Bechtel Project

Standard Operation Procedure


SOP - Data Validation and Inspection

Issue Date

11/05/2008

EnviroZone L.L.C.

Prepared by : Envirozone M.E. L.L.C (Sunil )


Date : 01/05/2008 1 - SOP -Table of Contents 1. 2. 3. 4. 5. 6. 7. 8. 9. Scope and applicability Health and safety warnings Cautions Interferences Personal qualifications/responsibilities Terms and Definitions Method description Equipment/supplies and computer hardware/software Procedure of execution

10. Troubleshooting

Page 0

Bechtel Project

Standard Operation Procedure


SOP - Data Validation and Inspection

Issue Date

11/05/2008

1. Scope and applicability


[Describing the purpose of the process or procedure and when the procedure is to be followed.] Purpose: How to operate and maintain fixed monitoring station When to follow this procedure: At the time of maintenance.

2. Health and safety warnings


[Indicating operations that should result in personal injury or loss of life and explaining what will happen if the procedure is not followed or is followed incorrectly; listed here and at the critical steps in the procedure.] Take care that the main switch is off before installation. Main power from the electrical supply is 230 VAC. 50/60HZ

3. Cautions
[Indicating activities that could result in equipment damage, degradation of sample, or possible invalidation of results; listed here and at the critical steps in the procedure.] Any operation that is not listed in the present SOP or in the operation manuals of the various equipment could result in equipment damage, degradation of sample, or possible invalidation of results

4. Interferences
[Describing any source of contamination, any component of the process that may interfere with the accuracy of the final product.]

5. Personal qualifications/responsibilities
[Denoting the minimal experience the SOP follower should have to complete the task satisfactorily, and citing any applicable requirements, like certification or inherently governmental function.) SOP follower shall have a technical education in the field of instrumentation

Page 2
ENVIROZONE MIDDLE EAST Nahla Medical Supplies ABU DHABI

United Arab Emirates

Bechtel Project

Standard Operation Procedure


SOP - Data Validation and Inspection

Issue Date

11/05/2008

6. Terms and Definitions


[Identifying any acronyms, abbreviations, or specialized terms used in the SOP.] None

7. Method description
[General background information about the method like physical principle, chemical reactions and mathematical equations, which are required for the understanding of the SOP.]

8. Equipment/ supplies and computer hardware/ software


[Listing and specifying, where necessary, equipment, materials, reagents, gases, chemical standards as well as computer hardware and software used for sampling data, manipulate analytical records and/or report data ]

Window Air Condition Exaust pipe

8.1 - Air Monitoring Station

Page 3
ENVIROZONE MIDDLE EAST Nahla Medical Supplies ABU DHABI

United Arab Emirates

Bechtel Project

Standard Operation Procedure


SOP - Data Validation and Inspection

Issue Date

11/05/2008

8.2 - Gas Sampling Head.

Mesh for protection from dust

8.3 Sample handling unit

Gas inlet for SO2 analyser

Fans

Page 4
ENVIROZONE MIDDLE EAST Nahla Medical Supplies ABU DHABI

United Arab Emirates

Bechtel Project

Standard Operation Procedure


SOP - Data Validation and Inspection

Issue Date

11/05/2008

8.4 Connection of the main power supply For all fixed monitoring stations, a power supply cable of approx. 3 meters is rolled below the shelter. This cable is to be connected to the external electrical counter box. 8.4 Main Power Supply

230VAC Single phase cable

Before connecting this cable to the electrical connector, open the door of the shelter and make sure the general circuit breaker is OFF. 8.5 Earthing
Electrical Grounding

Page 5
ENVIROZONE MIDDLE EAST Nahla Medical Supplies ABU DHABI

United Arab Emirates

Bechtel Project

Standard Operation Procedure


SOP - Data Validation and Inspection

Issue Date

11/05/2008

8.5 - Main power distribution board Secondary circuit-breakers

Main circuit breaker

8.6 - Digital Inputs and Outputs and Analog Inputs board.

Didital Inputs

Analog Inputs

Page 6
ENVIROZONE MIDDLE EAST Nahla Medical Supplies ABU DHABI

United Arab Emirates

Bechtel Project

Standard Operation Procedure


SOP - Data Validation and Inspection

Issue Date

11/05/2008

8.7 - Cabinet Internal view for Analog/Digital board, Temperature sensor and Ground connecter

Digital Ground point

Temperature sensor

Temperature sensor Input (4 to 20mA)

Page 7
ENVIROZONE MIDDLE EAST Nahla Medical Supplies ABU DHABI

United Arab Emirates

Bechtel Project

Standard Operation Procedure


SOP - Data Validation and Inspection

Issue Date

11/05/2008

8.8 - External cabinet view for Analog/Digital Board, Temperature Sensor and Ground connecter.

Page 8
ENVIROZONE MIDDLE EAST Nahla Medical Supplies ABU DHABI

United Arab Emirates

Bechtel Project

Standard Operation Procedure


SOP - Data Validation and Inspection

Issue Date

11/05/2008

8.9 - Over all Inside view for the Gas

Page 9
ENVIROZONE MIDDLE EAST Nahla Medical Supplies ABU DHABI

United Arab Emirates

Bechtel Project

Standard Operation Procedure


SOP - Data Validation and Inspection

Issue Date

11/05/2008

8.10 - Close up view for Digital Outputs from Gas Leak Detector Going to A/D Board for above 4 Alarms.

