You are on page 1of 29

South Pars Gas Field Development Phases 15&16 Onshore Facilities

Doc Title : LIST OF EQUIPMENT UNIT-100


Doc. Number : EL-1516-100-P312-001 Rev.: 2

Pars Oil and Gas Company Class: 1

LEGEND
(A): (B): (C): (D): (E): (F), (G): (H): Internal Diameter (L*I) in meters Revision Index (I): Height between tangent lines in meters Item (J): Material: CS or LTCS + CA mm (Corrosion Allowance), Designation of the Item Number of items SS, 316L, 304L, TI (Titanium), AL (Aluminum) Total number of equipment (K): Design pressure (Barg) Suction / Discharge for pumps Main and Second Criteria per piece Shell / Tube for exchangers If necessary, value will be given as follow: x*value per piece 3 In / Bottom or Out / Top Design Flowrate (m /h) Rated Installed Power (kw) (L): Design temperature Exchanger Surface Area (m 2) Same as point (k) Duty (kw) (M): Type 3 Volume (m ) H: Horizontal or V: Vertical T: Turbine, M: Motor or D: Diesel, P: Pneumatic Bare tube area (m2); only for areorefrigerant Centrifugal Pump Head at rated capacity (m) Centrifugal (C), Dosing (Dos) for dosing pumps Reciprocating / Dosing Pump Differential Pressure (bar) Exchanger Type(TEMA) Others: trays type (valve, random) (N): Design case for exchangers S: summer case W: winter case PW: winter-packed sealine case Power Pe: estimated absorbed

shaft power
Pi: installed power

NOTES
1) Steam out to be considered:150C/ATM 2) Full Vacuum to be considered at the temperature of 5C 3) By mechanical department 4) To be finalized during detail engineering. 5) Flow rate to be confirmed based on corrosion inhibitor requirement.
This document is the property of N.I.O.C.. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.

NARGAN

Page 3 of 6

South Pars Gas Field Development Phases 15&16 Onshore Facilities


Doc Title : LIST OF EQUIPMENT UNIT-100
Doc. Number : EL-1516-100-P312-001 Rev.: 2

Pars Oil and Gas Company Class: 1

ITEM LIST
Phase 15 Phase 16

100-A-101 100-D-101 100-D-102 100-D-103 100-D-104 100-DH-103 100-E-101 100-P-101 100-P-102 A/B 100-P-103 A/B 100-P-104 A/B/C 100-X-101 100-U-101
100-D-105 100-P-105

LP Steam Condenser High Pressure Separator High Pressure Separator Sump Drum Steam Condensate Surge Drum Sump Drum Heater Gas Heater Sump Pump Steam Condensate Pumps Slug Catcher MEG Injection Pumps HP Separator MEG Injection Pumps Slug Catcher Methanol Injection Package
Methanol Storage Drum Methanol Injection Pump

100-A-201 100-D-201 100-D-202 100-D-203 100-D-204 100-DH-203 100-E-201 100-P-201 100-P-202 A/B 100-P-203 A/B 100-P-204 A/B/C 100-X-201 100-U-201
100-D-205 100-P-205

LP Steam Condenser High Pressure Separator High Pressure Separator Sump Drum Steam Condensate Surge Drum Sump Drum Heater Gas Heater Sump Pump Steam Condensate Pumps Slug Catcher MEG Injection Pumps HP Separator MEG Injection Pumps Slug Catcher Methanol Injection Package
Methanol Storage Drum Methanol Injection Pump

This document is the property of N.I.O.C.. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.

NARGAN

Page 4 of 6

South Pars Gas Field Development Phases 15&16 Onshore Facilities


Doc Title : LIST OF EQUIPMENT UNIT-100
Doc. Number : EL-1516-100-P312-001
DESIGNATION OF ITEM No of ITEM No of Equi. Total Main CRITERIA Second CRITERIA Diam. L. x I. (m) (H)
2

Pars Oil and Gas Company Rev.: 2


T.L. H (m) (I) Material (4) Shell Casing Tube Impeller (J) CS+3mm on Header Design Pressure Shell In/Btm (bar g) (K) 2 (2) Tube Out/Top (bar g) Design Temp Shell In/Btm (C) Tube Out/Top (C) (L) 135 (1) Type Remarks

Class: 1

REV.

ITEM

(A) 1

(B) 100-A-101

( C) LP Steam Condenser

(D) 1

(E) 2

(F) 2141kW

( G) 68.6 m

(M) Air Cooler

(N) Design case: PW

1 1 1 1 1

100-D-101 100-D-102 100-D-103 100-D-104 100-D-105

High Pressure Separator High Pressure Separator Sump Drum Steam Condensate Surge Drum Methanol Storage Drum

1 1 1 1 1

2 2 2 2 2

65.4 m 65.4 m 28.2 m 7.2 m 5 m

3.2 3.2 2.25 1.4

6.0 6.0 6.3 4.2

LTCS + SS clad (TP 321) LTCS + SS clad (TP 321) SS (AISI 304 L) CS+3 mm CS+3 mm

82 (2) 82 (2) 14 (2) 2.0 (2) 3.5 (2)

-46/85 (1) -46/85 (1) -58/55 (1) 135 (1) 85

V V H H V Included in 100-U-101

100-DH-103

Sump Drum Heater

Electric Heater

Included in 100-D-103

100-E-101

Gas Heater

19900 kW

201.6 m

CS + 3 mm

SS 304L

8 (2)

82 (2)

270

-46/85 (1)

BEM

Design case: PW - W

100-P-101

Sump Pump Steam Condensate Pumps Slug Catcher MEG Injection Pumps HP Separator MEG Injection Pumps Methanol Injection Pump

15 m/h

96 m

(3)

(3)

25

55

Centr. Vertical Submerged Centri. Hrizontal Reciprocatin g / Dosing Reciprocatin g / Dosing Reciprocatin g / Dosing

Pe=6.1 kW

1 1

100-P-102 A/B 100-P-103 A/B 100-P-104 A/B/C 100-P-105

2 2

4 4

39.5 m/h 3 m/h (5)

66.8 m DP=79.9 / 107.9bar DP=66.7 / 79.9bar DP=81 bar

(3) (3)

(3) (3)

11.5 136

135 85

Pe=16.4 kW Pe: by vendor

1 m/h

(3)

(3)

102.3

85

Pe: by vendor

1.5 m/h

90

85

included in 100-U-101

100-X-101

Slug Catcher

2000 m

646"

CS+3 mm

139

-29/85

Finger

This document is the property of N.I.O.C.. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.
NARGAN

Page 5 of 6

South Pars Gas Field Development Phases 15&16 Onshore Facilities


Doc Title : LIST OF EQUIPMENT UNIT-100
Doc. Number : EL-1516-100-P312-001
Diam. L. x I. (m) (H) T.L. H (m) (I) Material (4) Shell Casing (J) Tube Impeller Design Pressure Shell In/Btm (bar g) (K) Tube Out/Top (bar g)

Pars Oil and Gas Company Rev.: 2


Design Temp Shell In/Btm (C) Tube Out/Top (C) (L) Type Remarks

Class: 1

REV.

