco and a replacement shipper that acquired capacity released on a temporary basis, Hess Corporation (Hess). Southern Company Services, Inc. (Southern Company) temporarily released capacity (in two portions) to Hess that is subject to a negotiated rate service agreement under Rate Schedule FT for firm transportation service under Transcos Momentum Expansion Project
Transco submits this section pursuant to the Commissions policy that pipelines implement negotiated rate transactions by filing either the negotiated rate agreement itself or a tariff sheet describing the agreement. Nor Am Gas Transmission Co., 77 FERC 61,011, at 61,037 (1996).
1

20110623-5100 FERC PDF (Unofficial) 6/23/2011 2:58:32 PM

Federal Energy Regulatory Commission June 23, 2011 Page 2

(Momentum).2 The temporary release of capacity from Southern Company to Hess, effective May 1, 2011 through October 31, 2012, facilitates an asset management arrangement between the two companies. On June 9, 2011, Hess requested that Transco apply to Hess replacement service agreements the same negotiated commodity rate that applies to the firm transportation service for Southern Company under Momentum. In accordance with the Commissions policy that pipelines decide on a case-by-case basis whether a negotiated usage charge applies to an asset manager replacement shipper,3 Transco has determined that Hess is similarly situated to Southern Company and therefore is eligible to receive the negotiated commodity rate under its replacement service agreements. On June 20, 2011, Transco and Hess executed amendments to the replacement service agreements to include the negotiated commodity rate on Exhibit C effective June 9, 2011 subject to Transcos receipt of necessary authorization from the Commission. Accordingly, pursuant to the Commissions Alternative Rate Policy Statement and the provisions of Transco's Rate Schedule FT that permit Transco to negotiate rates,4 Transco submits herewith for filing with the Commission the tariff sections reflecting summaries of the negotiated rate agreements between Transco and Hess. The summaries include the exact legal name of the customer, the applicable charge, the applicable rate schedule for the service, the receipt and delivery points, the quantity of gas to be transported under the service agreements and the term of the negotiated rate. Transco affirms that Hess service agreements do not deviate in any material aspect from the Rate Schedule FT form of service agreement in Transcos FERC Gas Tariff. Due to the timing of the capacity release transaction and the need to execute negotiated rate agreements with Hess, Transco was unable to file the tariff sections submitted herewith prior to the effective date of the negotiated commodity rate agreements. However, Transco is submitting the required tariff sections as soon as reasonably practicable following the execution of the negotiated rate agreements. The Commission recently has found, under similar circumstances, that this approach is preferable to delaying the implementation of a capacity release transaction.5

Transcos Momentum Expansion Project was approved by Commission order issued February 14, 2001 in Docket Nos. CP01-388-000 and CP01-388-001, as amended on April 10, 2003 in Docket No. CP01388-002. 3 Texas Eastern Transmission LP, et al., 129 FERC 61,031 (2009), order denying clarification, 130 FERC 61,111 (2010). 4 Alternatives to Traditional Cost-of-Service Ratemaking for Natural Gas Pipelines and Regulation of Negotiated Transportation Services of Natural Gas Pipelines (Alternative Rate Policy Statement), 74 FERC 61,076, reh'g and clarification denied, 75 FERC 61,024, reh'g denied, 75 FERC 61,066 (1996). Transcontinental Gas Pipe Line Corp., 76 FERC 61,318 (1996) and Section 3.5 of Transcos Rate Schedule FT. 5 See Texas Eastern Transmission, LP, 130 FERC 61,189 at P 27 (2010) (Texas Eastern).

20110623-5100 FERC PDF (Unofficial) 6/23/2011 2:58:32 PM

Federal Energy Regulatory Commission June 23, 2011 Page 3

Effective Date and Waivers The revised tariff sections submitted herein are proposed to be effective June 9, 2011, the date that Hess requested that Transco apply the negotiated commodity rate under Momentum to its replacement service agreements. Consistent with Texas Eastern,6 Transco respectfully requests a waiver of Section 154.207 of the Commissions regulations and any other waivers that may be required for the Commission to permit the tariff sections filed herein to become effective June 9, 2011. Materials Submitted Herewith In accordance with Section 154.7(a)(1) of the Commissions regulations, the following material is submitted herewith: An eTariff XML filing package, filed as a zip (compressed) file, containing: (1) (2) (3) (4) (5) The revised tariff sections in RTF format with metadata attached; A transmittal letter in PDF format; A clean version of the revised tariff sections in PDF format for publishing in eLibrary; A marked version of the revised tariff sections in accordance with Section 154.201(a) of the Regulations; and A copy of the complete filing in PDF format for publishing in eLibrary.

Posting and Certification of Service In accordance with the provisions of Section 154.2(d) of the Commissions regulations, copies of this filing are available for public inspection, during regular business hours, in a convenient form and place at Transcos main office at 2800 Post Oak Boulevard in Houston, Texas. In addition, Transco is serving copies of the instant filing to its affected customers, interested state commissions, and other interested parties. Any communications in regard to this filing should be sent to: David A. Glenn Senior Counsel Transcontinental Gas Pipe Line Company, LLC P.O. Box 1396 Houston, Texas 77251 (713) 215-2341 david.a.glenn@williams.com

Id.

