INSTALLATION AND COMMISSIONING ODPS 1200B-48-4 MPS
INSTALLATION.............................................................................................................7 2.1 2.2 Before you begin ...............................................................................................7 Unpacking the system .......................................................................................7
3 4
SYSTEM CONFIGURATION .........................................................................................8 INSTALLATION...........................................................................................................10 4.1 4.2 4.2.1 4.2.2 4.2.3 4.2.4 4.2.5 4.2.6 System cabinet ................................................................................................10 Electrical connections......................................................................................10 Grounding........................................................................................................10 AC input -connection .......................................................................................11 DC outputs -connection ...................................................................................12 Alarm connection.............................................................................................13 Battery connections .........................................................................................13 Rectifiers installation........................................................................................13
2006-09-05
Energy Systems
INSTALLATION AND COMMISSIONING ODPS 1200B-48-4 MPS
2006-09-05
Energy Systems
INSTALLATION AND COMMISSIONING ODPS 1200B-48-4 MPS
1 1.1
Date 2006-09-05
2006-09-05
Energy Systems
INSTALLATION AND COMMISSIONING ODPS 1200B-48-4 MPS
2006-09-05
Energy Systems
INSTALLATION AND COMMISSIONING ODPS 1200B-48-4 MPS
2 2.1
2.2
2006-09-05
Energy Systems
INSTALLATION AND COMMISSIONING ODPS 1200B-48-4 MPS
SYSTEM CONFIGURATION
Figure 1.
2006-09-05
Energy Systems
INSTALLATION AND COMMISSIONING ODPS 1200B-48-4 MPS
Figure 2.
2006-09-05
Energy Systems
INSTALLATION AND COMMISSIONING ODPS 1200B-48-4 MPS
4 4.1
Figure 3.
4.2
Electrical connections
Remove the front cover from the AC distribution Note! Check if the all appropriate protection elements to supply the system in the AC site main distribution are switched OFF.
4.2.1 Grounding
Connect the protective-grounding terminal of the cabinet mechanics to the main grounding bus bar of the site by proper cable. Step 1 Step 2 Bring in the PE cable through input sleeve packing on the back of the cabinet so that there is enough length to make the connections Connect the PE cable to the protective-grounding terminal of the cabinet
10
2006-09-05
Energy Systems
INSTALLATION AND COMMISSIONING ODPS 1200B-48-4 MPS
Figure 4.
Step 2
2006-09-05
11
Energy Systems
INSTALLATION AND COMMISSIONING ODPS 1200B-48-4 MPS
Figure 5. Note!
The cables connection. Check the AC-connections from the wiring diagram and the illustration of AC-connections to the system attached to this user manual.
Step 2
12
2006-09-05
Energy Systems
INSTALLATION AND COMMISSIONING ODPS 1200B-48-4 MPS
Step 4
Alarms
Output terminals on the PSC1 DO1-1 DO1-2 DO1-3 DO2-1 DO2-2 DO2-3
UA Urgent alarm
C NO NC
C NO
4.2.5
Battery connections
Step 1 Step 2 Step 3 Make sure that batteries circuits breakers BF11 and BF12 in DPS 1200B-48-4 power system are in the OFF-position Install the batteries on their shelves. Connect the internal battery cables so that the total nominal voltage of each battery string is 48 V. Connect the systems pre-installed battery connection, cable marked as + to the free plus-pole of the battery string and the cable marked as - to the free negative pole. The battery strings are numbered according to the battery fuse it is connected to.
Fasten the all cables to the cable supporter behind AC distribution in the cabinet Install the front cover from the AC distribution on their position.
4.2.6
Rectifiers installation
Step 1 Install the DPR 1200B -48 rectifiers in the DPS 1200B-48-4 power system (see details in DPS 1200B-48-4 user manual)
2006-09-05
13
Energy Systems
INSTALLATION AND COMMISSIONING ODPS 1200B-48-4 MPS
5 5.1
14
2006-09-05