This document is a preventative maintenance checklist for a moulding machine. It lists items in the hydraulic, electrical, mechanical, and cooling systems that should be checked and any necessary adjustments, changes, or repairs recorded. The checklist tracks the machine number, month, status of each item, comments, date of any changes made, quantity of items repaired, and the names of the repair technician and approver.
This document is a preventative maintenance checklist for a moulding machine. It lists items in the hydraulic, electrical, mechanical, and cooling systems that should be checked and any necessary adjustments, changes, or repairs recorded. The checklist tracks the machine number, month, status of each item, comments, date of any changes made, quantity of items repaired, and the names of the repair technician and approver.
Copyright:
Attribution Non-Commercial (BY-NC)
Available Formats
Download as XLS, PDF, TXT or read online from Scribd
This document is a preventative maintenance checklist for a moulding machine. It lists items in the hydraulic, electrical, mechanical, and cooling systems that should be checked and any necessary adjustments, changes, or repairs recorded. The checklist tracks the machine number, month, status of each item, comments, date of any changes made, quantity of items repaired, and the names of the repair technician and approver.
Copyright:
Attribution Non-Commercial (BY-NC)
Available Formats
Download as XLS, PDF, TXT or read online from Scribd
M/C NO : X = NG = OK Month : AD = Adjustment CH = Change ITEM DESCRIPTION STATUS COMMENTS 1 HYDRAULIC a. Oil filter b. Hidraulic oil c. Selenoid valve d. Pressure gauge e. Main pressure f. Oil seal / O-ring g. Rubber hose 2 ELECTRICAL a. Relay b. Timer c. Switch d. Safety / Sensor e. Emergency stop f. PLC g. PCB board h. Contactor I. Motor j. Counter k. Work light l. Heater - Heater band - Temperature Control - Termo couple - Contactor 3 MECHANICAL a. Screw and nuts b. Paking c. Greasing d. Lubrication e. Bearing 4 COOLING a. Heat exchanger b. Valve c. Rubber hose d. Cooling screw barrel
Date Changes / Modification Qty Repaired by Approved By