Energy Systems

Installation and Commissioning OUTDOOR DC POWER SYSTEMS ODPS 1200B-48-4 MPS

odps 1200b-48-4_mps_en_01.doc 2006-09-05

Energy Systems
INSTALLATION AND COMMISSIONING ODPS 1200B-48-4 MPS

TABLE OF CONTENTS 1 DOCUMENT INFORMATION ........................................................................................5 1.1 2 Version control...................................................................................................5

INSTALLATION.............................................................................................................7 2.1 2.2 Before you begin ...............................................................................................7 Unpacking the system .......................................................................................7

3 4

SYSTEM CONFIGURATION .........................................................................................8 INSTALLATION...........................................................................................................10 4.1 4.2 4.2.1 4.2.2 4.2.3 4.2.4 4.2.5 4.2.6 System cabinet ................................................................................................10 Electrical connections......................................................................................10 Grounding........................................................................................................10 AC input -connection .......................................................................................11 DC outputs -connection ...................................................................................12 Alarm connection.............................................................................................13 Battery connections .........................................................................................13 Rectifiers installation........................................................................................13

COMMISSIONING .......................................................................................................14 5.1 Starting up the system.....................................................................................14

2006-09-05

Energy Systems
INSTALLATION AND COMMISSIONING ODPS 1200B-48-4 MPS

This page is intentionally left blank.

2006-09-05

Energy Systems
INSTALLATION AND COMMISSIONING ODPS 1200B-48-4 MPS

1 1.1

DOCUMENT INFORMATION Version control


Document number ODPS 1200B-484_MPS_en_01.doc Previous version Document description ODPS 1200B-48-4 MPS DC Power Supply System, Installation and Commissioning Description of changes

Controlled by Andrzej Chaberek

Date 2006-09-05

2006-09-05

Energy Systems
INSTALLATION AND COMMISSIONING ODPS 1200B-48-4 MPS

This page is intentionally left blank.

2006-09-05

Energy Systems
INSTALLATION AND COMMISSIONING ODPS 1200B-48-4 MPS

2 2.1

INSTALLATION Before you begin


Step 1. Step 2. Step 3. Ensure that you have all the equipment needed to make a proper installation of the system. Also ensure that grounding terminals, AC-distributions are properly available. Take care that the regulations of IEC 60364 and CENELEC HD384 concerning installation and assembling of telecommunication and electrical equipment have been noticed. The local regulations and special instructions must also be noticed during the work. When choosing the place of the installation please notice that the cooling air must flow without restrictions through the ventilation holes. The system must have enough space in front of it for operation and service functions. Notice the direction of the cabling and the required space of the other equipment.

2.2

Unpacking the system


Step 1 Step 2 Step 4. Check that the received cargo is according to the packing list. Ensure that the cabinet and the equipment are not damaged during transportation. Check that proper documents are delivered with the system and necessary contact information for technical support is included.

2006-09-05

Energy Systems
INSTALLATION AND COMMISSIONING ODPS 1200B-48-4 MPS

SYSTEM CONFIGURATION

Figure 1.

System from the front.

2006-09-05

Energy Systems
INSTALLATION AND COMMISSIONING ODPS 1200B-48-4 MPS

Figure 2.

AC distribution (the cover removed).

2006-09-05

Energy Systems
INSTALLATION AND COMMISSIONING ODPS 1200B-48-4 MPS

4 4.1

INSTALLATION System cabinet


Step 1 Step 2 Set the system cabinet standing in its place and straighten it if needed by adjusting the base. Fasten the plinth of the cabinet to the ground base with the four screws (M12). The dimension of the fixing holes are shown bellow:

Figure 3.

The plinth of the cabinet and dimensioning of fixing screws (holes).

4.2

Electrical connections
Remove the front cover from the AC distribution Note! Check if the all appropriate protection elements to supply the system in the AC site main distribution are switched OFF.

4.2.1 Grounding
Connect the protective-grounding terminal of the cabinet mechanics to the main grounding bus bar of the site by proper cable. Step 1 Step 2 Bring in the PE cable through input sleeve packing on the back of the cabinet so that there is enough length to make the connections Connect the PE cable to the protective-grounding terminal of the cabinet

10

2006-09-05

Energy Systems
INSTALLATION AND COMMISSIONING ODPS 1200B-48-4 MPS

Figure 4.