Page 10
ENVIROZONE MIDDLE EAST Nahla Medical Supplies ABU DHABI

United Arab Emirates

Bechtel Project

Standard Operation Procedure


SOP - Data Validation and Inspection

Issue Date

11/05/2008

8.11 Installation of the analyzers in the rack cabinet To be installed in the rack : AF22M 1

See drawing. For installing each equipment, tear the telescopic slide off, put the equipment on the plate and pull back the slide till the locking system closes the slides. Connect power cable to the multiplug located on the rear of the rack cabinet. Connect RS232 cable to the respective AF22M COM port. Connect all of the pneumatics according to drawing. Each tube is clearly identified.

Page 11
ENVIROZONE MIDDLE EAST Nahla Medical Supplies ABU DHABI

United Arab Emirates

Bechtel Project

Standard Operation Procedure


SOP - Data Validation and Inspection

Issue Date

11/05/2008

8.12 - AFTER INSTALLATION OF AF22M

Page 12
ENVIROZONE MIDDLE EAST Nahla Medical Supplies ABU DHABI

United Arab Emirates

Bechtel Project

Standard Operation Procedure


SOP - Data Validation and Inspection

Issue Date

11/05/2008

8.13 - REAR VIEW OF THE CPU

HASP KEY

Connection of AF22M TO RS232 cable

PCI 1711 ADAM (For DI, DO and Analog inputs)

Page 13
ENVIROZONE MIDDLE EAST Nahla Medical Supplies ABU DHABI

United Arab Emirates

Bechtel Project

Standard Operation Procedure


SOP - Data Validation and Inspection

Issue Date

11/05/2008

8.14 19 Rack Back side view for Wiring and Tubing.

Cal.Gas Excess Flow meter

ESTEL board 37 pin connector Sorel Board RS232 Solonoid Valve

Estel boards extension

Power supply distribution board

Page 14
ENVIROZONE MIDDLE EAST Nahla Medical Supplies ABU DHABI

United Arab Emirates

Bechtel Project

Standard Operation Procedure


SOP - Data Validation and Inspection

Issue Date

11/05/2008

9. Procedure of execution Once the station is properly and fully installed , follow the next procedures. 9.1 : starting up the rack cabinet 1 - Switch on all of the equipment of the rack cabinet, meaning : - AF22M (1 main switch on the front panel),, - Computer (1 main switch on the front panel), 2 - Analyzer will show "Warm up". Wait for this message to stop and then refer to SOPs regarding operation of the analyzers themselves. 3 Open the Calibration Gas Cylinder to check the calibration. Detail SOP for Calibration Gas Cylinder is given in the QA/QC section.
Regulator

9.1 - Clibration Gas Cylinder for SO2

Page 15
ENVIROZONE MIDDLE EAST Nahla Medical Supplies ABU DHABI

United Arab Emirates

Bechtel Project

Standard Operation Procedure


SOP - Data Validation and Inspection

Issue Date

11/05/2008

9.2 : starting Envidas For Windows data acquisition software. 1 - Turn ON the 17" screen. 2 - Open a Windows session. There is no User's name nor Password to tun a Windows session. 3 - Launch Envidas For Windows software from the shortcut on the Desktop or from Program Files ->Envidas For Windows. 4 - The following windows appears and invites you to enter a User Name and Password. Enter : User Name : a No password was configured Click OK 9.1- Envidas

Page 16
ENVIROZONE MIDDLE EAST Nahla Medical Supplies ABU DHABI

United Arab Emirates

Bechtel Project

Standard Operation Procedure


SOP - Data Validation and Inspection

Issue Date

11/05/2008

9.2 - The main dynamic tabular window

In a few seconds, SO2 will show the related data. Following alarms are configured in ENVIDAS, Gas leak sensor Fault, Low, High, and High-High. Door open Smoke Note : Envidas For windows software SHALL be always run. When EFW is closed, no data acquisition is possible. Page 17
ENVIROZONE MIDDLE EAST Nahla Medical Supplies ABU DHABI

United Arab Emirates

Bechtel Project

Standard Operation Procedure


SOP - Data Validation and Inspection

Issue Date

11/05/2008

9.3 : starting Envidas For Windows Personal Edition (PE) local data reporting software. From the desktop, double click the Envidas PE icon or select it from Program Files -> Envidas. Like for Envidas FW, enter the User Name ("a). You have now the possibility to create a lot of various reports (report to the instrcution manual for detailed information). Note : Envidas PE shall not necessarily be run any time. It is to be used only in case of local data reporting is required.

10. Troubleshooting
[Should provide guidance on some of the more common problems likely to be encountered. It should be referred to the relevant sections of the manuals of the manufacturer.] Please Refer Manuals. Refer to the appropriate instruction manual and SOP in case of troubleshooting

Page 18