You are on page 1of 10

Exam Title

: Nortel 922-097 : Comm.Server 1000 Upgrades to Rls.5.0 for Technicians

Version : R6.1

www.prepking.com

Prepking - King of Computer Certification Important Information, Please Read Carefully


Other Prepking products A) Offline Testing engine Use the offline Testing engine product to practice the questions in an exam environment. B) Study Guide (not available for all exams) Build a foundation of knowledge which will be useful also after passing the exam. Latest Version We are constantly reviewing our products. New material is added and old material is updated. Free updates are available for 90 days after the purchase. You should check your member zone at Prepking and update 3-4 days before the scheduled exam date. Here is the procedure to get the latest version: 1.Go towww.Prepking.com 2.Click on Member zone/Log in (right side) 3. Then click My Account 4.The latest versions of all purchased products are downloadable from here. Just click the links. For most updates,it is enough just to print the new questions at the end of the new version, not the whole document. Feedback If you spot a possible improvement then please let us know. We always interested in improving product quality. Feedback should be send to feedback@Prepking.com. You should include the following: Exam number, version, page number, question number, and your login ID. Our experts will answer your mail promptly. Copyright Each PDF file contains a unique serial number associated with your particular name and contact information for security purposes. So if we find out that a particular PDF file is being distributed by you, Prepking reserves the right to take legal action against you according to the International Copyright Laws. Explanations This product does not include explanations at the moment. If you are interested in providing explanations for this exam, please contact feedback@Prepking.com.

www.prepking.com

1. A customer is upgrading an existing Communication Server (CS) 1000S at Rls. 4.5 to a CS 1000E Rls. 5.0 Standard Availability. A CP-PM Call Server card is being installed during the upgrade. The CP-PM Call Server card has been installed into Slot 1 and configured. What is the next sequential step in the upgrade process? A. Reboot the card to begin the software installation. B. Connect the administration console to Port 0 of the NTAK19EC SDI cable. C. Insert the RMD containing the Rls. 4.5 customer database into the faceplate of the CP-PM Call Server card. D. Insert the bootable RMD containing software installation files into the faceplate of the CP-PM Call Server card. Answer: B 2. A customer is upgrading an existing Communication Server (CS) 1000S at Rls. 4.5 to a CS 1000E Rls. 5.0 with a single IP Media Gateway 1000E chassis. In this configuration, which slot in the IP Media Gateway houses the Media Gateway Controller Card? A. Slot 0 B. Slot 1 C. Slot 2 D. Slot 3 Answer: A 3. A customer with a Communication Server (CS) 1000E at Rls. 4.5 with an Media Gateway (MG) 1000T containing three chassis is planning to migrate the functionality of the MG 1000T into the CS 1000E High Availability system, and then upgrade the system to Rls. 5.0. The system Signaling Servers are Nortel ISP 1100 servers. What must be done to the Signaling Server to complete the upgrade? A. Upgrade the server software to Rls. 5.0 only. B. Replace the hardware to CP-PM Signaling Server. C. No action is required; the Signaling Server can remain at Rls. 4.5. D. Upgrade the memory to 1 GB followed by a software upgrade to Rls. 5.0. Answer: D 4. A customer is upgrading an existing Communication Server (CS) 1000S at Rls. 4.5 to a CS 1000E Rls. 5.0 Standard Availability with a single IP Media Gateway (MG) 1000E chassis. Which components must be replaced in the MG 1000S A. SSC Card B. Call Server C. Voice Gateway Media Card D. Nortel IPS 1100 Signaling Server
www.prepking.com

to complete the upgrade?