20110623-5100 FERC PDF (Unofficial) 6/23/2011 2:58:32 PM

Federal Energy Regulatory Commission June 23, 2011 Page 4

Respectfully submitted, TRANSCONTINENTAL GAS PIPE LINE COMPANY, LLC

By _________________________________ Marg Camardello Manager, Certificates & Tariffs 713-215-3380 marg.r.camardello@williams.com

20110623-5100 FERC PDF (Unofficial) 6/23/2011 2:58:32 PM

Transcontinental Gas Pipe Line Company, LLC FERC Gas Tariff Fifth Revised Volume No. 1 PART I - OVERVIEW SECTION 1 TABLE OF CONTENTS Part I Overview Section 1 Table of Contents Section 2 Preliminary Statement Section 3 Maps

Part I - Overview Section 1 - Table of Contents Version 5.0.0

Part II Statement of Rates and Fuel Section 1 Open Access Firm Transportation Rates Section 1.1 Rate Schedule FT Section 1.1.1 FT - Non-Incremental Section 1.1.2 FT - SunBelt Expansion Section 1.1.3 FT - Maiden Delivery Lateral Section 1.1.4 FT - Pocono Expansion Section 1.1.5 FT - Cherokee Expansion Section 1.1.6 FT - Southcoast Expansion Section 1.1.7 FT - Market Link Expansion Section 1.1.8 FT - Sundance Expansion Section 1.1.9 FT - Leidy East Expansion Section 1.1.10 FT - Momentum Expansion Section 1.1.11 FT - Trenton Woodbury Expansion Section 1.1.12 FT - Leidy to Long Island Expansion Section 1.1.13 FT - Potomac Expansion Section 1.1.14 FT - Sentinel Expansion Section 1.1.15 FT - 85 North Expansion Section 1.2 Rate Schedule FT-G Section 1.3 Rate Schedule FTN Section 1.4 Rate Schedule FDLS Section 2 Open Access Interruptible Transportation Rates Section 2.1 Rate Schedule IT Section 2.2 Rate Schedule IDLS Section 3 Open Access Firm Storage Rates and Fuel Section 3.1 Rate Schedule WSS-Open Access Section 3.2 Reserved Section 3.3 Rate Schedule ESS Section 3.4 Rate Schedule EESWS Section 3.5 Rate Schedule LNG Section 4 Open Access Interruptible Storage Service Rates and Fuel Section 4.1 Rate Schedule ISS Section 5 Firm 7(c) Transportation Rates Section 5.1 Reserved Section 5.2 Rate Schedules X-269, X-270, X-274 through X-276 Section 6 Interruptible 7(c) Transportation Rates Section 6.1 Certificated Interruptible Transportation Section 7 Firm 7(c) Storage Rates and Fuel Section 7.1 Rate Schedule GSS Filed: June 23, 2011 Page 1 of 5 Effective: June 9, 2011

20110623-5100 FERC PDF (Unofficial) 6/23/2011 2:58:32 PM

Transcontinental Gas Pipe Line Company, LLC FERC Gas Tariff Fifth Revised Volume No. 1

Part I - Overview Section 1 - Table of Contents Version 5.0.0

Section 7.2 Rate Schedule LSS Section 7.3 Reserved Section 7.4 Rate Schedule SS-2 Section 7.5 Rate Schedule S-2 Section 7.6 Rate Schedule LG-A Section 8 Interruptible 7(c) Storage Rates and Fuel Section 8.1 Rate Schedule LG-S Section 9 Gathering Rates and List of Gathering Points Section 9.1 Firm and Interruptible Gathering Rates Section 9.2 List of Gathering Points Section 10 Aggregation and Balancing Services Rates and Fuel Section 10.1 Rate Schedule PAL Section 10.2 Trading Fees and Fuel Retention Section 11 Other Services Rates Section 11.1 Rate Schedule ICTS Section 12 Transportation Fuel Retention Factors Section 12.1 Firm and Interruptible Transportation Fuel Section 12.2 Rate Schedules FDLS and IDLS Transportation Fuel Section 13 Summary of Negotiated Commodity Rates Part III Rate Schedules Section 1 Open Access Firm Transportation Service Section 1.1 Rate Schedule FT Section 1.2 Rate Schedule FT-G Section 1.3 Rate Schedule FTN Section 1.4 Rate Schedule FDLS Section 2 Open Access Interruptible Transportation Service Section 2.1 Rate Schedule IT Section 2.2 Rate Schedule IDLS Section 3 Open Access Firm Storage Service Section 3.1 Rate Schedule WSS-Open Access Section 3.2 Reserved Section 3.3 Rate Schedule ESS Section 3.4 Rate Schedule EESWS Section 3.5 Rate Schedule LNG Section 4 Open Access Interruptible Storage Service Section 4.1 Rate Schedule ISS Section 5 Reserved Section 5.1 Reserved Section 6 Firm 7(c) Storage Service Section 6.1 Rate Schedule GSS Section 6.2 Rate Schedule LSS Section 6.3 Reserved Section 6.4 Rate Schedule SS-2 Section 6.5 Rate Schedule S-2 Section 6.6 Rate Schedule LG-A Section 7 Interruptible 7(c) Storage Service Filed: June 23, 2011 Page 2 of 5 Effective: June 9, 2011

20110623-5100 FERC PDF (Unofficial) 6/23/2011 2:58:32 PM

Transcontinental Gas Pipe Line Company, LLC FERC Gas Tariff Fifth Revised Volume No. 1 Section 7.1 Rate Schedule LG-S Section 8 Aggregation and Balancing Services Section 8.1 Rate Schedule PAL Section 8.2 Rate Schedule POOLING Section 9 Sales Service Section 9.1 Rate Schedule NS Section 10 Other Services Section 10.1 Rate Schedule ICTS

Part I - Overview Section 1 - Table of Contents Version 5.0.0

Part IV General Terms and Conditions Section 1 Application Section 2 Definitions Section 3 Quality Section 4 Measurements Section 5 Measurement Equipment Section 6 Billing Section 7 Payments Section 8 Reserved Section 9 Possession of Gas Section 10 Warranty of Title to Gas Section 11 Force Majeure Provision and Contract Entitlements Section 12 Pressures Section 13 Supply Curtailment Section 14 Duly Constituted Authorities Section 15 Refund of Cash-Out Revenues Section 16 Service Agreement Section 17 Notices Section 18 Deliveries and Receipts, Overruns, Unauthorized Takes and Penalties Section 19 Daily Delivery Point Entitlements (DPE) Section 19.1 DPE - Delivery Point Provisions Section 19.2 DPE - Facility Group Provisions Section 19.3 DPE - Maps Legend and Maps Section 19.4 DPE - Zone 4 Section 19.5 DPE - Zone 5 Section 19.6 DPE - Zone 6 Section 20 Policy for Construction of Interconnect Facilities Section 21 Rate Zones Section 22 Policy for Consolidation of Service Agreements Section 23 Restatement of Quantities in Thermal Units Section 24 Gas Research Institute Voluntary Contributions Section 25 Monthly Imbalance Resolution Section 26 Changes in Rates for Rate Schedule S-2 Section 27 Annual Charge Adjustment (ACA) Provision Section 28 Nominations, Allocations, Curtailment, and Confirmations Section 29 Best Available Operational Data Section 30 Complaint Procedures - Marketing Function Employees Section 31 Waiver Filed: June 23, 2011 Page 3 of 5 Effective: June 9, 2011

