Inspection and Test Plan : BACKFILLING

Form No. QCF/ITP/01 Date : SEP. 2006 LEGEND AP = APPROVAL H = Hold Point Activity No. 1 Activity Description Supplier Approval Method Statement (M/S) 1 2 3 4 Sample approval Leveling of layer Compaction of backfilling Anti-termite treatment M = Monitoring Revision : Serial No. S = Surveillance 02 01 Page No. : Issue No. : 1 of 1

IR = Inspection Request TC = Test Certificate required Verifying Document Tech. Submittal Tech. Submittal Mat. Submittal IR IR Approved M/S & Approved Supplier / Applicator Frequency Once Once Once Each Layer Each Layer Backfilling Top Layer Inspected By Sub Contractor H H H H TC H QC M M AP AP AP AP AP AP AP AP AP

Contract Document Reference Nil Nil Nil Nil Nil Part. Specs Clause 27.0

Acceptance Criteria D.M. Accreditation & Prequalification Approval of supplier / applicator TC Survey Report TC Demo by specialist & Approved M/S