The cabinet protective grounding terminal (PE)

4.2.2 AC input -connection


Below in the table 1 are the recommended mains fuse sizes for the protection of the supply line and cable cross sections for 1 phase AC input. 1 phase AC-connection Mains fuse Cable Table 1. Step 1 1 x 25 A 3 x 4 mm2 AC-input recommendation for ODPS 1200-48-4 MPS outdoor. Bring in the AC input and output cables through input sleeves packing on the back of the cabinet so that there is enough length to make the connections. To make this easier you could open the side doors (left and/or right). For that two screws in each side (accessible from the front) have to be unscrewed. Connect AC input cables PE cable to the PE terminal, phase cable (L) to the phase connection and the neutral (N) cable to the N-connection of the input MCB breaker F0 in the AC distribution (Figure 5)

Step 2

2006-09-05

11

Energy Systems
INSTALLATION AND COMMISSIONING ODPS 1200B-48-4 MPS

Figure 5. Note!

The cables connection. Check the AC-connections from the wiring diagram and the illustration of AC-connections to the system attached to this user manual.

4.2.3 DC outputs -connection


Step 1 Bring in the DC output cables through input sleeves packing on the back of the cabinet so that there is enough length to make the connections. To make this easier you could open the side doors (left and/or right). For that two screws in each side (accessible from the front) have to be unscrewed. Connect DC output cables - minus cable (-) to terminal of the load circuit breaker 1F1...1F4, plus to plus bus bar (see user manual for DPS 1200B system)

Step 2

12

2006-09-05

Energy Systems
INSTALLATION AND COMMISSIONING ODPS 1200B-48-4 MPS

4.2.4 Alarm connection


Step 3 Bring in the alarm output cables through input sleeves packing on the back of the cabinet so that there is enough length to make the connections. To make this easier you could open the side doors (left and/or right). For that two screws in each side (accessible from the front) have to be unscrewed. Connect alarm output cables to alarms terminals (Figure 5). Connections between user alarm terminals and alarm connectors of PSC1 controller board is presented bellow:

Step 4

Alarm terminals (distribution) 1 2 3 4 5 6

Alarms

Relay contacts (normal state without alarms) NC

Output terminals on the PSC1 DO1-1 DO1-2 DO1-3 DO2-1 DO2-2 DO2-3

UA Urgent alarm

C NO NC

NUA Not urgent alarm

C NO

4.2.5

Battery connections
Step 1 Step 2 Step 3 Make sure that batteries circuits breakers BF11 and BF12 in DPS 1200B-48-4 power system are in the OFF-position Install the batteries on their shelves. Connect the internal battery cables so that the total nominal voltage of each battery string is 48 V. Connect the systems pre-installed battery connection, cable marked as + to the free plus-pole of the battery string and the cable marked as - to the free negative pole. The battery strings are numbered according to the battery fuse it is connected to.

Fasten the all cables to the cable supporter behind AC distribution in the cabinet Install the front cover from the AC distribution on their position.

4.2.6

Rectifiers installation
Step 1 Install the DPR 1200B -48 rectifiers in the DPS 1200B-48-4 power system (see details in DPS 1200B-48-4 user manual)

2006-09-05

13

Energy Systems
INSTALLATION AND COMMISSIONING ODPS 1200B-48-4 MPS

5 5.1

COMMISSIONING Starting up the system


Taking the system into use is presented below step-by-step. Step 1 Step 2 Step 3 Step 4 Step 5 Step 6 Step 7 Step 8 Step 9 Check that the all connections are made according to the installation instructions and the wiring diagram. Check that the all circuit breakers in AC distribution and DPS 1200B-484 system are in OFF-position. Power on the outdoor system by switching ON the appropriate switch in the AC site distribution. Power on the DPS 1200B-48-4 system by switching ON the circuit breaker F0 Switch ON the batteries circuits breakers BF11 and / or BF12 in DPS 1200B-48-4 system Check if DPS 1200B-48-4 system work properly (see details in DPS 1200B-48-4 user manual) Power on the output loads by switching ON the 1F1 1F4 output circuit breakers accordingly Start the Air Conditioner by switching on the circuit breaker FAC Check if Air Conditioner work properly (see details in air conditioner user manual the factory setting for the start cooling temperature is 25 C)

14

2006-09-05