20110623-5100 FERC PDF (Unofficial) 6/23/2011 2:58:32 PM

Transcontinental Gas Pipe Line Company, LLC FERC Gas Tariff Fifth Revised Volume No. 1

Part I - Overview Section 1 - Table of Contents Version 5.0.0

Section 32 Credit Worthiness Section 33 Order of Discounts Section 34 Periodic Reports Section 35 Standards for Business Practices Section 36 Gathering Affiliate(s) Standards of Conduct Section 37 Cash Out Provisions Section 38 Fuel Retention Adjustment Section 39 Adjustments to Prior Gas Day Scheduled Quantities and PDAs Section 40 Discount Policy Section 41 Transmission Electric Power Cost Adjustment Provision Section 42 Capacity Release Section 43 System Management Gas Section 44 Extension of Service Agreement Section 45 Periodic Rate Adjustments and Surcharges Section 46 1Line Service Section 47 Transfers of Storage Inventory Section 48 Right of First Refusal Procedures Section 49 Procedures For Allocating Available Firm Capacity Section 50 Processing Rights Regarding Liquefiable Hydrocarbons Section 51 Operational Controls Section 52 Operational Flow Orders Section 53 Negotiated Rates Section 54 Penalty Revenue Sharing Section 55 Reservation of Capacity Section 56 Unauthorized Receipts Part V Forms of Service Agreement Section 1 Open Access Firm Transportation Service Section 1.1 Rate Schedule FT Section 1.2 Rate Schedule FT-G Section 1.3 Rate Schedule FTN Section 1.4 Rate Schedule FDLS Section 2 Open Access Interruptible Transportation Service Section 2.1 Rate Schedule IT Section 2.2 Rate Schedule IDLS Section 3 Open Access Firm Storage Service Section 3.1 Rate Schedule WSS Open Access Section 3.2 Reserved Section 3.3 Rate Schedule ESS Section 3.4 Rate Schedule ESSWS Section 3.5 Rate Schedule LNG Section 4 Open Access Interruptible Storage Service Section 4.1 Rate Schedule ISS Section 5 Reserved Section 5.1 Reserved Section 6 Firm 7(c) Storage Service Section 6.1 Rate Schedule GSS Filed: June 23, 2011 Page 4 of 5 Effective: June 9, 2011

20110623-5100 FERC PDF (Unofficial) 6/23/2011 2:58:32 PM

Transcontinental Gas Pipe Line Company, LLC FERC Gas Tariff Fifth Revised Volume No. 1 Section 6.2 Rate Schedule LSS Section 6.3 Reserved Section 6.4 Rate Schedule SS-2 Section 6.5 Rate Schedule S-2 Section 6.6 Rate Schedule LG-A Section 7 Interruptible 7(c) Storage Service Section 7.1 Rate Schedule LG-S Section 8 Aggregation and Balancing Services Section 8.1 Rate Schedule PAL Section 8.2 Rate Schedule POOLING Section 9 Sales Service Section 9.1 Rate Schedule NS Section 10 Other Services Section 10.1 Rate Schedule ICTS Section 10.2 1Line Service Part VI Miscellany Section 1 List of Non-Conforming Service Agreements Section 2 Volume No. 2 Tariff Table of Contents

Part I - Overview Section 1 - Table of Contents Version 5.0.0

Filed: June 23, 2011 Page 5 of 5

Effective: June 9, 2011

20110623-5100 FERC PDF (Unofficial) 6/23/2011 2:58:32 PM

PART II - STATEMENT OF RATES AND FUEL

SECTION 13 SUMMARY OF NEGOTIATED COMMODITY RATES

Page 1 of 1

20110623-5100 FERC PDF (Unofficial) 6/23/2011 2:58:32 PM

Transcontinental Gas Pipe Line Company, LLC FERC Gas Tariff Fifth Revised Volume No. 1

Part II - Statement of Rates and Fuel Section 13.1 - Summary of Negotiated Commodity Rate Version 0.0.0

SUMMARY OF NEGOTIATED COMMODITY RATE 1/

Shipper: Hess Corporation Contract Number: 9110812 Rate Schedule: FT Momentum Expansion MDQ (Dth): 3,000 Reservation Rate per dt: $0.00000 2/ Negotiated Commodity Rate per dt: $0.00000 3/ Primary Receipt Point(s): 1000065 Pooling-Station 65 Primary Delivery Point(s): 1006163 Lexington Contract Term: May 1, 2011 October 31, 2012 Rate Effective Date: The term of the negotiated commodity rate is June 9, 2011 October 31, 2012

1/ This negotiated rate agreement does not deviate in any material respect from the Form of Service Agreement contained in Sellers Tariff. 2/ This daily reservation rate is not a negotiated rate, and is the pre-arranged, non-biddable daily reservation rate for this capacity release implementing an asset management arrangement. 3/ Buyer shall be responsible for compressor fuel and line loss make-up retention and Buyer shall pay the electric power charges and all applicable surcharges for Sellers Rate Schedule FT service to Buyer under the Momentum Expansion Project. The fuel and line loss make-up retention, electric power charges and applicable surcharges are subject to change from time to time as approved by the FERC.