Answer: A 5. A customer is upgrading an existing Communication Server (CS) 1000S at Rls. 4.5 to a CS 1000E Rls. 5.0. A CP-PM Call Server card is being installed during the upgrade. Which statements correctly describe the software installation process? (Choose two.) A. Rls. 5.0 software does not need to be installed on the CP-PM Call Server. B. The Software Install tool is launched on the first boot of the CP-PM Call Server. C. Rls. 5.0 software must be loaded onto the CP-PM Call Server using a bootable RMD. D. A bootable RMD must be created containing the Rls. 5.0 software and operating system. Answer: CD 6. A customer is upgrading an existing Communication Server (CS) 1000S at Rls. 4.5 to a CS 1000E Rls. 5.0. Standard Availability system with two IP Media Gateways. During the upgrade, the system automatically maps small system Terminal Numbers to large system Terminal format. Which action must be completed manually? A. Re-program Tone Receiver Terminal Numbers B. Re-program Trunk Terminal Numbers with new format C. Re-program IP Phone Terminal Numbers with new format D. Change the format on the Element Manager IP Telephony Node files Answer: D 7. A customer with a Communication Server (CS) 1000E at Rls. 4.5 with an Media Gateway (MG) 1000T is planning to migrate the functionality of the MG 1000T into the CS 1000E High Availability system, and then upgrade the system to Rls. 5.0. The upgraded system will have two IP Media Gateways. Which statement is true regarding DSP resources for the IP Media Gateways in the upgraded system? A. DSP resources are no longer required for inter-IPMG call. B. DSP resources are no longer required for TDM to IP calls. C. DSP resources are localized to a particular IPMG where the DSP resource is located. D. DSP resources are considered system resources and are not localized to a particular chassis. Answer: C 8. A customer with a Communication Server (CS) 1000E at Rls. 4.5 with an Media Gateway (MG) 1000T is planning to migrate the functionality of the MG 1000T into the CS 1000E High Availability system, and then upgrade the system to Rls. 5.0. The upgraded system will have two IP Media Gateways. Which statement is true for this type of upgrade? A. The IPMG type remains SSC. B. The IPMG does not require an IP address. C. The IP address for each IPMG is automatically configured. D. The IP address for each IPMG must be configured in LD 97.
www.prepking.com

Answer: D 9. A customer is upgrading an existing Communication Server (CS) 1000S at Rls. 4.5 to a CS 1000E Rls. 5.0 Standard Availability. A CP-PM Signaling Server card is being installed during the upgrade. Which two

statements correctly describes the software installation process? (Choose two.) A. Rls. 5.0 software does not need to be installed on the CP-PM Signaling Server. B. The Software Install tool is launched on the first boot of the CP-PM Signaling Server. C. A bootable RMD must be created containing the Rls. 5.0 software and operating system. D. Rls. 5.0 software must be loaded onto the CP-PM Signaling Server using a bootable RMD. Answer: AB 10. A customer is upgrading a Communication Server (CS) 1000E at Rls. 4.5 to a Communication Server (CS) 1000E Rls. 5.0 system. The customer has decided to replace an existing Nortel ISP 1100 Signaling Server with a CP-PM Signaling Server. The NRS database has already been backed up. What is the next step in the upgrade process? A. The ISP 1100 tools menu is used to back-up the IP data files to a CD. B. Element Manager is used to back up the IP data files to an ftp location. C. Element Manager is used to back up the IP data files to a 3.5?floppy disc. D. The ISP 1100 tools menu is used to back up the IP data files to a 3.5" floppy disc. Answer: D 11. A customer with a Communication Server (CS) 1000E at Rls. 4.5 with a Media Gateway (MG) 1000T with two chassis is planning to migrate the functionality of the MG 1000T into the CS 1000E High Availability system, and then upgrade the system to Rls. 5.0. What happens to the MG 1000T SSC card security device (dongle)? A. It is discarded or returned to Nortel. B. It is placed on the CP-PM Call Server card. C. It is placed on the MGC card in any Media Gateway. D. It is placed on the MGC card installed in the first Media Gateway. Answer: A 12. A customer is upgrading an existing Communication Server (CS) 1000S at Rls. 4.5 to a CS 1000E Rls. 5.0. A Media Gateway Controller (MGC) with DSP Daughterboard is being installed to replace the SSC card in this configuration. Assume the following upgrade tasks have been completed: 1) The MG 1000 chassis has been powered down. 2) The SSC card has been removed from the MG 1000T. 3) The CP-PM Call Server software has been loaded. 4) The DSP Daughterboard and 128 mb CF have been installed.
www.prepking.com