ITEM

DESIGNATION OF ITEM

No of ITEM

No of Equi. Total

Main CRITERIA

Second CRITERIA

(A) 1

(B) 100-U-101

( C) Methanol Injection Package

(D) 1

(E) 2

(F)

( G)

(M)

(N)

Each of the two packages consists of:

-one Methanol Storage Drum (100-D-105) -one Methanol Injection Pump (100-P-105)

This document is the property of N.I.O.C.. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.
NARGAN

Page 6 of 6

South Pars Gas Field Development Phases 15&16 Onshore Facilities


Doc Title : LIST OF EQUIPMENT UNIT-102
Doc. Number : EL-1516-102-P312-001

Pars Oil and Gas Company Rev.: 0 Class: 1

ITEM LIST Common for all six MEG Regeneration Packages


102-A-102 102-D-105 102-D-106 A/B 102-D-107 102-F-103 A/B 102-F-104 102-P-102 A/B/C 102-P-103 A/B 102-P-104 102-P-105 A/B 102-P-106 A/B 102-P-110 102-T-101 A/B 102-T-102 A/B 102-U-102
102-T-103 102-P-109 A/B

LP Steam Condenser MEG Sump Drum Rich MEG Flash Drums Steam Condensate Surge Drum Lean MEG Filters Lean MEG Feed Filter MEG Injection Pumps Lean MEG Booster Pumps MEG Sump Pump Rich MEG Pumps Steam Condensate Pumps Lean MEG Feed Pump Lean MEG Storage Tanks Rich MEG Storage Tanks
PH Control Package Storage tank Injection pumps

102-U-101
102-A-101 102-C-101 102-D-101 102-D-102 102-D-103 102-E-101 102-F-101 A/B 102-F-102 102-P-101 102-P-107

MEG Regeneration Package


External reflux condenser Still column Glycol flash drum Glycol reboiler Reflux drum Rich/lean MEG exchanger Rich glycol filters Charcoal filter Reflux pump Glycol export pump

102-U-201
102-A-201 102-C-201 102-D-201 102-D-202 102-D-203 102-E-201 102-F-201 A/B 102-F-202 102-P-201 102-P-207

MEG Regeneration Package


External reflux condenser Still column Glycol flash drum Glycol reboiler Reflux drum Rich/lean MEG exchanger Rich glycol filters Charcoal filter Reflux pump Glycol export pump

102-U-103
102-T-104 102-P-111 A/B/C/D/E/F

Corrosion Inhibitor Package


Storage tank Injection pumps

102-U-104
102-T-105 102-P-112 A/B/C/D/E/F

Antifoam Package
Storage tank Injection pumps

This document is the property of N.I.O.C.. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.

NARGAN

Page 4 of 8

South Pars Gas Field Development Phases 15&16 Onshore Facilities


Doc Title : LIST OF EQUIPMENT UNIT-102
Doc. Number : EL-1516-102-P312-001

Pars Oil and Gas Company Rev.: 0 Class: 1

ITEM LIST
102-U-301
102-A-301 102-C-301 102-D-301 102-D-302 102-D-303 102-E-301 102-F-301 A/B 102-F-302 102-P-301 102-P-307

MEG Regeneration Package


External reflux condenser Still column Glycol flash drum Glycol reboiler Reflux drum Rich/lean MEG exchanger Rich glycol filters Charcoal filter Reflux pump Glycol export pump

102-U-501
102-A-501 102-C-501 102-D-501 102-D-502 102-D-503 102-E-501 102-F-501 A/B 102-F-502 102-P-501 102-P-507

MEG Regeneration Package


External reflux condenser Still column Glycol flash drum Glycol reboiler Reflux drum Rich/lean MEG exchanger Rich glycol filters Charcoal filter Reflux pump Glycol export pump

102-U-401
102-A-401 102-C-401 102-D-401 102-D-402 102-D-403 102-E-401 102-F-401 A/B 102-F-402 102-P-401 102-P-407

MEG Regeneration Package


External reflux condenser Still column Glycol flash drum Glycol reboiler Reflux drum Rich/lean MEG exchanger Rich glycol filters Charcoal filter Reflux pump Glycol export pump

102-U-601
102-A-601 102-C-601 102-D-601 102-D-602 102-D-603 102-E-601 102-F-601 A/B 102-F-602 102-P-601 102-P-607

MEG Regeneration Package


External reflux condenser Still column Glycol flash drum Glycol reboiler Reflux drum Rich/lean MEG exchanger Rich glycol filters Charcoal filter Reflux pump Glycol export pump

This document is the property of N.I.O.C.. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.

NARGAN

Page 5 of 8

South Pars Gas Field Development Phases 15&16 Onshore Facilities


Doc Title : LIST OF EQUIPMENT UNIT-102
Doc. Number : EL-1516-102-P312-001
DESIGNATION OF ITEM No of ITEM No of Equi. Total Main CRITERIA Second CRITERIA Diam. L. x I. (m) (H) T.L. H (m) (I) Material (4) Shell Casing (J) Tube Impeller Design Pressure Shell In/Btm (bar g) (K) Tube Out/Top (bar g)

Pars Oil and Gas Company Rev.: 0


Design Temp Shell In/Btm (C) (L) Tube Out/Top (C) Type Remarks

Class: 1

REV.

ITEM

(A) 0

(B) 102-A-101

( C) External reflux condenser LP Steam Condenser

(D) 1

(E) 6

(F)

( G)

(M)

(N) Included in 102-U-101 - 601

102-A-102

4090 kW

CS + 3 mm

2 (2)

135 (1)

Air Cooler

102-C-101

Still column

Included in 102-U-101 - 601

102-D-101

Glycol flash drum

Included in 102-U-101 - 601 Included in 102-U-101 - 601 Included in 102-U-101 - 601 28.1 m 2.25 6.3 CS + Coating + 3 mm 3.5 (2) 155 (1) H

102-D-102

Glycol reboiler

102-D-103

Reflux drum

102-D-105

MEG Sump Drum

102-D-106 A/B

Rich MEG Flash Drums Steam Condensate Surge Drum

13.6 m

1.85

4.45

CS + 3 mm

3.5 (2)

85 (1)

102-D-107

19.1 m

5.4

CS + 3 mm

2 (2)

135 (1)

102-E-101

Rich/lean MEG exchanger

Included in 102-U-101 - 601

0 0 0

102-F-101 A/B 102-F-102 102-F-103 A/B

Rich glycol filters Charcoal filter Lean MEG Filters

2 1 2

12 6 2 44 m/h CS + 3 mm 6.5 85 Cartridge

Included in 102-U-101 - 601 Included in 102-U-101 - 601

This document is the property of N.I.O.C.. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.
NARGAN

Page 6 of 8

South Pars Gas Field Development Phases 15&16 Onshore Facilities


Doc Title : LIST OF EQUIPMENT UNIT-102
Doc. Number : EL-1516-102-P312-001
DESIGNATION OF ITEM No of ITEM No of Equi. Total Main CRITERIA Second CRITERIA Diam. L. x I. (m) (H) T.L. H (m) (I) Material (4) Shell Casing (J) CS + 3 mm Tube Impeller Design Pressure Shell In/Btm (bar g) (K) 3.7 (5) Tube Out/Top (bar g)

Pars Oil and Gas Company Rev.: 0


Design Temp Shell In/Btm (C) (L) 85 Tube Out/Top (C) Type Remarks

Class: 1

REV.

ITEM

(A) 0

(B) 102-F-104

( C) Lean MEG Feed Filter

(D) 1

(E) 1

(F) 5 m/h

( G)

(M) Cartridge

(N)

102-P-101 102-P-102 A/B/C 102-P-103 A/B

Reflux pump

6 22 m/h DP= 210.3 bar 41.6 m 234 85 Reciprocating / Dosing Centrifugal Centr. Vertical Submerged Centrifugal Centrifugal

Included in 102-U-101 - 601 (3) (3) Pe= 257.3 kW

MEG Injection Pumps Lean MEG Booster Pumps MEG Sump Pump

44 m/h

(3)

(3)

6.5

85

Pe= 9.1 kW

102-P-104

15 m/h

54.2 m

(3)

(3)

9.2

155

Pe= 3.9 kW

0 0

102-P-105 A/B 102-P-106 A/B

Rich MEG Pumps Steam Condensate Pumps Glycol export pump

2 2

2 2

80 m/h 70 m/h

187 m 48.4 m

(3) (3)

(3) (3)

24.8 7.93

85 135

Pe= 92.4 kW Pe= 15.5 kW

102-P-107

Included in 102-U-101 - 601 Included in 102-U-102


5 m/h 53.6 m (3) (3) 7.7 85 Centrifugal Pe= 5.9 kW Included in 102-U-103 Included in 102-U-104

