LEV SHVARZMAN 58 Lady Loretta Lane, Maple, Vaughan Toronto, ON, L6A 4E9 Cell: +1-647-296-0475 Home: +1-289-553-0674

lev.shvarzman@gmail.com WIRELESS ENGINEER

HIGHLIGHTS OF QUALIFICATIONS: Over 10 years of extensive experience in RF Wireless Communication Expert in installation, testing and integration of Nokia, Ericsson mobile equipment Complete knowledge of UMTS/GSM and WCDMA mobile systems Complete knowledge of Nokia Core network equipment: Trans-coders, GSM BSC, MSC and UMTS RNC (BSC) cabinet Advanced computer skills: Word, Excel, Outlook Strong analytical and problem solving skills

PROFESSIONAL EXPERIENCE NOKIA SIEMENS NETWORKS, Moscow, Russia RAN Engineer January 2011- July 2011

Sites Exception, Commissioning and Integration 3G Flexi WBTS of Nokia for MTS

TEKSYSTEMS Inc. for PARSONS TELECOM, Windsor, Toronto- Canada Sites Install Technician for TELUS May 2010-September2009 Installed power plates into HAUWEI equipment ( DCDU ) Solved problems to install power plates Detected troubleshooting and pointed out possible causes and recommended solution Installed Nokia Siemens Network Equipment ( MGW, HLR and RNC) Performed cable racking, iron work, equipment frames, frames grounding Connected power cables to the equipment and frames November 2008-March 2009

TEKSYSTEMS Inc. for PARSONS TELECOM, Montreal Switch Install Technician for Bell Mobility, TELUS

Installed Nokia Siemens Network Equipment (MSS, SGSN, MGW, HLR and RNC) Performed cable racking, iron work, equipment frames, frames grounding Pulled power cable and connected to the equipment and frames Connected fiber cable between frames

Installed hardware (carts, servers and racks)

Mer Group, Israel Install Technician RF-Department with EL-AR Guinea, Africa

2004-2008

Commissioned and integrated UMTS & GSM, WCDMA communication networks for Nokia, Ericsson and Nortel Configured and tested hardware and equipment according to customer specifications Conducted installation, testing and integration RBS cell-sites of Ericsson communication equipment Provided installation of equipment as requested by customer and connected power cables from BTS/RBS to power unit, set up battery units and connected cables between batteries and equipment Troubleshot and repaired equipment failures in BTS/RBS cell-sites working on the project involving Alvarion Networks with French Telecom in the Caribbean and French Guinea 2001-2004

Leadcom Integration Solution LTD. Install Technician RF-Department

Supervised teams for integration, commissioning and installation of GSM Cell-Sites and Microwave Porta, Ecuador Provided testing and integration Nokia (BTS) mobile communication equipment Comcell, Columbia Completed installation, commissioning and integration of Nortel TDMA Macro Cell GT & T, Guyana Proficient with power meters, spectrum analyzers and Site Master Completed installation and testing for Urban and Macro Cell (TDMA) Provided integration for BTS Cell-Sites for GSM 900, 1800 communication equipment

EDUCATION Ericsson RBS Installation and Testing Course Ericsson Branch, Israel NOKIA Ultra-Site Installation & Commissioning Course Nokia Technical Centre, Turkey 2006

2001/2005