Which is the next sequential step in the upgrade process? A. Install the CP-PM Signaling Server card. B. Configure the Conference and TDS loops. C. Enter mgcsetup to configure IP parameters. D. Place the MGC card into slot zero and connect it to the network. Answer: D 13. A customer is upgrading an existing Communication Server (CS) 1000S at Rls. 4.5 to a CS 1000E Rls. 5.0 Standard Availability with a single IP Media Gateway 1000E chassis. As part of this upgrade a CP-PM

Call Server Card has been added. What happens to the Terminal Number (TN) format during the upgrade? A. The TN format used by the small system (Card - Unit) is retained. B. The TN format is automatically converted to the large system format of Loop-Shelf-Card-Unit for all assigned Terminal Numbers. C. The TN format must be changed to the large system format of Loop - Shelf - Card - Unit through manually re-programming all devices assigned Terminal Numbers. D. The format is automatically converted to the large system format of Loop - Shelf - Card - Unit for IP Phones only. Answer: B 14. A customer is upgrading a Communication Server (CS) 1000E at Rls. 4.5 to a Communication Server (CS) 1000E Rls. 5.0 system. The system has a co-resident IP Peer Network and a NRS database. Which upgrade step is correct? A. The NRS database must be backed-up before attempting the upgrade. B. The Signaling Server database must be backed-up before attempting the upgrade. C. The NRS database must be copied to the Call Server before attempting the upgrade. D. The Signaling Server can be upgraded as all data is retrieved from the Call Server. Answer: A 15. A customer is upgrading a Communication Server (CS) 1000E at Rls. 4.5 to a Communication Server (CS) 1000E Rls. 5.0. The customer has decided to replace the existing Nortel ISP 1100 Signaling Server with a CP-PM Signaling Server. Assume the following upgrade tasks have been completed: 1) The CP-PM Signaling Server Card S5 Switch has been set to position 2. 2) The Hard Drive (Fixed Media Device) has been installed onto the CP-PM SS card. Which is the next sequential step in the hardware installation portion of the upgrade process? A. The CP-PM SS Card is connected to the TLAN. B. The CP-PM SS Card is connected to the ELAN.
www.prepking.com

All other devices assigned Terminal Numbers must be manually reprogrammed.

C. The CP-PM SS Card is placed into Empty Slot 0. D. The CP-PM SS Card is placed into Empty Slot 2. Answer: D 16. A customer is upgrading an existing Communication Server (CS) 1000S at Rls. 4.5 to CS 1000E Rls. 5.0 Standard Availability system. The customer has decided to install a CP-PM Signaling Server Card. What must be done to configure the CP-PM card as a Signaling Server? A. Set the S5 switch to Position 2, to enable Hard Disk for FMD. B. Set the S5 switch to ON, to enable 1 GB of additional memory. C. Set the S5 switch to Position1, to enable Compact Flash for FMD. D. Set the S5 switch to OFF, to enable 512 MB of additional memory. Answer: A 17. A customer with a Communication Server (CS) 1000E at Rls. 4.5 with a Media Gateway (MG) 1000T is planning to migrate the functionality of the MG 1000T into a CS 1000E Rls. 5.0 High Availability system. Which statement regarding this particular upgrade situation is false? A. The PRI cards in the MG 1000T must be replaced. B. All MG 1000T chassis are added to the CS 1000E as new IPMGs. C. All PRI and DSP resources must be added to the CS 1000E database. D. The NARS/BARS database on the MG 1000T must be replicated on the CS 1000E. Answer: A 18. A customer is upgrading an existing Communication Server (CS) 1000S at Rls. 4.5 to a CS 1000E SA Rls. 5.0. A CP-PM Call Server card is being installed during the upgrade. Assume the following upgrade

tasks have been completed: 1) The CP-PM Call Server Card F5 Switch has been set to position 1. 2) The 1 GB Compact Flash has been installed onto the CP-PM CS card. Which is the next sequential step in the upgrade process? A. Install the CP-PM CS card into Slot 1. B. Connect the CP-PM CS card to the ELAN. C. Install the large system security dongle onto the CP-PM card. D. Lock the CP-PM CS card into the slot using the faceplate latches. Answer: C 19. A customer is upgrading an existing Communication Server (CS) 1000S at Rls. 4.5 to a CS 1000E Rls. 5.0 Standard Availability with a single Media Gateway 1000E chassis. customer has decided to install a new CP-PM Call Server Card. Which steps are recommended to properly back-up the small system customer database so it can be converted and restored to the new CP-PM Call Server?
www.prepking.com