102-P-109 A/B

Injection pumps Lean MEG Feed Pump Injection pumps

102-P-110 102-P-111 A/B/C/D/E/F 102-P-112 A/B/C/D/E/F

Injection pumps

102-T-101 A/B

Lean MEG Storage Tanks

working capacity 1000 m3

12

11

CS + 1.5 mm

-10 / 170 mbarg + hydrostatic head

85

Fixed roof

This document is the property of N.I.O.C.. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.
NARGAN

Page 7 of 8

South Pars Gas Field Development Phases 15&16 Onshore Facilities


Doc Title : LIST OF EQUIPMENT UNIT-102
Doc. Number : EL-1516-102-P312-001
DESIGNATION OF ITEM No of ITEM No of Equi. Total Main CRITERIA Second CRITERIA Diam. L. x I. (m) (H) 12 T.L. H (m) (I) 11 Material (4) Shell Casing (J) CS + 1.5 mm Tube Impeller Design Pressure Shell In/Btm (bar g) (K) -10 / 170 mbarg + hydrostatic head Tube Out/Top (bar g)

Pars Oil and Gas Company Rev.: 0


Design Temp Shell In/Btm (C) Tube Out/Top (C) (L) 85 Type Remarks

Class: 1

REV.

ITEM

(A) 0

(B) 102-T-102 A/B

( C) Rich MEG Storage Tanks Storage tank

(D) 2

(E) 2

(F) working capacity 1000 m3

( G)

(M) Fixed roof

(N)

102-T-103

Included in 102-U-102

102-T-104

Storage tank

Included in 102-U-103

102-T-105

Storage tank

Included in 102-U-104

102-U-101

MEG Regeneration Package PH Control Package Corrosion Inhibitor Package Antifoam Package

Total capacity: 73047 Kg/h. MEG: 27758 Kg/h, water: 45289 Kg/h. 6 identical MEG regeneration packages are provided: 4x25% packages normally operating and 2 stand-by packages. Total capacity: 3.0 m3 /h.This package contains: one storage tank (102-T-103), two Injection pumps (102-P-109 A/B).

102-U-102

102-U-103

Total capacity: 6.0 l/h. (6) This package contains: one storage tank (102-T-104), six identical Injection pumps (102-P-111 A/B/C/D/E/F).

102-U-104

Total capacity: 60 l/h. (7) This package contains: one storage tank (102-T-105), six identical Injection pumps (102-P-112 A/B/C/D/E/F).

This document is the property of N.I.O.C.. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.
NARGAN

Page 8 of 8

South Pars Gas Field Development Phases 15&16 Onshore Facilities


Doc Title : LIST OF EQUIPMENT UNIT-103
Doc. Number : EL-1516-103-P312-001 Rev.: 0

Pars Oil and Gas Company Class: 1

ITEM LIST
Phase 15

103-A-101 103-A-102 103-A-103 103-A-104 103-C-101 103-D-101 103-D-102 103-D-103 103-D-105 103-D-106 103-D-107 103-D-108 103-D-109 103-D-110 103-DH-108 103-E-101 A/B 103-E-102 103-E-103 103-E-104

Stabilized Condensate Air Cooler First Stage Offgas Compressor Aftercooler Second Stage Offgas Compressor Aftercooler Stabilizer Reflux Condenser Condensate Stabiliser Preflash Drum First Stage Offgas Compressor Suction Drum Second Stage Offgas Compressor Suction Condensate Desalter Condensate Degassing Drum Stabiliser Reflux Drum Sump Drum HP Steam Condensate Flash Drum First Stage Offgas Compressor Discharge Sump Drum Heater Condensate Preflash Heaters Condensate Desalter Preheater Stabilizer Reboiler Stabilizer Side Reboiler

103-F-101A/B 103-K-101 103-P-101 A/B 103-P-102 A/B 103-P-103 A/B 103-P-104 103-P-105 A/B 103-P-108 103-U-101
103-P-106 A/B 103-T-101

Glycolated Water Filters First Stage & Second Stage Offgas Compressor Desalter Feed Pumps Stabilizer Reflux Pumps Stabilized Condensate Export Pumps Sump Drum Pump Steam Condensate Pumps Condensate Recycle Pump Demulsifier Package
Demulsifier Injection pumps Demulsifier Storage tank

103-U-102
103-P-107 A/B/C/D/E 103-T-102

Corrosion Inhibitor Package


Corrosion Inhibitor Injection pumps Corrosion Inhibitor Storage tank

This document is the property of N.I.O.C.. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.

NARGAN

Page 4 of 8

South Pars Gas Field Development Phases 15&16 Onshore Facilities


Doc Title : LIST OF EQUIPMENT UNIT-103
Doc. Number : EL-1516-103-P312-001 Rev.: 0

Pars Oil and Gas Company Class: 1

ITEM LIST
Phase 16

103-A-201 103-A-202 103-A-203 103-A-204 103-C-201 103-D-201 103-D-202 103-D-203 103-D-205 103-D-206 103-D-207 103-D-208 103-D-209 103-D-210 103-DH-208 103-E-201 A/B 103-E-202 103-E-203 103-E-204

Stabilized Condensate Air Cooler First Stage Offgas Compressor Aftercooler Second Stage Offgas Compressor Aftercooler Stabilizer Reflux Condenser Condensate Stabiliser Preflash Drum First Stage Offgas Compressor Suction Drum Second Stage Offgas Compressor Suction Drum Condensate Desalter Condensate Degassing Drum Stabiliser Reflux Drum Sump Drum HP Steam Condensate Flash Drum First Stage Offgas Compressor Discharge Drum Sump Drum Heater Condensate Preflash Heaters Condensate Desalter Preheater Stabilizer Reboiler Stabilizer Side Reboiler

103-F-201 103-K-201 103-P-201 A/B 103-P-202 A/B 103-P-203 A/B 103-P-204 103-P-205 A/B 103-P-208 103-U-201
103-P-206 A/B 103-T-201

Glycolated Water Filters First Stage & Second Stage Offgas Compressor Desalter Feed Pumps Stabilizer Reflux Pumps Stabilized Condensate Export Pumps Sump Drum Pump Steam Condensate Pumps Condensate Recycle Pump Demulsifier Package
Demulsifier Injection pumps Demulsifier Storage tank

103-U-202
103-P-207 A/B/C/D/E 103-T-202

Corrosion Inhibitor Package


Corrosion Inhibitor Injection pumps Corrosion Inhibitor Storage tank

This document is the property of N.I.O.C.. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.

NARGAN

Page 5 of 8

South Pars Gas Field Development Phases 15&16 Onshore Facilities


Doc Title : LIST OF EQUIPMENT UNIT-103
Doc. Number : EL-1516-103-P312-001
DESIGNATION OF ITEM No of ITEM No of Equi. Total Main CRITERIA Second CRITERIA Diam. L. x I. (m) (H) T.L. H (m) (I) Material (4) Shell Casing (J) CS Tube Impeller Design Pressure Shell In/Btm (bar g) (K) 12 (2) Tube Out/Top (bar g)

Pars Oil and Gas Company Rev.: 0


Design Temp Shell In/Btm (C) (L) 160 (1) Tube Out/Top (C) Type Remarks

Class: 1

REV.