Filed: June 23, 2011 Page 1 of 1

Effective: June 9, 2011

20110623-5100 FERC PDF (Unofficial) 6/23/2011 2:58:32 PM

Transcontinental Gas Pipe Line Company, LLC FERC Gas Tariff Fifth Revised Volume No. 1

Part II - Statement of Rates and Fuel Section 13.2 - Summary of Negotiated Commodity Rate Version 0.0.0

SUMMARY OF NEGOTIATED COMMODITY RATE 1/

Shipper: Hess Corporation Contract Number: 9110813 Rate Schedule: FT Momentum Expansion MDQ (Dth): 28,500 Reservation Rate per dt: $0.00000 2/ Negotiated Commodity Rate per dt: $0.00000 3/ Primary Receipt Point(s): 1001748 Shubuta-Destin M3576 Primary Delivery Point(s): 1006062 Danville Contract Term: May 1, 2011 October 31, 2012 Rate Effective Date: The term of the negotiated commodity rate is June 9, 2011 October 31, 2012

1/ This negotiated rate agreement does not deviate in any material respect from the Form of Service Agreement contained in Sellers Tariff. 2/ This daily reservation rate is not a negotiated rate, and is the pre-arranged, non-biddable daily reservation rate for this capacity release implementing an asset management arrangement. 3/ Buyer shall be responsible for compressor fuel and line loss make-up retention and Buyer shall pay the electric power charges and all applicable surcharges for Sellers Rate Schedule FT service to Buyer under the Momentum Expansion Project. The fuel and line loss make-up retention, electric power charges and applicable surcharges are subject to change from time to time as approved by the FERC.

Filed: June 23, 2011 Page 1 of 1

Effective: June 9, 2011

20110623-5100 FERC PDF (Unofficial) 6/23/2011 2:58:32 PM

Transcontinental Gas Pipe Line Company, LLC FERC Gas Tariff Fifth Revised Volume No. 1 PART I - OVERVIEW SECTION 1 TABLE OF CONTENTS Part I Overview Section 1 Table of Contents Section 2 Preliminary Statement Section 3 Maps

Part I - Overview Section 1 - Table of Contents Version 5.0.0

Part II Statement of Rates and Fuel Section 1 Open Access Firm Transportation Rates Section 1.1 Rate Schedule FT Section 1.1.1 FT - Non-Incremental Section 1.1.2 FT - SunBelt Expansion Section 1.1.3 FT - Maiden Delivery Lateral Section 1.1.4 FT - Pocono Expansion Section 1.1.5 FT - Cherokee Expansion Section 1.1.6 FT - Southcoast Expansion Section 1.1.7 FT - Market Link Expansion Section 1.1.8 FT - Sundance Expansion Section 1.1.9 FT - Leidy East Expansion Section 1.1.10 FT - Momentum Expansion Section 1.1.11 FT - Trenton Woodbury Expansion Section 1.1.12 FT - Leidy to Long Island Expansion Section 1.1.13 FT - Potomac Expansion Section 1.1.14 FT - Sentinel Expansion Section 1.1.15 FT - 85 North Expansion Section 1.2 Rate Schedule FT-G Section 1.3 Rate Schedule FTN Section 1.4 Rate Schedule FDLS Section 2 Open Access Interruptible Transportation Rates Section 2.1 Rate Schedule IT Section 2.2 Rate Schedule IDLS Section 3 Open Access Firm Storage Rates and Fuel Section 3.1 Rate Schedule WSS-Open Access Section 3.2 Reserved Section 3.3 Rate Schedule ESS Section 3.4 Rate Schedule EESWS Section 3.5 Rate Schedule LNG Section 4 Open Access Interruptible Storage Service Rates and Fuel Section 4.1 Rate Schedule ISS Section 5 Firm 7(c) Transportation Rates Section 5.1 Reserved Section 5.2 Rate Schedules X-269, X-270, X-274 through X-276 Section 6 Interruptible 7(c) Transportation Rates Section 6.1 Certificated Interruptible Transportation Section 7 Firm 7(c) Storage Rates and Fuel Section 7.1 Rate Schedule GSS Filed: June 23, 2011 Page 1 of 5 Effective: June 9, 2011

20110623-5100 FERC PDF (Unofficial) 6/23/2011 2:58:32 PM

Transcontinental Gas Pipe Line Company, LLC FERC Gas Tariff Fifth Revised Volume No. 1

Part I - Overview Section 1 - Table of Contents Version 5.0.0

Section 7.2 Rate Schedule LSS Section 7.3 Reserved Section 7.4 Rate Schedule SS-2 Section 7.5 Rate Schedule S-2 Section 7.6 Rate Schedule LG-A Section 8 Interruptible 7(c) Storage Rates and Fuel Section 8.1 Rate Schedule LG-S Section 9 Gathering Rates and List of Gathering Points Section 9.1 Firm and Interruptible Gathering Rates Section 9.2 List of Gathering Points Section 10 Aggregation and Balancing Services Rates and Fuel Section 10.1 Rate Schedule PAL Section 10.2 Trading Fees and Fuel Retention Section 11 Other Services Rates Section 11.1 Rate Schedule ICTS Section 12 Transportation Fuel Retention Factors Section 12.1 Firm and Interruptible Transportation Fuel Section 12.2 Rate Schedules FDLS and IDLS Transportation Fuel Section 13 Summary of Negotiated Commodity Rates Part III Rate Schedules Section 1 Open Access Firm Transportation Service Section 1.1 Rate Schedule FT Section 1.2 Rate Schedule FT-G Section 1.3 Rate Schedule FTN Section 1.4 Rate Schedule FDLS Section 2 Open Access Interruptible Transportation Service Section 2.1 Rate Schedule IT Section 2.2 Rate Schedule IDLS Section 3 Open Access Firm Storage Service Section 3.1 Rate Schedule WSS-Open Access Section 3.2 Reserved Section 3.3 Rate Schedule ESS Section 3.4 Rate Schedule EESWS Section 3.5 Rate Schedule LNG Section 4 Open Access Interruptible Storage Service Section 4.1 Rate Schedule ISS Section 5 Reserved Section 5.1 Reserved Section 6 Firm 7(c) Storage Service Section 6.1 Rate Schedule GSS Section 6.2 Rate Schedule LSS Section 6.3 Reserved Section 6.4 Rate Schedule SS-2 Section 6.5 Rate Schedule S-2 Section 6.6 Rate Schedule LG-A Section 7 Interruptible 7(c) Storage Service Filed: June 23, 2011 Page 2 of 5 Effective: June 9, 2011

