Name: Engr. Syed Abid Hassan Zaidi Designation: Internee (Mechanical Engineer) Duration: 6 Weeks [ 1st June 8th July ] Report To: Mr. Sohail Ahmed Khan University: NEDUET Karachi Business Unit: INF (Infrastructure Solutions) Engr.abidhassan@hotmail.com Email:
2011
Page 2 of 17
Preface
The focus of mine while writing the final report is on, the way I describe what I learn during my precious internship period, however briefly. The report focuses primarily on the content of the different meetings that were provided for me by the Mechanical Execution Manager Mr. Sohail Ahmed Khan, with different professionals that were mainly working on the issues that I was interested in knowing more. I must admit that one month is not enough to have a deeper study on different sections of INF but it was helpful for me to meet different project managers and have an overview of the way that they worked and how they faced different challenges and solved different problems. During my internship period at Siemens Pk, I also tried to get knowledge about their way of working, which I will share with you later. I want to thank, first, all the staff member of BU-INF for their support in my internship period and for the fact that they made me feel comfortable all the time I was there, so that I could easily concentrate on my study and observation which Im sure will be a great help for me in my future career. SIEMENS Pak is the countrys top rated engineering company. During my 6 weeks of internship in infrastructure solutions, I was sent to different sections of BU-INF under the supervision of Mr. Sohail Ahmed Khan.
2011
Page 3 of 17
1. Execution Mechanical === 2. INF Portfolio/QMS 3. Planning 4. Stores 5. Purchase 6. Execution Electrical
=== Mr. Usman Bin Rashid === Mr. Muhammad Anjum === Mr. Nasir Kamal === Mr. Urooj Abbasi === Mr. Waseem Furqan
2011
Page 4 of 17
1. Sales and Marketing 2. Engineering and Design 3. Manufacturing 4. Installation and Commissioning 5. Services
2011
Page 5 of 17
Execution Mechanical
In Mechanical Execution Department, the period from 1-6-2011 to 6-6-2011 and 30-6-2011 to 8-7-2011 with Mr. Sohail Ahmed Khan was quite informative therefore I was able learn the complete working cycle , about the piece of mechanical work execute by Mechanical Team on the SITE by following the Drawings (Provided by client) and the Project plan (Created by the Planning dep't.) . S.M = SITE Manager CM = Construction Manager Commercial department involves Attendance / Salary / Comm.-officer / Purchase. Admin involves comp. updates /Security. Community department involves Load person issue. HSE = Health & Safety Environment. A medic on SITE works on health maintenance under the supervision of Doctors.
2011
Page 6 of 17
2011
Page 7 of 17
Proper documentation and its monitoring should be maintain, to improve the results, processes, and control over the paper work. HSE = Health safety environment. EHS = Environmental, occupational health & safety. IPI = In-process inspection. NCR= Non-conformity report. Non-conformity: Non-fulfillment of a specified requirement.
2011
Page 8 of 17
According to QMS Procedures INF has a REFERENCE no. SP-5. The documents which have reference number (Record or reference no.) are controlled documents, through which the documents easily be detected.
Tool box talk is like a school assembly which contains daily lectures
on different topics related to safety and precautions before the work starts.
2011
Page 9 of 17
2011
Page 10 of 17
Primavera (Soft ware for WBS & very easy to use) Histograms (Ms excel)
In piping process we have some major steps: Making & Cutting Weight Beveling Length Align/fitting Dia-inch Welding NDT= Non-Destructive Testing. RT = Radio Graphic Testing. DPT = Die Penetrating Testing. Micro Scheduling = Planning w.r.t Man-Hours.
Procurement Plan: Costing all Procurements which we have to done. Different profit of projects:
Variance = Earned MHRS - Plan MHRS Efficiency = Earned MHRS / Actual MHRS Data set = Programming facing data updated. Key Progress = Indicated Report Men Hour is a standard unit. Estimating the labor to be used or in use. Budgeted MHRS Planned MHRS Earned MHRS Actual MHRS
2011
Page 11 of 17
In any on going project, weekly, monthly or yearly reports are taken & monitoring the performance by the calculation of Variance, Actual MHRS & Earned MHRS. There are two types of reports: Graphical reports. Tabular reports.