ITEM

(A) 0

(B) 103-A-101

( C) Stabilized Condensate Air Cooler First Stage Offgas Compressor Aftercooler Second Stage Offgas Compressor Aftercooler Stabilizer Reflux Condenser

(D) 1

(E) 2

(F) 5960 kW

( G)

(M) Air Cooler

(N) Design case: S - PW 103-A-102 in one common bay with 103-A-103 sharing fans. Design case: W Design case: S - W

103-A-102

1750 kW

SS 321

32 (2)

150 (1)

Air Cooler

103-A-103

1920 kW

SS 321

82 (2)

150 (1)

Air Cooler

103-A-104

251 kW

SS 321

11.5 (2)

115 (1)

Air Cooler

103-C-101

Condensate Stabiliser

130.4 m

2.6

23.7

CS + 3 mm

11.8 (2)

11.5 (2)

-29/225 (1)

-29/110 (1)

Valves tray ( SS 304L)

103-D-101

Preflash Drum First Stage Offgas Compressor Suction Drum Second Stage Offgas Compressor Suction Drum Condensate Desalter Condensate Degassing Drum Stabiliser Reflux Drum Sump Drum HP Steam Condensate Flash Drum First Stage Offgas Compressor Discharge Drum

137.2 m

3.55

11.5

LTCS + 3 mm

32 (2)

-46 / +85 (1)

103-D-102

3.2 m

1.15

2.65

CS + 3 mm

11.5 (2)

105 (1)

103-D-103

11.2 m

1.6

4.5

SS 321

32 (2)

133 (1)

103-D-105

213 T/h 328 m/h 112.8m 3.5 10.5

CS + 3 mm

46.5

85

Electrostatic desalter H

Dimensions by desalter MFR

103-D-106

CS + 3 mm

3.5 (2)

102 (1)

103-D-107

6.1 m

1.3

4.15

SS 321 LTCS + COATING+ 3 mm CS + 3 mm

11.5 (2)

85 (1)

103-D-108

36.4 m

2.4

7.2

3.5 (2)

-46 / +205 (1)

103-D-109

6.9 m

1.4

8 (2)

270 (1)

103-D-110

6.4 m

1.25

4.36

SS 321

32 (2)

133 (1)

103-DH-108

Sump Drum Heater

2
This document is the property of N.I.O.C.. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.

Electric Heater

Included in 103-D-108

NARGAN

Page 6 of 8

South Pars Gas Field Development Phases 15&16 Onshore Facilities


Doc Title : LIST OF EQUIPMENT UNIT-103
Doc. Number : EL-1516-103-P312-001
DESIGNATION OF ITEM No of ITEM No of Equi. Total Main CRITERIA Second CRITERIA Diam. L. x I. (m) (H) T.L. H (m) (I) CS + 3 mm CS + 3 mm CS + 3 mm CS + 3 mm Material (4) Shell Casing (J) LTCS + 3 mm CS + 3 mm 12 (2) Tube Impeller Design Pressure Shell In/Btm (bar g) (K) 139 (2) 160 (1) Tube Out/Top (bar g)

Pars Oil and Gas Company Rev.: 0


Design Temp Shell In/Btm (C) (L) -46 / +85 Tube Out/Top (C) Type Remarks

Class: 1

REV.

ITEM

(A) 0

(B)

( C)

(D) 2

(E) 4

(F) 11020 kW

( G)

(M) NEN

(N) Design Case: PW

Condensate Preflash 103-E-101 A/B Heaters 103-E-102 Condensate Desalter Preheater Stabilizer Reboiler Stabilizer Side Reboiler

3260 kW

12 (2)

46.5 (2)

210 (1)

95 (1)

AES

Design Case PW-W

103-E-103

12030 kW

CS + 3 mm

12 (2)

55 (2)

225 (1)

330 (1)

BKU

Design Case: S-PW

103-E-104

6710 kW

CS + 3 mm

11.8 (2)

12 (2)

175 (1)

225 (1)

BXU

Design Case: S-PW

103-F-101A/B

Glycolated Water Filters

51 m/h

LTCS + 3 mm

33 (2)

-46/85 (1)

Cartidge or Basket

103-K-101

First Stage Offgas Compressor And Second Stage Offgas Compressor

14460.1 Nm/h 37245.9 Nm/h

DP = 19.1 bar

(3)

(3)

11.5

32.0

105

132

Reciprocating

Pe = 920 KW

DP = 43.9 bar

(3)

(3)

32.0

82.0

132

150

Reciprocating

Pe = 1883 KW

103-P-101 A/B Desalter Feed Pumps Stabilizer Reflux Pumps Stabilized Condensate Export Pumps Sump Drum Pump

344.2 m/h

146 m

(3)

(3)

44.1

85

Centrifugal

Pe = 153 KW

103-P-102 A/B

2.5 m/h

72 m

(3)

(3)

17.3

85

Centrifugal

Pe = 4.9 KW

103-P-103 A/B

290 m/h

151 m

(3)

(3)

18.4

102

Centrifugal

Pe = 139.4 KW

103-P-104

15 m/h

79.1 m

(3)

(3)

13.5

-46 / 175

Centr. Vertical Submerged

Pe = 9.5 KW

103-P-105 A/B

Steam Condensate Pumps Demulsifier Injection pumps Corrosion Inhibitor Injection pumps Condensate Recycle Pump

29.5 m/h

150.45 m

(3)

(3)

25.4

270

Centrifugal

Pe = 25.1 KW

103-P-106 A/B 103-P-107 A/B/C/D/E 103-P-108

Includeed In 103-U-101

10

Included In 103-U-102

160 m/h

626.4 m

(3)

(3)

48.5

102

Centrifugal

Pe = 304 KW

This document is the property of N.I.O.C.. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.
NARGAN

Page 7 of 8

South Pars Gas Field Development Phases 15&16 Onshore Facilities


Doc Title : LIST OF EQUIPMENT UNIT-103
Doc. Number : EL-1516-103-P312-001
DESIGNATION OF ITEM No of ITEM No of Equi. Total Main CRITERIA Second CRITERIA Diam. L. x I. (m) (H) T.L. H (m) (I) Material (4) Shell Casing (J) Tube Impeller Design Pressure Shell In/Btm (bar g) (K) Tube Out/Top (bar g)

Pars Oil and Gas Company Rev.: 0


Design Temp Shell In/Btm (C) Tube Out/Top (C) (L) Type Remarks

Class: 1

REV.

ITEM

(A) 0

(B) 103-T-101

( C) Demulsifier Storage tank Corrosion Inhibitor Storage tank

(D) 1

(E) 2

(F)

( G)

(M)

(N) Included In 103-U-101

103-T-102

Included In 103-U-102

103-U-101

Demulsifier Package Corrosion Inhibitor Package

Each of the two packages contains:- one Storage Tank (103-T-101);- two Injection Pumps (103-P-106 A/B), one in service and one in stand-by. Each of the two packages contains:- one Storage Tank (103-T-102);- five Injection Pumps (103-P-107 A/B/C/D/E);-spare pumps in warehouse.

103-U-102

This document is the property of N.I.O.C.. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.
NARGAN

Page 8 of 8

South Pars Gas Field Development Phases 15&16 Onshore Facilities


Doc Title : LIST OF EQUIPMENT UNIT-109
Doc. Number : EL-1516-109-P312-001 Rev.: 1 Pars Oil and Gas Company Class: 1

ITEM LIST
Common to phases 15 & 16

109-A-101 109-A-102 109-A-103 109-A-104 109-A-105 109-A-106 109-C-101 109-C-102 109-D-101 109-D-102 109-D-103 109-D-104 109-D-105 109-D-106 109-D-107 109-DH-101 109-E-101 109-E-102 109-F-101 A/B 109-F-102 A/B

First Sour Water Stripper Bottom Cooler First Sour Water Stripper Condenser Second Sour Water Stripper Bottom Cooler Second Sour Water Stripper Condenser First Steam Condensate Surge Drum Condenser Second Steam Condensate Surge Drum Condenser First Sour Water Stripper Second Sour Water Stripper First Sour Water Stripper Feed Drum Second Sour Water Stripper Feed Drum First Sour Water Stripper Reflux Drum Second Sour Water Stripper Reflux Drum First Steam Condensate Surge Drum Second Steam Condensate Surge Drum Sour Water Sump Drum Sour Water Sump Drum Heater First Sour Water Stripper Reboiler Second Sour Water Stripper Reboiler First Sour Water Filters Second Sour Water Filters

109-P-101 A/B/C/D 109-P-102 A/B 109-P-103 A/B 109-P-104 A/B 109-P-105 A/B 109-P-106 A/B 109-P-107 A/B 109-P-108 A/B 109-P-109

Sour Water Stripper Feed Pumps Slop Oil Pumps First Sour Water Stripper Bottom Pumps First Sour Water Stripper Reflux Pumps
Second Sour Water Stripper Bottom Pumps Second Sour Water Stripper Reflux Pumps

First Steam Condensate Pumps Second Steam Condensate Pumps Sour Water Sump Pump

This document is the property of N.I.O.C.. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.