20110623-5100 FERC PDF (Unofficial) 6/23/2011 2:58:32 PM

Transcontinental Gas Pipe Line Company, LLC FERC Gas Tariff Fifth Revised Volume No. 1 Section 7.1 Rate Schedule LG-S Section 8 Aggregation and Balancing Services Section 8.1 Rate Schedule PAL Section 8.2 Rate Schedule POOLING Section 9 Sales Service Section 9.1 Rate Schedule NS Section 10 Other Services Section 10.1 Rate Schedule ICTS

Part I - Overview Section 1 - Table of Contents Version 5.0.0

Part IV General Terms and Conditions Section 1 Application Section 2 Definitions Section 3 Quality Section 4 Measurements Section 5 Measurement Equipment Section 6 Billing Section 7 Payments Section 8 Reserved Section 9 Possession of Gas Section 10 Warranty of Title to Gas Section 11 Force Majeure Provision and Contract Entitlements Section 12 Pressures Section 13 Supply Curtailment Section 14 Duly Constituted Authorities Section 15 Refund of Cash-Out Revenues Section 16 Service Agreement Section 17 Notices Section 18 Deliveries and Receipts, Overruns, Unauthorized Takes and Penalties Section 19 Daily Delivery Point Entitlements (DPE) Section 19.1 DPE - Delivery Point Provisions Section 19.2 DPE - Facility Group Provisions Section 19.3 DPE - Maps Legend and Maps Section 19.4 DPE - Zone 4 Section 19.5 DPE - Zone 5 Section 19.6 DPE - Zone 6 Section 20 Policy for Construction of Interconnect Facilities Section 21 Rate Zones Section 22 Policy for Consolidation of Service Agreements Section 23 Restatement of Quantities in Thermal Units Section 24 Gas Research Institute Voluntary Contributions Section 25 Monthly Imbalance Resolution Section 26 Changes in Rates for Rate Schedule S-2 Section 27 Annual Charge Adjustment (ACA) Provision Section 28 Nominations, Allocations, Curtailment, and Confirmations Section 29 Best Available Operational Data Section 30 Complaint Procedures - Marketing Function Employees Section 31 Waiver Filed: June 23, 2011 Page 3 of 5 Effective: June 9, 2011

20110623-5100 FERC PDF (Unofficial) 6/23/2011 2:58:32 PM

Transcontinental Gas Pipe Line Company, LLC FERC Gas Tariff Fifth Revised Volume No. 1

Part I - Overview Section 1 - Table of Contents Version 5.0.0

Section 32 Credit Worthiness Section 33 Order of Discounts Section 34 Periodic Reports Section 35 Standards for Business Practices Section 36 Gathering Affiliate(s) Standards of Conduct Section 37 Cash Out Provisions Section 38 Fuel Retention Adjustment Section 39 Adjustments to Prior Gas Day Scheduled Quantities and PDAs Section 40 Discount Policy Section 41 Transmission Electric Power Cost Adjustment Provision Section 42 Capacity Release Section 43 System Management Gas Section 44 Extension of Service Agreement Section 45 Periodic Rate Adjustments and Surcharges Section 46 1Line Service Section 47 Transfers of Storage Inventory Section 48 Right of First Refusal Procedures Section 49 Procedures For Allocating Available Firm Capacity Section 50 Processing Rights Regarding Liquefiable Hydrocarbons Section 51 Operational Controls Section 52 Operational Flow Orders Section 53 Negotiated Rates Section 54 Penalty Revenue Sharing Section 55 Reservation of Capacity Section 56 Unauthorized Receipts Part V Forms of Service Agreement Section 1 Open Access Firm Transportation Service Section 1.1 Rate Schedule FT Section 1.2 Rate Schedule FT-G Section 1.3 Rate Schedule FTN Section 1.4 Rate Schedule FDLS Section 2 Open Access Interruptible Transportation Service Section 2.1 Rate Schedule IT Section 2.2 Rate Schedule IDLS Section 3 Open Access Firm Storage Service Section 3.1 Rate Schedule WSS Open Access Section 3.2 Reserved Section 3.3 Rate Schedule ESS Section 3.4 Rate Schedule ESSWS Section 3.5 Rate Schedule LNG Section 4 Open Access Interruptible Storage Service Section 4.1 Rate Schedule ISS Section 5 Reserved Section 5.1 Reserved Section 6 Firm 7(c) Storage Service Section 6.1 Rate Schedule GSS Filed: June 23, 2011 Page 4 of 5 Effective: June 9, 2011

20110623-5100 FERC PDF (Unofficial) 6/23/2011 2:58:32 PM

Transcontinental Gas Pipe Line Company, LLC FERC Gas Tariff Fifth Revised Volume No. 1 Section 6.2 Rate Schedule LSS Section 6.3 Reserved Section 6.4 Rate Schedule SS-2 Section 6.5 Rate Schedule S-2 Section 6.6 Rate Schedule LG-A Section 7 Interruptible 7(c) Storage Service Section 7.1 Rate Schedule LG-S Section 8 Aggregation and Balancing Services Section 8.1 Rate Schedule PAL Section 8.2 Rate Schedule POOLING Section 9 Sales Service Section 9.1 Rate Schedule NS Section 10 Other Services Section 10.1 Rate Schedule ICTS Section 10.2 1Line Service Part VI Miscellany Section 1 List of Non-Conforming Service Agreements Section 2 Volume No. 2 Tariff Table of Contents

Part I - Overview Section 1 - Table of Contents Version 5.0.0

Filed: June 23, 2011 Page 5 of 5

Effective: June 9, 2011

20110623-5100 FERC PDF (Unofficial) 6/23/2011 2:58:32 PM

PART II - STATEMENT OF RATES AND FUEL

SECTION 13 SUMMARY OF NEGOTIATED COMMODITY RATES

Page 1 of 1

20110623-5100 FERC PDF (Unofficial) 6/23/2011 2:58:32 PM

Transcontinental Gas Pipe Line Company, LLC FERC Gas Tariff Fifth Revised Volume No. 1

