We have to start with ….Our projects are mainly onsite and offshore model projects.

In
this project we have one staging area in between source to target databases. In some
project they won’t use staging area’s. Staging area simplify the process..

Architecture
Analysis Requirement Gathering Design Development  Testing  Production

Analysis and Requirement Gathering: Output :Analysis Doc, Subject Area


100% in onsite,
Business Analyst, project manager.
Gather the useful information for the DSS and indentifying the subject areas, identify the
schema objects and all..
Design: Output: Technical Design Doc’s, HLD, UTP
ETL Lead, BA and Data Architect
80% onsite .( Schema design in Erwin and implement in database and preparing the
technical design document for ETL.
20% offshore: HLD & UTP
Based on the Technical specs.. developers has to create the HLD(high level design) it will
have he Informatica flow chart. What are the transformation required for that mapping.
In some companies they won’t have HLD. Directly form technical specs they will create
mappings. HLD will cover only 75% of requirement.
UTP Unit Test Plan.. write the test cases based on the requirement. Both positive and
negative test cases.

Development : output : Bugs free code, UTR, Integration Test Plan


ETL Team and offshore BA
100% offshore
Based on the HLD. U have to create the mappings. After that code review and code
standard review will be done by another team member. Based on the review comments u
have to updated the mapping. Unit testing based on the UTP. U have to fill the UTP and
Enter the expected values and name it as UTR (Unit Test Results). 2 times code review
and 2 times unit testing will be conducted in this phase. Migrating to testing repository
Integration test plan has to prepare by the senior people.

Testing : Output: ITR, UAT, Deployment Doc and User Guide


Testing Team, Business Analyst and Client.
80% offshore
Based on the integration test plan testing the application and gives the bugs list to the
developer. Developers will fix the bugs in the development repository and again migrated
to testing repository. Again testing starts till the bugs free code.
20% Onsite
UAT User Accept Testing. Client will do the UAT.. this is last phase of the etl project. If
client satisfy with the product .. next deployment in production environment.

Production:
50% offshore 50% onsite
Work will be distributed between offshore and onsite based on the run time of the
application. Mapping Bugs needs to fix by Development team. Development team will
support for warranty period of 90 days or based on agreement days..

In ETL projects Three Repositorys. For each repository access permissions and location
will be different.
Development : E1
Testing : E2
Prduction : E3