NARGAN

Page 4 of 7

South Pars Gas Field Development Phases 15&16 Onshore Facilities


Doc Title : LIST OF EQUIPMENT UNIT-109
Doc. Number : EL-1516-109-P312-001
DESIGNATION OF ITEM No of ITEM No of Equi. Total Main CRITERIA Second CRITERIA Diam. L. x I. (m) (H) T.L. H (m) (I) Material (4) Shell Casing (J) SS 304L Tube Impeller Design Pressure Shell In/Btm (bar g) (K) 13 (2) Tube Out/Top (bar g)

Pars Oil and Gas Company Rev.: 1


Design Temp Shell In/Btm (C) Tube Out/Top (C) (L) 150 (1) Type Remarks

Class: 1

REV.

ITEM

(A) 1

(B)
st

( C)
1 SOUR WATER STRIPPER BOTTOM COOLER 1st SOUR WATER STRIPPER CONDENSER 2nd SOUR WATER STRIPPER BOTTOM COOLER 2nd SOUR WATER STRIPPER CONDENSER 1st STEAM COND. SURGE DRUM CONDENSER 2nd STEAM COND. SURGE DRUM CONDENSER

(D) 1

(E) 1

(F)
3320x1.1 Kw

( G) 176.3 m2

(M) Air cooler

(N) Pi=2x55 kW common for 109A-101 and 109-A-103 Pi=2x45 kW common for 109A-102/104/105/106 Pi=2x55 kW common for 109A-101 and 109-A-103 Pi=2x45 kW common for 109A-102/104/105/106 Pi=2x45 kW common for 109A-102/104/105/106 Pi=2x45 kW common for 109A-102/104/105/106

109-A-101

109-A-102

3970 Kw

116.3 m2

SS 321

3.5 (2)

148 (1)

Air cooler

109-A-103

3320x1.1 Kw

176.3 m2

SS 304L

13 (2)

150 (1)

Air cooler

109-A-104

3970 Kw

116.3 m2

SS 321

3.5 (2)

148 (1)

Air cooler

109-A-105

406x1.1 Kw

14.3 m2

CS+3mm

2 (2)

135

Air cooler

109-A-106

406x1.1 Kw

14.3 m2

CS+3mm

2 (2)

135

Air cooler

1 1

109-C-101 109-C-102

1st SOUR WATER STRIPPER 2nd SOUR WATER STRIPPER

1 1

1 1

29.6 m3 29.6 m3

1.35 1.35

20.7 20.7

Bottom up to 12.5m: CS Top: CS (SS316L clad) Bottom up to 12.5m: CS Top: CS (SS316L clad)

3.8 (2) 3.8 (2)

3.5 (2) 3.5 (2)

190 (1) 190 (1)

Packing Packing

109-D-101

1st SOUR WATER STRIPPER FEED DRUM 2nd SOUR WATER STRIPPER FEED DRUM 1st SOUR WATER STRIPPER REFLUX DRUM 2nd SOUR WATER STRIPPER REFLUX DRUM

44.9 m3

2.4

9.12

CS (SS321 cladding)

3.5 (2)

131 (1)

109-D-102

44.9 m3

2.4

9.12

CS (SS321 cladding)

3.5 (2)

131 (1)

109-D-103

2.4 m3

1.1

2.39

SS 316L

3.5 (2)

148 (1)

109-D-104

2.4 m3

1.1

2.39

SS 316L

3.5 (2)

148 (1)

This document is the property of N.I.O.C.. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.
NARGAN

Page 5 of 7

South Pars Gas Field Development Phases 15&16 Onshore Facilities


Doc Title : LIST OF EQUIPMENT UNIT-109
Doc. Number : EL-1516-109-P312-001
DESIGNATION OF ITEM No of ITEM No of Equi. Total Main CRITERIA Second CRITERIA Diam. L. x I. (m) (H) 1.1 T.L. H (m) (I) 2.2 Material (4) Shell Casing (J) CS + 3mm Tube Impeller Design Pressure Shell In/Btm (bar g) (K) 2 (2) Tube Out/Top (bar g)

Pars Oil and Gas Company Rev.:1


Design Temp Shell In/Btm (C) Tube Out/Top (C) (L) 135 (1) Type Remarks

Class: 1

REV.

ITEM

(A) 1

(B) 109-D-105

( C)
1st STEAM CONDENSATE SURGE DRUM 2nd STEAM CONDENSATE SURGE DRUM SOUR WATER SUMP DRUM

(D) 1

(E) 1

(F) 2.4 m3

( G)

(M) H

(N)

109-D-106

2.4 m3

1.1

2.2

CS + 3mm

2 (2)

135 (1)

109-D-107

22.2 m3

2.2

5.1

CS+coating+3mm

3.5(2)

148 (1)

109-DH-101

SUMP DRUM HEATER

Electric Heater

Included in 109-D-107

109-E-101

109-E-102

1st SOUR WATER STRIPPER REBOILER 2nd SOUR WATER STRIPPER REBOILER

4.7x103kW

309.3 m2

CS+ 3mm

SS 304L

5.4 (2)

8 (2)

162

270

BKU

4.7x103kW

309.3 m3

CS+ 3mm

SS 304L

5.4 (2)

8 (2)

162

270

BKU

109-F-101

1st SOUR WATER FILTERS 2nd SOUR WATER FILTERS

62 m3/h

CS+3mm

11.4 (2)

131 (1)

Cartridge or basket Cartridge or basket

109-F-102

62 m3/h

CS+3mm

11.4 (2)

131 (1)

109-P-101 A/B/C/D 109-P-102 A/B

SOUR WATER STRIPPER FEED PUMPS SLOP OIL PUMPS

31 m3/h

63.2 m

(3)

(3)

11.3

131

Centrifugal

Pe=13.3 kW

5 m3/h

25.2 m

(3)

(3)

6.1

131

Centrifugal

Pe=0.8 kW

1st SOUR WATER 109-P-103 A/B STRIPPER BTTOM PUMPS

42.5 m3/h

26.1 m

(3)

(3)

7.5

150

Centrifugal

Pe=5.2 Kw

This document is the property of N.I.O.C.. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.
NARGAN

Page 6 of 7

South Pars Gas Field Development Phases 15&16 Onshore Facilities


Doc Title : LIST OF EQUIPMENT UNIT-109
Doc. Number : EL-1516-109-P312-001
Diam. L. x I. (m) (H) T.L. H (m) (I) (3) Material (4) Shell Casing Tube Impeller (J) (3) Design Pressure Shell In/Btm (bar g) (K) 9.3 Tube Out/Top (bar g)

Pars Oil and Gas Company Rev.:1


Design Temp Shell In/Btm (C) Tube Out/Top (C) (L) 148 Type Remarks

Class: 1

REV.