Part II - Statement of Rates and Fuel Section 13.1 - Summary of Negotiated Commodity Rate Version 0.0.0

SUMMARY OF NEGOTIATED COMMODITY RATE 1/

Shipper: Hess Corporation Contract Number: 9110812 Rate Schedule: FT Momentum Expansion MDQ (Dth): 3,000 Reservation Rate per dt: $0.00000 2/ Negotiated Commodity Rate per dt: $0.00000 3/ Primary Receipt Point(s): 1000065 Pooling-Station 65 Primary Delivery Point(s): 1006163 Lexington Contract Term: May 1, 2011 October 31, 2012 Rate Effective Date: The term of the negotiated commodity rate is June 9, 2011 October 31, 2012

1/ This negotiated rate agreement does not deviate in any material respect from the Form of Service Agreement contained in Sellers Tariff. 2/ This daily reservation rate is not a negotiated rate, and is the pre-arranged, non-biddable daily reservation rate for this capacity release implementing an asset management arrangement. 3/ Buyer shall be responsible for compressor fuel and line loss make-up retention and Buyer shall pay the electric power charges and all applicable surcharges for Sellers Rate Schedule FT service to Buyer under the Momentum Expansion Project. The fuel and line loss make-up retention, electric power charges and applicable surcharges are subject to change from time to time as approved by the FERC.

Filed: June 23, 2011 Page 1 of 1

Effective: June 9, 2011

20110623-5100 FERC PDF (Unofficial) 6/23/2011 2:58:32 PM

Transcontinental Gas Pipe Line Company, LLC FERC Gas Tariff Fifth Revised Volume No. 1

Part II - Statement of Rates and Fuel Section 13.2 - Summary of Negotiated Commodity Rate Version 0.0.0

SUMMARY OF NEGOTIATED COMMODITY RATE 1/

Shipper: Hess Corporation Contract Number: 9110813 Rate Schedule: FT Momentum Expansion MDQ (Dth): 28,500 Reservation Rate per dt: $0.00000 2/ Negotiated Commodity Rate per dt: $0.00000 3/ Primary Receipt Point(s): 1001748 Shubuta-Destin M3576 Primary Delivery Point(s): 1006062 Danville Contract Term: May 1, 2011 October 31, 2012 Rate Effective Date: The term of the negotiated commodity rate is June 9, 2011 October 31, 2012

1/ This negotiated rate agreement does not deviate in any material respect from the Form of Service Agreement contained in Sellers Tariff. 2/ This daily reservation rate is not a negotiated rate, and is the pre-arranged, non-biddable daily reservation rate for this capacity release implementing an asset management arrangement. 3/ Buyer shall be responsible for compressor fuel and line loss make-up retention and Buyer shall pay the electric power charges and all applicable surcharges for Sellers Rate Schedule FT service to Buyer under the Momentum Expansion Project. The fuel and line loss make-up retention, electric power charges and applicable surcharges are subject to change from time to time as approved by the FERC.

Filed: June 23, 2011 Page 1 of 1

Effective: June 9, 2011

20110623-5100 FERC PDF (Unofficial) 6/23/2011 2:58:32 PM

FERC rendition of the electronically filed tariff records in Docket No. RP11-02210-000 Filing Data: CID: C000654 Filing Title: Filing to Add Statement of Negotiated Commodity Rates Company Filing Identifier: 496 Type of Filing Code: 570 Associated Filing Identifier: Tariff Title: Fifth Revised Volume No. 1 Tariff ID: 4 Payment Confirmation: Suspension Motion: N Tariff Record Data: Record Content Description, Tariff Record Title, Record Version Number, Option Code: Section 1, Table of Contents, 5.0.0, A Record Narative Name: Tariff Record ID: 111 Tariff Record Collation Value: 276889600 Tariff Record Parent Identifier: 105 Proposed Date: 2011-06-09 Priority Order: 1000000000 Record Change Type: CHANGE Record Content Type: 1 Associated Filing Identifier:

PART I - OVERVIEW SECTION 1 - TABLE OF CONTENTS Part I - Overview Section 1 - Table of Contents Section 2 - Preliminary Statement Section 3 - Maps Part II - Statement of Rates and Fuel Section 1 - Open Access Firm Transportation Rates Section 1.1 Rate Schedule FT Section 1.1.1 FT - Non-Incremental Section 1.1.2 FT - SunBelt Expansion Section 1.1.3 FT - Maiden Delivery Lateral Section 1.1.4 FT - Pocono Expansion Section 1.1.5 FT - Cherokee Expansion Section 1.1.6 FT - Southcoast Expansion Section 1.1.7 FT - Market Link Expansion Section 1.1.8 FT - Sundance Expansion Section 1.1.9 FT - Leidy East Expansion Section 1.1.10 FT - Momentum Expansion Section 1.1.11 FT - Trenton Woodbury Expansion Section 1.1.12 FT - Leidy to Long Island Expansion Section 1.1.13 FT - Potomac Expansion Section 1.1.14 FT - Sentinel Expansion Section 1.1.15 FT - 85 North Expansion Section 1.2 Rate Schedule FT-G Section 1.3 Rate Schedule FTN Section 1.4 Rate Schedule FDLS Section 2 - Open Access Interruptible Transportation Rates Section 2.1 Rate Schedule IT Section 2.2 Rate Schedule IDLS