2011
Page 12 of 17
Stores Department
In Stores department the period from 20-6-2011 to 22-6-2011 with Mr. Nasir Kamal, was quite informative therefore I was able to learn the procedure of storage of materials and stuff which are required in the processing of project, given by the clients. We visited different persons for different purposes. Mr. Adeel receives the material land controls the receiving which is done siemens to siemens or from the abroad and make its purchase requisition and processes further. Mr. Shahab does the same work & receives the delivery on the local basis and then makes PR on SAP software. Mr.Shahbaz controls both local & imported. He takes the both arriving & passes it through to the further processes. Assets are the main activity of the project, stores also controls all the assets. Every thing & stuff used for the project on SITE is called asset & stuff has a particular standard of efficiency, then it is categorized as an Asset. Mr. Salman controls the quality of materials, with the help of Screw guage, Vernier Calliper, and Length Measuring tapes etc. Physical Test consists of: Lengths Defects (Corrosion) Dimensions Visual Inspections Specification (Acc to the req. of Client)
2011
Page 13 of 17
MR = Material Requisition Green color for Material Blue Rust color for Tools color for Heavy machinery & Lifters
Yellow color for SITE making / Establishment First there is match of Delivery chalan, Purchase order & Purchase requisition then pass to the GR (Goods receipts) then it goes for the inspection to Mr. Salman, then the Quality control engineer checks it & says ok or not.
Material = Consumable at site while tools and asset are not. Tools = Below 10,000 Rs. Assets = Above 10,000 Rs. D.N = Dispatch Note P.R = Purchase Requisition
This is the summary & the main information I got from the Stores department.
2011
Page 14 of 17
Purchase Department
In the Purchase department, during the period from 23-06-2011 to 24-06-2011, with Mr. Urooj Abbasi was quite informative therefore, I was able to learn the procedures, how they controls the overall purchasing of all the stuff. Siemens has a list of registered quality vendors of about 320 vendors & they are categorized into 3 categories A, B and C. "A" category vendors are considered as a good and quality ones as "B" category is of average & "C" category vendors are most on a complaint side. And 99% of the vendors are selected from category "A". If the vendor is producing bad quality continuously & the quality control department rejects the parts so often the vendor will be remove from the registered list. We start the process, material comes from the supplier & then sent to inspection & then it is inspected physically which is information of purchasing from PR report. If meeting the inspection & testing criteria. Then results noted in GR (goods receipt). Lab test required and sending to lab testing & then handed over to the store department & results noted in GR. Accepted material will be delivered to SITE, after issuing a DN (dispatch note).
DN = Dispatch Note PO = Purchase Order GR = Goods Receipt CS = Comparative Statements RFQ = Request for Quotation
2011
Page 15 of 17
Step 2: Purchase dep't sent the Request for Quotation to its registered vendors.
Step 3: After collection of quotations, purchase dep't create a Comparative statement of all the vendors.
Step 4: Through the CS the selection procedure starts, under the two parameters (A) Rates and (B) Delivery Time.
Step 5: Purchase dep't created a PO, and send it to the vendor who has won the bid.
Step 6: Delivery Follow-up is being continuously given to the vendors by the purchase dep't, so that the vendors may deliver in time.
Step 7: As the material is delivered to the store, its Inspection is carried out, after inspection it'll be dispatch to the site for that DN is to be created.
That was the capsule of the information, I have experienced in Purchase department.
2011
Page 16 of 17
Execution Electrical
Electrical Execution Department, the period from 27-6-2011 to 29-6-2011 with Mr. Waseem Furqan was quite informative therefore I was able learn the complete procedure like how they work, about the piece of electrical work execute by Electrical Team on the SITE by the Project plan (Created by the Planning dep't.) .
2011
Page 17 of 17
Delivery Installation Customer training In Electrical Execution department, they carry out all the matters of the electrical department. Overall Electrical appliances used in the projects, they are executing all of them. There is a manager in SITE & Electrical Engineers operating all the electrical functions over there. Electrical execution department executes from the office & take care and maintain official reports of the electrical department of the project. This is all information I gained from the Electrical Execution department.
Conclusion
In conclusion, I have to admit that I really appreciate the way I have been guided through this internship program. Beginning from the opportunity to take the time I needed to refresh and expand my knowledge in several issues concerning rural development, education and other issues, over a somehow protected period where I could discover and learn to value my future in industry, and finally earned the confidence to deal with assignments myself. I would also like to thank the Followings: Mr. Sohail Ahmed khan (Execution Mechanical) Mr. Faraz (Planning) Mr. Usman Bin Rashid (QMS/HSE) Mr. Zuhaib Khan (Purchase) Mr. Asif (QMS/HSE)
For all their patience in attending and responding adequately to my amateurish queries.
2011