ITEM

DESIGNATION OF ITEM

No of ITEM

No of Equi. Total

Main CRITERIA

Second CRITERIA

(A) 1

(B) 109-P-104 A/B

( C) 1st SOUR WATER STRIPPER REFLUX PUMPS 2nd SOUR WATER STRIPPER BTTOM PUMPS 2nd SOUR WATER STRIPPER REFLUX PUMPS 1st STEAM CONDENSATE PUMPS 2nd STEAM CONDENSATE PUMPS SOUR WATER SUMP PUMP

(D) 1

(E) 2

(F) 6.4 m3/h

( G) 46.9 m

(M) Centrifugal

(N) Pe=3.5 kW

109-P-105 A/B

42.5 m3/h

26.1 m

(3)

(3)

7.5

150

Centrifugal

Pe=5.2 kW

109-P-106 A/B

6.4 m3/h

46.9 m

(3)

(3)

9.3

148

Centrifugal

Pe=3.5 kW

109-P-107 A/B

8.4 m3/h

105.2 m

(3)

(3)

14.4

135

Centrifugal

Pe=8.4 kW

109-P-108 A/B

8.4 m3/h

105.2 m

(3)

(3)

14.4

135

Centrifugal
Centr. Vertical Submerged

Pe=8.4 kW

109-P-109

15 m3/h

55.8 m

(3)

(3)

10.3

148

Pe=3.4 kW

This document is the property of N.I.O.C.. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.
NARGAN

Page 7 of 7

South Pars Gas Field Development Phases 15&16 Onshore Facilities


Doc Title : LIST OF EQUIPMENT UNIT-110
Doc. Number : EL-1516-110-P312-001 Rev.: 1

Pars Oil and Gas Company Class: 1

ITEM LIST
Phase 15 &16

110-D-101 110-D-102 110-D-103 110-D-104 110-D-105 110-DH-105 110-E-101 A/B 110-E-102 110-E-103 110-F-101 A/B 110-P-101 110-P-102 110-P-103

Preflash Drum Flash Drum Degassing Drum


HP Steam Condensate Flash Drum

Sump Drum Sump Drum Heater Condensate Preflash Heater Condensate Second Heater Condensate Final Heater Glycolated Water Filter Stabilized Condensate Pump Steam Condensate Pump Sump Drum Pump

This document is the property of N.I.O.C.. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.

NARGAN

Page 4 of 5

South Pars Gas Field Development Phases 15&16 Onshore Facilities


Doc Title : LIST OF EQUIPMENT UNIT-110
Doc. Number : EL-1516-110-P312-001
DESIGNATION OF ITEM No of ITEM No of Equi. Total Main CRITERIA (3) (F) 129.3 m3 83.3 m3 81.0 m3 9.0 m3 Second CRITERIA Diam. L. x I. (m) (H) 3.6 3.1 3.2 1.4 T.L. H (m) (I) 11.5 10 9 5.4 Material (3) Shell Casing (J) LTCS+3mm (3) SS (TP321) (3) (*) CS+3mm (3) SS (TP321) (3) (*) CS+3mm (3) CS+3mm (3) LTCS+coating +3mm (3) SS (3) (*) SUMP DRUM HEATER Tube Impeller Design Pressure Shell In/Btm (bar g) (K) 17 (2) 5 (2) 3.5 (2) 8 (2) Tube Out/Top (bar g)

Pars Oil and Gas Company Rev.: 1


Design Temp Shell In/Btm (C) Tube Out/Top (C) (L) -46/85 (1) 205 (1) 135 (1) 270 (1) Type Remarks

Class: 1

REV.

ITEM

(A) 1 1 1 1

(B) 110-D-101 110-D-102 110-D-103 110-D-104

( C) PREFLASH DRUM FLASH DRUM DEGASSING DRUM STEAM CONDENSATE FLASH DRUM SUMP DRUM

(D) 1 1 1 1

(E) 1 1 1 1

( G)

(M) H H H V

(N) (*) Internals (*) Internals

110-D-105

29.8 m3

2.25

6.75

3.5 (2)

-46/205 (1)

(*) Internals

110-DH-105

45 kW (3)

Included in 110-D-105

110-E-101A/B

CONDENSATE PREFLASH HEATER CONDENSATE SECOND HEATER CONDENSATE FINAL HEATER GLYCOLED WATER FILTERS STABILISED CONDENSATE PUMP STEAM CONDENSATE PUMP SUMP DRUM PUMP

11021x1.1 kW

CS+ 3mm (3) CS+ 3mm (3) CS+ 3mm (3)

LTCS+ 3mm (3) CS+ 3mm (3) CS+ 3mm (3)

5 (2)

139 (2)

165 (1)

-46/85 (1)

NEN

Design case: WD

110-E-102

4301x1.1 kW

5 (2)

18 (2)

205 (1)

105 (1)

AES

Design case: S

110-E-103

17344x1.1 kW

18 (2)

55 (2)

205 (1)

330

BEU

Design case: WD

110-F-101 A/B

50.6 m3/h

LTCS+3mm (3)

18 (2)

-46/85 (1)

Cartridge or basket

110-P-101

204m3/h

90.5 m

CS+ 3mm (3) CS+ 3mm (3)

(3)

12.5

135

Centrifugal

Pe= 55.5 kW

110-P-102

35.7 m3/h

117.3 m

(3)

21.5

270

Centrifugal
Centr. Vertical Submerged

Pe= 20.9 kW

110-P-103

12.9 m3/h

158.7 m

(3)

(3)

17.6

205

Pe= 7.2 kW

This document is the property of N.I.O.C.. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.
NARGAN

Page 5 of 5

South Pars Gas Field Development Phases 15&16 Onshore Facilities


Doc Title : LIST OF EQUIPMENT UNIT-110
Doc. Number : EL-1516-110-P312-001 Rev.: 2

Pars Oil and Gas Company Class: 1

ITEM LIST
Phase 15 &16

110-D-101 110-D-102 110-D-103 110-D-104 110-D-105 110-DH-105 110-E-101 A/B 110-E-102 110-E-103 110-F-101 A/B 110-P-101 110-P-102 110-P-103

Preflash Drum Flash Drum Degassing Drum


HP Steam Condensate Flash Drum

Sump Drum Sump Drum Heater Condensate Preflash Heater Condensate Second Heater Condensate Final Heater Glycolated Water Filter Stabilized Condensate Pump Steam Condensate Pump Sump Drum Pump

This document is the property of N.I.O.C.. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.

NARGAN

Page 4 of 5

South Pars Gas Field Development Phases 15&16 Onshore Facilities


Doc Title : LIST OF EQUIPMENT UNIT-110
Doc. Number : EL-1516-110-P312-001
DESIGNATION OF ITEM No of ITEM No of Equi. Total Main CRITERIA (3) (F) 129.3 m3 83.3 m3 81.0 m3 9.0 m3 Second CRITERIA Diam. L. x I. (m) (H) 3.6 3.1 3.2 1.4 T.L. H (m) (I) 11.5 10 9 5.4 Material (3) Shell Casing (J) LTCS+3mm (3) SS (TP321) (3) (*) CS+3mm (3) SS (TP321) (3) (*) CS+3mm (3) CS+3mm (3) LTCS+coating +3mm (3) SS (3) (*) SUMP DRUM HEATER Tube Impeller Design Pressure Shell In/Btm (bar g) (K) 17 (2) 5 (2) 3.5 (2) 8 (2) Tube Out/Top (bar g)

Pars Oil and Gas Company Rev.: 2


Design Temp Shell In/Btm (C) Tube Out/Top (C) (L) -46/85 (1) 205 (1) 135 (1) 270 (1) Type Remarks

Class: 1

REV.