20110623-5100 FERC PDF (Unofficial) 6/23/2011 2:58:32 PM

Section 3 - Open Access Firm Storage Rates and Fuel Section 3.1 Rate Schedule WSS-Open Access Section 3.2 Reserved Section 3.3 Rate Schedule ESS Section 3.4 Rate Schedule EESWS Section 3.5 Rate Schedule LNG Section 4 - Open Access Interruptible Storage Service Rates and Fuel Section 4.1 Rate Schedule ISS Section 5 - Firm 7(c) Transportation Rates Section 5.1 Reserved Section 5.2 Rate Schedules X-269, X-270, X-274 through X-276 Section 6 - Interruptible 7(c) Transportation Rates Section 6.1 Certificated Interruptible Transportation Section 7 - Firm 7(c) Storage Rates and Fuel Section 7.1 Rate Schedule GSS Section 7.2 Rate Schedule LSS Section 7.3 Reserved Section 7.4 Rate Schedule SS-2 Section 7.5 Rate Schedule S-2 Section 7.6 Rate Schedule LG-A Section 8 - Interruptible 7(c) Storage Rates and Fuel Section 8.1 Rate Schedule LG-S Section 9 - Gathering Rates and List of Gathering Points Section 9.1 Firm and Interruptible Gathering Rates Section 9.2 List of Gathering Points Section 10 - Aggregation and Balancing Services Rates and Fuel Section 10.1 Rate Schedule PAL Section 10.2 Trading Fees and Fuel Retention Section 11 - Other Services Rates Section 11.1 Rate Schedule ICTS Section 12 - Transportation Fuel Retention Factors Section 12.1 Firm and Interruptible Transportation Fuel Section 12.2 Rate Schedules FDLS and IDLS Transportation Fuel Section 13 - Summary of Negotiated Commodity Rates Part III - Rate Schedules Section 1 - Open Access Firm Transportation Service Section 1.1 Rate Schedule FT Section 1.2 Rate Schedule FT-G Section 1.3 Rate Schedule FTN Section 1.4 Rate Schedule FDLS Section 2 - Open Access Interruptible Transportation Service Section 2.1 Rate Schedule IT Section 2.2 Rate Schedule IDLS Section 3 - Open Access Firm Storage Service Section 3.1 Rate Schedule WSS-Open Access Section 3.2 Reserved Section 3.3 Rate Schedule ESS Section 3.4 Rate Schedule EESWS Section 3.5 Rate Schedule LNG Section 4 - Open Access Interruptible Storage Service

20110623-5100 FERC PDF (Unofficial) 6/23/2011 2:58:32 PM

Section 4.1 Rate Schedule ISS Section 5 - Reserved Section 5.1 Reserved Section 6 - Firm 7(c) Storage Service Section 6.1 Rate Schedule GSS Section 6.2 Rate Schedule LSS Section 6.3 Reserved Section 6.4 Rate Schedule SS-2 Section 6.5 Rate Schedule S-2 Section 6.6 Rate Schedule LG-A Section 7 - Interruptible 7(c) Storage Service Section 7.1 Rate Schedule LG-S Section 8 - Aggregation and Balancing Services Section 8.1 Rate Schedule PAL Section 8.2 Rate Schedule POOLING Section 9 - Sales Service Section 9.1 Rate Schedule NS Section 10 - Other Services Section 10.1 Rate Schedule ICTS Part IV - General Terms and Conditions Section 1 - Application Section 2 - Definitions Section 3 - Quality Section 4 - Measurements Section 5 - Measurement Equipment Section 6 - Billing Section 7 - Payments Section 8 - Reserved Section 9 - Possession of Gas Section 10 - Warranty of Title to Gas Section 11 - Force Majeure Provision and Contract Entitlements Section 12 - Pressures Section 13 - Supply Curtailment Section 14 - Duly Constituted Authorities Section 15 - Refund of Cash-Out Revenues Section 16 - Service Agreement Section 17 - Notices Section 18 - Deliveries and Receipts, Overruns, Unauthorized Takes and Penalties Section 19 - Daily Delivery Point Entitlements (DPE) Section 19.1 DPE - Delivery Point Provisions Section 19.2 DPE - Facility Group Provisions Section 19.3 DPE - Maps Legend and Maps Section 19.4 DPE - Zone 4 Section 19.5 DPE - Zone 5 Section 19.6 DPE - Zone 6 Section 20 - Policy for Construction of Interconnect Facilities Section 21 - Rate Zones Section 22 - Policy for Consolidation of Service Agreements Section 23 - Restatement of Quantities in Thermal Units

20110623-5100 FERC PDF (Unofficial) 6/23/2011 2:58:32 PM

Section 24 - Gas Research Institute Voluntary Contributions Section 25 - Monthly Imbalance Resolution Section 26 - Changes in Rates for Rate Schedule S-2 Section 27 - Annual Charge Adjustment (ACA) Provision Section 28 - Nominations, Allocations, Curtailment, and Confirmations Section 29 - Best Available Operational Data Section 30 - Complaint Procedures - Marketing Function Employees Section 31 - Waiver Section 32 - Credit Worthiness Section 33 - Order of Discounts Section 34 - Periodic Reports Section 35 - Standards for Business Practices Section 36 - Gathering Affiliate(s) Standards of Conduct Section 37 - Cash Out Provisions Section 38 - Fuel Retention Adjustment Section 39 - Adjustments to Prior Gas Day Scheduled Quantities and PDAs Section 40 - Discount Policy Section 41 - Transmission Electric Power Cost Adjustment Provision Section 42 - Capacity Release Section 43 - System Management Gas Section 44 - Extension of Service Agreement Section 45 - Periodic Rate Adjustments and Surcharges Section 46 - 1Line Service Section 47 - Transfers of Storage Inventory Section 48 - Right of First Refusal Procedures Section 49 - Procedures For Allocating Available Firm Capacity Section 50 - Processing Rights Regarding Liquefiable Hydrocarbons Section 51 - Operational Controls Section 52 - Operational Flow Orders Section 53 - Negotiated Rates Section 54 - Penalty Revenue Sharing Section 55 - Reservation of Capacity Section 56 - Unauthorized Receipts Part V - Forms of Service Agreement Section 1 - Open Access Firm Transportation Service Section 1.1 Rate Schedule FT Section 1.2 Rate Schedule FT-G Section 1.3 Rate Schedule FTN Section 1.4 Rate Schedule FDLS Section 2 - Open Access Interruptible Transportation Service Section 2.1 Rate Schedule IT Section 2.2 Rate Schedule IDLS Section 3 - Open Access Firm Storage Service Section 3.1 Rate Schedule WSS Open Access Section 3.2 Reserved Section 3.3 Rate Schedule ESS Section 3.4 Rate Schedule ESSWS Section 3.5 Rate Schedule LNG Section 4 - Open Access Interruptible Storage Service Section 4.1 Rate Schedule ISS

