UNDERGROUND CIVIL WORKS 6838-01-09-41-0003 Rev. 0
STRATEGIC STORAGE OF CRUDE OIL
Page 1 of 5
PROJECT, VISAKHAPATNAM
1.0 COMMUNICATION
1.1 GENERAL
1. Letter
2. Facsimile
3. E-mail communication
4. Transmittals
5. Minutes of Meeting
EL-ES / 6838/ L / /
2. Job No.
NOTE-A
L LETTER
F FACSIMILE
DT DOCUMENT TRANSMITTAL
E E-MAIL
NOTE-B
IH OWNER (HO)
IS OWNER (SITE)
EL PMC (HO)
CL CONTRACTOR (HO)
FOR OWNER
CONTRACTORS
All letters from CONTRACTOR’s office shall follow and use the prefixes as
given above with their own numbering system.
1.7 All draft press release, information hand outs and photographs for
publication relating to the contract shall be submitted for review and
approval of owner prior to release.