ITEM

(A) 2 2 3 2

(B) 110-D-101 110-D-102 110-D-103 110-D-104

( C) PREFLASH DRUM FLASH DRUM DEGASSING DRUM STEAM CONDENSATE FLASH DRUM SUMP DRUM

(D) 1 1 1 1

(E) 1 1 1 1

( G)

(M) H H H V

(N) (*) Internals (*) Internals

110-D-105

29.8 m3

2.25

6.75

3.5 (2)

-46/205 (1)

(*) Internals

110-DH-105

45 kW (3)

Included in 110-D-105

110-E-101A/B

CONDENSATE PREFLASH HEATER CONDENSATE SECOND HEATER CONDENSATE FINAL HEATER GLYCOLED WATER FILTERS STABILISED CONDENSATE PUMP STEAM CONDENSATE PUMP SUMP DRUM PUMP

11021x1.1 kW

CS+ 3mm (3) CS+ 3mm (3) CS+ 3mm (3)

LTCS+ 3mm (3) CS+ 3mm (3) CS+ 3mm (3)

5 (2)

139 (2)

165 (1)

-46/85 (1)

NEN

Design case: WD

110-E-102

4301x1.1 kW

5 (2)

18 (2)

205 (1)

105 (1)

AES

Design case: S

110-E-103

17344x1.1 kW

18 (2)

55 (2)

205 (1)

330

BEU

Design case: WD

110-F-101 A/B

50.6 m3/h

LTCS+3mm (3)

18 (2)

-46/85 (1)

Cartridge or basket

110-P-101

204m3/h

90.5 m

CS+ 3mm (3) CS+ 3mm (3)

(3)

12.5

135

Centrifugal

Pe= 55.5 kW

110-P-102

35.7 m3/h

117.3 m

(3)

21.5

270

Centrifugal
Centr. Vertical Submerged

Pe= 20.9 kW

110-P-103

12.9 m3/h

158.7 m

(3)

(3)

17.6

205

Pe= 7.2 kW

This document is the property of N.I.O.C.. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.
NARGAN

Page 5 of 5

South Pars Gas Field Development Phases 15&16 Onshore Facilities


Doc Title : LIST OF EQUIPMENT UNIT-122
Doc. Number : EL-1516-122-P312-001 Rev.: 0 Pars Oil and Gas Company Class: 1

ITEM LIST
Phases 15&16 -Train 1 Phases 15&16 -Train 2

122-D-101 A 122-D-102 A

HP Fuel Gas Drum LP Fuel Gas Drum

122-D-101 B 122-D-102 B

HP Fuel Gas Drum LP Fuel Gas Drum

This document is the property of N.I.O.C.. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.

NARGAN

Page 4 of 5

South Pars Gas Field Development Phases 15&16 Onshore Facilities


Doc Title : LIST OF EQUIPMENT UNIT-122
Doc. Number : EL-1516-122-P312-001
DESIGNATION OF ITEM No of ITEM No of Equi. Total Main CRITERIA Second CRITERIA Diam. L. x I. (m) (H) 1.5 1.2 T.L. H (m) (I) 3 2.9 Material (2) Shell Casing Tube Impeller (J) CS+3 mmCA (1) CS+3 mmCA (1) Design Pressure Shell In/Btm (bar g) (K) 31 8.5 Tube Out/Top (bar g)

Pars Oil and Gas Company Rev.: 0


Design Temp Shell In/Btm (C) Tube Out/Top (C) (L) 85 85 Type Remarks

Class: 1

REV.

ITEM

(A) 0 0

(B)

( C)

(D) 2 2

(E) 2 2

(F) 7.1 m
3

( G)

(M) V V

(N) Internals: S.S Internals: S.S

122-D-101 A/B HP Fuel Gas Drums 122-D-101 A/B HP Fuel Gas Drums

3.7 m3

This document is the property of N.I.O.C.. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.
NARGAN

Page 5 of 5

South Pars Gas Field Development Phases 15&16 Facilities


Doc Title : EQUIPMENT LIST FOR PROPANE STORAGE AND EXPORT ( UNIT 147 ) Doc. Number : EL-1516-147-P312-001

Onshore

Pars Oil and Gas Company


Rev. No.: 0 Class: 3

ITEM LIST
Common to Phasees 15 &16 147-A-101 147-D-101 A/B 147-D-102 A/B 147-D-103 A/B 147-D-104 147-D-105 147-D-106 147-D-107 147-D-108 147-D-109 147-E-101 147-E-102 147-E-103 147-E-104 147-K-101 A/B 147-K-102 A/B 147-P-101 A/B 147-P-102 147-P-103 A/B/C 147-P-104 147-P-106 147-P-107 147-P-108 147-P-109
Refrigerant Condenser Low Pressure Suction Drums Medium Pressure Suction Drums High Pressure Suction Drums Refrigerant Surge Drum Propane BOG Compressor Suction Drum Recovered Propane Drum LPG Flare KO Drum Refrigeration Area Drain Drum Tank Area Drain Drum Low Pressure Propane Chiller Medium Pressure Propane Chiller High Pressure Propane Chiller Propane Boil Off Gas Condenser Refrigerant Compressor Propane Boil Off Gas Compressor Propane Loading Pumps Propane Circulation Pump Propane Loading Pumps Propane Circulating Pump Propane Recovery Pump Refrigeration Area Drain Drum Pump Tank Area Drain Drum Pump Recovered Propane Transfer Pump
This document is the property of N.I.O.C.. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.
NARGAN

147-T-101 147-T-102 147-X-101

Propane Storage Tank Propane Storage Tank LPG Tank Flare Package

Page 4 of 6

South Pars Gas Field Development Phases 15&16 Onshore Facilities


Doc Title : EQUIPMENT LIST FOR PROPANE STORAGE AND EXPORT ( UNIT 147 ) Doc. Number : EL-1516-147-P312-001
Material REV. ITEM DESIGNATION OF ITEM No of ITEM No of Equi. Total Main CRITERIA Second CRITERIA Diam. L.x.I. (m) T.L. H (m) Shell Casing (J) Tube Impeller (4) Design Pressure Shell In/Btm (bar g) (K) 28 Tube Out/Top (bar g)

Pars Oil and Gas Company


Rev. No.: 0 Class: 3
Desing Temp Shell In/Btm (C) (L) -46/115 Tube Out/Top (C) Type Remarks

Page 5 of 5

(A) 0

(B) 147-A-101

( C) REFRIGERANT CONDENSER

(D) 1

(E) 1

(F) 19.3 MW

( G) HOLD m2

(H)

(I)

(M) Air cooler

(N) Pi=19276.6 KW

LTCS + 3mm

0 0 0 0 0 0 0 0 0

147-D-101 A/B 147-D-102 A/B 147-D-103 A/B 147-D-104 147-D-105 147-D-106 147-D-107 147-D-108 147-D-109

LOW PRESSURE SUCTION DRUMS MEDIUM PRESSURE SUCTION DRUMS HIGH PRESSURE SUCTION DRUMS REFRIGERANT SURGE DRUM PROPANE BOG COMPRESSOR SUCTION DRUM RECOVERED PROPANE DRUM LPG FLARE K.O. DRUM REFRIGERANT AREA DRAIN DRUM TANK AREA DRAIN DRUM

2 2 2 1 1 1 1 1 1

2 2 2 1 1 1 1 1 1

17.3 m3 7.4 m3 8.6 m3 87.4 m3 15.3 m3 9.7 m3 HOLD 77.7 m3 57 m3

2.1 1.5 1.6 2.9 2 1.5 HOLD 3 3

3.6 3.2 3.2 11.3 3.55 5 HOLD 10 7

LTCS + 3mm LTCS + 3mm LTCS + 3mm LTCS + 3mm LTCS + 3mm LTCS + 3mm LTCS + 3mm LTCS + 3mm LTCS + 3mm

18 18 18 28 3.5 (2) 18 3.5 3.5 3.5

-46 / 85 -46 / 85 -46 / 85 -46 / 85 -46 / 85 -46 / 85 HOLD -46 / 85 -46 / 85

V V V H V H H H H
Internals: SS (4) Internals: SS (4)

0 0 0 0

147-E-101 147-E-102 147-E-103 147-E-104

LOW PRESSURE PROPANE CHILLER MEDUIM PRESSURE PROPANE CHILLER HIGH PRESSURE PROPANE CHILLER PROPANE BOIL OFF GAS CONDENSER

1 1 1 1

1 1 1 1

1.30 MW 1.93 MW 1.12 MW 3.48 MW

(3) (3) (3) (3)