20110623-5100 FERC PDF (Unofficial) 6/23/2011 2:58:32 PM

Section 5 - Reserved Section 5.1 Reserved Section 6 - Firm 7(c) Storage Service Section 6.1 Rate Schedule GSS Section 6.2 Rate Schedule LSS Section 6.3 Reserved Section 6.4 Rate Schedule SS-2 Section 6.5 Rate Schedule S-2 Section 6.6 Rate Schedule LG-A Section 7 - Interruptible 7(c) Storage Service Section 7.1 Rate Schedule LG-S Section 8 - Aggregation and Balancing Services Section 8.1 Rate Schedule PAL Section 8.2 Rate Schedule POOLING Section 9 - Sales Service Section 9.1 Rate Schedule NS Section 10 - Other Services Section 10.1 Rate Schedule ICTS Section 10.2 1Line Service Part VI - Miscellany Section 1 - List of Non-Conforming Service Agreements Section 2 - Volume No. 2 Tariff Table of Contents
Record Content Description, Tariff Record Title, Record Version Number, Option Code: Section 13, Summary of Negotiated Commodity Rates, 0.0.0, A Record Narative Name: Tariff Record ID: 1970 Tariff Record Collation Value: 286064640 Tariff Record Parent Identifier: 106 Proposed Date: 2011-06-09 Priority Order: 1000000000 Record Change Type: NEW Record Content Type: 1 Associated Filing Identifier:

PART II - STATEMENT OF RATES AND FUEL

20110623-5100 FERC PDF (Unofficial) 6/23/2011 2:58:32 PM

SECTION 13 SUMMARY OF NEGOTIATED COMMODITY RATES


Record Content Description, Tariff Record Title, Record Version Number, Option Code: Section 13.1, Summary of Negotiated Commodity Rate, 0.0.0, A Record Narative Name: Tariff Record ID: 1972 Tariff Record Collation Value: 286065664 Tariff Record Parent Identifier: 1970 Proposed Date: 2011-06-09 Priority Order: 1000000000 Record Change Type: NEW Record Content Type: 1 Associated Filing Identifier:

SUMMARY OF NEGOTIATED COMMODITY RATE 1/

Shipper: Hess Corporation Contract Number: 9110812 Rate Schedule: FT - Momentum Expansion MDQ (Dth): 3,000 Reservation Rate per dt: $0.00000 2/ Negotiated Commodity Rate per dt: $0.00000 3/ Primary Receipt Point(s): 1000065 - Pooling-Station 65 Primary Delivery Point(s): 1006163 - Lexington Contract Term: May 1, 2011 - October 31, 2012 Rate Effective Date: The term of the negotiated commodity rate is June 9, 2011 October 31, 2012

1/ This negotiated rate agreement does not deviate in any material respect from the Form of Service Agreement contained in Sellers Tariff. 2/ This daily reservation rate is not a negotiated rate, and is the pre-arranged, nonbiddable daily reservation rate for this capacity release implementing an asset management arrangement. 3/ Buyer shall be responsible for compressor fuel and line loss make-up retention and Buyer shall pay the electric power charges and all applicable surcharges for Sellers Rate Schedule FT service to Buyer under the Momentum Expansion Project. The fuel and line loss make-up retention, electric power charges and applicable surcharges are subject to change from time to time as approved by the FERC.

20110623-5100 FERC PDF (Unofficial) 6/23/2011 2:58:32 PM

Record Content Description, Tariff Record Title, Record Version Number, Option Code: Section 13.2, Summary of Negotiated Commodity Rate, 0.0.0, A Record Narative Name: Tariff Record ID: 1973 Tariff Record Collation Value: 286066688 Tariff Record Parent Identifier: 1970 Proposed Date: 2011-06-09 Priority Order: 1000000000 Record Change Type: NEW Record Content Type: 1 Associated Filing Identifier:

SUMMARY OF NEGOTIATED COMMODITY RATE 1/

Shipper: Hess Corporation Contract Number: 9110813 Rate Schedule: FT - Momentum Expansion MDQ (Dth): 28,500 Reservation Rate per dt: $0.00000 2/ Negotiated Commodity Rate per dt: $0.00000 3/ Primary Receipt Point(s): 1001748 - Shubuta-Destin M3576 Primary Delivery Point(s): 1006062 - Danville Contract Term: May 1, 2011 - October 31, 2012 Rate Effective Date: The term of the negotiated commodity rate is June 9, 2011 October 31, 2012

1/ This negotiated rate agreement does not deviate in any material respect from the Form of Service Agreement contained in Sellers Tariff. 2/ This daily reservation rate is not a negotiated rate, and is the pre-arranged, nonbiddable daily reservation rate for this capacity release implementing an asset management arrangement. 3/ Buyer shall be responsible for compressor fuel and line loss make-up retention and Buyer shall pay the electric power charges and all applicable surcharges for Sellers Rate Schedule FT service to Buyer under the Momentum Expansion Project. The fuel and line loss make-up retention, electric power charges and applicable surcharges are subject to change from time to time as approved by the FERC.

20110623-5100 FERC PDF (Unofficial) 6/23/2011 2:58:32 PM

20110623-5100 FERC PDF (Unofficial) 6/23/2011 2:58:32 PM

Document Content(s) Transm Ltr_Hess_Negot Cmdty Rate.PDF..................................1-4 Clean Tariff.PDF......................................................5-12 Marked Tariff.PDF.....................................................13-20 Complete Filing.PDF...................................................21-40 FERC GENERATED TARIFF FILING.RTF......................................41-48

You might also like