this project we have one staging area in between source to target databases. In some
project they won’t use staging area’s. Staging area simplify the process..
Architecture
Analysis Requirement Gathering Design Development Testing Production
Production:
50% offshore 50% onsite
Work will be distributed between offshore and onsite based on the run time of the
application. Mapping Bugs needs to fix by Development team. Development team will
support for warranty period of 90 days or based on agreement days..
In ETL projects Three Repositorys. For each repository access permissions and location
will be different.
Development : E1
Testing : E2
Prduction : E3