LTCS + 3mm LTCS + 3mm LTCS + 3mm LTCS + 3mm LTCS + 3mm LTCS + 3mm LTCS + 3mm LTCS + 3mm

18 18 18 18

45.4 45.4 45.4 18

-46 / 55 -46 / 55 -46 / 55 -46 / 55

-46 / 55 -46 / 55 -46 / 55 -46 / 55

HOLD HOLD HOLD HOLD

Design case : Holding Design case : Holding Design case : Holding Design case : Holding

147-K-101 A/B

REFRIGERANT COMPRESSOR

69486 kg/hr 52489 kg/hr 91153 kg/hr

DP=1.9 bar DP=5.2 bar DP=14 bar DP=2.2 bar

(3) (3) (3) (3)

(3) (3) (3) (3)

18 18 18 3.5

28 28 28 3.5

-46 / 85 -46 / 85 -46 / 85 -46 / 85

-46 / 115 -46 / 115 -46 / 115 -46 / 85

Centrifugal Centrifugal Centrifugal Centrifugal Pe=608 KW Pe=9117 KW

147-K-102 A/B

PROPANE BOIL OFF GAS COMPRESSOR

28965 kg/hr

This document is the property of N.I.O.C.. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.
NARGAN

Page 5 of 6

South Pars Gas Field Development Phases 15&16 Onshore Facilities


Doc Title : EQUIPMENT LIST FOR PROPANE STORAGE AND EXPORT ( UNIT 147 ) Doc. Number : EL-1516-147-P312-001
Material REV. ITEM DESIGNATION OF ITEM No of ITEM No of Equi. Total Main CRITERIA Second CRITERIA Diam. L.x.I. (m) T.L. H (m) Shell Casing (J) (3) (3) (3) (3) (3) (3) (3) (3) Tube Impeller (4) (3) (3) (3) (3) (3) (3) (3) (3) Design Pressure Shell In/Btm (bar g) (K) 25 28.2 25 28.2 22.7 14.8 12.1 23.5 Tube Out/Top (bar g)

Pars Oil and Gas Company


Rev. No.: 0 Class: 3
Desing Temp Shell In/Btm (C) (L) -50 / 55 -50 / 55 -50 / 55 -50 / 55 -46 / 85 -46 / 85 -46 / 85 -46 / 85 Tube Out/Top (C) Type Remarks

Page 5 of 5

(A) 0 0 0 0 0 0 0 0

(B)

( C)

(D) 3 1 3 1 1 1 1 2

(E) 3 1 3 1 1 1 1 2

(F) 1250 m3/hr 339 m3/hr 1250 m3/hr 339 m3/hr 2 m3/hr 21 m3/hr 15 m3/hr 52.2 m3/hr

( G) 19.74 bar 21.3 bar 19.74 bar 21.3 bar 21.6 bar 9.24 bar 7.6 bar 4.2 bar

(H)

(I)

(M) Cent. Vertical Submerged Cent. Vertical Submerged Cent. Vertical Submerged Cent. Vertical Submerged Reciprocating Cent. Vertical Submerged Cent. Vertical Submerged Centrifugal

(N) Pe=812 KW Pe=287 KW Pe=812 KW Pe=287 KW Pe=4.1 KW Pe=13.5 KW Pe=9 KW Pe=15.8 KW

147-P-101 A/B/C PROPANE LOADING PUMPS 147-P-102 PROPANE CIRCULATION PUMP

147-P-103 A/B/C PROPANE LOADING PUMPS 147-P-104 147-P-106 147-P-107 147-P-108 147-P-109 A/B PROPANE CIRCULATION PUMP PROPANE RECOVERY PUMP REFRIGERATION AREA DRAIN DRUM PUMP TANK AREA DRAIN DRUM PUMP RECOVERED PROPANE TRANSFER PUMP

0 0 0

147-T-101 147-T-102 147-X-101

PROPANE STORAGE TANKS PROPANE STORAGE TANKS LPG TANK FLARE PACKAGE

1 1 1

1 1 1

working capacity

45000m3
working capacity

by vendor by vendor

by vendor by vendor

by vendor by vendor

-2/+130 mbarg + full of water -2/+130 mbarg + full of water

-50 / 55 -50 / 56

Double wall Double wall

45000m4 HOLD

Refrrigerated, full containment, reinforced concrete external wall

This document is the property of N.I.O.C.. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.

NARGAN

Page 6 of 6

South Pars Gas Field Development Phases 15&16 Facilities


Doc Title : EQUIPMENT LIST FOR BUTANE STORAGE AND EXPORT ( UNIT 148 ) Doc. Number : EL-1516-148-P312-001

Onshore

Pars Oil and Gas Company


Rev. No.: 0 Class: 3

ITEM LIST
Common to Phasees 15 &16 148-E-101 148-E-102 148-E-103 148-P-101 A/B/C 148-P-102 148-P-103 A/B/C 148-P-104 148-T-101 148-T-102
High Pressure Butane Chiller Medium Pressure Butane Chiller Butane Circulation Subcooler Butane Loading Pumps Butane Circulating Pump Butane Loading Pumps Butane Circulating Pump Butane Storage Tank Butane Storage Tank

This document is the property of N.I.O.C.. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.
NARGAN

Page 4 of 5

South Pars Gas Field Development Phases 15&16 Onshore Facilities


Doc Title : EQUIPMENT LIST FOR BUTANE STORAGE AND EXPORT ( UNIT 148 ) Doc. Number : EL-1516-148-P312-001
Material REV. ITEM DESIGNATION OF ITEM No of ITEM No of Equi. Total Main CRITERIA Second CRITERIA Diam. L.x.I. (m) T.L. H (m) Shell Casing (J) Tube Impeller (4) Design Pressure Shell In/Btm (bar g) (K) 18 18 18 24 24 24 Tube Out/Top (bar g)

Pars Oil and Gas Company


Rev. No.: 0 Class: 3
Desing Temp Shell In/Btm (C) (L) -46 / 55 -46 / 55 -46 / 55 -15 / 55 -15 / 55 -29 / 55 Tube Out/Top (C) Type Remarks

Page 5 of 5

(A) 0 0 0

(B) 148-E101 148-E102 148-E103

( C) High Pressure Butane Chiller Medium Pressure Butane Chiller Butane Circulation Subcooler

(D) 1 1 1

(E) 1 1 1

(F) 634 KW 995 KW 2227 KW

( G) HOLD HOLD HOLD

(H)

(I)

(M) HOLD HOLD HOLD

(N) Design case : HOLDING Design case : HOLDING Design case : HOLDING

LTCS+3mm LTCS+3mm LTCS+3mm LTCS+3mm LTCS+3mm LTCS+3mm

0 0 0 0

148-P-101 A/B/C Butane Loading Pumps 148-P-102 Butane Circulating Pump

3 1 3 1

3 1 3 1

1250 m3/hr 718 m3/hr 1250 m3/hr 718 m3/hr

18.94 bar 19.2 bar 18.94 bar 19.2 bar

(3) (3) (3) (3)

(3) (3) (3) (3)

25.3 25.6 25.3 25.6

-46 / 55 -46 / 55 -46 / 55 -46 / 55

148-P-103 A/B/C Butane Loading Pumps 148-P-104 Butane Circulating Pump

Centr, Vertical Submerged Centr, Vertical Submerged Centr, Vertical Submerged Centr, Vertical Submerged

Pe=822 KW Pe=548 KW Pe=822 KW Pe=548 KW

0 0

148-T-101 148-T-102

Butane Storage Tank Butane Storage Tank

1 1

1 1

working capacity 35000 m3

by vendor by vendor

by vendor by vendor

by vendor by vendor

-2/+130 mbarg + full of water -2/+130 mbarg + full of water

-15 / 55 -15 / 55

Double wall Double wall

Refrigerated, full containment, reinforced concrete external wall

This document is the property of N.I.O.C.. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.