Rehoming Scenarios
Rehoming to a different parent MSC Rehoming to a different parent MGW Rehoming to a different parent BSC

Rehoming Scenarios
BSC Rehoming Parent MSC changes
MSC(1) MSC(2)

BSC(1)

BTS(1) BTS(2) BTS(3) BTS(4) BTS(5) BTS(6) BTS(7)

Rehoming Scenarios
BSC Rehoming Parent MSC changes
MSC(1) MSC(2)

BSC(1)

BTS(1) BTS(2) BTS(3) BTS(4) BTS(5) BTS(6) BTS(7)

Rehoming Scenarios
BSC Rehoming Parent MGW changes
MSS(1)

MGW(1)

MGW(2)

BSC(1)

BTS(1) BTS(2) BTS(3) BTS(4) BTS(5) BTS(6) BTS(7)

Rehoming Scenarios
BSC Rehoming Parent MGW changes
MSS(1)

MGW(1)

MGW(2)

BSC(1)

BTS(1) BTS(2) BTS(3) BTS(4) BTS(5) BTS(6) BTS(7)

Rehoming Scenario
Site Rehoming Parent BSC changes
MSC(1)

BSC(1)

BSC(2)

BTS(3) BTS(4) BTS(5)

BTS(1) BTS(2) BTS(3) BTS(4) BTS(5) BTS(6) BTS(7)

Rehoming Scenario
Site Rehoming Parent BSC changes
MSC(1)

BSC(1)

BSC(2)

BTS(3) BTS(4) BTS(5) BTS(1) BTS(2)

BTS(3) BTS(4) BTS(5) BTS(6) BTS(7)

Why spend on Rehoming?


Switch capacity BSC capacity Upgraded technology Border optimization Performance degradation

Switch Capacity Overloaded


BSC rehomed from MSS42\\MGW04 to MSS54\\MGW06 Avoid chocking in switch A requirement from NSS

BSC Capacity Overloaded


49 sites rehomed from IAB003_BSC1 and IAB003_BSC3 to IAB004_BSC2 (S12)

BSC3i-600
600TRXs 4500Erlangs 124E1s upgradable to 252

BSC3i-2000
2000TRXs 12000Erlangs 378E1s

Upgraded Technology
Shorter setup time Shorter routing path Speech perception Pool structure possible

Upgraded Technology

Border Optimization
BSC CP Load MSC CP Load Extra Location Updates Inter BSC HO delay KPIs degradation Bad design

Border Optimization

Border Optimization

Performance Degradation
Mismatch of BSC and MSC definitions Sudden degradation of statistics

Performance Monitoring
Drive Testing Statistical monitoring

Drive Testers Check List


Inter BSC HO (both directions on all borders) Inter MSC HO (both directions on all borders) Intra cell HO (900 to 1800 and 1800 to 900) Call drops Call setup time Inter cell HO Location updates (both directions on all borders) Speech codecs (AMR, Non AMR) GPRS/EDGE Calls from HOME PLMN to other PLMNs and vice versa Emergency calls Route verification Subscriber distribution in VLRs (if pool activated)

Statistical Performance Monitoring


Routine checks of all KPIs

Phase 5 Plan
IPW104_BSC2 IJL005_BSC3 IPW023_BSC2 IPW104_BSC1 LGT100_BSC2 IPW023_BSC1 IAB004_BSC2 IAB004_BSC1, IAB003_BSC3, IIB103_BSC2 IAB003_BSC1 IPW751_BSC3 (28/38) IIB213_BSC1 IRP310_BSC2 IRP606_BSC1 IPW751_BSC2