As part of this upgrade, the

A. LD 43 - BKO, followed by LD 43 EDD B. LD 43 - EDD, followed by LD 43 BKO C. LD 43 - EDD, followed by LD 143 Archive D. LD 143 - Archive, followed by LD 43 EDD Answer: C 20. A customer with a Communication Server (CS) 1000E at Rls. 4.5 with an Media Gateway (MG) 1000T is planning to migrate the functionality of the MG 1000T into the CS 1000E High Availability system, and then upgrade the system to Rls. 5.0. This upgrade includes a Media Gateway Controller card with two low density DSP daughterboards per Media Gateway. How many DSP channels does this configuration provide per Media Gateway? A. 8 B. 16 C. 32 D. 64 Answer: D 21. A customer with a Communication Server (CS) 1000E at Rls. 4.5 with a Media Gateway (MG) 1000T with two chassis is planning to migrate the functionality of the MG 1000T into the CS 1000E High Availability system, and then upgrade the system to Rls. 5.0. Which statement is true regarding the existing MG 1000E Rls. 4.5 Voice Gateway Media Card (VGMC)? A. The VGMC in the MG 1000E must be replaced. B. The VGMC in the MG 1000E is no longer needed. C. The VGMC in the MG 1000E can remain at Rls. 4.5. D. The VGMC in the MG 1000E can be upgraded to support Rls. 5.0. Answer: D 22. A customer with multiple system types at four locations would like to upgrade their entire Communication Server (CS) 1000 network to Communication Server running CS 1000 Rls. 5.0. Each location is currently

Rls. 4.5. Which two locations would require call processor upgrades in order to be

eligible for an upgrade to Rls. 5.0? (Choose two.) A. Site A - CS 1000E CP-PII B. Site B - CS 1000M MG CP4 C. Site C - CS 1000M Chassis D. Site D - CS 1000E CP-PIV Answer: BC 23. A customer would like to upgrade their Communication Server (CS) 1000E Standard Availability System to a High Availability CS 1000E system. Which component is required to make the CS 1000E Logical Call
www.prepking.com

Processors considered a High Availability CS 1000E solution? A. Dual CP-PM Signaling Server B. Alternate Call Servers with Automated database Replication C. Dual Call Processors using an SLAN for database synchronization D. Dual Call Processors using a High Speed Pipe (HSP) for database synchronization Answer: D 24. A customer is planning to upgrade an existing system to Communication Server (CS) 1000E running Rls. 5.0. The upgraded system will include a Commercial-Off-the-Shelf (COTS) server. In order to take advantage of the features provided by the Enterprise Common Manager framework, which options can be deployed? (Choose two.) A. Linux Operating System and IBM306m B. Linux Operating System and HP DL320 C. VxWorks Operating System and ISP 1100 D. VxWorks Operating System and HP DL320 Answer: AB 25. A customer is upgrading an existing Communication Server (CS) 1000S at Rls. 4.5 to a CS 1000E Rls. 5.0. They want to implement Media Security (SRTP). Which new hardware components can be used to support this requirement? (Choose two.) A. CP-PM Signaling Server B. Voice Gateway Media Card 32 C. Voice Gateway Media Card 32S D. Voice Gateway Media Card 16S E. Media Gateway Controller DSP Daughterboard Answer: CE

www.prepking.com

100% Pass Guaranteed or Full Refund Word to Word Real Exam Questions from Real Test Buy full version of exam from this link below http://www.prepking.com/922-097.htm

You might also like